e10CDM | aviation consultancy




March 14, 2013
Passenger Terminal Expo 2013
                             Geneva




                 Operations & Management

                   A-CDM overview
                    Etienne van Zuijlen
                     Founder & Managing Director


April 9, 2013                                      ©e10CDM   | aviation consultancy
March 14, 2013
Airport CDM

EU ATM Masterplan “baseline”                    ATM Network Integration




            more info: www.euro-cdm.org


April 9, 2013
March 14, 2013                                              ©   e10CDM | aviation consultancy 5
A-CDM “101” in 3 minutes




April 9, 2013
March 14, 2013                        ©   e10CDM | aviation consultancy 6
Integrating airports in ATM
What is an airport in the ATM jargon?
      – Airports

      – Airport Operators

      – Airport Operations / Airside Operations

      – (Airside) Operations at Airports

      – (Airside) Operations at and around Airports



Airport are the nodes in the ATM network where different actors
conduct operations that contribute to the overall performance

April 9, 2013
March 14, 2013                                        ©   e10CDM | aviation consultancy 1
Integrated Trajectories

                               Ground & Airborne Sectors Fully Integrated



       Runway-          Departure              Entry Fix      Runway        Parking       Parking           Runway         Departure
      Entry Point          Fix                   TMA         Threshold      Position      Position         Entry Point       Fix




Taxi outbound   Departure            Enroute           Approach    Taxi inbound   Turn-Around Taxi outbound        Departure    Enroute




                                    Gate-to-GateProcess                    Air-to-Air Process


       April 9, 2013
       March 14, 2013                                                                                ©   e10CDM | aviation consultancy 2
Multi-angled Approach

Research & Development           Regulatory




April 9, 2013
March 14, 2013                        ©   e10CDM | aviation consultancy 3
But EU A-CDM Implementation is very slow…




                      more info: www.euro-cdm.org

April 9, 2013
March 14, 2013                                      •   ©   e10CDM | aviation consultancy 4
While A-CDM benefits are real & accountable
                          CDM@MUC              CDM@BRU             CDM@CDG                 CDM@FRA                 CDM@LHR
                                                                                                                   (targets)
Taxi Time                                          - 3 min.              -2 min.                 ~0 min.                -2 min./
Outbound                        - 10%                                (- 4 Adv. Con.)                                      -10%
Fuel savings                  -2,65 M€             - 2.7 M€             -2.55 M€
CO2 [tonnes/yr]                16706                17022                16060                 non public          -10% TO-fuel
NOx [tonnes/yr]                 21.6                  22                  20.75
ATFM CTOT                       +5%              non public            non public              non public             non public
Slot Adherence                  [93%]              [>90%]                                        [>90%]                 [>80%]
IATA DEPARTURE               non public          non public              +5 -10 %                  +~7%               non public
Punctuality
Late gate-change                 <1%             non public            non public                 - ~5%            0% IBT -20min

TOBT adherence             ~50% (stable)         non public            non public                + ~20%               non public
[vs ASRT+/-5min]                                                                               (50 -> 70%)
Network benefit           -~4 min vs                                                       -~10 min vs.            -~4 min vs
                          avg EU-delay               -10%                  -10%            avg EU-delay            avg EU-delay
                sources: www.euro-cdm.org, MUC, FRA & LHR public info & own analysis


   March 14, 2013 Sources: http://euro-cdm.org/library/eurocontrol/cdm_benefits_flyer.pdf, FRA & LHR © e10CDM | aviation& own analysis 5
   April 9, 2013                                                                                     public CDM documents consultancy
Vision: connect info from all (EU-core) airports




March 14, 2013                       ©   e10CDM | aviation consultancy 6
Driving Ops Change: real partnerships needed
• Good intentions are there:
      – ACI Europe / Eurocontrol / CANSO MoC
      – Industry Efficiency Programs (initial targets)
      – ATM Masterplan & Update (funding ??)
      – SESAR, Nextgen & ICAO ASBU alignment

• Missing key ingredients:
      – thrust & drive
      – collaborative leadership
April 9, 2013
March 14, 2013                             ©   e10CDM | aviation consultancy 7
What is needed to succesfully implement?
The A-CDM Experience       Key recommendations
                           •   have common objective
                           •   respect all partners
                  A-CDM    •   be transparant
                 Lessons   •   share & learn
                  Learnt   •   formalise commitment
                           •   no simple IT project..
                           •   needs “doers”, not talkers
                           •   How airports should work
      Just Do It, what are you waiting for?
April 9, 2013
March 14, 2013                            ©   e10CDM | aviation consultancy 8
e10CDM | aviation consultancy



                           Etienne van Zuijlen
                           e10CDM | aviation consultancy
                           Founder & Managing Director

                          P   +31 294 779833
                          M   +31 6 46837965
                          E   info@e10cdm.nl
                          S   live:e10cdm
                          T   @e10cdm
                          W   www.e10cdm.nl




March 14, 2013

e10CDM aviation consultancy - PTE2013 conference - Ops & Mngmnt - A-CDM overview

  • 1.
    e10CDM | aviationconsultancy March 14, 2013
  • 2.
    Passenger Terminal Expo2013 Geneva Operations & Management A-CDM overview Etienne van Zuijlen Founder & Managing Director April 9, 2013 ©e10CDM | aviation consultancy March 14, 2013
  • 3.
    Airport CDM EU ATMMasterplan “baseline” ATM Network Integration more info: www.euro-cdm.org April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 5
  • 4.
    A-CDM “101” in3 minutes April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 6
  • 5.
    Integrating airports inATM What is an airport in the ATM jargon? – Airports – Airport Operators – Airport Operations / Airside Operations – (Airside) Operations at Airports – (Airside) Operations at and around Airports Airport are the nodes in the ATM network where different actors conduct operations that contribute to the overall performance April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 1
  • 6.
    Integrated Trajectories Ground & Airborne Sectors Fully Integrated Runway- Departure Entry Fix Runway Parking Parking Runway Departure Entry Point Fix TMA Threshold Position Position Entry Point Fix Taxi outbound Departure Enroute Approach Taxi inbound Turn-Around Taxi outbound Departure Enroute Gate-to-GateProcess Air-to-Air Process April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 2
  • 7.
    Multi-angled Approach Research &Development Regulatory April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 3
  • 8.
    But EU A-CDMImplementation is very slow… more info: www.euro-cdm.org April 9, 2013 March 14, 2013 • © e10CDM | aviation consultancy 4
  • 9.
    While A-CDM benefitsare real & accountable CDM@MUC CDM@BRU CDM@CDG CDM@FRA CDM@LHR (targets) Taxi Time - 3 min. -2 min. ~0 min. -2 min./ Outbound - 10% (- 4 Adv. Con.) -10% Fuel savings -2,65 M€ - 2.7 M€ -2.55 M€ CO2 [tonnes/yr] 16706 17022 16060 non public -10% TO-fuel NOx [tonnes/yr] 21.6 22 20.75 ATFM CTOT +5% non public non public non public non public Slot Adherence [93%] [>90%] [>90%] [>80%] IATA DEPARTURE non public non public +5 -10 % +~7% non public Punctuality Late gate-change <1% non public non public - ~5% 0% IBT -20min TOBT adherence ~50% (stable) non public non public + ~20% non public [vs ASRT+/-5min] (50 -> 70%) Network benefit -~4 min vs -~10 min vs. -~4 min vs avg EU-delay -10% -10% avg EU-delay avg EU-delay sources: www.euro-cdm.org, MUC, FRA & LHR public info & own analysis March 14, 2013 Sources: http://euro-cdm.org/library/eurocontrol/cdm_benefits_flyer.pdf, FRA & LHR © e10CDM | aviation& own analysis 5 April 9, 2013 public CDM documents consultancy
  • 10.
    Vision: connect infofrom all (EU-core) airports March 14, 2013 © e10CDM | aviation consultancy 6
  • 11.
    Driving Ops Change:real partnerships needed • Good intentions are there: – ACI Europe / Eurocontrol / CANSO MoC – Industry Efficiency Programs (initial targets) – ATM Masterplan & Update (funding ??) – SESAR, Nextgen & ICAO ASBU alignment • Missing key ingredients: – thrust & drive – collaborative leadership April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 7
  • 12.
    What is neededto succesfully implement? The A-CDM Experience Key recommendations • have common objective • respect all partners A-CDM • be transparant Lessons • share & learn Learnt • formalise commitment • no simple IT project.. • needs “doers”, not talkers • How airports should work Just Do It, what are you waiting for? April 9, 2013 March 14, 2013 © e10CDM | aviation consultancy 8
  • 13.
    e10CDM | aviationconsultancy Etienne van Zuijlen e10CDM | aviation consultancy Founder & Managing Director P +31 294 779833 M +31 6 46837965 E info@e10cdm.nl S live:e10cdm T @e10cdm W www.e10cdm.nl March 14, 2013