1.
2. DURGAPUR PROJECTS LIMITED
REPORT -2015
LAW COLLEGE DURGAPUR
Name Of The Organization : DURGAPUR PROJECTS LIMITED
Name Of The Student : Partha karmakar
Roll No : BURMSW 2014/9
Session : 2014-2016
3. The DURGAPUR PROJECTS LIMITED is a Government of West Bengal Enterprise and an ISO 9001; 2000 Certified
Company in corporate on 6-th September, 1961. It is the brainchild of late Dr. Bidhan Chandra Roy, the first chief
minister of West Bengal Industrial Development of West Bengal.
Company location :
4. 1. POWER PLANT 2. COKE OVEN PLANT
3. WATER WORKS : The water works has two types of consumers ; Industrial, Domestic.
5.
6. In a coal-fired stream station —much like a nuclear station—water is turned into steam, which in turn
drives turbine generators to produce electricity. Here are some process or steps to a coal to electricity
production;
coal -> conveyor -> Boiler -> Steam Turbine -> Generator -> Electricity cables -> transformer ->
pylons -> Sub stations .
7. LOCATION & CAPACITY OF 132/11KV GRID SUB-STATION
Substation Incoming 132KV & Outgoing 11KV
A-Zone ““ ““
B-Zone ““ ““
A-B Zone ““ ““
C-Zone ““ ““
C-Zone(Angadpur) ““ ““
Citi center ““ ““
Fuljhore ““ ““
8. In Durgapur Plant city Industries area depends and Production and collect their
Materials via nearest industries . many plants of Durgapur City was collect power
energy from DPL.
In DPL current Manpower is total 3274 .
9. In Durgapur Project Limited the Student of trainee are observed HR practices in Power plant no. 4 & 5 are
below;
Health:-
Ventilation
Lighting
Drinking water
Latrines and urinals.
Safety :-
• Lifting devices
• Floors and stairs
• Fire prevents
• All heavy machines are automated controlled.
Welfare Amenities :-
• Sitting arrangements for employees who are required to work in standing position.
• First- aid boxes are ready for emergency service during duty hours.
• Ambulance rooms, Ambulance are available.
• 4 canteens are available.
• Rest rooms /lunch rooms with drinking water are available.
• Fire Brigade car with fire brigad workers are available.
Working hours :-
Working hours total 3 shifts with 8 hour timely duty.
10. PROBLEMS IN DPL:-
Majors problems faced by DPL in functioning that are given below;
Production loss
Insufficient production
Poor supply of raw materials
Old machineries
Post vacant, too many pressure in management
Weak in Management
Poor policy maintaining Condition
Multiplicity of Trade Unions
Lacking from the use of updated knowledge.
Suggestions to overcome the problem
Suggestion's how to overcome the problems ;
Use updated knowledge and renovation
Recruitment needs
Renovation of old machineries
Policy and management strong
11. LEARNING :- I learn and gather knowledge in respect of the matters of the
organization during this training period;
Various methods of management and development were learnt in a significant way by Sri.
Samaresh Maity, Asstt. Manager (P/A).
Organization policy plays an important role in any organization.
I learnt some methods, Act that is including in a plant/factory Act.
I learnt the environment of works in a factory/plant.
We came to know the objectives of HRM and the duties of a HR Manager, imparted by the