EMC ® Documentum ®
Advanced Document Transformation
                        Services
                         Version 6.7 SP1


                       Release Notes




                                 EMC Corporation
                             Corporate Headquarters:
                         Hopkinton, MA 01748-9103
                                     1-508-435-1000
                                   www.EMC.com
EMC believes the information in this publication is accurate as of its publication date. The information is subject to change
without notice.
The information in this publication is provided as is. EMC Corporation makes no representations or warranties of any kind
with respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness
for a particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an
applicable software license.
For the most up-to-date listing of EMC product names, see EMC Corporation Trademarks on EMC.com. All other trademarks
used herein are the property of their respective owners.
© Copyright 2011 EMC Corporation. All rights reserved.

                                                                                                                Revision History:
                                                                                                 November 2011: Release 6.7 SP1
                                                                                                            June 2012: Revision A
                                                                                                      September 2012: Revision B
Table of Contents



Chapter 1        Overview .....................................................................................................         5
                 Features of Advanced Document Transformation Services ..................................                               5
                 Capabilities of Advanced Document Transformation Services .............................                                7
                 Supported transformations by source and target formats ....................................                            8
                 Documentum Advanced Document Transformation Services
                 documentation .................................................................................................       9
                 Software download information ........................................................................                9
                 Troubleshooting and getting help ......................................................................              10

Chapter 2        Compatibility and Feature Updates                       ............................................................. 11
Chapter 3        Environment and System Requirements                            ..................................................... 13
Chapter 4        New Features and Changes for Advanced Document
                 Transformation Services 6.7 ........................................................................                 15
                 CTS Activity Template updates to work with xCP ...............................................                       15
                 Option to create new standardized object during registration analysis .................                              16
                 Certification for Windows 2008 Server and Office 2010 ........................................                       16
                 Bates stamping (numbering) profile for visual document identification
                 and tracking .....................................................................................................   16
                 Additional transformation support ....................................................................               16
                 64–bit certification ............................................................................................    17

Chapter 5        Fixed Problems ...........................................................................................           19
                 Fixed problems in Advanced Document Transformation Services 6.7 SP1 .............                                    19
                 Fixed problems in Advanced Document Transformation Services 6.7 ...................                                  21

Chapter 6        Known Problems and Limitations ...............................................................                       23
                 Known problems ..............................................................................................        23
                   Additional information about known problems ..............................................                         25
                      Workaround for DTS-3587.........................................................................                25
                      Workaround for DTS-3353.........................................................................                25
                      Workaround for DTS-3540.........................................................................                26
                      Workaround for MTS-2115 ........................................................................                26
                 Limitations.......................................................................................................   27

Chapter 7        Installation       ................................................................................................... 29




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                                                3
Table of Contents




                                                  List of Tables




Table 1.        Advanced Document Transformation Services features ...........................................                           5
Table 2.        Supported capabilities with Advanced Document Transformation
                  Services ...........................................................................................................   7
Table 3.        Supported transformations with Advanced Document Transformation
                  Services ...........................................................................................................   8




4                           EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 1
Overview



The Advanced Document Transformation Services Release Notes describes the features and capabilities
of the product and gives detail on supported transformations and file formats. This document also
describes certifications for both hardware and software, information about fixed customer-reported
problems, known problems, and limitations.
Advanced Document Transformation Services is server software that generates copies of documents
in Portable Document Format (PDF), PDF text, and HyperText Markup Language (HTML). You can
use Documentum client applications to request such a copy (called a rendition) of a document stored
in a Documentum repository. The transformation capabilities of Advanced Document Transformation
Services include PDF assembly, header/footer creation, security, textual watermarking, and content
overlays.
Advanced Document Transformation Services can also provide PDF transformations from other
file formats such as image and email formats.
Some Documentum client applications do not provide access to PDF and HTML renditions; consult
the documentation for the client you are using.



Features of Advanced Document
Transformation Services
The following are the features that Advanced Document Transformation Services offers.

Table 1. Advanced Document Transformation Services features

 Feature                                                         Comments
 Runs as a Windows Service and intelligently handles
 exceptions raised by native applications.
 Transforms common document formats into PDF and                 See Supported transformations by source
 HTML.                                                           and target formats, page 8
 Creates automated transformations.                              Not available out of the box.
                                                                 Configuration required. See the Content
                                                                 Transformation Services Transformation
                                                                 Suite Administration Guide.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                    5
Overview




    Feature                                                       Comments
    Transforms a document as part of a business workflow          CTS Activity Template is included.
    process using the CTS Activity Template.                      See the Content Transformation Services
                                                                  Transformation Suite Administration Guide.
    Creates new renditions.
    Creates PDF/A and PDF/X compliant files                       See the Content Transformation Services
                                                                  Transformation Suite Administration Guide.
    Generates thumbnail, storyboard, and low-resolution           Not available out of the box.
    renditions of some imported files.                            Configuration required. See Content
                                                                  Transformation Services Transformation
                                                                  Suite Administration Guide.
    Compatible with entire Documentum product suite.
    Creates new objects that are related to the original
    object.
    Preserves bookmarks and hyperlinks in source
    documents.
    Controls PDF job parameters such as page size, layout,
    and security.
    Merges multiple files into a single PDF file.
    Adds watermarks and overlays.
    Creates headers and footers.
    Auto-generates TOC from a merged PDF file.
    Auto-generates page numbers.
    Adds attachments to PDF.
    Transforms image formats to PDF.
    Transforms CAD drawings to PDF.                               Requires additional licensing*.
    Transforms Microsoft Project files to PDF.                    Requires the installation of Microsoft
                                                                  Project*.
    Transforms Microsoft Visio files to PDF.                      Requires the installation of Microsoft
                                                                  Visio*.
    Transforms EMCMF to MSG                                       See the Content Transformation Services
                                                                  Transformation Suite Administration Guide.
    Transforms MSG to EMCMF                                       See the Content Transformation Services
                                                                  Transformation Suite Administration Guide.
    Transforms EMCMF to HTML and PDF                              See the Content Transformation Services
                                                                  Transformation Suite Administration Guide.
* These rendering applications must be purchased separately.




6                         EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Overview




Capabilities of Advanced Document
Transformation Services
The following table details the capabilities of Advanced Document Transformation Services.

Table 2. Supported capabilities with Advanced Document Transformation Services

 Input format      Creates            Creates           Creates             Writes XMP    Extracts XMP
                   thumbnail*         storyboard*       low-resolution      to content    from content
                                                        rendition*
 BMP                       √                                    √
 DOC, DOCX                 √                 √                  √                              √
 DOT, DOTX                 √                 √                  √                              √
 EML
 HTML                      √                 √                  √
 GIF                       √                                    √
 JPEG                      √                                    √
 MPP                       √                 √                  √
 MSG                       √
 ODB                       √                 √                  √
 ODF                       √                 √                  √
 ODG                       √                 √                  √
 ODH                       √                 √                  √
 ODP                       √                 √                  √
 ODS                       √                 √                  √
 ODT                       √                 √                  √
 PDF                       √                 √                  √                  √           √
 PNG                       √                 √
 POT, POTX                 √                 √                  √                              √
 PPT, PPTX                 √                 √                  √                              √
 PS                        √                 √                  √
 RTF                       √                 √                  √
 TIFF                      √                 √                  √
 TIFF (multi-              √                 √                  √
 page)
 TXT                       √                 √                  √




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                  7
Overview




    Input format   Creates          Creates            Creates            Writes XMP         Extracts XMP
                   thumbnail*       storyboard*        low-resolution     to content         from content
                                                       rendition*
    VSD                      √              √                  √
    XHTML                    √              √
    XLS, XLSX                √              √                  √                                    √
    XLT, XLTX                √              √                  √                                    √
* Thumbnail, storyboard, and low-resolution renditions are not available out of the box. Some
configuration is required. See the Content Transformation Services Transformation Suite Administration
Guide for details.



Supported transformations by source and
target formats
The supported transformations are dependent upon the installation of various applications on the
Advanced Document Transformation Server, as detailed in .
With the required supporting applications installed, Advanced Document Transformation Services
can perform the following transformations.

Table 3. Supported transformations with Advanced Document Transformation Services

    Source formats (input)                                               Target formats (output)
    BMP                                                                  PDF, PDF/A, PDF/X
    DOC, DOCX, DOT, DOTX                                                 PDF, PDF/A, PDF/X , HTML
    EML                                                                  PDF, TXT
    EMCMF (EMCMail)                                                      HTML, MSG, PDF
    EPS                                                                  PDF*
    HTML                                                                 PDF, PDF/A
    GIF                                                                  PDF
    JPEG                                                                 PDF, PDF/A, PDF/X
    MPP                                                                  PDF, PDF/A, PDF/X
    MSG                                                                  EMCMF, PDF, RTF, TXT
    ODB, ODF, ODG, ODH, ODP, ODS, ODT                                    PDF, PDF/A, PDF/X
    PDF                                                                  HTML, PDF, PDF/A
    PNG                                                                  PDF, PDF/X, PDF/A
    PPT, PPTX, POT, POTX                                                 HTML, PDF, PDF/A, PDF/X
    PS                                                                   PDF *
    RTF                                                                  HTML, PDF



8                      EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Overview




 Source formats (input)                                                    Target formats (output)
 TIFF (single and multi-page)                                              PDF, PDF/A
 TXT                                                                       HTML, PDF
 VSD                                                                       PDF, PDF/A, PDF/X
 XHTML                                                                     PDF, PDF/X, PDF/A
 XLS, XLSX, XLT, XLTX                                                      HTML, PDF, PDF/A, PDF/X
 XLSM, CSV, XLTM, XLSB, DOTM, DOCM, POTM                                   PDF

Note: All formats that support PDF also support PDFText
* Requires the installation of Ghostscript.



Documentum Advanced Document
Transformation Services documentation
The following documents comprise the Advanced Document Transformation Services documentation
set for this version of the product:
• EMC Documentum Advanced Document Transformation Services Release Notes, version 6.7 SP1 (this
  document)
• Documentum Environment and System Requirements Guide, version 6.7 SP1
• EMC Documentum Content Transformation Services Transformation Suite Installation Guide, version 6.7
• EMC Documentum Content Transformation Services Transformation Suite Administration Guide,
  version 6.7
The Powerlink website (http://powerlink.EMC.com) contains the downloadable packages for specific
product versions along with the release notes, installation guide, and other relevant documentation
associated with the product version. After logging in to Powerlink, click Support, and locate the link
for the specific product technical documentation required.
Product documentation that is available online from the application (such as online help) does not
appear as a separate item. It is automatically downloaded and installed with the software.



Software download information
This product is available as an FTP download from the Powerlink website (http://powerlink.EMC.com).
You should have received instructions through email regarding how to download products.
The Powerlink website (http://powerlink.EMC.com) provides access to https://EMC.subscribenet.
com/control/dctm/index, which provides a complete listing of the products available for download.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                    9
Overview




Troubleshooting and getting help
Technical support services for Documentum products are designed to make your deployment and
management of Documentum products as effective as possible. After logging in to Powerlink website
(http://powerlink.EMC.com), click Support, and locate the link for EMC Customer Support Guide. The
EMC Customer Support Guide provides an explanation of Documentum support services and policies.




10                   EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 2
Compatibility and Feature Updates



This release of Advanced Document Transformation Services consists only of bug fixes; there are
no changes




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1           11
Compatibility and Feature Updates




12                         EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 3
Environment and System
Requirements



The Documentum 6.7 SP1 Environment and System Requirements Guide contains the hardware
requirements and software versions for your product supported with this release. The Documentum
6.7 SP1 Environment and System Requirements Guide and product documentation are available on the
Powerlink web site http://powerlink.EMC.com.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1        13
Environment and System Requirements




14                       EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 4
New Features and Changes for
Advanced Document Transformation
Services 6.7



This chapter describes the following new features and changes for Advanced Document
Transformation Services 6.7:
• CTS Activity Template updates to work with xCP, page 15
• Option to create new standardized object during registration analysis, page 16
• Certification for Windows 2008 Server and Office 2010, page 16
• Bates stamping (numbering) profile for visual document identification and tracking, page 16
• Additional transformation support, page 16
• 64–bit certification, page 17



CTS Activity Template updates to work with
xCP
The CTS Activity Template has been updated and verified to function with the xCP Process Engine.
The xCP team has launched three CTS xCelerators that are built upon the Activity Template available
with CTS:
• CreatePDFRenditions: Enables a process to create a PDF rendition of an object and save it as a
  rendition or as a new object.
• CreateHTMLRenditions: Enables a process to create a HTML rendition of an object and save
  it as a rendition or as a new object.
• Merge Virtual Document to PDF: Enables a process to request the merging of components of a
  Virtual Document into a PDF rendition and save it as a rendition of the virtual document or
  as a new object.
Please refer to the EMC Community website for more information regarding the CTS xCelerators:
https://community.emc.com/docs/DOC-9520. For more information on the CTS Activity Template,
see the chapter, "Installing and Configuring the CTS Activity Template” in the Content Transformation
Services Transformation Suite Installation Guide and the chapter, "Working with the CTS Activity
Template” in the Content Transformation Services Transformation Suite Administration Guide.


EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1            15
New Features and Changes for Advanced Document Transformation Services 6.7




Option to create new standardized object
during registration analysis
CTS has the ability to generate new standardized renditions on import as part of the CTS registration
process. In 6.7, this feature has been extended so that this generated content can be optionally stored
as new Documentum objects. A relationship between the original source is created for tracking. This
helps support integrations where the consuming application does not understand about renditions
and also enables the standardized content to have different permissions, lifecycles and workflows
from the parent. For example, a protected Word document that is imported could be automatically
transformed to a watermarked, secure, web-ready PDF with World READ permissions.
For more information, see the Content Transformation Services Transformation Suite Administration Guide.



Certification for Windows 2008 Server and
Office 2010
For this release, Microsoft Windows 2008 Server is now supported as a host for Content
Transformation Services products.
Microsoft Office 2010 is now certified as a supported rendering application. As a result, support for
applicable Office 2010 file formats is now available.



Bates stamping (numbering) profile for visual
document identification and tracking
To support customers requiring visual identification and tracking on documents (for example,
legal and medical), Advanced Document Transformation Services now supports bates stamping
(or numbering). A bates stamping transformation is available which will apply the stamp to the
document (a format that can be converted to PDF, including another PDF) using the entered value
and parameters. The result is a PDF rendition of the document that includes a unique bates stamp.



Additional transformation support
Transformation support has been added for:
• HTML Thumbnailing and Web Page Previews
• Open Document Format (ODB, ODF, ODG, ODH, ODP, ODS, ODT) to PDF, PDF/A
• XHTML to PDF, PDF/A
• PNG to PDF, PDF/A




16                       EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
New Features and Changes for Advanced Document Transformation Services 6.7




64–bit certification
Advanced Document Transformation Services is now certified to run on 64–bit operating systems.
For more information, see the Content Transformation Services Transformation Suite Installation Guide
and the Software requirements section in these Release Notes.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                       17
New Features and Changes for Advanced Document Transformation Services 6.7




18                        EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 5
Fixed Problems



This section lists the known problems fixed in Advanced Document Transformation Services 6.7
and 6.7 SP1.



Fixed problems in Advanced Document
Transformation Services 6.7 SP1
This section identifies problems that have been resolved, which were previously documented in the
release notes as a known problem or limitation.
The following table lists the defect numbers and a description of the problems fixed in Advanced
Document Transformation Services 6.7 SP1:

 Defect #                 Description of fixed problems
 DTS–3762                 Boxes over superscript hyperlinks overlap with each other.
 DTS-3714                 Bullet numbers are missing in the PDF file when there are bookmarks
                          (hyperlinks).
 DTS-3654                 After applying the CTS 6.7 patch, the Documentum Administrator and
                          CTS log files did not reflect the correct CTS product version. This issue
                          is resolved.
 DTS-3609                 We fixed the issue where letters in a hyperlink appeared in all capital letters,
                          even when the capitalization checkbox was unchecked.
 DTS-3608                 If in a hyperlink in a document the font is selected and the "all caps"
                          (highlight the hyperlink select Format>Font, under effect) checkbox is
                          checked off, the rendered hyperlink appears in all caps.
 DTS-3604                 Hyperlinks break into two lines, and the partial link is not working.
 DTS-3572                 AdvancedPDF plugin removes
                          CONVERTUSINGEXTENDEDCADSUPPORT attribute for newly
                          added DGN format.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                  19
Fixed Problems




 Defect #         Description of fixed problems
 DTS-3550         The BOM (byte order mark) in NLog.config under the
                  %CTS%AdlibProcess Manager process is corrupted and,
                  therefore, does not work on the Japanese Windows 2008 Server operating
                  system. The right value sequence is 0xEF,0xBB,0xBF, but if your file has
                  0x81, 0x45, 0xBF, the process does not work. You can work around this issue
                  by removing 3 bytes or replacing those with the right sequence.
 DTS-3487         PDF files with embedded drawings fail to render.
 DTS-3467         Too many files with name cts_response_registerXXXX.xml occur in the
                  C:DocumentumExport folder on the CTS host, thus causing disk drives
                  on ADTS and MTS hosts to be full.
 DTS-3499         Characters after the hyperlink like periods, or brackets, are being included
                  in the hyperlink, which was not the case in other versions.

                  To work around this issue create the following registry key:

                  Key: HKEY_LOCAL_MACHINESOFTWAREAdlibAdlib
                  Express1.0.0Native App SettingsMicrosoft Word

                  Name: HyperlinkRemovePadding

                  Type: STRING

                  Value: 2.2
 DTS-3405         When importing multipage PDFs it fails to create storyboard renditions.
                  Single page PDF works fine
 DTS-3401         In storyboard images some font types were getting garbled.
 DTS-3320         ADTS renders ppt12 documents into a PDF with a white line through the
                  middle.
 DTS-3037         Missing text in PDF renditions (ADTS 65 SP3 and ADTS 6.6).

 DTS-2760         No thumbnails are created for GIF documents in ADTS 6.5 SP3.
 DTS-1508         The destination of a PDF bookmark is rotated to 90 degrees counterclockwise
                  in landscape pages if ADTS merges a PDF that was converted by Acrobat
                  and contains both landscape and portrait pages.
 DTS-1144         The issue where MergePDF and CondensePDF profiles failed to generate any
                  PDF rendition when one of the inputs was unsupported has been resolved.




20               EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Fixed Problems




Fixed problems in Advanced Document
Transformation Services 6.7
This document does not contain any fixed problems that were previously documented as known
problems or limitations. A list of fixed problems is available on http://powerlink.EMC.com.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1              21
Fixed Problems




22               EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 6
Known Problems and Limitations



This chapter identifies problems and limitations that might affect your use of the product.



Known problems
This section describes known problems in EMC Documentum software and documentation that
might affect your use of the product.
The following table lists the known problems for Advanced Document Transformation Services
6.7 SP1:

 Defect #                 Description of known problems
 AVTS-190                 When a "Reset rendition” request is generated for a source file while there
                          is also a transformation request for a new rendition of the file, another
                          rendition is created. That is, while a "dm_transcode_event” item is present
                          in the queue, and a user requests to reset the rendition of the source file
                          (creating a dm_register_asset request), another dm_transcode_event gets
                          generated in the queue, thereby creating two renditions for the same
                          transformation request. The server is attempting to reset the rendition
                          request that is current in the queue when the reset rendition request occurs.

                          This occurs because the transformation request creates a dm_relation on
                          the object, and this relation normally gets deleted as the transformation
                          is done (unless the ’save transformation’ option is selected). During the
                          register request, CTS checks to see if there is any relation on this object,
                          and if there is, it creates a transformation request based on this relation.
                          This is for recreating all the transformations that are ’saved’ for this object.
                          In this specific case, the transformation request is still active, and so does
                          the relation, while CTS performs the register request. So CTS creates an
                          additional transformation request.

                          This scenario seems to happen consistently when "importAndAddJob"
                          scenario from CTSWebServices client is executed.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                      23
Known Problems and Limitations




 Defect #                 Description of known problems
 DTS-3587                 After removal of CTS and DFC, some item do not ge removed from the
                          system.

                          To perform a clean removal. see the workaround in Workaround for
                          DTS-3587, page 25
 DTS-3540                 ADTS 6.7 install fails on nonsystem drives (for example, C:) on Windows
                          2008 64-bit host. Error received: executeAdlibInstallerEnvisionOCR200.exe2
                          - DiPACTSExecuteProcess failed! - DiUtil: ExecuteProcess failed to execute:
                          adexps.exe /start /ui_disable - The directory name is invalid.

                          See Workaround for DTS-3540, page 26.
 DTS-3353                 When a security password is entered when using the condense_Pdf profile,
                          an error appears in the Adlib Express Process Log: "Error: PDF Security
                          Enabled" and no PDF rendition is created.

                          See Workaround for DTS-3353, page 25.
 MTS-2141                 QueueProcessorContext Islands in CTServerService.xml are lost when two
                          products are configured to the same repository and one of them is later
                          reconfigured.

                          Workaround: Whenever a CTServerService.xml is modified, a backup
                          is created before being modified. A backup file with a name like
                          "CTSServerService.xml.bak.2” is created. Before reconfiguring a CTS
                          product, you can revert to the last backed up file or you can back up the
                          CTServerService.xml file.
 MTS-2115                 Office executable terminates unexpectedly. Submitting an MS Office file for
                          reset rendition fails. Error in CTS log but nothing in Office application log.
                          This issue occurs because during Office installation, the .NET programming
                          supportability was not enabled (enabled by default).

                          See Workaround for MTS-2115, page 26.
 MTS-187                  Commented lines in configuration files for one CTS product are removed
                          when another CTS product configuration programs is run on the same host.

                          For example, you have installed Media Transformation Services and
                          then commented out the pdfstoryboard MP in the CTSPluginService.xml
                          configuraiton file. If you then install another CTS product (such as ADTS
                          or DTS), the line for the pdfstoryboard plugin is removed from the
                          CTSPluginService.xml file.
 MTS-45                   The Start/Stop menu is not enabled or disabled according to the CTS
                          instance. When a particular CTS instance is running, the CTS admin agent
                          does not do anything.




24                       EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Known Problems and Limitations




Additional information about known problems
This section includes supplemental information about known problems.



Workaround for DTS-3587

To perform a clean removal of your CTS product host, delete some things manually. Perform the
following manual steps:

1.   Delete the CTS Admin Agent service using the command "sc delete CtsAdminAgent".
2.   Delete the following registry entries (including all subentries):
     a.   HKEY_LOCAL_MACHINESOFTWAREApache Software FoundationProcrun
          2.0CtsAdminAgent
     b. HKEY_LOCAL_MACHINESOFTWAREDocumentumContentDetectors
     c.   HKEY_LOCAL_MACHINESOFTWAREDocumentumDFC Runtime Environment
3.   Delete the folders C:Program FilesDocumentum and C:Documentum (or the
     corresponding locations where the product was installed on your system).



Workaround for DTS-3353
1.   Check out condensePDF_adts.xml from /System/Media Server/Command Line Files.
2.   Move the entire <JOB:PDFSETTINGS> and its child nodes to between <JOB:CONDENSE> and
     <JOB:TOC>:
     <JOB:CONDENSE ENABLED="Yes" />
     <!-- PDFSETTINGS - Specifies the settings associated with DOCTYPE = "PDF" -->
     <JOB:PDFSETTINGS IMAGECOMPRESSION="Automatic" JPEGCOMPRESSIONLEVEL="9"
      MONOIMAGECOMPRESSION="CCITTGroup4"
     GRAYSCALE="No" PAGECOMPRESSION="Yes" DOWNSAMPLEIMAGES="Yes" RESOLUTION="doc_
     token_resolution" CONVERTUSINGNATIVEAPPLICATIONSUPPORT="Yes"
      CONVERTUSINGEXTENDEDFILETYPESUPPORT="Yes" PDFVERSION="doc_token_pdfVersion"
      CONVERTUSINGEXTENDEDCADSUPPORT="No">
     <JOB:FONTEMBEDDING ENABLED="Yes" LICENSEDFONTS="Yes" MULTILANGUAGEFONTS="Yes"
      PARTIALFONTS="Yes" STANDARDFONTS="Yes"/>
     <JOB:OPTIMIZE ENABLED="doc_token_optimize"/>
     <JOB:SECURITY ENABLED="doc_token_enableSecurity" ENCRYPTIONMODE="doc_token_
     encryptionMode" NOCHANGINGANNOTATION="Enabled"
     NOCHANGINGDOCUMENT="doc_token_changesAllowed" NOCONTENTACCESSIBILITY="doc_
     token_enableAccess"
     NODOCUMENTASSEMBLY="doc_token_docAssembly" NOFORMFIELDFILLIN="doc_token_
     formFieldFilling" NOHIGHQUALITYPRINTING="Enabled"
     NOPRINTING="doc_token_printing" NOSELECTIONCOPYINGCONTENT="doc_token_allowCopy"
      OPENPASSWORD="doc_token_secOpass"
     SECURITYPASSWORD="doc_token_secCpass"/>
     </JOB:PDFSETTINGS>
     <JOB:TOC ENABLED="No" DOCUMENTBOOKMARKS="Yes" DOCUMENTBOOKMARKTEXTMODE=
     "DocumentFilename" CONTENTBOOKMARKS="Yes">

3.   Check in condensePDF_adts.xml.



EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                      25
Known Problems and Limitations




Workaround for DTS-3540

If you chose to install ADTS in a folder such as "Program FilesDocumentumCTS" on nonsystem
(for example, C:) drive, the ADTS configuration program is not installed. Therefore you cannot do
anything except remove and reinstall under a different folder (not Program Files). Use the following
procedure to remove before proceeding.

1.   Reboot the computer as directed (if it is not rebooted already).
2.   Stop Adlib Services (Adlib FMR, Adlib Process Manager, Adlib Exponent Connector, and Adlib
     Exponent Manager).
3.   Stop Adlib Express Server.
4.   Remove "Documentum Content Transformation Services" using Control PannelPrograms and
     Features.
     Select "No, I will restart my computer at a later time" on the final step and click "Finish".
5.   Remove "Express Web Services" using Control PannelPrograms and Features.
     Click "OK" for any errors.
     Open a cmd window and execute the following:
     sc delete "Exponent Connector Service"
     sc delete "Exponent Manager Service"

6.   Remove "Adlib Express" from Control PannelPrograms and Features.
     a.   Select "Yes" for keeping Express settings.
     b. Select "Yes" for rehosting Express Licenses.
     c.   Select "Yes" for completely removing the selected application and all of its features.
     d. Select "OK" for continuing with some errors.
     e.   Select "Yes, I want to restart my computer now" before finishing.
7.   After system restarts, delete "Program FilesDocumentumCTS" and "Program Files
     (x86)DocumentumCTS" folders.
8.   Reinstall ADTS in another folder ("Program Files" folder on nonsystem drive does not work).



Workaround for MTS-2115

This issue occurs because during Office installation, the .NET programming supportability was not
enabled. Follow this procedure to enable .NET programming post-installation.

1.   Open Windows Add/Remove program.
2.   Select Microsoft Office Enterprise 2007 > Change > Add or Remove feature > Continue.
3.   Expand Office Shared features > Visual Basic Application.
4.   Check that Visual Basic Application is installed. If this feature is not installed, select Run From
     my Computer option.




26                       EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Known Problems and Limitations




Limitations
This section describes limits on the usability of current functionality. The limitations might be part of
the product design or might result from issues with associated third-party products.
The following table lists the known limitations for Advanced Document Transformation Services 6.7:

 Defect #                 Description of limitations
 AVTS-589                 We do not support installation of DFC and ADTS in different locations.
 DTS-3823                 If you want to enable performance/throughput logging, install the
                          icmMetric.dar file. For information on how to download and install this
                          DAR file, see the EMC Documentum Content Transformation Product Suite
                          Installation Guide.
 DTS-3724                 In 64-bit environments, CTS product uninstallers require 32-bit Java. Before
                          invoking the uninstaller, revert the changes done after installation to Java
                          on the CTS host as follows:

                          1.   Stop all services that are using Java from C:Program
                               FilesDocumentumJava.

                          2.   Rename the 1.6.0_17 or 1.6.0.27 folder (whichever one is in use) to
                               another name (for example, 1.6.0_27_64bit).

                          3.   Rename the 1.6.0_17_32 or 1.6.0.27_32 folder back to the original name,
                               either 1.6.0_17 or 1.6.0_27.
 DTS-3121                 No support for OpenOffice formats in a localized OS (or a localized
                          OpenOffice application).
 DTS-2717                 Problems occur with Word documents that contain commenting. The
                          "Use Balloons" option does not work when using only Office 2003 as the
                          rendering application.
 DTS-1340                 When converting to PDF/X, there is no preflight validation.
 DTS-1320                 Word Transformation to PDF with password and ’not allow printing’ and
                          ’not allow content copy or extraction’ still allows it to be printed and copy
                          content. The ’Security Open Password’ and ’Security Change Password’
                          must be different during the document transformation to activate the
                          security properties.

                          This is a part of the PDF specification as designed by Adobe. After opening
                          any PDF file, and attempting to set a same password for them will result
                          in error. To test:
                          • Open any PDF file and select File > Properties > Security tab.

                          • Select "Require a password to open the document", and enter a password.

                          • Select "Restrict editing and printing of the document. A password
                            is required to change these permission settings" and enter a different
                            password. If you try to enter a same password, the operation fails.




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1                      27
Known Problems and Limitations




 Defect #                 Description of limitations
 DTS-1135                 For any Excel sheet that does not contain any data, bookmarks are still
                          created in PDFs. For example, if an Excel Workbook contains three sheets
                          with data only in the first two sheets, it is expected that only two sheets
                          be included in the PDF. Clicking on this third sheet in the PDF leads the
                          pointer to the first page.
 DTS-1113                 If all files are not the same size and orientation, the condensePDF profile
                          does not produce accurate results . Only the whitespaces should be removed
                          but in the PDF rendition, data from the files might be removed. The
                          condensePDF profile can only remove the white space between pages of the
                          same size and orientation.
 DTS-841                  The default installation of ADTS on Windows sets a limitation on the
                          memory usage of a third-party library.

                          To correct this issue, change the Registry Settings for: HKEY_
                          LOCAL_MACHINESOFTWAREAdlibAdlib FMRAdlib
                          ExpressDefaultAvailMemUsageLimit Setting this value to 0 corrects all
                          issues.
 DTS-510                  ADTS is not capable of properly handling HTML files that have embedded
                          pictures that exceed 32kb, so HTML files with embedded pictures exceeding
                          32kb cannot be transformed to PDF.

                          Only Mozilla Firefox can support this. Internet Explorer 8 supports strings
                          only up to 32 kilobytes in length.




28                       EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
Chapter 7
Installation



The instructions for installing and upgrading the product are provided in the Content Transformation
Services Product Suite Installation Guide.
Ensure that your system meets the requirements listed in the Documentum 6.7 SP1 Environment
and System Requirements Guide before installing or upgrading the software. The Documentum 6.7
SP1 Environment and System Requirements Guide and product documentation are available on the
Powerlink website (http://powerlink.EMC.com).




EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1            29

Documentum advanced document_transformation_services_release_notes_6.7_sp1

  • 1.
    EMC ® Documentum® Advanced Document Transformation Services Version 6.7 SP1 Release Notes EMC Corporation Corporate Headquarters: Hopkinton, MA 01748-9103 1-508-435-1000 www.EMC.com
  • 2.
    EMC believes theinformation in this publication is accurate as of its publication date. The information is subject to change without notice. The information in this publication is provided as is. EMC Corporation makes no representations or warranties of any kind with respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness for a particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. For the most up-to-date listing of EMC product names, see EMC Corporation Trademarks on EMC.com. All other trademarks used herein are the property of their respective owners. © Copyright 2011 EMC Corporation. All rights reserved. Revision History: November 2011: Release 6.7 SP1 June 2012: Revision A September 2012: Revision B
  • 3.
    Table of Contents Chapter1 Overview ..................................................................................................... 5 Features of Advanced Document Transformation Services .................................. 5 Capabilities of Advanced Document Transformation Services ............................. 7 Supported transformations by source and target formats .................................... 8 Documentum Advanced Document Transformation Services documentation ................................................................................................. 9 Software download information ........................................................................ 9 Troubleshooting and getting help ...................................................................... 10 Chapter 2 Compatibility and Feature Updates ............................................................. 11 Chapter 3 Environment and System Requirements ..................................................... 13 Chapter 4 New Features and Changes for Advanced Document Transformation Services 6.7 ........................................................................ 15 CTS Activity Template updates to work with xCP ............................................... 15 Option to create new standardized object during registration analysis ................. 16 Certification for Windows 2008 Server and Office 2010 ........................................ 16 Bates stamping (numbering) profile for visual document identification and tracking ..................................................................................................... 16 Additional transformation support .................................................................... 16 64–bit certification ............................................................................................ 17 Chapter 5 Fixed Problems ........................................................................................... 19 Fixed problems in Advanced Document Transformation Services 6.7 SP1 ............. 19 Fixed problems in Advanced Document Transformation Services 6.7 ................... 21 Chapter 6 Known Problems and Limitations ............................................................... 23 Known problems .............................................................................................. 23 Additional information about known problems .............................................. 25 Workaround for DTS-3587......................................................................... 25 Workaround for DTS-3353......................................................................... 25 Workaround for DTS-3540......................................................................... 26 Workaround for MTS-2115 ........................................................................ 26 Limitations....................................................................................................... 27 Chapter 7 Installation ................................................................................................... 29 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 3
  • 4.
    Table of Contents List of Tables Table 1. Advanced Document Transformation Services features ........................................... 5 Table 2. Supported capabilities with Advanced Document Transformation Services ........................................................................................................... 7 Table 3. Supported transformations with Advanced Document Transformation Services ........................................................................................................... 8 4 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 5.
    Chapter 1 Overview The AdvancedDocument Transformation Services Release Notes describes the features and capabilities of the product and gives detail on supported transformations and file formats. This document also describes certifications for both hardware and software, information about fixed customer-reported problems, known problems, and limitations. Advanced Document Transformation Services is server software that generates copies of documents in Portable Document Format (PDF), PDF text, and HyperText Markup Language (HTML). You can use Documentum client applications to request such a copy (called a rendition) of a document stored in a Documentum repository. The transformation capabilities of Advanced Document Transformation Services include PDF assembly, header/footer creation, security, textual watermarking, and content overlays. Advanced Document Transformation Services can also provide PDF transformations from other file formats such as image and email formats. Some Documentum client applications do not provide access to PDF and HTML renditions; consult the documentation for the client you are using. Features of Advanced Document Transformation Services The following are the features that Advanced Document Transformation Services offers. Table 1. Advanced Document Transformation Services features Feature Comments Runs as a Windows Service and intelligently handles exceptions raised by native applications. Transforms common document formats into PDF and See Supported transformations by source HTML. and target formats, page 8 Creates automated transformations. Not available out of the box. Configuration required. See the Content Transformation Services Transformation Suite Administration Guide. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 5
  • 6.
    Overview Feature Comments Transforms a document as part of a business workflow CTS Activity Template is included. process using the CTS Activity Template. See the Content Transformation Services Transformation Suite Administration Guide. Creates new renditions. Creates PDF/A and PDF/X compliant files See the Content Transformation Services Transformation Suite Administration Guide. Generates thumbnail, storyboard, and low-resolution Not available out of the box. renditions of some imported files. Configuration required. See Content Transformation Services Transformation Suite Administration Guide. Compatible with entire Documentum product suite. Creates new objects that are related to the original object. Preserves bookmarks and hyperlinks in source documents. Controls PDF job parameters such as page size, layout, and security. Merges multiple files into a single PDF file. Adds watermarks and overlays. Creates headers and footers. Auto-generates TOC from a merged PDF file. Auto-generates page numbers. Adds attachments to PDF. Transforms image formats to PDF. Transforms CAD drawings to PDF. Requires additional licensing*. Transforms Microsoft Project files to PDF. Requires the installation of Microsoft Project*. Transforms Microsoft Visio files to PDF. Requires the installation of Microsoft Visio*. Transforms EMCMF to MSG See the Content Transformation Services Transformation Suite Administration Guide. Transforms MSG to EMCMF See the Content Transformation Services Transformation Suite Administration Guide. Transforms EMCMF to HTML and PDF See the Content Transformation Services Transformation Suite Administration Guide. * These rendering applications must be purchased separately. 6 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 7.
    Overview Capabilities of AdvancedDocument Transformation Services The following table details the capabilities of Advanced Document Transformation Services. Table 2. Supported capabilities with Advanced Document Transformation Services Input format Creates Creates Creates Writes XMP Extracts XMP thumbnail* storyboard* low-resolution to content from content rendition* BMP √ √ DOC, DOCX √ √ √ √ DOT, DOTX √ √ √ √ EML HTML √ √ √ GIF √ √ JPEG √ √ MPP √ √ √ MSG √ ODB √ √ √ ODF √ √ √ ODG √ √ √ ODH √ √ √ ODP √ √ √ ODS √ √ √ ODT √ √ √ PDF √ √ √ √ √ PNG √ √ POT, POTX √ √ √ √ PPT, PPTX √ √ √ √ PS √ √ √ RTF √ √ √ TIFF √ √ √ TIFF (multi- √ √ √ page) TXT √ √ √ EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 7
  • 8.
    Overview Input format Creates Creates Creates Writes XMP Extracts XMP thumbnail* storyboard* low-resolution to content from content rendition* VSD √ √ √ XHTML √ √ XLS, XLSX √ √ √ √ XLT, XLTX √ √ √ √ * Thumbnail, storyboard, and low-resolution renditions are not available out of the box. Some configuration is required. See the Content Transformation Services Transformation Suite Administration Guide for details. Supported transformations by source and target formats The supported transformations are dependent upon the installation of various applications on the Advanced Document Transformation Server, as detailed in . With the required supporting applications installed, Advanced Document Transformation Services can perform the following transformations. Table 3. Supported transformations with Advanced Document Transformation Services Source formats (input) Target formats (output) BMP PDF, PDF/A, PDF/X DOC, DOCX, DOT, DOTX PDF, PDF/A, PDF/X , HTML EML PDF, TXT EMCMF (EMCMail) HTML, MSG, PDF EPS PDF* HTML PDF, PDF/A GIF PDF JPEG PDF, PDF/A, PDF/X MPP PDF, PDF/A, PDF/X MSG EMCMF, PDF, RTF, TXT ODB, ODF, ODG, ODH, ODP, ODS, ODT PDF, PDF/A, PDF/X PDF HTML, PDF, PDF/A PNG PDF, PDF/X, PDF/A PPT, PPTX, POT, POTX HTML, PDF, PDF/A, PDF/X PS PDF * RTF HTML, PDF 8 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 9.
    Overview Source formats(input) Target formats (output) TIFF (single and multi-page) PDF, PDF/A TXT HTML, PDF VSD PDF, PDF/A, PDF/X XHTML PDF, PDF/X, PDF/A XLS, XLSX, XLT, XLTX HTML, PDF, PDF/A, PDF/X XLSM, CSV, XLTM, XLSB, DOTM, DOCM, POTM PDF Note: All formats that support PDF also support PDFText * Requires the installation of Ghostscript. Documentum Advanced Document Transformation Services documentation The following documents comprise the Advanced Document Transformation Services documentation set for this version of the product: • EMC Documentum Advanced Document Transformation Services Release Notes, version 6.7 SP1 (this document) • Documentum Environment and System Requirements Guide, version 6.7 SP1 • EMC Documentum Content Transformation Services Transformation Suite Installation Guide, version 6.7 • EMC Documentum Content Transformation Services Transformation Suite Administration Guide, version 6.7 The Powerlink website (http://powerlink.EMC.com) contains the downloadable packages for specific product versions along with the release notes, installation guide, and other relevant documentation associated with the product version. After logging in to Powerlink, click Support, and locate the link for the specific product technical documentation required. Product documentation that is available online from the application (such as online help) does not appear as a separate item. It is automatically downloaded and installed with the software. Software download information This product is available as an FTP download from the Powerlink website (http://powerlink.EMC.com). You should have received instructions through email regarding how to download products. The Powerlink website (http://powerlink.EMC.com) provides access to https://EMC.subscribenet. com/control/dctm/index, which provides a complete listing of the products available for download. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 9
  • 10.
    Overview Troubleshooting and gettinghelp Technical support services for Documentum products are designed to make your deployment and management of Documentum products as effective as possible. After logging in to Powerlink website (http://powerlink.EMC.com), click Support, and locate the link for EMC Customer Support Guide. The EMC Customer Support Guide provides an explanation of Documentum support services and policies. 10 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 11.
    Chapter 2 Compatibility andFeature Updates This release of Advanced Document Transformation Services consists only of bug fixes; there are no changes EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 11
  • 12.
    Compatibility and FeatureUpdates 12 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 13.
    Chapter 3 Environment andSystem Requirements The Documentum 6.7 SP1 Environment and System Requirements Guide contains the hardware requirements and software versions for your product supported with this release. The Documentum 6.7 SP1 Environment and System Requirements Guide and product documentation are available on the Powerlink web site http://powerlink.EMC.com. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 13
  • 14.
    Environment and SystemRequirements 14 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 15.
    Chapter 4 New Featuresand Changes for Advanced Document Transformation Services 6.7 This chapter describes the following new features and changes for Advanced Document Transformation Services 6.7: • CTS Activity Template updates to work with xCP, page 15 • Option to create new standardized object during registration analysis, page 16 • Certification for Windows 2008 Server and Office 2010, page 16 • Bates stamping (numbering) profile for visual document identification and tracking, page 16 • Additional transformation support, page 16 • 64–bit certification, page 17 CTS Activity Template updates to work with xCP The CTS Activity Template has been updated and verified to function with the xCP Process Engine. The xCP team has launched three CTS xCelerators that are built upon the Activity Template available with CTS: • CreatePDFRenditions: Enables a process to create a PDF rendition of an object and save it as a rendition or as a new object. • CreateHTMLRenditions: Enables a process to create a HTML rendition of an object and save it as a rendition or as a new object. • Merge Virtual Document to PDF: Enables a process to request the merging of components of a Virtual Document into a PDF rendition and save it as a rendition of the virtual document or as a new object. Please refer to the EMC Community website for more information regarding the CTS xCelerators: https://community.emc.com/docs/DOC-9520. For more information on the CTS Activity Template, see the chapter, "Installing and Configuring the CTS Activity Template” in the Content Transformation Services Transformation Suite Installation Guide and the chapter, "Working with the CTS Activity Template” in the Content Transformation Services Transformation Suite Administration Guide. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 15
  • 16.
    New Features andChanges for Advanced Document Transformation Services 6.7 Option to create new standardized object during registration analysis CTS has the ability to generate new standardized renditions on import as part of the CTS registration process. In 6.7, this feature has been extended so that this generated content can be optionally stored as new Documentum objects. A relationship between the original source is created for tracking. This helps support integrations where the consuming application does not understand about renditions and also enables the standardized content to have different permissions, lifecycles and workflows from the parent. For example, a protected Word document that is imported could be automatically transformed to a watermarked, secure, web-ready PDF with World READ permissions. For more information, see the Content Transformation Services Transformation Suite Administration Guide. Certification for Windows 2008 Server and Office 2010 For this release, Microsoft Windows 2008 Server is now supported as a host for Content Transformation Services products. Microsoft Office 2010 is now certified as a supported rendering application. As a result, support for applicable Office 2010 file formats is now available. Bates stamping (numbering) profile for visual document identification and tracking To support customers requiring visual identification and tracking on documents (for example, legal and medical), Advanced Document Transformation Services now supports bates stamping (or numbering). A bates stamping transformation is available which will apply the stamp to the document (a format that can be converted to PDF, including another PDF) using the entered value and parameters. The result is a PDF rendition of the document that includes a unique bates stamp. Additional transformation support Transformation support has been added for: • HTML Thumbnailing and Web Page Previews • Open Document Format (ODB, ODF, ODG, ODH, ODP, ODS, ODT) to PDF, PDF/A • XHTML to PDF, PDF/A • PNG to PDF, PDF/A 16 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 17.
    New Features andChanges for Advanced Document Transformation Services 6.7 64–bit certification Advanced Document Transformation Services is now certified to run on 64–bit operating systems. For more information, see the Content Transformation Services Transformation Suite Installation Guide and the Software requirements section in these Release Notes. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 17
  • 18.
    New Features andChanges for Advanced Document Transformation Services 6.7 18 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 19.
    Chapter 5 Fixed Problems Thissection lists the known problems fixed in Advanced Document Transformation Services 6.7 and 6.7 SP1. Fixed problems in Advanced Document Transformation Services 6.7 SP1 This section identifies problems that have been resolved, which were previously documented in the release notes as a known problem or limitation. The following table lists the defect numbers and a description of the problems fixed in Advanced Document Transformation Services 6.7 SP1: Defect # Description of fixed problems DTS–3762 Boxes over superscript hyperlinks overlap with each other. DTS-3714 Bullet numbers are missing in the PDF file when there are bookmarks (hyperlinks). DTS-3654 After applying the CTS 6.7 patch, the Documentum Administrator and CTS log files did not reflect the correct CTS product version. This issue is resolved. DTS-3609 We fixed the issue where letters in a hyperlink appeared in all capital letters, even when the capitalization checkbox was unchecked. DTS-3608 If in a hyperlink in a document the font is selected and the "all caps" (highlight the hyperlink select Format>Font, under effect) checkbox is checked off, the rendered hyperlink appears in all caps. DTS-3604 Hyperlinks break into two lines, and the partial link is not working. DTS-3572 AdvancedPDF plugin removes CONVERTUSINGEXTENDEDCADSUPPORT attribute for newly added DGN format. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 19
  • 20.
    Fixed Problems Defect# Description of fixed problems DTS-3550 The BOM (byte order mark) in NLog.config under the %CTS%AdlibProcess Manager process is corrupted and, therefore, does not work on the Japanese Windows 2008 Server operating system. The right value sequence is 0xEF,0xBB,0xBF, but if your file has 0x81, 0x45, 0xBF, the process does not work. You can work around this issue by removing 3 bytes or replacing those with the right sequence. DTS-3487 PDF files with embedded drawings fail to render. DTS-3467 Too many files with name cts_response_registerXXXX.xml occur in the C:DocumentumExport folder on the CTS host, thus causing disk drives on ADTS and MTS hosts to be full. DTS-3499 Characters after the hyperlink like periods, or brackets, are being included in the hyperlink, which was not the case in other versions. To work around this issue create the following registry key: Key: HKEY_LOCAL_MACHINESOFTWAREAdlibAdlib Express1.0.0Native App SettingsMicrosoft Word Name: HyperlinkRemovePadding Type: STRING Value: 2.2 DTS-3405 When importing multipage PDFs it fails to create storyboard renditions. Single page PDF works fine DTS-3401 In storyboard images some font types were getting garbled. DTS-3320 ADTS renders ppt12 documents into a PDF with a white line through the middle. DTS-3037 Missing text in PDF renditions (ADTS 65 SP3 and ADTS 6.6). DTS-2760 No thumbnails are created for GIF documents in ADTS 6.5 SP3. DTS-1508 The destination of a PDF bookmark is rotated to 90 degrees counterclockwise in landscape pages if ADTS merges a PDF that was converted by Acrobat and contains both landscape and portrait pages. DTS-1144 The issue where MergePDF and CondensePDF profiles failed to generate any PDF rendition when one of the inputs was unsupported has been resolved. 20 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 21.
    Fixed Problems Fixed problemsin Advanced Document Transformation Services 6.7 This document does not contain any fixed problems that were previously documented as known problems or limitations. A list of fixed problems is available on http://powerlink.EMC.com. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 21
  • 22.
    Fixed Problems 22 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 23.
    Chapter 6 Known Problemsand Limitations This chapter identifies problems and limitations that might affect your use of the product. Known problems This section describes known problems in EMC Documentum software and documentation that might affect your use of the product. The following table lists the known problems for Advanced Document Transformation Services 6.7 SP1: Defect # Description of known problems AVTS-190 When a "Reset rendition” request is generated for a source file while there is also a transformation request for a new rendition of the file, another rendition is created. That is, while a "dm_transcode_event” item is present in the queue, and a user requests to reset the rendition of the source file (creating a dm_register_asset request), another dm_transcode_event gets generated in the queue, thereby creating two renditions for the same transformation request. The server is attempting to reset the rendition request that is current in the queue when the reset rendition request occurs. This occurs because the transformation request creates a dm_relation on the object, and this relation normally gets deleted as the transformation is done (unless the ’save transformation’ option is selected). During the register request, CTS checks to see if there is any relation on this object, and if there is, it creates a transformation request based on this relation. This is for recreating all the transformations that are ’saved’ for this object. In this specific case, the transformation request is still active, and so does the relation, while CTS performs the register request. So CTS creates an additional transformation request. This scenario seems to happen consistently when "importAndAddJob" scenario from CTSWebServices client is executed. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 23
  • 24.
    Known Problems andLimitations Defect # Description of known problems DTS-3587 After removal of CTS and DFC, some item do not ge removed from the system. To perform a clean removal. see the workaround in Workaround for DTS-3587, page 25 DTS-3540 ADTS 6.7 install fails on nonsystem drives (for example, C:) on Windows 2008 64-bit host. Error received: executeAdlibInstallerEnvisionOCR200.exe2 - DiPACTSExecuteProcess failed! - DiUtil: ExecuteProcess failed to execute: adexps.exe /start /ui_disable - The directory name is invalid. See Workaround for DTS-3540, page 26. DTS-3353 When a security password is entered when using the condense_Pdf profile, an error appears in the Adlib Express Process Log: "Error: PDF Security Enabled" and no PDF rendition is created. See Workaround for DTS-3353, page 25. MTS-2141 QueueProcessorContext Islands in CTServerService.xml are lost when two products are configured to the same repository and one of them is later reconfigured. Workaround: Whenever a CTServerService.xml is modified, a backup is created before being modified. A backup file with a name like "CTSServerService.xml.bak.2” is created. Before reconfiguring a CTS product, you can revert to the last backed up file or you can back up the CTServerService.xml file. MTS-2115 Office executable terminates unexpectedly. Submitting an MS Office file for reset rendition fails. Error in CTS log but nothing in Office application log. This issue occurs because during Office installation, the .NET programming supportability was not enabled (enabled by default). See Workaround for MTS-2115, page 26. MTS-187 Commented lines in configuration files for one CTS product are removed when another CTS product configuration programs is run on the same host. For example, you have installed Media Transformation Services and then commented out the pdfstoryboard MP in the CTSPluginService.xml configuraiton file. If you then install another CTS product (such as ADTS or DTS), the line for the pdfstoryboard plugin is removed from the CTSPluginService.xml file. MTS-45 The Start/Stop menu is not enabled or disabled according to the CTS instance. When a particular CTS instance is running, the CTS admin agent does not do anything. 24 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 25.
    Known Problems andLimitations Additional information about known problems This section includes supplemental information about known problems. Workaround for DTS-3587 To perform a clean removal of your CTS product host, delete some things manually. Perform the following manual steps: 1. Delete the CTS Admin Agent service using the command "sc delete CtsAdminAgent". 2. Delete the following registry entries (including all subentries): a. HKEY_LOCAL_MACHINESOFTWAREApache Software FoundationProcrun 2.0CtsAdminAgent b. HKEY_LOCAL_MACHINESOFTWAREDocumentumContentDetectors c. HKEY_LOCAL_MACHINESOFTWAREDocumentumDFC Runtime Environment 3. Delete the folders C:Program FilesDocumentum and C:Documentum (or the corresponding locations where the product was installed on your system). Workaround for DTS-3353 1. Check out condensePDF_adts.xml from /System/Media Server/Command Line Files. 2. Move the entire <JOB:PDFSETTINGS> and its child nodes to between <JOB:CONDENSE> and <JOB:TOC>: <JOB:CONDENSE ENABLED="Yes" /> <!-- PDFSETTINGS - Specifies the settings associated with DOCTYPE = "PDF" --> <JOB:PDFSETTINGS IMAGECOMPRESSION="Automatic" JPEGCOMPRESSIONLEVEL="9" MONOIMAGECOMPRESSION="CCITTGroup4" GRAYSCALE="No" PAGECOMPRESSION="Yes" DOWNSAMPLEIMAGES="Yes" RESOLUTION="doc_ token_resolution" CONVERTUSINGNATIVEAPPLICATIONSUPPORT="Yes" CONVERTUSINGEXTENDEDFILETYPESUPPORT="Yes" PDFVERSION="doc_token_pdfVersion" CONVERTUSINGEXTENDEDCADSUPPORT="No"> <JOB:FONTEMBEDDING ENABLED="Yes" LICENSEDFONTS="Yes" MULTILANGUAGEFONTS="Yes" PARTIALFONTS="Yes" STANDARDFONTS="Yes"/> <JOB:OPTIMIZE ENABLED="doc_token_optimize"/> <JOB:SECURITY ENABLED="doc_token_enableSecurity" ENCRYPTIONMODE="doc_token_ encryptionMode" NOCHANGINGANNOTATION="Enabled" NOCHANGINGDOCUMENT="doc_token_changesAllowed" NOCONTENTACCESSIBILITY="doc_ token_enableAccess" NODOCUMENTASSEMBLY="doc_token_docAssembly" NOFORMFIELDFILLIN="doc_token_ formFieldFilling" NOHIGHQUALITYPRINTING="Enabled" NOPRINTING="doc_token_printing" NOSELECTIONCOPYINGCONTENT="doc_token_allowCopy" OPENPASSWORD="doc_token_secOpass" SECURITYPASSWORD="doc_token_secCpass"/> </JOB:PDFSETTINGS> <JOB:TOC ENABLED="No" DOCUMENTBOOKMARKS="Yes" DOCUMENTBOOKMARKTEXTMODE= "DocumentFilename" CONTENTBOOKMARKS="Yes"> 3. Check in condensePDF_adts.xml. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 25
  • 26.
    Known Problems andLimitations Workaround for DTS-3540 If you chose to install ADTS in a folder such as "Program FilesDocumentumCTS" on nonsystem (for example, C:) drive, the ADTS configuration program is not installed. Therefore you cannot do anything except remove and reinstall under a different folder (not Program Files). Use the following procedure to remove before proceeding. 1. Reboot the computer as directed (if it is not rebooted already). 2. Stop Adlib Services (Adlib FMR, Adlib Process Manager, Adlib Exponent Connector, and Adlib Exponent Manager). 3. Stop Adlib Express Server. 4. Remove "Documentum Content Transformation Services" using Control PannelPrograms and Features. Select "No, I will restart my computer at a later time" on the final step and click "Finish". 5. Remove "Express Web Services" using Control PannelPrograms and Features. Click "OK" for any errors. Open a cmd window and execute the following: sc delete "Exponent Connector Service" sc delete "Exponent Manager Service" 6. Remove "Adlib Express" from Control PannelPrograms and Features. a. Select "Yes" for keeping Express settings. b. Select "Yes" for rehosting Express Licenses. c. Select "Yes" for completely removing the selected application and all of its features. d. Select "OK" for continuing with some errors. e. Select "Yes, I want to restart my computer now" before finishing. 7. After system restarts, delete "Program FilesDocumentumCTS" and "Program Files (x86)DocumentumCTS" folders. 8. Reinstall ADTS in another folder ("Program Files" folder on nonsystem drive does not work). Workaround for MTS-2115 This issue occurs because during Office installation, the .NET programming supportability was not enabled. Follow this procedure to enable .NET programming post-installation. 1. Open Windows Add/Remove program. 2. Select Microsoft Office Enterprise 2007 > Change > Add or Remove feature > Continue. 3. Expand Office Shared features > Visual Basic Application. 4. Check that Visual Basic Application is installed. If this feature is not installed, select Run From my Computer option. 26 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 27.
    Known Problems andLimitations Limitations This section describes limits on the usability of current functionality. The limitations might be part of the product design or might result from issues with associated third-party products. The following table lists the known limitations for Advanced Document Transformation Services 6.7: Defect # Description of limitations AVTS-589 We do not support installation of DFC and ADTS in different locations. DTS-3823 If you want to enable performance/throughput logging, install the icmMetric.dar file. For information on how to download and install this DAR file, see the EMC Documentum Content Transformation Product Suite Installation Guide. DTS-3724 In 64-bit environments, CTS product uninstallers require 32-bit Java. Before invoking the uninstaller, revert the changes done after installation to Java on the CTS host as follows: 1. Stop all services that are using Java from C:Program FilesDocumentumJava. 2. Rename the 1.6.0_17 or 1.6.0.27 folder (whichever one is in use) to another name (for example, 1.6.0_27_64bit). 3. Rename the 1.6.0_17_32 or 1.6.0.27_32 folder back to the original name, either 1.6.0_17 or 1.6.0_27. DTS-3121 No support for OpenOffice formats in a localized OS (or a localized OpenOffice application). DTS-2717 Problems occur with Word documents that contain commenting. The "Use Balloons" option does not work when using only Office 2003 as the rendering application. DTS-1340 When converting to PDF/X, there is no preflight validation. DTS-1320 Word Transformation to PDF with password and ’not allow printing’ and ’not allow content copy or extraction’ still allows it to be printed and copy content. The ’Security Open Password’ and ’Security Change Password’ must be different during the document transformation to activate the security properties. This is a part of the PDF specification as designed by Adobe. After opening any PDF file, and attempting to set a same password for them will result in error. To test: • Open any PDF file and select File > Properties > Security tab. • Select "Require a password to open the document", and enter a password. • Select "Restrict editing and printing of the document. A password is required to change these permission settings" and enter a different password. If you try to enter a same password, the operation fails. EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 27
  • 28.
    Known Problems andLimitations Defect # Description of limitations DTS-1135 For any Excel sheet that does not contain any data, bookmarks are still created in PDFs. For example, if an Excel Workbook contains three sheets with data only in the first two sheets, it is expected that only two sheets be included in the PDF. Clicking on this third sheet in the PDF leads the pointer to the first page. DTS-1113 If all files are not the same size and orientation, the condensePDF profile does not produce accurate results . Only the whitespaces should be removed but in the PDF rendition, data from the files might be removed. The condensePDF profile can only remove the white space between pages of the same size and orientation. DTS-841 The default installation of ADTS on Windows sets a limitation on the memory usage of a third-party library. To correct this issue, change the Registry Settings for: HKEY_ LOCAL_MACHINESOFTWAREAdlibAdlib FMRAdlib ExpressDefaultAvailMemUsageLimit Setting this value to 0 corrects all issues. DTS-510 ADTS is not capable of properly handling HTML files that have embedded pictures that exceed 32kb, so HTML files with embedded pictures exceeding 32kb cannot be transformed to PDF. Only Mozilla Firefox can support this. Internet Explorer 8 supports strings only up to 32 kilobytes in length. 28 EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1
  • 29.
    Chapter 7 Installation The instructionsfor installing and upgrading the product are provided in the Content Transformation Services Product Suite Installation Guide. Ensure that your system meets the requirements listed in the Documentum 6.7 SP1 Environment and System Requirements Guide before installing or upgrading the software. The Documentum 6.7 SP1 Environment and System Requirements Guide and product documentation are available on the Powerlink website (http://powerlink.EMC.com). EMC Documentum Advanced Document Transformation Services Release Notes, Version 6.7 SP1 29