Name: Danika Olson                                      Absences:
         Phone:206-650-1445                                      1st Qtr.
         Address: 3010 s 144th St. Seatac WA 98168               2nd Qtr.
                                                                 3rd Qtr.
         Date of Registration:                                   4th Qtr.
         Grade:11th grade
         Year of Graduation:2013                                 Total Hours in Program:
         Date of Completion/Withdrawal:




Digital Media Arts
[Featuring the Animation Technology CIP#100304]
With AP 2D Studio Art & Fine Arts & English equivalency credit

The various ‘standards’ covered herein have several tasks
associated. Further, each task is valued as either Exposure (1)
only, Limited (2) practice, Skilled (3) or Trainer (4).

edward
9/14/2011
Competency Profile Standards 2011-2012

C-1      Computer Concepts
C-2      Career Investigation
C-3      Communicate in multiple modes
C-4      Solve problems using critical thinking
C-5      Demonstrate positive work behaviors
C-6      Strand Health and SafetyI
C-7      Demonstrate health and safety practices
C-8Strand Health and SafetyII
C-9      Art Theory
A-1      Storyboarding
A-2      Lighting
C-10     How Digital Video, Quality & Color Works
A-3      Cameras, Still & Video
C-11     Exposure Control
C-12     Light Meters & Exposure
A-4      Still Photography Lighting
A-5      Digital Camera & Photography
A-6      Digital Editing and Printing
A-7      Studio Production
A-8      Remotes
A-9      Pre-Production
A-10     News Production
C-13     Camera & Support Equipment
C-14     Camera Operation & Control
C-15     Composition
A-11     Location Shooting
C-16     Audio Basics
A-12     Sound Effects
A-13     Animation Introduction
C-17     Digital Special Effects
C-18     Directing
A-14     Rendering
C-19     Video Recording Formats
C-20     Video Editing
A-15     Video & Audio for the Internet
A-16     Post Production
A-17     Legal and Ethical Issues
C-21     Survey of History of Photography
C-22     Critical Analysis
A-18     Analyze basic business practices required to start and run a company/organization
A-19     Portfolio & Presentation
C-23     Knowledge of Acceptable Use Policy
C-24     Introduction to Internet Concepts
C-25     Basic Principles of Graphic Design
C-26     Image Use and Design
C-27     Utilize Multimedia and Graphic Tools
Standard - Computer Concepts (C1)                  1 2 3 4           Standard: Career Investigation (C2)               1 2 3 4
                                                        x           Evaluate industries, organizations, and careers           X
Identify internal computer parts, peripherals, mobile
                                                                    based on multiple sources of research and
technology
                                                                    information
Contrast and compare different models of a PC               X       Assess interest areas to determine potential career         X
(low, medium, high priced)                                          pathways, including career ladders
Research the ‘short cut’ or ‘hot keys’ in Windows               X                                                               X
                                                                    Develop a career plan with alternatives
programs
Understanding the basics of different Operating                 X   Complete job applications and related employment            X
Systems                                                             documents (e.g. W-4)
                                                                X   Create professional cover letters, resumes, and             X
Understand about purchasing process for a PC
                                                                    portfolios in a variety of formats (print/electronic)
Review the various points of interest for an Internet           X   Apply job search skills to seek, evaluate, apply for,       X
search                                                              and accept employment
Identify sources of help with computer hardware or              X                                                               X
                                                                    Demonstrate good interviewing skills
software issues which arise from time to time
Check the terminology and nomenclature of PC                    X   Demonstrate employability skills needed to get and          X
hardware & operating systems                                        keep a job
                                                        X           Evaluate industries, organizations, and careers             X
Identify internal computer parts, peripherals, mobile
                                                                    based on multiple sources of research and
technology
                                                                    information
 Standard: Communicate in multiple modes                1 2 3 4        Standard: Solve problems using critical              1 2 3 4
                 (C3)                                                              thinking (C4)
Apply strategies to enhance effectiveness of                X       Demonstrate skills used to define and analyze a
all types of communications in the workplace                        given problem
                                                            X       Explain the importance and dynamics of
Apply reading skills and strategies to work-
                                                                    individual and teamwork approaches of problem
related documents
                                                                    solving
Locate information from books, journals,                        X   Describe methods of researching and validating
magazines, and the Internet                                         reliable information relevant to the problem
Apply basic writing skills to work-related                      X   Explain strategies used to formulate ideas,
communication                                                       proposals and solutions to problems
                                                                X   Select potential solutions based on reasoned
Write work-related materials
                                                                    criteria
                                                                X        Standard: Demonstrate positive work                1 2 3 4
Explain information presented graphically
                                                                                    behaviors (C5)
Use writing/publishing/presentation                             X   Identify time management and task prioritization
applications                                                        skills-
Apply basic skills for work-related oral                        X   Explain the importance of following workplace
communication                                                       etiquette/protocol
                                                            X       Demonstrate willingness to learn and further
Explain proper telephone etiquette and skills
                                                                    develop skills
Lead formal and informal group discussions                  X       Demonstrate self-management skills
Demonstrate effective negotiation and conflict              X       List causes of stress and effective stress
management                                                          management techniques
Apply active listening skills to obtain and clarify             X   Describe the importance of having a positive
information                                                         attitude and techniques that boost morale
Communicate with others in a diverse                            X   Show initiative by coming up with unique
workforce                                                           solutions and taking on extra responsibilities
                                                                x   Explain the importance of setting goals and
Apply strategies to enhance effectiveness of
                                                                    demonstrate the ability to set, reach, and
all types of communications in the workplace
                                                                    evaluate goals
Standard: Strand Health and Safety I (C6)               1 2 3 4     Explain the importance of taking pride in work
                                                                    accomplished and extrinsic and intrinsic
                                                                    motivators that can be used to increase pride
Identify and apply OSHA and other health and                        Value the importance of professionalism,
safety regulations that apply to specific tasks                     including reliability, honesty, responsibility, and
and jobs in the occupational area                                   ethics
Identify & apply EPA and other environmental
                                                                    Demonstrate respect of diversity to benefit the
protection regulations that apply to specific
                                                                    workplace
tasks and jobs in the occupational area
Identify and apply Right-To-Know (Hazard
Communication Policy) and other
communicative regulations that apply to
specific tasks & jobs in the occupational area
Explain procedures for documenting and                         Standard: Demonstrate health and safety             1 2 3 4
reporting hazards to appropriate authorities                   practices (C7)
List penalties for non-compliance with                         Identify, describe and demonstrate the effective
appropriate health and safety regulations                      use of Material Safety Data Sheets (MSDS)
                                                               Read chemical, product, and equipment labels
Identify contact information for appropriate
                                                               to determine appropriate health and safety
health and safety agencies and resources
                                                               considerations
Create a systematic safety program which                       Identify, describe and demonstrate personal,
would achieve OSHA compliance and promote                      shop and job site safety practices and
a safe working environment                                     procedures
                                                  1 2 3 4      Demonstrate safe dress and use of relevant
                                                               safety gear and personal protective equipment
                                                               (PPE), including wrist rests, adjustable
Standard: Strand Health and Safety II (C8)                     workspaces and equipment, gloves, boots,
                                                               earplugs, eye protection, and breathing
                                                               apparatus
Explain why the business owner, or designate                   Illustrate appropriate safe body mechanics,
can train you about health and safety issues                   including proper lifting techniques and
                                                               ergonomics
Employee beware, ultimately your                               Locate emergency equipment in your lab, shop,
responsibility                                                 and classroom, including (where appropriate)
                                                               eyewash stations, shower facilities, sinks, fire
                                                               extinguishers, fire blankets, telephone, master
                                                               power switches, and emergency exits
Review what skill sets to use when at work                     Demonstrate the safe use, storage, and
with possibly a dangerous environment                          maintenance of every piece of equipment in the
                                                               lab, shop, and classroom
                                                  1 2 3        Describe safety practices and procedures to be
         Standard: Art Theory (C9)                         4   followed when working with and around
                                                               electricity
                                                       X       Illustrate proper handling and storage practices,
Art Elements                                                   including working with hazardous materials,
                                                               disposal, and recycling
                                                       X       Demonstrate proper workspace cleaning
Art Principles
                                                               procedures
Composition                                            X               Standard: Storyboarding (A1)                1 2 3 4
Color Theory                                           X       Storyboards/Concept of Art                            x
Basic Art History                                      X       Applying art elements and principles                    x
Art Appreciation                                       X       30% of time in pre-production                           x
Design Principles – especially as they apply to        X                                                             x
                                                               Synthesize elements and principles.
characters and environments
                                                       x       Standard: How Digital Video, Quality & Color        1 2 3 4
Using Source Art
                                                                              Works (C10)
           Standard: Lighting (A2)                1 2 3 4 Fields and Frames
3 Point Lighting                                      X   Interlaced Scanning
Key                                                   X   Progressive Scanning
Fill                                                  X   Analog and Digital Signals
Back                                                  X   Component and Composite Video
Types of lighting Instruments                         X   Underexposure/ Overexposure
Type of Lamps                                           X Video Noise
Color Temperature                                       X Saturation
Lighting Intensity                                      X Brightness or Luma Level
Set Lighting                                            X Waveform Monitor and Vectorscope
Techniques of Lighting                                  X Principles of Color
Contrast Ratio                                        x   Fields and Frames
Lighting Plot                                           x       Interlaced Scanning
Vector Lines                                        X           Progressive Scanning
Cutaway Shots                                       X           Analog and Digital Signals
Jump Cuts                                           X           Fields and Frames
Hard Light                                             X Interlaced Scanning
Soft Light                                             X Progressive Scanning
    Standard: Cameras, Still & Video (A3)        1 2 3 4 Analog and Digital Signals
Make of Camera                                       X   Component and Composite Video
Focal Length                                           X        Standard: Exposure Control (C11)         1 2 3 4
Animated Camera                                        X Understand the relationship between the shutter       X
                                                                and light
                                                            X   Understand how to convey motion in a still                     X
Zoom/Pan/Dolly
                                                                photograph
                                                            X   Understand how the aperture of the camera                      X
Multiple Camera
                                                                works in relation to light
                                                            X   Understand the concept of depth of field and                   X
Type of Lenses
                                                                how to control it
                                                            X   Understand the trade-off between aperture and                  X
Zoom Lenses
                                                                shutter choice
                                                            X   Understand how to use shutter speed and                        X
Angle of View
                                                                aperture to control exposure
                                                            X   Understand how to use a camera and avoid or                    X
Zoom and Zoom Ratio
                                                                control blur in your images
F-Stops/Lens Speed/Iris                                     X Standard: Light Meters & Exposure (C12)                  1 2 3 4
                                                            X Understand the concept of equivalent                         X
Depth of Field
                                                                exposures and how to achieve and apply them
Focusing/Follow Focus/Rack Focus                            X Understand how exposure meters work                          X
Macro Focus                                                 X Use in-camera exposure meters                                X
Filters                                                     X Understand how automatic exposure systems                    X
                                                                operate
Image Stabilization                                         X   Understand how to meter different scenes                   X
Type of Lenses                                              X Be able to deal with hard-to-meter scenes                    X
Identify various parts and controls of a SLR                X Understand how to bracket a scene                                x
camera (film and/or digital)
Understand the basic principles of how to                   X                                                          1 2 3 4
operate either a manual or automatic SLR                        Standard: Still Photography Lighting (A4)
camera
Understand the basic guidelines for making                  X Understand the basic concepts of degree of                   X
successful photographs                                          diffusion and direction of light
Know and use the vocabulary necessary to                    X                                                              X
identify and learn to use the parts of the                      Shoot effectively with available light
camera
Identify different camera formats and their                 X Identify a variety of lighting equipment including           X
                                                                lights, diffusers and reflectors, supports for
advantages and disadvantages
                                                                lighting devices, and understand their uses
                                                            x   Understand the purpose for using more than                     X
                                                                one lighting device, and how to position fill lights
Identify special purpose cameras
                                                                to achieve certain effects, such as studio, on
                                                                camera, existing, supplemental, reflectors, etc.
  Standard: Digital Camera & Photography         1 2 3 4                                                                       X
                                                                Identify a variety of flash units, flash meters,
                    (C13)                                       and flash accessories, and understand how
                                                                they are used

Identify the basic features of digital cameras              X Meter for flash and calculate exposure                       X
and know how to use them
Understand the composition of a digital image               X Arrange lighting for portraits and reflective            X
and the factors that affect its quality and file                objects, and to enhance the appearance of
size                                                            textured surfaces
                                                            X   Understand the theory of light and qualities of        x
Understand how digital images are transferred                   light such as electromagnetic spectrum,
to a computer for storage and manipulation                      variances, reflectance, and physical properties
                                                                of light
Understand the differences between normal-                  X Standard: Digital Editing and Printing (A6)          1 2 3 4
focal length for digital camera lenses and
traditional camera lenses
Understand how to make adjustments for                      X Understand how to prepare a computer to                      X
contrast, color balance and exposure using a
                                                                correctly display digital images.
digital camera
Understand the basic differences between                    X                                                              X
various digital cameras on the market and
                                                                Adjust portions or complete images using
weigh the relative advantages and
                                                                software tools
disadvantages, conveniences and costs
associated with their use
Understand how to use scanners                              X Use other techniques including filters to readjust           X
                                                                or sharpen images
                                                            X   Edit image using software including: burning,              X
Work with histograms to create better images                    dodging, levels, masks, importance and benefits
                                                                of using layers, retouching
Understand color management                                 X   Understand the ethics of altering images.                  X
                                                            x   Understand the relative advantages and                     X
Understand how to store digital images                          disadvantages of a number of kinds of printers
                                                                and printer technologies
      Standard: Studio Production (A7)             1 2 3 4 Standard: Remotes (A8)                                  1 2 3 4
Equipment and Facilities                             x     Location Survey                                             X
Studio Sets                                            X   Camera Positions                                              X
Studio Hand Signals                                    X   On-Location Audio                                           X
Studio Crew Positions                                  X   Lighting                                                    X
Role of the Director                                   X   Production Communication                                    X
Directing Process                                      X   Single-Camera vs. Multiple-Camera Production                X
On-Camera Talent                                       X   Multiple-Camera Production                                  X
Video Switchers                                        X   Single-Camera Production                                      X
Multiple-Camera Studio Productions                     X   Film-Style Dramatic Production                            x
Standard: Pre-Production (A9)                      1 2 3 4 Standard: News Production (A10)                         1 2 3 4
Training                                                        ENG and EFP                                        X
Read-through and Rehearsals                                     Video Journalists                                    X
Shot List                                                       News Producer                                        X
Permits                                                         News Sources                                         X
Location Permissions                                            On-Location News Interview                           X
Transportation                                                  News Editing                                         X
Shooting Calendar                                               Rundowns                                             x
Equipment Rental                                                News Studio Crew                                       x
  Standard: Camera & Support Equipment             1 2 3 4 News Bias
                  (C13)
Camera Head                                                 x   Newsworthiness
Viewfinder                                                  X   News Writing Guidelines
Camera Lens                                                 X   Standard: Camera Operation & Control (C14)         1 2 3 4
Hand-Held Shooting                                          X   Depth of Field                                           x
Tripod Shooting                                             X   Exposure                                                 x
Boom and Jib Shooting                              x            Angle of View                                            X
Camera Care and Maintenance                     X Pull Focus                                             X
Camera Head                                     X Composition                                            X
         Standard: Composition (C15)      1 2 3 4 Aspect Ratio                                           X
Form vs. Content                              X   Camera Movements                                           X
Insert Shots and Cutaways                     X   Type of Shots                                              X
Defining Composition                          X   Imaging Device                                             X
Static Composition                            X   Video Resolution                                           X
Dynamic Composition                           X   Camera Mounts and Tripod                                   X
Clearly Establish Your Objectives             X   Camera Pan Heads                                           X
Single Center of Interest                       X Basic Camera Moves                                         X
                                                       Pan/Tilt/Dolly/Truck/Pedestal
Shifting the Center of Interest                     X  Color Balancing/ White Balancing                    X
Leading the Subject                                 X Shutter Speed                                        X
Rule of Thirds                                      X Shutter Speeds and F-Stops                           X
Maintaining Tonal Balance                       X      Frame Rate                                          X
Balance Mass                                    X      Viewfinder                                          X
The Concrete and the Abstract                   X           Standard: Location Shooting (A11)        1 2 3 4
Frame Central Subject Matter                    X      Camera Mounts                                     x
Convey Meaning Through Colors and Tones         X      Lighting                                          x
Control the Number of Prime Objects             X      Power (Camera & Lighting)                         x
                                                X      Shooting Techniques (Multi Camera vs Single       x
Balance Complexity and Order
                                                       Camera)
Movement and Meaning                          x        Audio                                             x
         Standard: Audio Basics (C16)     1 2 3 4 Traffic Control                                        x
Audio Frequency                                            Standard: Sound Effects (A12)             1 2 3 4
Types of Microphones                                   Background Music                                  x
Microphone Patterns                                    Sound Effects                                     x
Wireless Microphone                                    Self-Made Sound                                 x
Care of Microphone                                     Sound Editing                                   x
Impedance                                              Synchronized sound to animation                   x
Levels                                                    Standard: Animation Introduction (A13)     1 2 3 4
Audio Connectors and Adapter                           Principles of Animation
Standard: Digital Special Effects (C17)   1 2 3 4 Animation History
Green Screen Shooting                                  Motion Paths
Computer generated Effects                             Key Frames
          Standard: Rendering (A14        1 2 3 4                    Standard: Directing (C18)       1 2 3 4
Still Images                                           Script Breakdown                                x
Rendering Attributes                                   Marking the Script                                x
Movies and Animations                                  Shooting for Editing                            x
Codecs                                                 Multiple Takes                                    x
Safe Frame                                             Organization Skills                               x
Hardware / Software                                    Eye on the Big Picture                            x
Render                                                 Direction Vocabulary                            x
Atmospherics                                           Capabilities of the Equipment                     x
Use of Key                                                        Standard: Video Editing (C20)      1 2 3 4
Colors / Alpha                                         Dedicated and Software-Based Editors
                                                       Linear and Non-Linear Editing Systems
                                                       Time-Code
Standard: Video Recording Formats (C19)         1 2 3 4 On-Line and Off-Line Editing
                                                          Standard: Video & Audio for the Internet              1 2 3 4
Consumer Video Formats
                                                                            (A15)
Digital Compression                                           Podcasting formats
MPEG-2 and MPEG-4 Compression                                 Streaming live video
JPEG Compression                                              Video posting websites
Professional Video Formats                                    Export protocols
Exporting Video                                               Internet terminology
        Standard: Post Production (A16)         1 2 3 4 File size and compression
Awareness of post-production steps                x        Standard: Legal and Ethical Issues (A17)             1 2 3 4
Defining needed export types                        x   Invasion of Privacy
Image Keying                                       x          Access Restrictions and Rights
Compositing Software                               x          Libel and Slander
Foley Work                                         x          Copyright
Animation on Video                                     x      Talent and Location Releases
Editing                                                x      The Fair Use Act
Transitions                                            x      Public Domain
Rough Cut                                          x          Securing Rights to Music
                                                   x           Standard: Survey of History of Photography       1 2 3 4
Final Cut
                                                                                 (C21)
                                                       x      Identify significant discoveries, developments,         X
Sound Effects
                                                              and inventions in the history of photography
                                                   x          Understand the chronology of the development            X
Foley
                                                              and popularization of photography
                                                       x      Understand the significance of early                    X
Music                                                         documentary photography and its social,
                                                              political, and scientific impact
                                                   x          Identify the historically important figures and     X
Dialogue Looping
                                                              sponsoring individuals and agencies
        Standard: Critical Analysis (C22)       1 2 3 4       Distinguish between various movements, styles,          X
                                                              and trends in the history of photography
Be able to discuss and debate the possible             X      Identify the work of major photographers of the     X
                                                                th         th
intention of various photographs                              19 and 20 centuries
Use reflection in evaluation to your own work       x         Dem Reel or Animation Short                         x
Standard: Analyze basic business practices      1 2 3 4                                                         1 2 3 4
        required to start and run a                              Standard: Portfolio & Presentation (A19)
       company/organization (A18)

Define entrepreneurship                                X      Present for grading
Describe the relationship between suppliers,               X Slide show of rendered images
producers, and consumers
Compare and contrast types of businesses,              X
including sole proprietorships, small
businesses, companies, corporations,                          Hard Copy Portfolio
governmental agencies, and no-profit
organizations
Describe practices that ensure quality                 X      Digital Media Presentation
customer service
Explain the value of competition in                    x      Web Presentation
business/field
  Standard: Knowledge of Acceptable Use         1 2 3 4 Panel Presentation
               Policy (C23)
Collaborate with classmates in researching or
                                                              Dem Reel or Animation Short
reviewing an Acceptable Use Policy
Standard: Introduction to Internet Concepts    1 2 3 4
Internet search (optional)
                                                                                     (C24)
                                                                 Recognize the computer as a communication
Responsibilities of Internet use                                 skill and a way of connecting with people and
                                                                 information
                                                                 Students consider the development of the
Discuss legal issues associated with locating
                                                                 internet and assess advantages and
and retrieving information from the internet
                                                                 disadvantages
Understand Acceptable Use Policy, copyright
                                                                 Browsers (optional)
and Fair Use Laws
 Conduct research on the Internet and correctly
                                                                 Search Engines
identify site sources in bibliography
Utilize information from electronic
                                                                 Responsibilities of Internet use
communication sources
   Standard: Image Use and Design (C25)              1 2 3 4 History of the Internet (optional)
                                                             Standard: Basic Principles of Graphic Design 1 2 3 4
Plan an interactive image
                                                                                    (C26)
Storyboard interactive image                                     Review and redesign
Evaluate and integrate interactive components
                                                                 Project Planning
into a website
Storyboard interactive components                                Storyboarding
Analyze images as a means of information
                                                                 File management and naming conventions
display
Appropriate use of color, shapes and lines
                                                                 Copyright and image standard practices
(elements of design)
Import/create images                                             Optimizing JPEGs and GIFs
Layers                                                           Composition, contrast and balance
Frames                                                           Emphasis
Behaviors                                                        Line
Disjoint and simple rollover images                              Unity and color
Working with images                                              Editing images
Effects                                                          Rule of Thirds
  Standard: Utilize Multimedia and Graphic           1 2 3 4 Proximity and patterns
                 Tools (C27)
Describe various interactive media tools                         Shape
Create and manipulate illustrations using a
                                                                 Typography
drawing or painting program
Import and export graphics using external
                                                                 Scanning photographs, objects, and drawings
peripherals
Identify and define different graphic file formats               Using a digital camera
Open and run video clips                                         Panel elements and structure
Create a simple video clip                                       Export window and settings
Play and record sound clips                                      Effects
                                                                 Drawing
                                                                 Text
                                                                 Graphics file types
                                                                 Copyright issues
                                                                 Redesign and peer review
CORE subjects & 21st Century Themes



     Learning & Innovation Skills                          1   2   3   4

         Creativity & Innovation

         Critical Thinking & Problem Solving

         Communications & Collaboration

     Information, Media & Technology Skills

         Information Technology

         Media Literacy

         ICT (Information, Communications & Technology)
           Literacy

     Life & Career Skills

         Flexibility & Adaptability

         Initiative & Self-Direction

         Social & Cross-Cultural Skills

         Productivity & Accountability

         Leadership & Responsibility

Dma Competencies 2011 12

  • 1.
    Name: Danika Olson Absences: Phone:206-650-1445 1st Qtr. Address: 3010 s 144th St. Seatac WA 98168 2nd Qtr. 3rd Qtr. Date of Registration: 4th Qtr. Grade:11th grade Year of Graduation:2013 Total Hours in Program: Date of Completion/Withdrawal: Digital Media Arts [Featuring the Animation Technology CIP#100304] With AP 2D Studio Art & Fine Arts & English equivalency credit The various ‘standards’ covered herein have several tasks associated. Further, each task is valued as either Exposure (1) only, Limited (2) practice, Skilled (3) or Trainer (4). edward 9/14/2011
  • 2.
    Competency Profile Standards2011-2012 C-1 Computer Concepts C-2 Career Investigation C-3 Communicate in multiple modes C-4 Solve problems using critical thinking C-5 Demonstrate positive work behaviors C-6 Strand Health and SafetyI C-7 Demonstrate health and safety practices C-8Strand Health and SafetyII C-9 Art Theory A-1 Storyboarding A-2 Lighting C-10 How Digital Video, Quality & Color Works A-3 Cameras, Still & Video C-11 Exposure Control C-12 Light Meters & Exposure A-4 Still Photography Lighting A-5 Digital Camera & Photography A-6 Digital Editing and Printing A-7 Studio Production A-8 Remotes A-9 Pre-Production A-10 News Production C-13 Camera & Support Equipment C-14 Camera Operation & Control C-15 Composition A-11 Location Shooting C-16 Audio Basics A-12 Sound Effects A-13 Animation Introduction C-17 Digital Special Effects C-18 Directing A-14 Rendering C-19 Video Recording Formats C-20 Video Editing A-15 Video & Audio for the Internet A-16 Post Production A-17 Legal and Ethical Issues C-21 Survey of History of Photography C-22 Critical Analysis A-18 Analyze basic business practices required to start and run a company/organization A-19 Portfolio & Presentation C-23 Knowledge of Acceptable Use Policy C-24 Introduction to Internet Concepts C-25 Basic Principles of Graphic Design C-26 Image Use and Design C-27 Utilize Multimedia and Graphic Tools
  • 3.
    Standard - ComputerConcepts (C1) 1 2 3 4 Standard: Career Investigation (C2) 1 2 3 4 x Evaluate industries, organizations, and careers X Identify internal computer parts, peripherals, mobile based on multiple sources of research and technology information Contrast and compare different models of a PC X Assess interest areas to determine potential career X (low, medium, high priced) pathways, including career ladders Research the ‘short cut’ or ‘hot keys’ in Windows X X Develop a career plan with alternatives programs Understanding the basics of different Operating X Complete job applications and related employment X Systems documents (e.g. W-4) X Create professional cover letters, resumes, and X Understand about purchasing process for a PC portfolios in a variety of formats (print/electronic) Review the various points of interest for an Internet X Apply job search skills to seek, evaluate, apply for, X search and accept employment Identify sources of help with computer hardware or X X Demonstrate good interviewing skills software issues which arise from time to time Check the terminology and nomenclature of PC X Demonstrate employability skills needed to get and X hardware & operating systems keep a job X Evaluate industries, organizations, and careers X Identify internal computer parts, peripherals, mobile based on multiple sources of research and technology information Standard: Communicate in multiple modes 1 2 3 4 Standard: Solve problems using critical 1 2 3 4 (C3) thinking (C4) Apply strategies to enhance effectiveness of X Demonstrate skills used to define and analyze a all types of communications in the workplace given problem X Explain the importance and dynamics of Apply reading skills and strategies to work- individual and teamwork approaches of problem related documents solving Locate information from books, journals, X Describe methods of researching and validating magazines, and the Internet reliable information relevant to the problem Apply basic writing skills to work-related X Explain strategies used to formulate ideas, communication proposals and solutions to problems X Select potential solutions based on reasoned Write work-related materials criteria X Standard: Demonstrate positive work 1 2 3 4 Explain information presented graphically behaviors (C5) Use writing/publishing/presentation X Identify time management and task prioritization applications skills- Apply basic skills for work-related oral X Explain the importance of following workplace communication etiquette/protocol X Demonstrate willingness to learn and further Explain proper telephone etiquette and skills develop skills Lead formal and informal group discussions X Demonstrate self-management skills Demonstrate effective negotiation and conflict X List causes of stress and effective stress management management techniques Apply active listening skills to obtain and clarify X Describe the importance of having a positive information attitude and techniques that boost morale Communicate with others in a diverse X Show initiative by coming up with unique workforce solutions and taking on extra responsibilities x Explain the importance of setting goals and Apply strategies to enhance effectiveness of demonstrate the ability to set, reach, and all types of communications in the workplace evaluate goals Standard: Strand Health and Safety I (C6) 1 2 3 4 Explain the importance of taking pride in work accomplished and extrinsic and intrinsic motivators that can be used to increase pride Identify and apply OSHA and other health and Value the importance of professionalism, safety regulations that apply to specific tasks including reliability, honesty, responsibility, and and jobs in the occupational area ethics Identify & apply EPA and other environmental Demonstrate respect of diversity to benefit the protection regulations that apply to specific workplace tasks and jobs in the occupational area Identify and apply Right-To-Know (Hazard Communication Policy) and other
  • 4.
    communicative regulations thatapply to specific tasks & jobs in the occupational area Explain procedures for documenting and Standard: Demonstrate health and safety 1 2 3 4 reporting hazards to appropriate authorities practices (C7) List penalties for non-compliance with Identify, describe and demonstrate the effective appropriate health and safety regulations use of Material Safety Data Sheets (MSDS) Read chemical, product, and equipment labels Identify contact information for appropriate to determine appropriate health and safety health and safety agencies and resources considerations Create a systematic safety program which Identify, describe and demonstrate personal, would achieve OSHA compliance and promote shop and job site safety practices and a safe working environment procedures 1 2 3 4 Demonstrate safe dress and use of relevant safety gear and personal protective equipment (PPE), including wrist rests, adjustable Standard: Strand Health and Safety II (C8) workspaces and equipment, gloves, boots, earplugs, eye protection, and breathing apparatus Explain why the business owner, or designate Illustrate appropriate safe body mechanics, can train you about health and safety issues including proper lifting techniques and ergonomics Employee beware, ultimately your Locate emergency equipment in your lab, shop, responsibility and classroom, including (where appropriate) eyewash stations, shower facilities, sinks, fire extinguishers, fire blankets, telephone, master power switches, and emergency exits Review what skill sets to use when at work Demonstrate the safe use, storage, and with possibly a dangerous environment maintenance of every piece of equipment in the lab, shop, and classroom 1 2 3 Describe safety practices and procedures to be Standard: Art Theory (C9) 4 followed when working with and around electricity X Illustrate proper handling and storage practices, Art Elements including working with hazardous materials, disposal, and recycling X Demonstrate proper workspace cleaning Art Principles procedures Composition X Standard: Storyboarding (A1) 1 2 3 4 Color Theory X Storyboards/Concept of Art x Basic Art History X Applying art elements and principles x Art Appreciation X 30% of time in pre-production x Design Principles – especially as they apply to X x Synthesize elements and principles. characters and environments x Standard: How Digital Video, Quality & Color 1 2 3 4 Using Source Art Works (C10) Standard: Lighting (A2) 1 2 3 4 Fields and Frames 3 Point Lighting X Interlaced Scanning Key X Progressive Scanning Fill X Analog and Digital Signals Back X Component and Composite Video Types of lighting Instruments X Underexposure/ Overexposure Type of Lamps X Video Noise Color Temperature X Saturation Lighting Intensity X Brightness or Luma Level Set Lighting X Waveform Monitor and Vectorscope Techniques of Lighting X Principles of Color Contrast Ratio x Fields and Frames
  • 5.
    Lighting Plot x Interlaced Scanning Vector Lines X Progressive Scanning Cutaway Shots X Analog and Digital Signals Jump Cuts X Fields and Frames Hard Light X Interlaced Scanning Soft Light X Progressive Scanning Standard: Cameras, Still & Video (A3) 1 2 3 4 Analog and Digital Signals Make of Camera X Component and Composite Video Focal Length X Standard: Exposure Control (C11) 1 2 3 4 Animated Camera X Understand the relationship between the shutter X and light X Understand how to convey motion in a still X Zoom/Pan/Dolly photograph X Understand how the aperture of the camera X Multiple Camera works in relation to light X Understand the concept of depth of field and X Type of Lenses how to control it X Understand the trade-off between aperture and X Zoom Lenses shutter choice X Understand how to use shutter speed and X Angle of View aperture to control exposure X Understand how to use a camera and avoid or X Zoom and Zoom Ratio control blur in your images F-Stops/Lens Speed/Iris X Standard: Light Meters & Exposure (C12) 1 2 3 4 X Understand the concept of equivalent X Depth of Field exposures and how to achieve and apply them Focusing/Follow Focus/Rack Focus X Understand how exposure meters work X Macro Focus X Use in-camera exposure meters X Filters X Understand how automatic exposure systems X operate Image Stabilization X Understand how to meter different scenes X Type of Lenses X Be able to deal with hard-to-meter scenes X Identify various parts and controls of a SLR X Understand how to bracket a scene x camera (film and/or digital) Understand the basic principles of how to X 1 2 3 4 operate either a manual or automatic SLR Standard: Still Photography Lighting (A4) camera Understand the basic guidelines for making X Understand the basic concepts of degree of X successful photographs diffusion and direction of light Know and use the vocabulary necessary to X X identify and learn to use the parts of the Shoot effectively with available light camera Identify different camera formats and their X Identify a variety of lighting equipment including X lights, diffusers and reflectors, supports for advantages and disadvantages lighting devices, and understand their uses x Understand the purpose for using more than X one lighting device, and how to position fill lights Identify special purpose cameras to achieve certain effects, such as studio, on camera, existing, supplemental, reflectors, etc. Standard: Digital Camera & Photography 1 2 3 4 X Identify a variety of flash units, flash meters, (C13) and flash accessories, and understand how they are used Identify the basic features of digital cameras X Meter for flash and calculate exposure X and know how to use them
  • 6.
    Understand the compositionof a digital image X Arrange lighting for portraits and reflective X and the factors that affect its quality and file objects, and to enhance the appearance of size textured surfaces X Understand the theory of light and qualities of x Understand how digital images are transferred light such as electromagnetic spectrum, to a computer for storage and manipulation variances, reflectance, and physical properties of light Understand the differences between normal- X Standard: Digital Editing and Printing (A6) 1 2 3 4 focal length for digital camera lenses and traditional camera lenses Understand how to make adjustments for X Understand how to prepare a computer to X contrast, color balance and exposure using a correctly display digital images. digital camera Understand the basic differences between X X various digital cameras on the market and Adjust portions or complete images using weigh the relative advantages and software tools disadvantages, conveniences and costs associated with their use Understand how to use scanners X Use other techniques including filters to readjust X or sharpen images X Edit image using software including: burning, X Work with histograms to create better images dodging, levels, masks, importance and benefits of using layers, retouching Understand color management X Understand the ethics of altering images. X x Understand the relative advantages and X Understand how to store digital images disadvantages of a number of kinds of printers and printer technologies Standard: Studio Production (A7) 1 2 3 4 Standard: Remotes (A8) 1 2 3 4 Equipment and Facilities x Location Survey X Studio Sets X Camera Positions X Studio Hand Signals X On-Location Audio X Studio Crew Positions X Lighting X Role of the Director X Production Communication X Directing Process X Single-Camera vs. Multiple-Camera Production X On-Camera Talent X Multiple-Camera Production X Video Switchers X Single-Camera Production X Multiple-Camera Studio Productions X Film-Style Dramatic Production x Standard: Pre-Production (A9) 1 2 3 4 Standard: News Production (A10) 1 2 3 4 Training ENG and EFP X Read-through and Rehearsals Video Journalists X Shot List News Producer X Permits News Sources X Location Permissions On-Location News Interview X Transportation News Editing X Shooting Calendar Rundowns x Equipment Rental News Studio Crew x Standard: Camera & Support Equipment 1 2 3 4 News Bias (C13) Camera Head x Newsworthiness Viewfinder X News Writing Guidelines Camera Lens X Standard: Camera Operation & Control (C14) 1 2 3 4 Hand-Held Shooting X Depth of Field x Tripod Shooting X Exposure x Boom and Jib Shooting x Angle of View X
  • 7.
    Camera Care andMaintenance X Pull Focus X Camera Head X Composition X Standard: Composition (C15) 1 2 3 4 Aspect Ratio X Form vs. Content X Camera Movements X Insert Shots and Cutaways X Type of Shots X Defining Composition X Imaging Device X Static Composition X Video Resolution X Dynamic Composition X Camera Mounts and Tripod X Clearly Establish Your Objectives X Camera Pan Heads X Single Center of Interest X Basic Camera Moves X Pan/Tilt/Dolly/Truck/Pedestal Shifting the Center of Interest X Color Balancing/ White Balancing X Leading the Subject X Shutter Speed X Rule of Thirds X Shutter Speeds and F-Stops X Maintaining Tonal Balance X Frame Rate X Balance Mass X Viewfinder X The Concrete and the Abstract X Standard: Location Shooting (A11) 1 2 3 4 Frame Central Subject Matter X Camera Mounts x Convey Meaning Through Colors and Tones X Lighting x Control the Number of Prime Objects X Power (Camera & Lighting) x X Shooting Techniques (Multi Camera vs Single x Balance Complexity and Order Camera) Movement and Meaning x Audio x Standard: Audio Basics (C16) 1 2 3 4 Traffic Control x Audio Frequency Standard: Sound Effects (A12) 1 2 3 4 Types of Microphones Background Music x Microphone Patterns Sound Effects x Wireless Microphone Self-Made Sound x Care of Microphone Sound Editing x Impedance Synchronized sound to animation x Levels Standard: Animation Introduction (A13) 1 2 3 4 Audio Connectors and Adapter Principles of Animation Standard: Digital Special Effects (C17) 1 2 3 4 Animation History Green Screen Shooting Motion Paths Computer generated Effects Key Frames Standard: Rendering (A14 1 2 3 4 Standard: Directing (C18) 1 2 3 4 Still Images Script Breakdown x Rendering Attributes Marking the Script x Movies and Animations Shooting for Editing x Codecs Multiple Takes x Safe Frame Organization Skills x Hardware / Software Eye on the Big Picture x Render Direction Vocabulary x Atmospherics Capabilities of the Equipment x Use of Key Standard: Video Editing (C20) 1 2 3 4 Colors / Alpha Dedicated and Software-Based Editors Linear and Non-Linear Editing Systems Time-Code
  • 8.
    Standard: Video RecordingFormats (C19) 1 2 3 4 On-Line and Off-Line Editing Standard: Video & Audio for the Internet 1 2 3 4 Consumer Video Formats (A15) Digital Compression Podcasting formats MPEG-2 and MPEG-4 Compression Streaming live video JPEG Compression Video posting websites Professional Video Formats Export protocols Exporting Video Internet terminology Standard: Post Production (A16) 1 2 3 4 File size and compression Awareness of post-production steps x Standard: Legal and Ethical Issues (A17) 1 2 3 4 Defining needed export types x Invasion of Privacy Image Keying x Access Restrictions and Rights Compositing Software x Libel and Slander Foley Work x Copyright Animation on Video x Talent and Location Releases Editing x The Fair Use Act Transitions x Public Domain Rough Cut x Securing Rights to Music x Standard: Survey of History of Photography 1 2 3 4 Final Cut (C21) x Identify significant discoveries, developments, X Sound Effects and inventions in the history of photography x Understand the chronology of the development X Foley and popularization of photography x Understand the significance of early X Music documentary photography and its social, political, and scientific impact x Identify the historically important figures and X Dialogue Looping sponsoring individuals and agencies Standard: Critical Analysis (C22) 1 2 3 4 Distinguish between various movements, styles, X and trends in the history of photography Be able to discuss and debate the possible X Identify the work of major photographers of the X th th intention of various photographs 19 and 20 centuries Use reflection in evaluation to your own work x Dem Reel or Animation Short x Standard: Analyze basic business practices 1 2 3 4 1 2 3 4 required to start and run a Standard: Portfolio & Presentation (A19) company/organization (A18) Define entrepreneurship X Present for grading Describe the relationship between suppliers, X Slide show of rendered images producers, and consumers Compare and contrast types of businesses, X including sole proprietorships, small businesses, companies, corporations, Hard Copy Portfolio governmental agencies, and no-profit organizations Describe practices that ensure quality X Digital Media Presentation customer service Explain the value of competition in x Web Presentation business/field Standard: Knowledge of Acceptable Use 1 2 3 4 Panel Presentation Policy (C23) Collaborate with classmates in researching or Dem Reel or Animation Short reviewing an Acceptable Use Policy
  • 9.
    Standard: Introduction toInternet Concepts 1 2 3 4 Internet search (optional) (C24) Recognize the computer as a communication Responsibilities of Internet use skill and a way of connecting with people and information Students consider the development of the Discuss legal issues associated with locating internet and assess advantages and and retrieving information from the internet disadvantages Understand Acceptable Use Policy, copyright Browsers (optional) and Fair Use Laws Conduct research on the Internet and correctly Search Engines identify site sources in bibliography Utilize information from electronic Responsibilities of Internet use communication sources Standard: Image Use and Design (C25) 1 2 3 4 History of the Internet (optional) Standard: Basic Principles of Graphic Design 1 2 3 4 Plan an interactive image (C26) Storyboard interactive image Review and redesign Evaluate and integrate interactive components Project Planning into a website Storyboard interactive components Storyboarding Analyze images as a means of information File management and naming conventions display Appropriate use of color, shapes and lines Copyright and image standard practices (elements of design) Import/create images Optimizing JPEGs and GIFs Layers Composition, contrast and balance Frames Emphasis Behaviors Line Disjoint and simple rollover images Unity and color Working with images Editing images Effects Rule of Thirds Standard: Utilize Multimedia and Graphic 1 2 3 4 Proximity and patterns Tools (C27) Describe various interactive media tools Shape Create and manipulate illustrations using a Typography drawing or painting program Import and export graphics using external Scanning photographs, objects, and drawings peripherals Identify and define different graphic file formats Using a digital camera Open and run video clips Panel elements and structure Create a simple video clip Export window and settings Play and record sound clips Effects Drawing Text Graphics file types Copyright issues Redesign and peer review
  • 10.
    CORE subjects &21st Century Themes Learning & Innovation Skills 1 2 3 4  Creativity & Innovation  Critical Thinking & Problem Solving  Communications & Collaboration Information, Media & Technology Skills  Information Technology  Media Literacy  ICT (Information, Communications & Technology) Literacy Life & Career Skills  Flexibility & Adaptability  Initiative & Self-Direction  Social & Cross-Cultural Skills  Productivity & Accountability  Leadership & Responsibility