SlideShare a Scribd company logo
KCISP
SIX-SIGMA COST PANEL
Location: Press Line #1
Project: Die Set Die Location
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
Team Members:
 Todd Beck, Team Leader Press
 Tim Lemka, Team Leader Press
 Andy Gray, Team Leader Press
 James Whaley, Process Coach
 William Spicer, Process Coach
 Roderick Howard, Process Coach
 Ivy Poole and Warren Decker, Die Setters
 Scott Boylan and Randy Gorham, Die Setters
 Dylan Jones and Robert Oates, Die Setters
 Matthew Hunt & Bill Hodges, Project Leader
 Todd Zellak, Project Owner
 Bill Hodges and Todd Zellak, Project Champions
Project Location: Press Line 1 KCISP
Project Completion Date: 1/28/2021
SIX-SIGMA PANEL
6-PANEL
PROBLEM STATEMENT
During the Die Set process dies do not
clamp properly as a result of die
location errors resulting in locating
pins breaking resulting in excessive
DEFINE VOICE OF THE CUSTOMER
D M A I C R
VOICE OF THE CUSTOMER:
Die Sets not clamping properly result in excessive downtime.
CTQ/CTC STATEMENT (Critical To Quality/Cost - Customer Requirement):
Die Set process must be completed in 6 minutes or less to maintain schedule.
COST OF POOR QUALITY/COST:
Extended die set time, process inefficiencies. 3 major occurrences in 2020 resulted in 140 minutes of
downtime and potential to require an extra shift to catch up.
SCOPE AND GOAL:
Reduced die set location issues by 50%.
Plant: KCISP
Line: Stamping Press #1
Area: Stamping Press
Part/Process Name: Die Set Process
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
 Process
6-PANEL
Method (Process)
Environment
Reduce die
location related
downtime 50%
Manpower
Material Machine
- Gripper Crane
- Level
OIS Crane
Operator
D M A I C R
MEASURE
 KPOV and KPIVs – Cause & Effect Diagram
- Bolsters
Gripper
Crane
Operators
WDX Locator
Pin System
Standards
X1
Key Process Input Variables: In Y = f(X)
X1 = Revise WDX Standards Die Locating Pin System
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
New Design Old Design
 Key Process Input Variable #X1: Die Location Bolster Pin System
Bolster pin
engagement
to 50mm
from 25 mm
increases
robustness
of process
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
B1 14 holes
B2 14 Holes
B3 16 holes
B4 14 holes
Bolster holes drilled out and hardened inserts Installed C and D sides
 Key Process Input Variable #X1: Die Location Bolster Pin System
6-PANEL D M A I C R
ANALYZE & IMPROVE
 Key Process Input Variable #X1: Die Location Bolster Pin System
YTD (10/22) 140 minutes
0 die location failures since shutdown work as of 1/21/21.
BEFORE:
AFTER:
17 HEADS $40.50 8 HOURS = $5,508 Per Shift
3 occurrences resulted in Stamping having to run Production on 3 Saturdays to make
up lost time.
TOTAL $16,524
6-PANEL
 Replication: Where else in the Area or Plant can this be
replicated?
D M A I R
REPLICATE
C
 This is a replication project that was developed jointly with Stamping
Engineering, DSP and KSP.
 DSP and KSP have partially implemented.
 KCISP will move forward with P2 as required.
6-PANEL
Appendix
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
 Process
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
New Design Old Design
 Key Process Input Variable #X1: Die Location Bolster Pin System
6-PANEL DEFINE VOICE OF THE CUSTOMER
D M A I C R
Bolster Pin New Style Bolster Sleeve Hardened Inserts
Revised Die Location Bolster Pin System
 Key Process Input Variable #X1: Die Location Bolster Pin System
Hardened inserts allow tighter tolerances
and reduce location errors.

More Related Content

Similar to Die locator Pin Six-Sigma Project

Six sigma - dmr tilt table - matthew hunt
Six sigma  - dmr tilt table - matthew huntSix sigma  - dmr tilt table - matthew hunt
Six sigma - dmr tilt table - matthew hunt
Matthew Hunt
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
J. García - Verdugo
 
G.C.D_Co._Profile
G.C.D_Co._ProfileG.C.D_Co._Profile
G.C.D_Co._Profile
db
 
ADVB
ADVBADVB
Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
jfjohnson6
 
Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016
seeedstudio
 
Low Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created EqualLow Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created Equal
Epec Engineered Technologies
 
Nelson-Miller Sales Presentation - 100715
Nelson-Miller Sales Presentation - 100715Nelson-Miller Sales Presentation - 100715
Nelson-Miller Sales Presentation - 100715
Jim Kaldem
 
THREEGON
THREEGONTHREEGON
THREEGON
scottfong
 
RPWORLD On-demand Manufacturing.pdf
RPWORLD On-demand Manufacturing.pdfRPWORLD On-demand Manufacturing.pdf
RPWORLD On-demand Manufacturing.pdf
zhanjim40
 
Cirexx International
Cirexx InternationalCirexx International
Cirexx International
mhite
 
Kontro Quarterly 1Q 2020
Kontro Quarterly 1Q 2020Kontro Quarterly 1Q 2020
Kontro Quarterly 1Q 2020
Brent Keeter
 
The Savoy Story
The Savoy StoryThe Savoy Story
The Savoy Story
marcus mccoy
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
Kanissh GK
 
Design for Zinc Die Casting
Design for Zinc Die CastingDesign for Zinc Die Casting
Design for Zinc Die Casting
niucki1
 
Vincent LaManna Resume/Portfolio
Vincent LaManna Resume/PortfolioVincent LaManna Resume/Portfolio
Vincent LaManna Resume/Portfolio
Vince LaManna
 
Cirexx International Presentation
Cirexx International PresentationCirexx International Presentation
Cirexx International Presentation
liammorris
 
2) Brochure Davies Molding Company (6pg) 2013
2) Brochure Davies Molding Company (6pg) 20132) Brochure Davies Molding Company (6pg) 2013
2) Brochure Davies Molding Company (6pg) 2013
Derran Smith
 
Grenville Castings New Brochure
Grenville Castings New BrochureGrenville Castings New Brochure
Grenville Castings New Brochure
Joe Clements
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6Officedesigncontinue
Christopher Baker
 

Similar to Die locator Pin Six-Sigma Project (20)

Six sigma - dmr tilt table - matthew hunt
Six sigma  - dmr tilt table - matthew huntSix sigma  - dmr tilt table - matthew hunt
Six sigma - dmr tilt table - matthew hunt
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
 
G.C.D_Co._Profile
G.C.D_Co._ProfileG.C.D_Co._Profile
G.C.D_Co._Profile
 
ADVB
ADVBADVB
ADVB
 
Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
 
Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016
 
Low Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created EqualLow Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created Equal
 
Nelson-Miller Sales Presentation - 100715
Nelson-Miller Sales Presentation - 100715Nelson-Miller Sales Presentation - 100715
Nelson-Miller Sales Presentation - 100715
 
THREEGON
THREEGONTHREEGON
THREEGON
 
RPWORLD On-demand Manufacturing.pdf
RPWORLD On-demand Manufacturing.pdfRPWORLD On-demand Manufacturing.pdf
RPWORLD On-demand Manufacturing.pdf
 
Cirexx International
Cirexx InternationalCirexx International
Cirexx International
 
Kontro Quarterly 1Q 2020
Kontro Quarterly 1Q 2020Kontro Quarterly 1Q 2020
Kontro Quarterly 1Q 2020
 
The Savoy Story
The Savoy StoryThe Savoy Story
The Savoy Story
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
 
Design for Zinc Die Casting
Design for Zinc Die CastingDesign for Zinc Die Casting
Design for Zinc Die Casting
 
Vincent LaManna Resume/Portfolio
Vincent LaManna Resume/PortfolioVincent LaManna Resume/Portfolio
Vincent LaManna Resume/Portfolio
 
Cirexx International Presentation
Cirexx International PresentationCirexx International Presentation
Cirexx International Presentation
 
2) Brochure Davies Molding Company (6pg) 2013
2) Brochure Davies Molding Company (6pg) 20132) Brochure Davies Molding Company (6pg) 2013
2) Brochure Davies Molding Company (6pg) 2013
 
Grenville Castings New Brochure
Grenville Castings New BrochureGrenville Castings New Brochure
Grenville Castings New Brochure
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6Officedesigncontinue
 

Recently uploaded

Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Forth
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
MODULE ONE PRPC19 Design of Machine Elements- 1 .pdf
MODULE  ONE PRPC19 Design of Machine Elements- 1 .pdfMODULE  ONE PRPC19 Design of Machine Elements- 1 .pdf
MODULE ONE PRPC19 Design of Machine Elements- 1 .pdf
ShanthiniSellamuthu
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Forth
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
wstatus456
 
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdfRACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
xmasmen4u
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Forth
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
g1inbfro
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Forth
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
Forth
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
aichamardi99
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
afkxen
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
Blue Star Brothers
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
vaibhavsrivastava482521
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 

Recently uploaded (20)

Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
MODULE ONE PRPC19 Design of Machine Elements- 1 .pdf
MODULE  ONE PRPC19 Design of Machine Elements- 1 .pdfMODULE  ONE PRPC19 Design of Machine Elements- 1 .pdf
MODULE ONE PRPC19 Design of Machine Elements- 1 .pdf
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
 
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdfRACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
RACI Matrix Managed Services on Cloud 08-11-19_AS.pdf
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 

Die locator Pin Six-Sigma Project

  • 1. KCISP SIX-SIGMA COST PANEL Location: Press Line #1 Project: Die Set Die Location
  • 2. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R Team Members:  Todd Beck, Team Leader Press  Tim Lemka, Team Leader Press  Andy Gray, Team Leader Press  James Whaley, Process Coach  William Spicer, Process Coach  Roderick Howard, Process Coach  Ivy Poole and Warren Decker, Die Setters  Scott Boylan and Randy Gorham, Die Setters  Dylan Jones and Robert Oates, Die Setters  Matthew Hunt & Bill Hodges, Project Leader  Todd Zellak, Project Owner  Bill Hodges and Todd Zellak, Project Champions Project Location: Press Line 1 KCISP Project Completion Date: 1/28/2021 SIX-SIGMA PANEL
  • 3. 6-PANEL PROBLEM STATEMENT During the Die Set process dies do not clamp properly as a result of die location errors resulting in locating pins breaking resulting in excessive DEFINE VOICE OF THE CUSTOMER D M A I C R VOICE OF THE CUSTOMER: Die Sets not clamping properly result in excessive downtime. CTQ/CTC STATEMENT (Critical To Quality/Cost - Customer Requirement): Die Set process must be completed in 6 minutes or less to maintain schedule. COST OF POOR QUALITY/COST: Extended die set time, process inefficiencies. 3 major occurrences in 2020 resulted in 140 minutes of downtime and potential to require an extra shift to catch up. SCOPE AND GOAL: Reduced die set location issues by 50%. Plant: KCISP Line: Stamping Press #1 Area: Stamping Press Part/Process Name: Die Set Process
  • 4. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R  Process
  • 5. 6-PANEL Method (Process) Environment Reduce die location related downtime 50% Manpower Material Machine - Gripper Crane - Level OIS Crane Operator D M A I C R MEASURE  KPOV and KPIVs – Cause & Effect Diagram - Bolsters Gripper Crane Operators WDX Locator Pin System Standards X1 Key Process Input Variables: In Y = f(X) X1 = Revise WDX Standards Die Locating Pin System
  • 6. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R New Design Old Design  Key Process Input Variable #X1: Die Location Bolster Pin System Bolster pin engagement to 50mm from 25 mm increases robustness of process
  • 7. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R B1 14 holes B2 14 Holes B3 16 holes B4 14 holes Bolster holes drilled out and hardened inserts Installed C and D sides  Key Process Input Variable #X1: Die Location Bolster Pin System
  • 8. 6-PANEL D M A I C R ANALYZE & IMPROVE  Key Process Input Variable #X1: Die Location Bolster Pin System YTD (10/22) 140 minutes 0 die location failures since shutdown work as of 1/21/21. BEFORE: AFTER: 17 HEADS $40.50 8 HOURS = $5,508 Per Shift 3 occurrences resulted in Stamping having to run Production on 3 Saturdays to make up lost time. TOTAL $16,524
  • 9. 6-PANEL  Replication: Where else in the Area or Plant can this be replicated? D M A I R REPLICATE C  This is a replication project that was developed jointly with Stamping Engineering, DSP and KSP.  DSP and KSP have partially implemented.  KCISP will move forward with P2 as required.
  • 11. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R  Process
  • 12. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R
  • 13. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R New Design Old Design  Key Process Input Variable #X1: Die Location Bolster Pin System
  • 14. 6-PANEL DEFINE VOICE OF THE CUSTOMER D M A I C R Bolster Pin New Style Bolster Sleeve Hardened Inserts Revised Die Location Bolster Pin System  Key Process Input Variable #X1: Die Location Bolster Pin System Hardened inserts allow tighter tolerances and reduce location errors.