This document summarizes a Six Sigma project to reduce die set location issues on Press Line #1. The problem was that dies were not clamping properly during die set due to location errors, breaking locating pins and causing downtime. The team revised the die location bolster pin system by extending the pin engagement and adding hardened inserts to bolster holes. This solved the problem, eliminating die location failures and associated downtime since implementation in January 2021. The goal of reducing die set location issues by 50% was achieved.