COVERING LETTER
Dear Sir,
I would like to take this opportunity to tell you a little about myself, and
why I feel that I can be a valuable asset to your organization if given the
chance.
A s p a r t o f m y E n g i n e e r i n g d e g r e e , I s p e c i a l i z e d i n t h e f i e l d o f
Mechanical Engineering (MEP). I have a firm background in this field
and have a strong desire to work in the same, thereby keep expanding
my know le dg e in t he fie ld of bu ilding a nd const r u ct ion. I a m a n
independent and extremely passionate of Mechanical engineering with a
natural aptitude for it.
I have obtained some good experience working with large national
companies dealing with MEP designing & errection, I am looking to
pursue a career with an organization where I can utilize experience
to the fullest, An organization which also allows me to grow both
technically and professionally. I truly believe that you can offer me just
that opportunity.
I have included my resume with this letter for your review. Thank you
for your time and consideration.
Yours Sincerely,
SYED JAMALUDDIN KHALID
Contact :0556431810
SYED JAMALUDDIN KHALID (B.tech Mechanical )
E-mail :engjamaluddin@gmail.com
:Contact no -0556431810
OBJECTIVE
Seeking a challenging position as a MECHANICAL ENGINEER (MEP) best utilizing my
experience, technical ability, analytical & problem solving skills, and team-playing orientation.
SUMMARY
• Mechanical Engineer with 9 years experience in MEP field.
• Excellent skills & sound experience in MEP.
EDUCATION QUALIFICATION.
B.Tech. (Mechanical Engineering) I division. April2002-April2006
Jawaharlal Nehru Technological University,
Hyderabad,Andhra Pradesh, INDIA..
ADDITIONAL QUALIFICATIONS
• Undergone training in Repair and Maintenance of Air-conditioners at Advance Training Institute (ATI) Govt.
of India, Hyderabad.
• Undergone training in HVAC systems at Institue of HVAC Engineers, Hyderabad.
SOFTWARE AWARENESS:
• AutoCAD – Latest version.
• HAP (Heat Load, Equipment Selection, Estimation, Duct Design Modules)
• C ,C++,MS office Excel
AREAS OF EXPERTISE
An Astute professional with functional experience in Project / Site management, Resource planning,
Value engineering and Utilities in Mechanical Electrical and building services. Experience in Design,
Installation & Testing and Commissioning of MEP services. A dept in planning, executing and spearheading
MEP projects involving engineering, co-ordination, strategy development, contract administration, resource
planning with a flair for adopting modern methodologies/innovations in compliance to quality standards.
Experience in Heat Load Calculation, Duct Designing, Fans/AHU/FCU External Static Pressure Calculation,
Pump Head Calculation, Equipment Selection etc. Installation of airside systems including Testing,
Balancing and Commissioning.Erection of Chillers, Chilled water pumps, Air Handling Units and related
equipment.
CAREER HISTORY
GHANTOOT GULF CONTRACTING, ABU DHABI - MEP PROJECTS ENGINEER
DURATION 2008 – Up to present.
DUTIES AND RESPONSIBILITIES:
 Making the building survey and mobilizing the site.
 Reviewing the tender/design and submitting shop drawings, technical submittals in compliance with
contract drawings and project specifications.
Reviewing any design changes and preparing for approvals and variations.
 Estimating the total quantity of materials and making the BOQ (Bill of Quantities) and costing the
projects.
 Preparing method statements for installation of works, co-ordinate with main contractor, other sub-
contractors and consultants.
 Selection of all equipment’s as per specifications and drawings provided by Consultants.
Responsible for finalizing and ordering of all mechanical equipment’s and materials.
Preparation of Material submittal and Shop drawing and obtaining Consultant’s approvals.
 Preparing and submittal of materials, equipment’s and taking approvals from the consultants.
Project planning, detail designing, and concepts on time, on budget, and per quality goals.
 Attending meetings with clients, architectures, consultants and managers regarding progress, co-
ordination, changes in drawings and for various updates.
 Ensure that all work at site is done according to approved shop drawings and procedures followed
by quality and safety aspects.
 Making Inspection with consultants and clients for work done and taking approvals.
 Duct designing as per SMACNA & ASHRAE standards.
 Aware of all ASHRAE, local and international standards.
Field Knowledge of HVAC, Drainage, Water supply, Firefighting and BMS works.
 Responsible for material requirement followed by bill of quantity (BOQ) and submission of
measurements and quantity of material used in projects.
 Finalizing the material as per standards specifications, calculation of total cost of projects &
recommended budgets.
 Preparing work schedules, assigning duties to sub-ordinates and labour management.
Co-ordination with other MEP and Civil works etc.
 Involve in preparation of as built drawings, O&M manuals and all handing over submittals.
 Testing and Commissioning of works followed by air balancing and water balancing.
PROJECTS IN-PROGRESS
Project : AL SHAHAMA RESIDENCE 20, G+3 +R Residence Building + Common
Basement and 44 G+1+R Town Houses (Pre cast Under Estidama Pearl rating 1)
 Title : MEP Project Engineer.
 Client : ALI Mohammed Sadiq AL Baloshi (CHAIRMAN GHANTOOT GROUP)
 MEP Consultant : Pioneer engineer Consultants Abu Dhabi.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions
 PROJECT : MEENA TOWER 3B+G+5p+17+R
 Title : MEP Project Engineer.
 Client : Ali Mohammed Sadiq AL Baloshi (CHAIRMAN GHANTOOT GROUP)
 MEP Consultant : Pioneer engineering Consultants Abu Dhabi
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions
 PROJECT : CENTURION RESIDENCE DIP 2 Dubai ( B+G+5 residence
building)
 Title : MEP Project Engineer.
 Client : Royal Centurion Holdings.
 Consultant : ADCC.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions 
PREVIOUSLY PARTICIPATED PROJECTS:
 Project : C.B.D Dubai International City 29 Buildings G+6+R.
 Duration : July2008 to Sep2010.
 Title : Sr. MEP Engineer.
 Client : Limitless
 MEP Consultant : ECG.Consultants.
 Main Contractor : GHANTOOT GULF CONTRACTING.
 Project : 8 residential buildings at Al Samha Abu Dhabi
 Title : MEP Project Engineer (HVAC, Plumbing & BMS).
 Client : Mohammed Mana Al baloshi (Director Ghantoot Road divisions)
 MEP Consultant : EMIRAL Engineering Consultants.
 Main Contractor : Ghantoot Gulf Contracting.
 MEP Contractor : Ghantoot MEP divisions (In-house project)
 Project : 22 Luxary villas at Al Samha Abu Dhabi
 Title : MEP Project Engineer.
 Client : Ali Mohammed Sadiq Al Baloshi (Chairman Ghantoot Group)
 MEP Consultant : EMIRAL Engineering Consultants.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions
 Project : Labor Camp (Mafrak I cad) Abu Dhabi
 Title : MEP Project Engineer.
 Client : M/S Ghantoot Group.
 MEP Consultant : EMIRAL Engineering Consultants.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions
 Project : Foot Ball Pitch Facility building (Emirates palace Hotel Abu Dhabi.)
 Title : MEP Project Engineer-HVAC (HVAC, Fire Protection & BMS).
 Client : Emirates Palace Company.
 MEP Consultant : K.E.O International consultants.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi..
 MEP Contractor : Ghantoot MEP divisions
 Project : Private Luxury at Villa Lewa Palace (H.H SHEIKH HAMDAN BIN ZAYED)
 Title : MEP Project Engineer.
 Client : Al Ain Properties.
 MEP Consultant : HEBERGER Engineering Consultant.
 Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.
 MEP Contractor : Ghantoot MEP divisions
PERSONAL INFORMATION
 Gender : Male
 Marital Status : Married
 Date of Birth : 2nd APR 1982
 Nationality : Indian
 Languages : English, Urdu, Hindi, Telugu, basic Arabic
 Passport No : L 4582536
 Date of Issue : 12/9/2013
 Date of Expiry : 11/9/2023
 Place of Issue : Hyderabad TELANGANA.
 Visa status : Residential Visa
 Driving license : Holding a valid U.A.E driving license.
REFERENCE:
 Available on Request.
 Marital Status : Married
 Date of Birth : 2nd APR 1982
 Nationality : Indian
 Languages : English, Urdu, Hindi, Telugu, basic Arabic
 Passport No : L 4582536
 Date of Issue : 12/9/2013
 Date of Expiry : 11/9/2023
 Place of Issue : Hyderabad TELANGANA.
 Visa status : Residential Visa
 Driving license : Holding a valid U.A.E driving license.
REFERENCE:
 Available on Request.

CV_Mechanical Engineer

  • 1.
    COVERING LETTER Dear Sir, Iwould like to take this opportunity to tell you a little about myself, and why I feel that I can be a valuable asset to your organization if given the chance. A s p a r t o f m y E n g i n e e r i n g d e g r e e , I s p e c i a l i z e d i n t h e f i e l d o f Mechanical Engineering (MEP). I have a firm background in this field and have a strong desire to work in the same, thereby keep expanding my know le dg e in t he fie ld of bu ilding a nd const r u ct ion. I a m a n independent and extremely passionate of Mechanical engineering with a natural aptitude for it. I have obtained some good experience working with large national companies dealing with MEP designing & errection, I am looking to pursue a career with an organization where I can utilize experience to the fullest, An organization which also allows me to grow both technically and professionally. I truly believe that you can offer me just that opportunity. I have included my resume with this letter for your review. Thank you for your time and consideration. Yours Sincerely, SYED JAMALUDDIN KHALID Contact :0556431810
  • 2.
    SYED JAMALUDDIN KHALID(B.tech Mechanical ) E-mail :engjamaluddin@gmail.com :Contact no -0556431810 OBJECTIVE Seeking a challenging position as a MECHANICAL ENGINEER (MEP) best utilizing my experience, technical ability, analytical & problem solving skills, and team-playing orientation. SUMMARY • Mechanical Engineer with 9 years experience in MEP field. • Excellent skills & sound experience in MEP. EDUCATION QUALIFICATION. B.Tech. (Mechanical Engineering) I division. April2002-April2006 Jawaharlal Nehru Technological University, Hyderabad,Andhra Pradesh, INDIA.. ADDITIONAL QUALIFICATIONS • Undergone training in Repair and Maintenance of Air-conditioners at Advance Training Institute (ATI) Govt. of India, Hyderabad. • Undergone training in HVAC systems at Institue of HVAC Engineers, Hyderabad. SOFTWARE AWARENESS: • AutoCAD – Latest version. • HAP (Heat Load, Equipment Selection, Estimation, Duct Design Modules) • C ,C++,MS office Excel AREAS OF EXPERTISE An Astute professional with functional experience in Project / Site management, Resource planning, Value engineering and Utilities in Mechanical Electrical and building services. Experience in Design, Installation & Testing and Commissioning of MEP services. A dept in planning, executing and spearheading MEP projects involving engineering, co-ordination, strategy development, contract administration, resource planning with a flair for adopting modern methodologies/innovations in compliance to quality standards. Experience in Heat Load Calculation, Duct Designing, Fans/AHU/FCU External Static Pressure Calculation, Pump Head Calculation, Equipment Selection etc. Installation of airside systems including Testing, Balancing and Commissioning.Erection of Chillers, Chilled water pumps, Air Handling Units and related equipment. CAREER HISTORY GHANTOOT GULF CONTRACTING, ABU DHABI - MEP PROJECTS ENGINEER DURATION 2008 – Up to present. DUTIES AND RESPONSIBILITIES:
  • 3.
     Making thebuilding survey and mobilizing the site.  Reviewing the tender/design and submitting shop drawings, technical submittals in compliance with contract drawings and project specifications. Reviewing any design changes and preparing for approvals and variations.  Estimating the total quantity of materials and making the BOQ (Bill of Quantities) and costing the projects.  Preparing method statements for installation of works, co-ordinate with main contractor, other sub- contractors and consultants.  Selection of all equipment’s as per specifications and drawings provided by Consultants. Responsible for finalizing and ordering of all mechanical equipment’s and materials. Preparation of Material submittal and Shop drawing and obtaining Consultant’s approvals.  Preparing and submittal of materials, equipment’s and taking approvals from the consultants. Project planning, detail designing, and concepts on time, on budget, and per quality goals.  Attending meetings with clients, architectures, consultants and managers regarding progress, co- ordination, changes in drawings and for various updates.  Ensure that all work at site is done according to approved shop drawings and procedures followed by quality and safety aspects.  Making Inspection with consultants and clients for work done and taking approvals.  Duct designing as per SMACNA & ASHRAE standards.  Aware of all ASHRAE, local and international standards. Field Knowledge of HVAC, Drainage, Water supply, Firefighting and BMS works.  Responsible for material requirement followed by bill of quantity (BOQ) and submission of measurements and quantity of material used in projects.  Finalizing the material as per standards specifications, calculation of total cost of projects & recommended budgets.  Preparing work schedules, assigning duties to sub-ordinates and labour management. Co-ordination with other MEP and Civil works etc.  Involve in preparation of as built drawings, O&M manuals and all handing over submittals.  Testing and Commissioning of works followed by air balancing and water balancing. PROJECTS IN-PROGRESS Project : AL SHAHAMA RESIDENCE 20, G+3 +R Residence Building + Common Basement and 44 G+1+R Town Houses (Pre cast Under Estidama Pearl rating 1)  Title : MEP Project Engineer.  Client : ALI Mohammed Sadiq AL Baloshi (CHAIRMAN GHANTOOT GROUP)  MEP Consultant : Pioneer engineer Consultants Abu Dhabi.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions  PROJECT : MEENA TOWER 3B+G+5p+17+R  Title : MEP Project Engineer.  Client : Ali Mohammed Sadiq AL Baloshi (CHAIRMAN GHANTOOT GROUP)  MEP Consultant : Pioneer engineering Consultants Abu Dhabi  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions  PROJECT : CENTURION RESIDENCE DIP 2 Dubai ( B+G+5 residence building)  Title : MEP Project Engineer.  Client : Royal Centurion Holdings.
  • 4.
     Consultant :ADCC.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions PREVIOUSLY PARTICIPATED PROJECTS:  Project : C.B.D Dubai International City 29 Buildings G+6+R.  Duration : July2008 to Sep2010.  Title : Sr. MEP Engineer.  Client : Limitless  MEP Consultant : ECG.Consultants.  Main Contractor : GHANTOOT GULF CONTRACTING.  Project : 8 residential buildings at Al Samha Abu Dhabi  Title : MEP Project Engineer (HVAC, Plumbing & BMS).  Client : Mohammed Mana Al baloshi (Director Ghantoot Road divisions)  MEP Consultant : EMIRAL Engineering Consultants.  Main Contractor : Ghantoot Gulf Contracting.  MEP Contractor : Ghantoot MEP divisions (In-house project)  Project : 22 Luxary villas at Al Samha Abu Dhabi  Title : MEP Project Engineer.  Client : Ali Mohammed Sadiq Al Baloshi (Chairman Ghantoot Group)  MEP Consultant : EMIRAL Engineering Consultants.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions  Project : Labor Camp (Mafrak I cad) Abu Dhabi  Title : MEP Project Engineer.  Client : M/S Ghantoot Group.  MEP Consultant : EMIRAL Engineering Consultants.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions  Project : Foot Ball Pitch Facility building (Emirates palace Hotel Abu Dhabi.)  Title : MEP Project Engineer-HVAC (HVAC, Fire Protection & BMS).  Client : Emirates Palace Company.  MEP Consultant : K.E.O International consultants.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi..  MEP Contractor : Ghantoot MEP divisions  Project : Private Luxury at Villa Lewa Palace (H.H SHEIKH HAMDAN BIN ZAYED)  Title : MEP Project Engineer.  Client : Al Ain Properties.  MEP Consultant : HEBERGER Engineering Consultant.  Main Contractor : Ghantoot Gulf Contracting Abu Dhabi.  MEP Contractor : Ghantoot MEP divisions PERSONAL INFORMATION  Gender : Male
  • 5.
     Marital Status: Married  Date of Birth : 2nd APR 1982  Nationality : Indian  Languages : English, Urdu, Hindi, Telugu, basic Arabic  Passport No : L 4582536  Date of Issue : 12/9/2013  Date of Expiry : 11/9/2023  Place of Issue : Hyderabad TELANGANA.  Visa status : Residential Visa  Driving license : Holding a valid U.A.E driving license. REFERENCE:  Available on Request.
  • 6.
     Marital Status: Married  Date of Birth : 2nd APR 1982  Nationality : Indian  Languages : English, Urdu, Hindi, Telugu, basic Arabic  Passport No : L 4582536  Date of Issue : 12/9/2013  Date of Expiry : 11/9/2023  Place of Issue : Hyderabad TELANGANA.  Visa status : Residential Visa  Driving license : Holding a valid U.A.E driving license. REFERENCE:  Available on Request.