Malawi
- 1. Name of Project Description of Work
Construction
Period
Project for the
Reconstruction of
Mainroad 5 Bridges
between Balaka and
Salima
Angoni Culvert: 4 continuous box
culvert: L=22.4m, W=16m, Revetment:
gabion, Nankokwe Bridge: substructure
work: cast-in placed piles ø1,200mm,
L=18.5 - 19.0 m, 1 pier, 2 abutments,
Superstructure work: post-tensioned
PC T-girder, L=42m, W=9.1m,
Revetment: gabion, Luwadzi Bridge:
Superstructure work: cast-in-placed
piles: ø1,200mm, L=13.0 - 14.0m, 2
abutments, 1 pier, Superstructure work:
post-tensioned PC, T-girder, L=50.0m,
W=9.1m, Revetment: gabion
2006-2007