Name of Project Description of Work
Construction
Period
Project for the
Reconstruction of
Mainroad 5 Bridges
between Balaka and
Salima
Angoni Culvert: 4 continuous box
culvert: L=22.4m, W=16m, Revetment:
gabion, Nankokwe Bridge: substructure
work: cast-in placed piles ø1,200mm,
L=18.5 - 19.0 m, 1 pier, 2 abutments,
Superstructure work: post-tensioned
PC T-girder, L=42m, W=9.1m,
Revetment: gabion, Luwadzi Bridge:
Superstructure work: cast-in-placed
piles: ø1,200mm, L=13.0 - 14.0m, 2
abutments, 1 pier, Superstructure work:
post-tensioned PC, T-girder, L=50.0m,
W=9.1m, Revetment: gabion
2006-2007
Malawi

More Related Content

Viewers also liked (10)

MPL Digital Marketing Local Buzz PowerPoint
MPL Digital Marketing Local Buzz PowerPointMPL Digital Marketing Local Buzz PowerPoint
MPL Digital Marketing Local Buzz PowerPoint
 
Events wc 1 June 2015
Events wc 1 June 2015Events wc 1 June 2015
Events wc 1 June 2015
 
NCAA Division II Athletic Administrator Career Motivation
NCAA Division II Athletic Administrator Career MotivationNCAA Division II Athletic Administrator Career Motivation
NCAA Division II Athletic Administrator Career Motivation
 
Señora del Adviento
Señora del AdvientoSeñora del Adviento
Señora del Adviento
 
вислови у слові вічність
вислови у слові вічністьвислови у слові вічність
вислови у слові вічність
 
Ratecard Media Planning & Buying
Ratecard Media Planning & BuyingRatecard Media Planning & Buying
Ratecard Media Planning & Buying
 
Public Art Presentation-Secondary Education PowerPoint
Public Art Presentation-Secondary Education PowerPointPublic Art Presentation-Secondary Education PowerPoint
Public Art Presentation-Secondary Education PowerPoint
 
Carteles de adviento
Carteles de advientoCarteles de adviento
Carteles de adviento
 
Santos ficha infantil
Santos ficha infantil Santos ficha infantil
Santos ficha infantil
 
APRO Software
APRO SoftwareAPRO Software
APRO Software
 

Malawi

  • 1. Name of Project Description of Work Construction Period Project for the Reconstruction of Mainroad 5 Bridges between Balaka and Salima Angoni Culvert: 4 continuous box culvert: L=22.4m, W=16m, Revetment: gabion, Nankokwe Bridge: substructure work: cast-in placed piles ø1,200mm, L=18.5 - 19.0 m, 1 pier, 2 abutments, Superstructure work: post-tensioned PC T-girder, L=42m, W=9.1m, Revetment: gabion, Luwadzi Bridge: Superstructure work: cast-in-placed piles: ø1,200mm, L=13.0 - 14.0m, 2 abutments, 1 pier, Superstructure work: post-tensioned PC, T-girder, L=50.0m, W=9.1m, Revetment: gabion 2006-2007