Chapter 1 bears over all
e.g responsibility for
Operator oil company
drilling operation
engage
to locate
area of Geologist
interest
I hire
If drilling
consultant
hire landman
to acquire hire drilling
rights contractors to do the actual
1 drilling
maintain rigs
equipments
contract Day rate
type
contractor
provides
rigs
personnel
Turnkey
contractor
to provide
Well design
rigs
personnel
consumables
Drilling Process
i
Budgeting ii
Planning iii Design
well specs tf obj Construct well plan
Well Team completed
data acquisition x
Goals HFE
budget cost worksheet Geological Submitted
Prognosis
rig scheduling Well plan
Well obj approved
finalized n approved
ggg
Execution Optimization
Spud well Drilling program
ost Drill Analysis completed
Complete
Drilling program
Test PbA applied
Handover to Prod pre Spud
meeting
Steps in drilling OIG
obtain seismicLog
obtain concession
calculate reserve
4 if high proceedwith
obtain permitfrom Gov
We
preparedrilling completion program
ask for bidsfromdrillingcontractors
on i Footage
Day
work
if required modifydrilling programme
construct roads location1
platformsfor access
conduct prespud meeting
further modification if necessary
drillwell
Types of wells
i exploration well ii appraisal well
wildcat well to test
drilled during initial economic
Phase of exploration viability
commerciability
to determine presence
conducted through various
of H C obtain Gnq
well test through combustion
datds of oil from oil produced
production potential
fluid samples
N Development Well Prod Well
L drilled in proved production field area to extract HC
iv Abandonment well
Lif no HE is found 0 wells need to be closed
I to avoid env impact
during explappraisal
V Re entry recompletion
for sidetracking deepening
Driving
Vertical for drilling straight down for shallow
Techniques
common during early days
land
Horizontal drilling horizontally to reach
target 2 one
drill to penetrate reservoir at
a shallow angle
F 7 or
Vertical Horizontal
to expose more of low permeability
reservoir to the wellbore
Well well
ex Frac
Directional process of directing wellbore
along a
trajectory to a predetermined
target
implement on off shore fixer
dg
platform
Application major surface obstruction
re use of old wells to explore new oil
relief well to control blow out
Drilling Operations Personnel
45
company representative
yd
Senior on
rig
nyman
Operating a
drilling
Icompa ensure drilling
company roles operation is run
Supervisor as planned
background
ie
intenetrents
ign.gl
5 10years DrillingExp
An
To
conduct preliminary studies
estimate well duration cost
DrillingEng
during initial prospect evaluation
me
no Authority for Expenditure
FEs are approved
To design coordinate b monitor overall
well program
0 managing rig side people
Why they must work with Geologist
develop understanding of
drilling Geology
0
identify anomalies during operations
Estimate expected Ppore 4 fracture gradient
Selecting casing sizes 4setting depths
0 Develop drilling mud program
o Prepare drilling OP
Drilling main personnel
Contractor
l Senior Tool Pusher Rig Manager
0 coordinates drilling
Toolpusher contractor's function
other
inrighffidaeseotwith
on
riot
sagging
key company man 0 main contact with
ersonnels supervisor
0 a
Drilling crew 0 Subsea Engineer
Engineering crew 0 Medics
Marine crew 0 Radio Operator
Driller operate Pumps draw works via driller
Drilling rotary table console
Crew Derrickman work 90ft above
rig floor
on derrick
handle sections of drill pipe
Pumpman assist devickman f responsible for
maintenance 1 smooth
Roug neck operation of mud pump
low ranking member of drilling crew
works on
rig floor
I
Macintewnancelottnegidnfefnance
controlacYiginiteensance scheduling
In charge of all maintenance
operations on the rigs
Rig Electrician maintenance 1 repairs
electrical equipment
RigMechanic
maimntennaan.EE earueipanirenIt
Motorman maintenance
todrilldev well
ganchovis
Used
from1 location to fix position
immobile towedlselfpropelled
Gps
L
Tf e se of
pontoons
to control
G 12ft 2400ft I buoyancye
245009
710,000 79000ft
Classifications power jelectric grid
used pneumatic
of
rigs mechanical diesel
hydraulic
Pipe used conventional
cable
CoitTubing
Height single
double
triple
Pipe rack
quad
Rotary
system no rotation
Position
rotary table
of top drive
derrick
conventional
slant
Drilling Process i Power Gen System
Subsystem Hoisting System
111
Circulating System
iv Rotary system
v Well control system
vi Data acquisition by
monitoring system
Rig Components is Derrick provide vertical height rea
for raisingtowering drill string
o
Travelling crownblock drilling line
Block Tackle
Travellingblock
T
control centre from which
Drawworks driver operates the rig
provide hoisting 1 braking
power req to raiseflower
heavystrings of the pipe
drum ofthedraw
works is
connected to the electric
motorisgearing system
Drilling Process
Subsystem
Hoisting System
To lower raise
drillstrings casing string
other sS equipments
out of hole
crown block
fit
Draw
work wire
g
Fd
Wtf tf y
line
g
anch0
travelling
WL TEN
µ
hook storagereel
Tensile Load
Ff WIEN
Ff Ft Why
The tensile load will be
W total load
a function oftheinefficiency supported by lines lbs
N no of lines
Drilling Terms
making connection i Periodic process of adding newjoints of drillpipe to
the drill
string
making trip taking the drill
string out of hole to change bitlatter BHA
lowering them backinto the hole
Steps raise Kelly above rotary table set slips
Rig Power System
Transmitted via
Y
mechdrivers ACDC
rectifier Major components
in cnn.im
i imi
Avg Total
arotarytable
Prime power
1000 3000hp
from electric
Movers Internal combustion or power supply
diesel engines from existing power
line
Rotary
Power To
Vertical Hole
Drilling
they L Torque 15kA lbs
t.ni.ec IneaiiIiITng
T
Input Power L Torque 80left lbs
P QgH Power 100
hp
2545
Output Power
PislnputPower
hp Po
ZANT
Eff 11 1001
Qf Rateoffuel 53,000
pi
consumption Clbs hr Pos OutputPower hp
H heating value N EngineRotarySpeed rpm
I OutputTorque ft lbs
i StaticTension in fast line when
upward motion is impending
seflitfirnifsiunitable
Max hook up hoisting speed derrick load
Drilling Rigs
µ actual derrick todd
iv Derrick efficiency factor
example load 300lb Ns 8
hp 500hp E O841
i Static Tension Line in Fastline when upward motion is
impending
Ffs Yg 381,900cg
s 44,590lbf
II Chak hook horsepower ill Max hoisting speed
Ph E Pi O841 500 th Py
W
4205h17
420.5
Xp153,000ft Im
Thus time req to pull 90ft Stand is
300,00
rebff
t 90ft
t.tt mih
I9 min 46.3flymin
The actual derrick load is givenby
Fds l
tfµtEN W I
tagYµtcffHC8
1300,000
382,890 lbf
Max eq load
Fde
Nµt4 w 8g4 zoo ooo
450,000lbf
Derrick eff factor
Ed
Fff
382,0
90 0.849 84.9 1
480,000
Rotating Swivel support weight of drill
string
System is permits rotation
Kelly Square hexagonal shaped for easy gripping
Torque is transmitted through Kelly bushing
flips used to prevent drillstring from falling
RotaryDrive Provide power to turn rotary table
Drillpipe specified by a Outer Diameter c Steel grade
b Weight
Hoot d range length
Drillcollar
Thick walled heavy steel pipe used to apply
the
weight on bit wops
7 swivel
rotary
ke d 0 rotation of the drillstring is enabled vid
table Kellybashing a hexagonal section of the pipe Kelly
I T 1 which is 15M long located in
p
the rotary table
I l
y lecap
o dP b D C r referred to as tubular
in
collar manually operated tongs u used to makeup
b break out the drill
strings
drill
bit
Drill Bit usually becomes dull after 5 25 hrs of operatio
48 Factors in i composition of formation drilling
selecting hardness of formation parameters
Cutting action is supported by powerful jets of
drilling fluid which r discharged under high P
through nozzles located at the side of the bit
I f t a good drillbit should provides
I longest working life lowest cost 1ft
I of hole drilled
FYI good 12PM
drill t Rate of penetration CROP depends on
bit
ppm Hydraulic Eff
Mud properties W O B
Types i Roller cone features used in soft very hard
formations
bearings
gauge protection
Isoellafred Fain
small large diameter
journal conventional b extended
types a ChilledTooth
jet bits
Selection based on formation
hardness
oIADC series 1 soft medium oIADC series 2 medium ha
romeekchoauntitsing
Gauging romeekchoauntitsing
scraping
oIADC series 5 hard
Very hard
rock cutting Chiselling
mechanism
b Insert Drill bit available in 5 series
no 4 8
for very hard formations
romcekefauntitsinmg Chipping b
crushing
ii PDC polycrystalline Diamond compact
gives better R.o.plfitted with diamonds
longer life
suitability for drilling at high RPM
DrillString
I Kelly hexagonal
Aquare
Components 40ft
154ft in length
attached to a swivel fits into a
matching slot in therotarytable
I Function to transmit rotation 4 weight
drill to the drillbit
pipe
sina.e.s.e.m.ie
me iiiring
hollow to allow fluids transmitting lines
to pass through
27ft a30ft pipe
D Drillcollar Thick wall heavy length of pipe
keep drillstring in tension
Stabilizer hold increase 1decrease hole angle
stabilize
g
Mud Circulating mud is continuously circulated down the
System drillstring out through the nozzle in the
bit back to the surface through the
annulus
application Clean rock cuttings
in the borehole
exert Phyd which prevents
formation fluid fromentering
the borehole
ensure stability of hole
form mud cake
cool the bit
in some configuration helps move the motor
to turn the bit
rotary hose drillstring is
turned at
swivel the surface
Pump 11T l 0 Which turn
ShaleShaker
o
the bit
IT annulus
f if no 11 drilling
niacin
t.li niii
i
gfJ
io n.m
c
Drill o n
bit tothe
µ 1 jet nozzle
surface in the
l typical Vol req 100bbl where bit
1 they r
60bbl removed
normal Teethgrinds
7 718 in hole 8000ft rocks into
fragments
mud pumps
duplex
reciprocating RD PUMP
triplex
Duplexpumps two liners Triplexpumps 3 liners
forwaylgrtkbeagkward forward strokes
No of cylinders dualacting
single acting
He 2Di Dr rod
4
Diameter ILD Ls Nc
length pigtfanmeter
ofstroke
Actual Vol Va Vi Eu or Qa c Ev
Pump rating Max delivery PqQ
Hydraulic
Power
P Q
Hhp PI
1714
further
Well Control Function Preventa flow of formation flui
System into wellbore during kick
I by
fbadonifponent
shutting in well surface
IBOP Il controlling removal of formation
fluid
pump mud with higher p
tripping dp in p out of hole
ftp.neyleanfeu employs a synthetic rubber
ring that inflates during
well shut off
RamPreventers
L pipe rams
ftp.fneing
OD of Close off
Dp annular
space
between
dplcasin
Shear Rams Blind rams
designed to cut Lused when no dP
off the r inside the hole
d p
me
t R

CV KEREN INDONESIA DLWANDLKAWNDLKAWNDLADMSNDSO

  • 1.
    Chapter 1 bearsover all e.g responsibility for Operator oil company drilling operation engage to locate area of Geologist interest I hire If drilling consultant hire landman to acquire hire drilling rights contractors to do the actual 1 drilling maintain rigs equipments contract Day rate type contractor provides rigs personnel Turnkey contractor to provide Well design rigs personnel consumables
  • 2.
    Drilling Process i Budgeting ii Planningiii Design well specs tf obj Construct well plan Well Team completed data acquisition x Goals HFE budget cost worksheet Geological Submitted Prognosis rig scheduling Well plan Well obj approved finalized n approved ggg Execution Optimization Spud well Drilling program ost Drill Analysis completed Complete Drilling program Test PbA applied Handover to Prod pre Spud meeting Steps in drilling OIG obtain seismicLog obtain concession calculate reserve 4 if high proceedwith obtain permitfrom Gov We preparedrilling completion program ask for bidsfromdrillingcontractors on i Footage Day work if required modifydrilling programme construct roads location1 platformsfor access conduct prespud meeting further modification if necessary drillwell
  • 3.
    Types of wells iexploration well ii appraisal well wildcat well to test drilled during initial economic Phase of exploration viability commerciability to determine presence conducted through various of H C obtain Gnq well test through combustion datds of oil from oil produced production potential fluid samples N Development Well Prod Well L drilled in proved production field area to extract HC iv Abandonment well Lif no HE is found 0 wells need to be closed I to avoid env impact during explappraisal V Re entry recompletion for sidetracking deepening
  • 4.
    Driving Vertical for drillingstraight down for shallow Techniques common during early days land Horizontal drilling horizontally to reach target 2 one drill to penetrate reservoir at a shallow angle F 7 or Vertical Horizontal to expose more of low permeability reservoir to the wellbore Well well ex Frac Directional process of directing wellbore along a trajectory to a predetermined target implement on off shore fixer dg platform Application major surface obstruction re use of old wells to explore new oil relief well to control blow out
  • 5.
    Drilling Operations Personnel 45 companyrepresentative yd Senior on rig nyman Operating a drilling Icompa ensure drilling company roles operation is run Supervisor as planned background ie intenetrents ign.gl 5 10years DrillingExp An To conduct preliminary studies estimate well duration cost DrillingEng during initial prospect evaluation me no Authority for Expenditure FEs are approved To design coordinate b monitor overall well program 0 managing rig side people Why they must work with Geologist develop understanding of drilling Geology 0 identify anomalies during operations Estimate expected Ppore 4 fracture gradient Selecting casing sizes 4setting depths 0 Develop drilling mud program o Prepare drilling OP
  • 6.
    Drilling main personnel Contractor lSenior Tool Pusher Rig Manager 0 coordinates drilling Toolpusher contractor's function other inrighffidaeseotwith on riot sagging key company man 0 main contact with ersonnels supervisor 0 a Drilling crew 0 Subsea Engineer Engineering crew 0 Medics Marine crew 0 Radio Operator Driller operate Pumps draw works via driller Drilling rotary table console Crew Derrickman work 90ft above rig floor on derrick handle sections of drill pipe Pumpman assist devickman f responsible for maintenance 1 smooth Roug neck operation of mud pump low ranking member of drilling crew works on rig floor I Macintewnancelottnegidnfefnance controlacYiginiteensance scheduling In charge of all maintenance operations on the rigs Rig Electrician maintenance 1 repairs electrical equipment RigMechanic maimntennaan.EE earueipanirenIt Motorman maintenance
  • 7.
    todrilldev well ganchovis Used from1 locationto fix position immobile towedlselfpropelled Gps L Tf e se of pontoons to control G 12ft 2400ft I buoyancye 245009 710,000 79000ft Classifications power jelectric grid used pneumatic of rigs mechanical diesel hydraulic Pipe used conventional cable CoitTubing Height single double triple Pipe rack quad Rotary system no rotation Position rotary table of top drive derrick conventional slant
  • 8.
    Drilling Process iPower Gen System Subsystem Hoisting System 111 Circulating System iv Rotary system v Well control system vi Data acquisition by monitoring system Rig Components is Derrick provide vertical height rea for raisingtowering drill string o Travelling crownblock drilling line Block Tackle Travellingblock T control centre from which Drawworks driver operates the rig provide hoisting 1 braking power req to raiseflower heavystrings of the pipe drum ofthedraw works is connected to the electric motorisgearing system
  • 9.
    Drilling Process Subsystem Hoisting System Tolower raise drillstrings casing string other sS equipments out of hole crown block fit Draw work wire g Fd Wtf tf y line g anch0 travelling WL TEN µ hook storagereel Tensile Load Ff WIEN Ff Ft Why The tensile load will be W total load a function oftheinefficiency supported by lines lbs N no of lines Drilling Terms making connection i Periodic process of adding newjoints of drillpipe to the drill string making trip taking the drill string out of hole to change bitlatter BHA lowering them backinto the hole Steps raise Kelly above rotary table set slips
  • 10.
    Rig Power System Transmittedvia Y mechdrivers ACDC rectifier Major components in cnn.im i imi Avg Total arotarytable Prime power 1000 3000hp from electric Movers Internal combustion or power supply diesel engines from existing power line Rotary Power To Vertical Hole Drilling they L Torque 15kA lbs t.ni.ec IneaiiIiITng T Input Power L Torque 80left lbs P QgH Power 100 hp 2545 Output Power PislnputPower hp Po ZANT Eff 11 1001 Qf Rateoffuel 53,000 pi consumption Clbs hr Pos OutputPower hp H heating value N EngineRotarySpeed rpm I OutputTorque ft lbs i StaticTension in fast line when upward motion is impending seflitfirnifsiunitable Max hook up hoisting speed derrick load Drilling Rigs µ actual derrick todd iv Derrick efficiency factor
  • 11.
    example load 300lbNs 8 hp 500hp E O841 i Static Tension Line in Fastline when upward motion is impending Ffs Yg 381,900cg s 44,590lbf II Chak hook horsepower ill Max hoisting speed Ph E Pi O841 500 th Py W 4205h17 420.5 Xp153,000ft Im Thus time req to pull 90ft Stand is 300,00 rebff t 90ft t.tt mih I9 min 46.3flymin The actual derrick load is givenby Fds l tfµtEN W I tagYµtcffHC8 1300,000 382,890 lbf Max eq load Fde Nµt4 w 8g4 zoo ooo 450,000lbf Derrick eff factor Ed Fff 382,0 90 0.849 84.9 1 480,000
  • 12.
    Rotating Swivel supportweight of drill string System is permits rotation Kelly Square hexagonal shaped for easy gripping Torque is transmitted through Kelly bushing flips used to prevent drillstring from falling RotaryDrive Provide power to turn rotary table Drillpipe specified by a Outer Diameter c Steel grade b Weight Hoot d range length Drillcollar Thick walled heavy steel pipe used to apply the weight on bit wops 7 swivel rotary ke d 0 rotation of the drillstring is enabled vid table Kellybashing a hexagonal section of the pipe Kelly I T 1 which is 15M long located in p the rotary table I l y lecap o dP b D C r referred to as tubular in collar manually operated tongs u used to makeup b break out the drill strings drill bit
  • 13.
    Drill Bit usuallybecomes dull after 5 25 hrs of operatio 48 Factors in i composition of formation drilling selecting hardness of formation parameters Cutting action is supported by powerful jets of drilling fluid which r discharged under high P through nozzles located at the side of the bit I f t a good drillbit should provides I longest working life lowest cost 1ft I of hole drilled FYI good 12PM drill t Rate of penetration CROP depends on bit ppm Hydraulic Eff Mud properties W O B Types i Roller cone features used in soft very hard formations bearings gauge protection Isoellafred Fain small large diameter journal conventional b extended types a ChilledTooth jet bits Selection based on formation hardness oIADC series 1 soft medium oIADC series 2 medium ha romeekchoauntitsing Gauging romeekchoauntitsing scraping oIADC series 5 hard Very hard rock cutting Chiselling mechanism
  • 14.
    b Insert Drillbit available in 5 series no 4 8 for very hard formations romcekefauntitsinmg Chipping b crushing ii PDC polycrystalline Diamond compact gives better R.o.plfitted with diamonds longer life suitability for drilling at high RPM DrillString I Kelly hexagonal Aquare Components 40ft 154ft in length attached to a swivel fits into a matching slot in therotarytable I Function to transmit rotation 4 weight drill to the drillbit pipe sina.e.s.e.m.ie me iiiring hollow to allow fluids transmitting lines to pass through 27ft a30ft pipe D Drillcollar Thick wall heavy length of pipe keep drillstring in tension Stabilizer hold increase 1decrease hole angle stabilize
  • 15.
    g Mud Circulating mudis continuously circulated down the System drillstring out through the nozzle in the bit back to the surface through the annulus application Clean rock cuttings in the borehole exert Phyd which prevents formation fluid fromentering the borehole ensure stability of hole form mud cake cool the bit in some configuration helps move the motor to turn the bit rotary hose drillstring is turned at swivel the surface Pump 11T l 0 Which turn ShaleShaker o the bit IT annulus f if no 11 drilling niacin t.li niii i gfJ io n.m c Drill o n bit tothe µ 1 jet nozzle surface in the l typical Vol req 100bbl where bit 1 they r 60bbl removed normal Teethgrinds 7 718 in hole 8000ft rocks into fragments
  • 16.
    mud pumps duplex reciprocating RDPUMP triplex Duplexpumps two liners Triplexpumps 3 liners forwaylgrtkbeagkward forward strokes No of cylinders dualacting single acting He 2Di Dr rod 4 Diameter ILD Ls Nc length pigtfanmeter ofstroke Actual Vol Va Vi Eu or Qa c Ev Pump rating Max delivery PqQ Hydraulic Power P Q Hhp PI 1714
  • 17.
    further Well Control FunctionPreventa flow of formation flui System into wellbore during kick I by fbadonifponent shutting in well surface IBOP Il controlling removal of formation fluid pump mud with higher p tripping dp in p out of hole ftp.neyleanfeu employs a synthetic rubber ring that inflates during well shut off RamPreventers L pipe rams ftp.fneing OD of Close off Dp annular space between dplcasin Shear Rams Blind rams designed to cut Lused when no dP off the r inside the hole d p me t R