CV: G. Mihiedine May 28, 2016
Page 1 of 7
Mobile: 00961 3171020; Email: ghami1@hotmail.com / gmihiedin@yahoo.com
ghazi.mihie@gmail.com
Structural Civil Engineer
Proposed role in the project:
Category:
1. Family name: Mihiedine
2. First names: Ghazi
3. Date of birth: 7th Oct.1961
4. Nationality: Lebanese
5. Civil status: Married
6. Education:
Institution
[Date from – Date to]
Degree(s) or Diploma(s) obtained:
1984 – 1987 Ecole les soeurs des saints coeurs Baccalaureate Diploma-part two
Lebanese (Philosophy Branch)
Diploma in Employment Skills
1996 to 2008 Freyssinet International CIE a professional certificate
7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
Language Reading Speaking Writing
Arabic 5 5 5
English 3 3 3
French 3 3 3
8. Membership of professional bodies: N/A
9. Other skills: (e.g. Computer literacy, etc.) Normal user of software (word, Exel),
compiling reports
10. Present position: Post tension concrete structure (Bridges Consultant technician )
11. Years within the firm: Over 20 years
12. Key qualifications: (Relevant to the assignment)
ď‚· Structural civil engineering ,Construction and Consultant of several bridges Systems
(camel crossing, UR, OR bridges, and OW Bridges); Preparation and submission of
technical reports; Managerial abilities, Develop & lead work teams; Study and evaluate
project requirements and scope; Review and interpret comments and approval of shop
drawings; Inspect overall design; Monitor projects progress timely completion;
Supervise and monitor post-tensioning activities of pre- tension ,post tension ,precast
girders box girders ,viaducts ,the all design and AASHTO manual.
CV: G. Mihiedine May 28, 2016
Page 2 of 7
ď‚· Qualities control for all post tensioning materials and equipment control
ď‚· Fixing all Bearing types ,pot ,and pads Bearings , Neoprene
ď‚· Fixing and Controlled all expansion joint types
ď‚· PT Building floor ,profiling ducts , anchorage life and dead end
- Employer Companies the present Date
1 – Freyssinet international company From 1996 To 2007
2 - Freyssinet Menard From 2007 To 2008
3 - Freyssinet international company From 2008 To 2009
4 – Khatib & Alami Consultant . C. From 2009 To 2015
Currently : Stand by
13. Specific experience in the region:
Country Date from – Date to
Saudi Arabia June 2009/ March 2015
Qatar Apr 2007 To Sep 2008
Lebanon Jan 1996 to June 2009
Total Experience From Jan 1996 To Mar 2015
CV: G. Mihiedine May 28, 2016
Page 3 of 7
14. Professional experience:
Date from –
Date to
Location Company Position Description
Presen
June 2009 To
March 2015
Saudi Arabia Saudi Arabian
Railway(SAR)/Mi
nistry Of
Finance/(PIF)
Bridges
Technician
Implement
Supervision
Consutant
I S C
ď‚· Supervise of all type bridges, e.g. camel crossing, UR, OR bridges, and OW Bridges.
 Supervising all Project ;CT100 Hafer elbaten-CTW200 Hail –CTW300 Quourayat –CTW400 Riyad
ď‚· Preparation and submission of technical progress reports
ď‚· Develop & lead teams.
ď‚· Study and evaluate project requirements and scope.
ď‚· Review comments and approval of shop drawings.
ď‚· Inspection of overall design in Co-ordination between multiple disciplines.
ď‚· Monitoring the progress of the project and timely completion.
ď‚· Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design
and AASHTO manual.
Apr 2007 To
Sep2008
Freyssinet
Menard
Qatar A
New Doha
international
airport
Bechtel
company
Contractor:
Uksel Turkish
company
Site Engineer
12 box girders
ď‚· Supervision of pre-stress silos.
ď‚· Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.
ď‚· Supervision of steel reinforcement of structural RCC structural elements.
ď‚· Supervision and monitoring of concrete pouring, and management of concreting program.
ď‚· Preparation of weekly and monthly progress reports for onward submission to the Structural
Engineer and Construction Manager.
Apr 2007 –
Sep 2008
Freyssinet
Menard
Qatar B
Ummbab Ciment
factory
F.C.B Cement
Contractor :
SIAC Egypt
Site engineer-
post tension
5 Silos
May 2008 To
June 2009
Lebanon-
Mdayrijj Sowfar
Bridge
Freyssinet
International
Butec joint
venture
Civil post tension
Supervisor
ď‚· Supervision of pre-stressed box girders
ď‚· Increment launching Box girders
CV: G. Mihiedine May 28, 2016
Page 4 of 7
May1999 To
Feb 2006
Lebanon
Rmayleh
PROJECT
Freyssinet
International
Lebanese
villages project
Freyssinet
Owner
Site Manager ď‚· Supervision of overall project.
ď‚· Excavation for the preparation of a Genie Civil lots, Embankment a Degradation terrassment for
agricultural land.
ď‚· Wings wall in natural stone building, Lebanese garden design, Plantation of old landscaping trees
ď‚· Sanitary sewer line and construction of manholes.
ď‚· Hydro-pressure, chlorination, bacteriological tests for potable water.
ď‚· Ex-filtration test for new sanitary sewer manhole.
ď‚· Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank.
Mandrill test for all types of duct bank.
ď‚· Installation and interlocking of curb stones on walkway & side walk paving
ď‚· Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary
& secondary roadways.
ď‚· Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe
as per Royal Commission specification, including catch basins.
ď‚· Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly
valves and concrete chambers.
JUN1997 –
Apr 1999
Lebanon
Hazmieh Adlieh
Bridges
B.E.T.H.E
contractor
ACE Consultant
Freyssinet
International
Civil supervisor ď‚· Supervision of pre-stress box girders
ď‚· Supervision of site works such as, foundation, retaining walls, columns, buildings
ď‚· Supervision of steel reinforcement of structural RCC structural elements
ď‚· Supervision and monitoring of pouring of concrete, and management of concreting program
ď‚· Preparation of weekly and monthly progress reports for onward submission to the Structural
Engineer and Construction Manager.
ď‚· Preparation of safety schemes at work site and coordinating with safety manager for ensuring
safety procedure to avoid fatal accidents.
CV: G. Mihiedine May 28, 2016
Page 5 of 7
Jan 1996 to
May 1996
-JUN 2015
TOJun 2016
-Aug 2016 to
Till now
present
Lebanon
Sibbline Ciment
factory
-Lebanon –
Zahleh City
Saudi Arabia
Diplomatic
Quarter Marriott
Hotel
Freyssinet
International
CCC Contractor
Dar Al Handasa
Consultant
=M A C
Construction
contractor
engineering
-Shapporji
Pallonjji
Company(Hill
international)
Freyssinet –
Menard sub
contractor
Khatib&Alami
Civil supervisor
Site engineer
-PT Slab
Technical
Supervisor
ď‚· Supervision of pre-stress silos
ď‚· Sleep Form concrete structure
ď‚· Preparation of safety schemes at work site and coordinating with safety manager for
ensuring safety procedure to avoid fatal accidents.
ď‚· Preparation of preliminary documentation regarding work execution and progress
monitoring in conformity to the project schedule.
ď‚· Preparation of Quality Control documents and coordinating with Quality Control Manager
for ensuring the works to be carried as per designed drawings and contractual
specifications.
ď‚· PT Slab building,7 floors Mall Gate ,structure Supervision post tension slab and Hollow
Core
ď‚· PT Slab building Technical Supervision Consultant Khatib&Alami specification and
procedure implementation supervision, and leadership the Sub Contractor Engineering
(Freyssinet - Menard Gulf )
15. Other relevant information :
- Freyssinet international Certificate (( Paris – French issue ))
- S A R , Saudi Arabia railway ,North-South project – Recommendation
CV: G. Mihiedine May 28, 2016
Page 6 of 7
Proof documents are available on request and professional certificates from corresponding companies are also available on request.
CV: G. Mihiedine May 28, 2016
Page 7 of 7

CV Ghazi 2016 finishing pdf

  • 1.
    CV: G. MihiedineMay 28, 2016 Page 1 of 7 Mobile: 00961 3171020; Email: ghami1@hotmail.com / gmihiedin@yahoo.com ghazi.mihie@gmail.com Structural Civil Engineer Proposed role in the project: Category: 1. Family name: Mihiedine 2. First names: Ghazi 3. Date of birth: 7th Oct.1961 4. Nationality: Lebanese 5. Civil status: Married 6. Education: Institution [Date from – Date to] Degree(s) or Diploma(s) obtained: 1984 – 1987 Ecole les soeurs des saints coeurs Baccalaureate Diploma-part two Lebanese (Philosophy Branch) Diploma in Employment Skills 1996 to 2008 Freyssinet International CIE a professional certificate 7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language Reading Speaking Writing Arabic 5 5 5 English 3 3 3 French 3 3 3 8. Membership of professional bodies: N/A 9. Other skills: (e.g. Computer literacy, etc.) Normal user of software (word, Exel), compiling reports 10. Present position: Post tension concrete structure (Bridges Consultant technician ) 11. Years within the firm: Over 20 years 12. Key qualifications: (Relevant to the assignment)  Structural civil engineering ,Construction and Consultant of several bridges Systems (camel crossing, UR, OR bridges, and OW Bridges); Preparation and submission of technical reports; Managerial abilities, Develop & lead work teams; Study and evaluate project requirements and scope; Review and interpret comments and approval of shop drawings; Inspect overall design; Monitor projects progress timely completion; Supervise and monitor post-tensioning activities of pre- tension ,post tension ,precast girders box girders ,viaducts ,the all design and AASHTO manual.
  • 2.
    CV: G. MihiedineMay 28, 2016 Page 2 of 7  Qualities control for all post tensioning materials and equipment control  Fixing all Bearing types ,pot ,and pads Bearings , Neoprene  Fixing and Controlled all expansion joint types  PT Building floor ,profiling ducts , anchorage life and dead end - Employer Companies the present Date 1 – Freyssinet international company From 1996 To 2007 2 - Freyssinet Menard From 2007 To 2008 3 - Freyssinet international company From 2008 To 2009 4 – Khatib & Alami Consultant . C. From 2009 To 2015 Currently : Stand by 13. Specific experience in the region: Country Date from – Date to Saudi Arabia June 2009/ March 2015 Qatar Apr 2007 To Sep 2008 Lebanon Jan 1996 to June 2009 Total Experience From Jan 1996 To Mar 2015
  • 3.
    CV: G. MihiedineMay 28, 2016 Page 3 of 7 14. Professional experience: Date from – Date to Location Company Position Description Presen June 2009 To March 2015 Saudi Arabia Saudi Arabian Railway(SAR)/Mi nistry Of Finance/(PIF) Bridges Technician Implement Supervision Consutant I S C  Supervise of all type bridges, e.g. camel crossing, UR, OR bridges, and OW Bridges.  Supervising all Project ;CT100 Hafer elbaten-CTW200 Hail –CTW300 Quourayat –CTW400 Riyad  Preparation and submission of technical progress reports  Develop & lead teams.  Study and evaluate project requirements and scope.  Review comments and approval of shop drawings.  Inspection of overall design in Co-ordination between multiple disciplines.  Monitoring the progress of the project and timely completion.  Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design and AASHTO manual. Apr 2007 To Sep2008 Freyssinet Menard Qatar A New Doha international airport Bechtel company Contractor: Uksel Turkish company Site Engineer 12 box girders  Supervision of pre-stress silos.  Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.  Supervision of steel reinforcement of structural RCC structural elements.  Supervision and monitoring of concrete pouring, and management of concreting program.  Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager. Apr 2007 – Sep 2008 Freyssinet Menard Qatar B Ummbab Ciment factory F.C.B Cement Contractor : SIAC Egypt Site engineer- post tension 5 Silos May 2008 To June 2009 Lebanon- Mdayrijj Sowfar Bridge Freyssinet International Butec joint venture Civil post tension Supervisor  Supervision of pre-stressed box girders  Increment launching Box girders
  • 4.
    CV: G. MihiedineMay 28, 2016 Page 4 of 7 May1999 To Feb 2006 Lebanon Rmayleh PROJECT Freyssinet International Lebanese villages project Freyssinet Owner Site Manager  Supervision of overall project.  Excavation for the preparation of a Genie Civil lots, Embankment a Degradation terrassment for agricultural land.  Wings wall in natural stone building, Lebanese garden design, Plantation of old landscaping trees  Sanitary sewer line and construction of manholes.  Hydro-pressure, chlorination, bacteriological tests for potable water.  Ex-filtration test for new sanitary sewer manhole.  Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank. Mandrill test for all types of duct bank.  Installation and interlocking of curb stones on walkway & side walk paving  Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary & secondary roadways.  Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe as per Royal Commission specification, including catch basins.  Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly valves and concrete chambers. JUN1997 – Apr 1999 Lebanon Hazmieh Adlieh Bridges B.E.T.H.E contractor ACE Consultant Freyssinet International Civil supervisor  Supervision of pre-stress box girders  Supervision of site works such as, foundation, retaining walls, columns, buildings  Supervision of steel reinforcement of structural RCC structural elements  Supervision and monitoring of pouring of concrete, and management of concreting program  Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager.  Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.
  • 5.
    CV: G. MihiedineMay 28, 2016 Page 5 of 7 Jan 1996 to May 1996 -JUN 2015 TOJun 2016 -Aug 2016 to Till now present Lebanon Sibbline Ciment factory -Lebanon – Zahleh City Saudi Arabia Diplomatic Quarter Marriott Hotel Freyssinet International CCC Contractor Dar Al Handasa Consultant =M A C Construction contractor engineering -Shapporji Pallonjji Company(Hill international) Freyssinet – Menard sub contractor Khatib&Alami Civil supervisor Site engineer -PT Slab Technical Supervisor  Supervision of pre-stress silos  Sleep Form concrete structure  Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.  Preparation of preliminary documentation regarding work execution and progress monitoring in conformity to the project schedule.  Preparation of Quality Control documents and coordinating with Quality Control Manager for ensuring the works to be carried as per designed drawings and contractual specifications.  PT Slab building,7 floors Mall Gate ,structure Supervision post tension slab and Hollow Core  PT Slab building Technical Supervision Consultant Khatib&Alami specification and procedure implementation supervision, and leadership the Sub Contractor Engineering (Freyssinet - Menard Gulf ) 15. Other relevant information : - Freyssinet international Certificate (( Paris – French issue )) - S A R , Saudi Arabia railway ,North-South project – Recommendation
  • 6.
    CV: G. MihiedineMay 28, 2016 Page 6 of 7 Proof documents are available on request and professional certificates from corresponding companies are also available on request.
  • 7.
    CV: G. MihiedineMay 28, 2016 Page 7 of 7