Volkan Sen is a mechanical engineer with over 7 years of experience in industrial projects. He has worked as a site manager, project manager, lead mechanical engineer, and commissioning engineer on various projects in Turkey and Ukraine. His skills include project planning, management, piping design, welding, equipment installation, and commissioning. He is looking for opportunities to develop his expertise in industrial EPC projects.
4 Years experience in Mechanical Engineering including 1 year in Design, 1 year in Shop drawing, and 2 years in Tendering. Seeking to leverage my skills and experience towards more advancement.
4 Years experience in Mechanical Engineering including 1 year in Design, 1 year in Shop drawing, and 2 years in Tendering. Seeking to leverage my skills and experience towards more advancement.
1. Volkan Sen
12/05/1984
volkansen4@gmail.com
+90 544 414 90 40
Yavuz Sultan Selim Mah. Mevlana Cad. Korfezkent 1. Etap A12
Blok 6. Kat. No28, Körfez/Kocaeli TURKEY
PERSONAL STATEMENT
I’m an adaptable and innovative qualified Mechanical Engineer with over 7 years experiences in
industrial projects.
I’m looking to develop my expertise in industrial EPC projects within a forward thinking company.
KEY SKILLS
Computer Skills
o AutoCAD
o Autodesk AutoCad Plant
o SolidWorks
o Autodesk Navisworks
o MS Office
o Microsoft Project
o Adobe PDF Reader
Technical Skills
o Project planning and managing skills based on PMI
o Carrying on weekly presentations for client
o S-Curves preparation for subcontractors’ performances’ measurement
o Gantt chart’s preparation for project’s tasks’ scheduling and following up tasks progress
o Quality reports preparation
o Weldlog preparation and following-up
o Man hour/ cost calculation measurements
o Preparation of documentation for progressive payments
o Organizing all construction, mechanical, electrical and instrumentation works on field
o Following up Critical Path up to project schedule to avoid possible delays on project tasks
o Above ground piping erection
o Underground piping erection
o Shop and field piping manufacturing and WPS/PQR matching up
o Familiar with welding methods and types, up to ASME/ANSI
o Managing NDT’s and Testing/commissioning teams
o Equipment installations
o Cold and hot insulation works
o Structural steel frame erections
o Familiar with construction works
o Familiar with elevation and coordinate systems
o Heat and steam tracing works
o Painting works
o Punch lists’ preparation
o Hydro and pneumatic testing
o Flushing and perching pipelines
2. o Shaft alignment for rotating equipment
o Preparation of test packages due to P&IDs and ASME B31 requirements
o As-build sketching
o Active survey equipment user
Language Skills
o English (Advanced)
o Russian (Native Speaker)
o German (Beginner)
o Turkish (Native Speaker)
Certificates
o Natural Gas Pipe Lines for Industrial Projects
o ISO Compliance Supervisor
o PMI Project Management educations participation certificate
o Diploma Equivalency Certificate given by Ministry of Education in Turkey
Memberships
o Institute of Mechanical Engineers of Turkey
o PMI Turkey
EDUCATION
o National Technical University of Ukraine 2003-2009
B.Sc. Mechanical Engineering 4.14 Graduate Degree
Own Diploma Equivalency Certificate given by Ministry of Education in Turkey
o Aliaga Alp Oguz Anatolian High School 1995-2002
English Language Oriented Science Degree 3.78 Graduate Degree
o Primary School named Namık Kemal 1990-1995 4.50 Graduate Degree
EMPLOYMENT
Site Manager / Project Manager / Lead Mechanical Engineer / Commissioning Engineer
Petkim Petrochemical Plant | Seaberk Mechanical Construction Company | İzmir-Aliaga-Turkey
http://www.petkim.com.tr/Sayfa/2/725/MANIFACTURING-PLANTS-VINYLCHLORIDE-
MONOMER-VCM-PLANT.aspx
03.15 > 08.15
• Turnover capacity: 2 million Turkish Liras man-hour calculated for installation works
Experiences;
• Managed construction, mechanical, electrical, instrumentation, painting, testing and
commissioning works and manpower on field
• Chose most efficient subcontractors for certain works
• Measured all subcontractors’ and welders’ performances daily
• Calculated progressive payments monthly
• Managed quality policies due to ASME
3. • Followed-up and reported planned/actual works’ progresses on Microsoft’s Project Manager
for the Client
• Completed over 2300 meters of above ground pipes’ spools’ welding in workshop and their
erection in the field
• Welded 140 tons of steel frame for pipe racks and pipe supports
• Installed gas vent booster
• Installed electrical pumps
• Installed heat exchangers
• Installed scrubber
• Completed insulation of pipelines and equipment
• Finalized system completions before the plant runs
Gas Line Piping Designer Engineer
Zirve Mühendislik | İzmir-Menemen-Turkey
05.11 -02.15
Experiences;
• Designed natural gas pipelines for industrial projects
• Contacted with clients for selling company’s services
• Merchandised materials
• Followed-up every project and reported their installation progress
• Tested and commissioned works after installations
Commissioning Engineer
Korosten MDF Plant
Hayat Holding | Zhitomir-Korosten -Ukraine
01.10 -03.11
Experiences;
• Managed testing teams and commissioning teams on field
• Prepared test packages due to P&ID’s
• Prepared punch lists and checked completions on field
• Prepared testing reports
• Prepared flushing reports
• Managed heat and cold insulation works after tests approvement
• Finalized system completions before the plant runs
Site Engineer
Boryspol International Airport Terminal D Structural Steel and Façade works
Metal Yapı Holding A.Ş. | Kiev-Boryspol -Ukraine
06.09 -01.10
Experiences;
• Managed erection works for façade glazing and steel frame installation works on field
• Followed-up production at factory
• Planned products and material delivery on site
• Managed staff and teams on site
• Followed up and reported project’s progress weekly
Production Engineer
Stolitsa Lift Factory
Nema Teknik Ukraine | Kiev-Brovary -Ukraine
06.08 -06.09
Experiences;
• Planned manufacturing of lift details on sheet metal
4. • Programmed CNC lathes for sheet metal forming
• Managed material delivery on site
• Followed-up and reported projects’ progress weekly
• Researched for most efficient and modern manufacturing techniques for sheet metal
engineering
PERSONAL INTERESTS
Traveling | Reading | Sports
REFERENCES
Civan Dincer - Planning & Cost Control Engineer
Renaissance Construction RF
Mobile: +79818611747
E-Mail: serkal@petkim.com.tr
Uğur Gündüz - Technical Office Chief
Petkim Petrochemical Plant
Mobile: +90 507 610 24 72
E-Mail: ugunduz@petkim.com.tr
Serkan Erkal - Project Manager
Petkim Petrochemical Plant
Mobile: +90 555 969 14 87
E-Mail: serkal@petkim.com.tr