SlideShare a Scribd company logo
Bahruz Pashayev Page 1 of 3
Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan
www.tekfenmuhendislik.com
PERSONAL
Name : Bahruz Pashayev
Date of Birth : 26 April 1990
Nationality : Azerbaijani
Language : Azeri- Mother Tongue
English – Upper Intermediate
KEY EXPERIENCE
 Designing and preparing engineering designs, plans, drawings and
specifications.
 Checking design calculations of designers and other engineers within the
team.
 Calculated quantity quality and cost for building materials.
 Made necessary adjustments to drawings after construction team review.
 Preparing Bar Banding Schedules (BBS).
 Use of British (BS), Russian (CNIP), and American (ACI) Standards.
 Preparation of Structural steel Detailing on TEKLA and coordination with local
norms, snips & standards.
EDUCATION
Azerbaijan Architecture and Construction University
 Civil Engineering, Master degree, Baku (Azerbaijan) – Sep2012 - Jun2015
 Civil Engineering, Bachelor degree, Baku (Azerbaijan) – Sep2008 - Jun2012
EMPLOYMENT RECORD
2014- Present Civil and Structural Engineer, Tekfen Engineering, Baku Office
Bahruz Pashayev Page 2 of 3
Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan
www.tekfenmuhendislik.com
2013- 2014 Construction Engineer , MINERA MMC, Baku
2010-2011 Master in Construction Works , State Oil Company of Azerbaijan
(SOCAR), Baku Azerbaijan
PROFESSIONAL EXPERIENCE
2014 – Present
Tekfen Engineering – Baku, Azerbaijan www.tekfenmuhendislik.com
Civil and Structural Engineer.
SCPX - South Caucasus Pipeline Expansion Project
 Preparing pipe support foundation’s reinforced details and MTO/MR.
 Checking steel structural drawings in terms of project standards.
 Regular site trips and reports for process & quality control checks.
 Explain drawings to production or construction teams and provide
adjustments as necessary.
 Determine quality, cost, strength and quantity of required materials, and enter
figures on materials lists.
 Estimate operational costs.
 Estimate technical or resource requirements for development or production
projects
Sangachal Terminal
 Shah Deniz 2 Onshore Terminal Facility Construction Works Project,
checking design calculations of designers and other engineers within the
team and preparing reinforcement detail for foundation.
 Developing designs to satisfy technical specifications.
2013 - 2014
MINERA MMC – Baku, Azerbaijan
Construction Engineer
 Support the Project Manager, Superintendent or other management roles in
the construction process throughout all phases of the life-cycle of a project to
include estimating, negotiation, contracting, buyout, construction
administration and closeout of individual projects and / or task order projects
at large;
Bahruz Pashayev Page 3 of 3
Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan
www.tekfenmuhendislik.com
 Create, update and maintain a variety of project controls that track the status
of: individual projects or task orders, changes to projects or task orders, RFI,
shop drawings and submittal, matters involving quality controls, safety,
financial performance, close-out and other aspects of the project(s) or task
order(s);
 Work with subject matter experts to create, review and process shop
drawings and other submittals that are required to document the construction
process;
 Support the change management process, by updating logs, routing source
documents to vendors, obtaining pricing, developing estimates and
proposals, writing change orders and other related activities;
 Support the estimating process by performing quantity surveys utilizing
digitizers, 3D modeling software and paper based processes that obtain and
summarize scope and quantities of work;
 Establish, monitor, communicate and maintain project schedules utilizing
contemporary scheduling software;
 Support the physical layout and an absolute understanding of the spatial
relationships of the physical work: by developing control line drawings, by
using CADD to obtain additional dimensioning information, by reviewing and
coordinating shop drawings and other activities that allows the various
elements of work to correctly fit together;
 Support the PM in negotiating contracts, subcontracts and purchase orders;
 Participating in Client/contractor meetings and resolving.
2010-2011
State Oil Company if Azerbaijan (SOCAR) - Baku, Azerbaijan
Master in Construction Works.
 To undertake all necessary pre-installation checks
 To identify any changes to scope and report back to the manager as early as
possible
 If requested to do so, to record any changes to scope as agreed by the
manager
 To install equipment in line with company standards and current regulations
 To complete all post installation & commissioning checks

More Related Content

What's hot

Resume
ResumeResume
Khalid farooq 04 01-16
Khalid farooq 04 01-16Khalid farooq 04 01-16
Khalid farooq 04 01-16
khalid Farooq
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
Sabith Syed Mohammed
 
David Reagle resume
David Reagle resumeDavid Reagle resume
David Reagle resume
David Reagle
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
Pramod Chaudhari
 
Hamid Darvish C.V summary
Hamid Darvish C.V summaryHamid Darvish C.V summary
Hamid Darvish C.V summary
Hamid Darvish
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
Wasi Sami
 
Resume - Prakash Patil
Resume - Prakash PatilResume - Prakash Patil
Resume - Prakash Patil
Prakash Patil
 
cv update 30 1 2016
cv update 30 1 2016cv update 30 1 2016
cv update 30 1 2016
Kassem Ismail
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
Mahesh Narayanan Subburam
 
Job opportunity in ksa
Job opportunity in ksaJob opportunity in ksa
Job opportunity in ksa
Ahmad Hamasha
 
curriculum11-10-2015
curriculum11-10-2015curriculum11-10-2015
curriculum11-10-2015
Patrick Holligan
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
Engr.Shakir Ahmad
 
MY PROFILE
MY PROFILEMY PROFILE
Resume mehdi soltani_ construction
Resume mehdi soltani_ constructionResume mehdi soltani_ construction
Resume mehdi soltani_ construction
Mehdi Soltani
 

What's hot (17)

Resume
ResumeResume
Resume
 
Khalid farooq 04 01-16
Khalid farooq 04 01-16Khalid farooq 04 01-16
Khalid farooq 04 01-16
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
David Reagle resume
David Reagle resumeDavid Reagle resume
David Reagle resume
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
Hamid Darvish C.V summary
Hamid Darvish C.V summaryHamid Darvish C.V summary
Hamid Darvish C.V summary
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
Resume - Prakash Patil
Resume - Prakash PatilResume - Prakash Patil
Resume - Prakash Patil
 
cv update 30 1 2016
cv update 30 1 2016cv update 30 1 2016
cv update 30 1 2016
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Job opportunity in ksa
Job opportunity in ksaJob opportunity in ksa
Job opportunity in ksa
 
curriculum11-10-2015
curriculum11-10-2015curriculum11-10-2015
curriculum11-10-2015
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Resume mehdi soltani_ construction
Resume mehdi soltani_ constructionResume mehdi soltani_ construction
Resume mehdi soltani_ construction
 

Viewers also liked

Murad Sadikhov_ Upstairs, Downstairs - The Business Year
Murad Sadikhov_ Upstairs, Downstairs - The Business YearMurad Sadikhov_ Upstairs, Downstairs - The Business Year
Murad Sadikhov_ Upstairs, Downstairs - The Business Year
Murad Sadikhov
 
Lana Hasanova
Lana HasanovaLana Hasanova
Lana Hasanova
Lana Hasanova
 
CV Javanshir Najafov
CV  Javanshir NajafovCV  Javanshir Najafov
CV Javanshir Najafov
Javanshir Najafov
 
OLIVIA CV
OLIVIA CVOLIVIA CV
OLIVIA CV
YOBEL09
 
CV-Ruslan Mammadov(2016)-EN
CV-Ruslan Mammadov(2016)-ENCV-Ruslan Mammadov(2016)-EN
CV-Ruslan Mammadov(2016)-EN
Ruslan Mammadov
 

Viewers also liked (9)

Murad Sadikhov_ Upstairs, Downstairs - The Business Year
Murad Sadikhov_ Upstairs, Downstairs - The Business YearMurad Sadikhov_ Upstairs, Downstairs - The Business Year
Murad Sadikhov_ Upstairs, Downstairs - The Business Year
 
Lana Hasanova
Lana HasanovaLana Hasanova
Lana Hasanova
 
CV Javanshir Najafov
CV  Javanshir NajafovCV  Javanshir Najafov
CV Javanshir Najafov
 
OLIVIA CV
OLIVIA CVOLIVIA CV
OLIVIA CV
 
CV Forması (1)
CV Forması (1)CV Forması (1)
CV Forması (1)
 
CV
CVCV
CV
 
Cv formu
Cv formuCv formu
Cv formu
 
Nino cv 2
Nino cv 2Nino cv 2
Nino cv 2
 
CV-Ruslan Mammadov(2016)-EN
CV-Ruslan Mammadov(2016)-ENCV-Ruslan Mammadov(2016)-EN
CV-Ruslan Mammadov(2016)-EN
 

Similar to CV Bahruz Pashayev

Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)
Arif Khan
 
CV-Fatheya
CV-FatheyaCV-Fatheya
CV-Fatheya
fatheya salem
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
 
A. Garcia_CV
A. Garcia_CVA. Garcia_CV
A. Garcia_CV
Adonies Garcia
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
Rizal A M
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
Jujare Visvesvara Rao
 
CIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEERCIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEER
Vinobha K
 
Resume maincv construction manager
Resume maincv construction managerResume maincv construction manager
Resume maincv construction manager
Muiz Mohamed
 
Amil guliyev CV
Amil guliyev CVAmil guliyev CV
Amil guliyev CV
Amil Guliyev
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
Saurabh Shah
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
Bharath Viswanathan ABB/KEMCO-E&I
 
Khalid Farooq 04-01-16
Khalid Farooq 04-01-16Khalid Farooq 04-01-16
Khalid Farooq 04-01-16
khalid Farooq
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu
 
resume_mehraj _ (3)
resume_mehraj _ (3)resume_mehraj _ (3)
resume_mehraj _ (3)
Mehraj mollah
 
Faraz_Resume_Qatar
Faraz_Resume_QatarFaraz_Resume_Qatar
Faraz_Resume_Qatar
Faraz Nabi
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
Abi Joseph
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix Resume
Sharon Haddix
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
BHAGATSINH VERMA
 
Mano_CV
Mano_CVMano_CV
Mano_CV
Manoharan R
 
ASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR octoberASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR october
Ashkan Rohanipour
 

Similar to CV Bahruz Pashayev (20)

Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)
 
CV-Fatheya
CV-FatheyaCV-Fatheya
CV-Fatheya
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
A. Garcia_CV
A. Garcia_CVA. Garcia_CV
A. Garcia_CV
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
CIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEERCIVIL / STRUCTURAL DESIGN ENGINEER
CIVIL / STRUCTURAL DESIGN ENGINEER
 
Resume maincv construction manager
Resume maincv construction managerResume maincv construction manager
Resume maincv construction manager
 
Amil guliyev CV
Amil guliyev CVAmil guliyev CV
Amil guliyev CV
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
Khalid Farooq 04-01-16
Khalid Farooq 04-01-16Khalid Farooq 04-01-16
Khalid Farooq 04-01-16
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
resume_mehraj _ (3)
resume_mehraj _ (3)resume_mehraj _ (3)
resume_mehraj _ (3)
 
Faraz_Resume_Qatar
Faraz_Resume_QatarFaraz_Resume_Qatar
Faraz_Resume_Qatar
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix Resume
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
Mano_CV
Mano_CVMano_CV
Mano_CV
 
ASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR octoberASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR october
 

CV Bahruz Pashayev

  • 1. Bahruz Pashayev Page 1 of 3 Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan www.tekfenmuhendislik.com PERSONAL Name : Bahruz Pashayev Date of Birth : 26 April 1990 Nationality : Azerbaijani Language : Azeri- Mother Tongue English – Upper Intermediate KEY EXPERIENCE  Designing and preparing engineering designs, plans, drawings and specifications.  Checking design calculations of designers and other engineers within the team.  Calculated quantity quality and cost for building materials.  Made necessary adjustments to drawings after construction team review.  Preparing Bar Banding Schedules (BBS).  Use of British (BS), Russian (CNIP), and American (ACI) Standards.  Preparation of Structural steel Detailing on TEKLA and coordination with local norms, snips & standards. EDUCATION Azerbaijan Architecture and Construction University  Civil Engineering, Master degree, Baku (Azerbaijan) – Sep2012 - Jun2015  Civil Engineering, Bachelor degree, Baku (Azerbaijan) – Sep2008 - Jun2012 EMPLOYMENT RECORD 2014- Present Civil and Structural Engineer, Tekfen Engineering, Baku Office
  • 2. Bahruz Pashayev Page 2 of 3 Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan www.tekfenmuhendislik.com 2013- 2014 Construction Engineer , MINERA MMC, Baku 2010-2011 Master in Construction Works , State Oil Company of Azerbaijan (SOCAR), Baku Azerbaijan PROFESSIONAL EXPERIENCE 2014 – Present Tekfen Engineering – Baku, Azerbaijan www.tekfenmuhendislik.com Civil and Structural Engineer. SCPX - South Caucasus Pipeline Expansion Project  Preparing pipe support foundation’s reinforced details and MTO/MR.  Checking steel structural drawings in terms of project standards.  Regular site trips and reports for process & quality control checks.  Explain drawings to production or construction teams and provide adjustments as necessary.  Determine quality, cost, strength and quantity of required materials, and enter figures on materials lists.  Estimate operational costs.  Estimate technical or resource requirements for development or production projects Sangachal Terminal  Shah Deniz 2 Onshore Terminal Facility Construction Works Project, checking design calculations of designers and other engineers within the team and preparing reinforcement detail for foundation.  Developing designs to satisfy technical specifications. 2013 - 2014 MINERA MMC – Baku, Azerbaijan Construction Engineer  Support the Project Manager, Superintendent or other management roles in the construction process throughout all phases of the life-cycle of a project to include estimating, negotiation, contracting, buyout, construction administration and closeout of individual projects and / or task order projects at large;
  • 3. Bahruz Pashayev Page 3 of 3 Xocalı pros. 37,Demirchi Tower,5-ci mərt., AZ1025, Bakı, Azərbaycan www.tekfenmuhendislik.com  Create, update and maintain a variety of project controls that track the status of: individual projects or task orders, changes to projects or task orders, RFI, shop drawings and submittal, matters involving quality controls, safety, financial performance, close-out and other aspects of the project(s) or task order(s);  Work with subject matter experts to create, review and process shop drawings and other submittals that are required to document the construction process;  Support the change management process, by updating logs, routing source documents to vendors, obtaining pricing, developing estimates and proposals, writing change orders and other related activities;  Support the estimating process by performing quantity surveys utilizing digitizers, 3D modeling software and paper based processes that obtain and summarize scope and quantities of work;  Establish, monitor, communicate and maintain project schedules utilizing contemporary scheduling software;  Support the physical layout and an absolute understanding of the spatial relationships of the physical work: by developing control line drawings, by using CADD to obtain additional dimensioning information, by reviewing and coordinating shop drawings and other activities that allows the various elements of work to correctly fit together;  Support the PM in negotiating contracts, subcontracts and purchase orders;  Participating in Client/contractor meetings and resolving. 2010-2011 State Oil Company if Azerbaijan (SOCAR) - Baku, Azerbaijan Master in Construction Works.  To undertake all necessary pre-installation checks  To identify any changes to scope and report back to the manager as early as possible  If requested to do so, to record any changes to scope as agreed by the manager  To install equipment in line with company standards and current regulations  To complete all post installation & commissioning checks