SlideShare a Scribd company logo
1 of 3
Download to read offline
Alistair F Helm MIET
353 Park Rd
Blackpool
Lancashire
Fy1 6RA
Tel No 07427 742074
alistair@tpartnership.com
Alistair has over 24 years experience of working in the electronic security industry, his particular area
of expertise relates to the design, installation and commissioning of CCTV systems in operational rail
and underground environments. He also has extensive experience and product knowledge of Access
Control, Fire Installations, PA/VA and Communications Systems.
Career Summary
Alistair joined Securicor Alarms in 1991 in the role of Intruder and
CCTV Surveyor. He left in 1994 to concentrate on major CCTV
projects, joining AVS Limited. His role as CCTV Surveyor involved
many rail sector projects across the Yorkshire area.
In 1996 Alistair joined Swift Security Systems Limited delivering CCTV,
Access Control and Fire Installation Systems with a project value of up
to £200k. Two years later he joined ADT Fire and Security in the role
of Systems Sales Manager but also with responsibility for the project
management of the installation. The maximum project value was now
£375k. 2000 saw Alistair joining Vicon as Northern Area Sales
Manager but he found his skills were better suited to dealing directly
with end users and in 2002 joined Euro telecom. His role was to
design CCTV and Access Control Equipment on worldwide projects.
He gained extensive major network system experience but
unfortunately the company went into receivership and Alistair became
self-employed before joining Technology Solutions Limited in 2003.
His role here was to establish a dedicated Rail Division particularly
focussing on CCTV, PA and Access Control but also delivering other
electronic security installations.
Alistair is approved by Network Rail in production of Form A and Form
B detailed design and CRE role in Retail Telecommunications, he has
a full understanding of NR standards. This includes concept design to
project completion including O & M production and SAT certification.
Design and procurement of large integrated security systems which
include National Grid, Design and a full understanding of Power fence,
perimeter protection, video analytics etc.
Design of perimeter security protection, recent project was an
aluminium plant in Saudi Arabia, Ras Al Khar. His responsibilities
extended to design check sign off.,Project Engineer of the installation
of a 17km high security fence that includes audible fence monitoring,
microwave detection and CCTV. Fibre optic networks for all security
disciplines .Contract Value $23m.
The most recent project was a multidiscipline telecoms project for
Network Rail as Contractors Responsible Engineer (CRE)
Total contract value in excess of £10m.
Qualifications
City + Guilds Radio + Video Engineering
{4 Year Apprenticeship}
City + Guilds Radio Communications
{Class 1 Licence]
Rail Competencies
Network Rail
Personal Track Safety
Form A production
Form B production
Grip stages
Other Competencies
OMNLYX Accreditation
SDH Major Network System
Accredited
Bosch
Dedicated Micros
IOSH
CRE
Alistair F Helm MIET
353 Park Rd
Blackpool
Lancashire
Fy1 6RA
Tel No 07427 742074
alistair@tpartnership.com
Specialist Areas of Expertise
 Railway CCTV Installations
 Security Systems [Fire/Access Control/PAVA]
 Telecommunications Systems + Networks
 CCTV Product Knowledge
 Major Project Integration
 Retail Telecommunications Form A, B design
 Contractors Responsible Engineer (CRE)
PROJECTS
 Preston MSCP, Retail Telecommunications Design
 Runcorn MSCP, Retail Telecommunications Design
 Sandhills Station, Retail Telecommunications Design/PM
 Bootle Station, Retail Telecommunications Design
 St Albans Station, Retail Telecommunications Design
 Laurencskirk Station, Retail Telecommunications Design
 Lancaster Station, Retail Telecommunications Design
 Carlisle Station, Retail Telecommunications Design
 Salford Central Station, Retail Telecommunications Design
 Stafford MSCP CRE
 Enhanced Security measures 28 signal boxes NR CRE
 Rotherham Station CRE
 Liverpool Central Design
 Long Eaton Station Install/Design
 James St Liverpool Install
 London Overground 17-stations up-grade Design/PM/CRE
 Ras Al Khar, Saudi Arabia 17km High Security Fence Design / PE
Alistair F Helm MIET
353 Park Rd
Blackpool
Lancashire
Fy1 6RA
Tel No 07427 742074
alistair@tpartnership.com

More Related Content

What's hot

Comparison of Wifi, Lifi and Gifi
Comparison of Wifi, Lifi and GifiComparison of Wifi, Lifi and Gifi
Comparison of Wifi, Lifi and GifiShahneel Siddiqui
 
Ppt presentation
Ppt presentationPpt presentation
Ppt presentationvishal4799
 
Wifi Lifi IQRA Peshawar BBA
Wifi Lifi IQRA Peshawar BBAWifi Lifi IQRA Peshawar BBA
Wifi Lifi IQRA Peshawar BBARizwan Khattak
 
5 g platform
5 g platform5 g platform
5 g platformEricsson
 
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...Mavenir
 
Saguna edge computing solution for private enterprise networks
Saguna edge computing solution for private enterprise networksSaguna edge computing solution for private enterprise networks
Saguna edge computing solution for private enterprise networksSaguna
 
Future of Telecommunication Technologies
Future of Telecommunication TechnologiesFuture of Telecommunication Technologies
Future of Telecommunication TechnologiesYashraj Nigam
 
Eion Wireless Corporate Overview
Eion Wireless Corporate OverviewEion Wireless Corporate Overview
Eion Wireless Corporate OverviewEIONWireless
 
OFS FTTx Webinar July 2017 at CABA
  OFS FTTx Webinar July 2017 at CABA  OFS FTTx Webinar July 2017 at CABA
OFS FTTx Webinar July 2017 at CABAOFS
 
Li fi alpna singh
Li fi  alpna singhLi fi  alpna singh
Li fi alpna singhAlpnaSingh5
 
5G Network Managament for Inteligent Transport Systems
5G Network Managament for Inteligent Transport Systems5G Network Managament for Inteligent Transport Systems
5G Network Managament for Inteligent Transport Systemslebarka
 
Isep m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)
Isep   m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)Isep   m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)
Isep m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)Thierry Lestable
 
Ppt for the seminr topic on gi fi technology
Ppt for the seminr topic on gi fi technologyPpt for the seminr topic on gi fi technology
Ppt for the seminr topic on gi fi technologyVikram Emmidi
 

What's hot (20)

Comparison of Wifi, Lifi and Gifi
Comparison of Wifi, Lifi and GifiComparison of Wifi, Lifi and Gifi
Comparison of Wifi, Lifi and Gifi
 
Ppt presentation
Ppt presentationPpt presentation
Ppt presentation
 
EENA 2018 - Multimedia usage in a PSAP
EENA 2018 - Multimedia usage in a PSAP  EENA 2018 - Multimedia usage in a PSAP
EENA 2018 - Multimedia usage in a PSAP
 
Wifi Lifi IQRA Peshawar BBA
Wifi Lifi IQRA Peshawar BBAWifi Lifi IQRA Peshawar BBA
Wifi Lifi IQRA Peshawar BBA
 
5 g platform
5 g platform5 g platform
5 g platform
 
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...
Mavenir: Why and How Private LTE & 5G Networks Are Rapidly Evolving for Enter...
 
Saguna edge computing solution for private enterprise networks
Saguna edge computing solution for private enterprise networksSaguna edge computing solution for private enterprise networks
Saguna edge computing solution for private enterprise networks
 
Future of Telecommunication Technologies
Future of Telecommunication TechnologiesFuture of Telecommunication Technologies
Future of Telecommunication Technologies
 
Eion Wireless Corporate Overview
Eion Wireless Corporate OverviewEion Wireless Corporate Overview
Eion Wireless Corporate Overview
 
OFS FTTx Webinar July 2017 at CABA
  OFS FTTx Webinar July 2017 at CABA  OFS FTTx Webinar July 2017 at CABA
OFS FTTx Webinar July 2017 at CABA
 
Li fi alpna singh
Li fi  alpna singhLi fi  alpna singh
Li fi alpna singh
 
Li fi
Li fiLi fi
Li fi
 
EENA2019: Track2 session4 _Study of use cases and communications involving Io...
EENA2019: Track2 session4 _Study of use cases and communications involving Io...EENA2019: Track2 session4 _Study of use cases and communications involving Io...
EENA2019: Track2 session4 _Study of use cases and communications involving Io...
 
EENA 2018 - Advanced Mobile Location - AML
EENA 2018 - Advanced Mobile Location - AML  EENA 2018 - Advanced Mobile Location - AML
EENA 2018 - Advanced Mobile Location - AML
 
5G Network Managament for Inteligent Transport Systems
5G Network Managament for Inteligent Transport Systems5G Network Managament for Inteligent Transport Systems
5G Network Managament for Inteligent Transport Systems
 
Gi-Fi ppt presentation
Gi-Fi ppt presentationGi-Fi ppt presentation
Gi-Fi ppt presentation
 
Isep m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)
Isep   m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)Isep   m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)
Isep m2 m - iot - course 1 - update 2013 - 09122013 - part 3 - v(0.7)
 
GiFi
GiFi GiFi
GiFi
 
Ppt for the seminr topic on gi fi technology
Ppt for the seminr topic on gi fi technologyPpt for the seminr topic on gi fi technology
Ppt for the seminr topic on gi fi technology
 
EENA2019: Track1 session3 Deploying Next Generation 112 in Europe_Cristina Lu...
EENA2019: Track1 session3 Deploying Next Generation 112 in Europe_Cristina Lu...EENA2019: Track1 session3 Deploying Next Generation 112 in Europe_Cristina Lu...
EENA2019: Track1 session3 Deploying Next Generation 112 in Europe_Cristina Lu...
 

Similar to CV 11122014

Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl Jones
 
Digital Satellites Profile (2)
Digital Satellites Profile (2)Digital Satellites Profile (2)
Digital Satellites Profile (2)Digital Satellites
 
Relocity Corporate Presentation 2010
Relocity Corporate Presentation   2010Relocity Corporate Presentation   2010
Relocity Corporate Presentation 2010mapstone
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
 
pure practical Telecoms/ICT training in Nigeria
pure practical Telecoms/ICT training in Nigeriapure practical Telecoms/ICT training in Nigeria
pure practical Telecoms/ICT training in NigeriaNeonetwireless
 
NG Rigging company presentation
NG Rigging company presentationNG Rigging company presentation
NG Rigging company presentationwilltwomey
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk
 
Corporate Brochure 1
Corporate Brochure 1Corporate Brochure 1
Corporate Brochure 1rajabodapati
 
Corporate Brochure
Corporate BrochureCorporate Brochure
Corporate Brochurerajabodapati
 
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute TelecomKevin James
 
Semper Fi Telecom profile
Semper Fi Telecom profileSemper Fi Telecom profile
Semper Fi Telecom profileDan Bradley
 
Robin Adcock Resume6
Robin Adcock Resume6Robin Adcock Resume6
Robin Adcock Resume6Robin Adcock
 
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public SafetyWireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safetytelecom-wiring
 
Tns Profile V 12.0
Tns Profile V 12.0Tns Profile V 12.0
Tns Profile V 12.0jw
 

Similar to CV 11122014 (20)

A Helm CV-19032016P
A Helm CV-19032016PA Helm CV-19032016P
A Helm CV-19032016P
 
Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - Copy
 
Digital Satellites Profile (2)
Digital Satellites Profile (2)Digital Satellites Profile (2)
Digital Satellites Profile (2)
 
MRHCV-short.DOC
MRHCV-short.DOCMRHCV-short.DOC
MRHCV-short.DOC
 
Relocity Corporate Presentation 2010
Relocity Corporate Presentation   2010Relocity Corporate Presentation   2010
Relocity Corporate Presentation 2010
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
pure practical Telecoms/ICT training in Nigeria
pure practical Telecoms/ICT training in Nigeriapure practical Telecoms/ICT training in Nigeria
pure practical Telecoms/ICT training in Nigeria
 
NG Rigging company presentation
NG Rigging company presentationNG Rigging company presentation
NG Rigging company presentation
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)
 
Corporate Brochure 1
Corporate Brochure 1Corporate Brochure 1
Corporate Brochure 1
 
Corporate Brochure
Corporate BrochureCorporate Brochure
Corporate Brochure
 
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute Telecom
 
Semper Fi Telecom profile
Semper Fi Telecom profileSemper Fi Telecom profile
Semper Fi Telecom profile
 
Robin Adcock Resume6
Robin Adcock Resume6Robin Adcock Resume6
Robin Adcock Resume6
 
FibreUP
FibreUPFibreUP
FibreUP
 
ICISS Newsletter Feb 14
ICISS Newsletter Feb 14ICISS Newsletter Feb 14
ICISS Newsletter Feb 14
 
Engr_DMH
Engr_DMHEngr_DMH
Engr_DMH
 
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public SafetyWireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
 
Tarkeeb capabilities v0.2
Tarkeeb capabilities v0.2Tarkeeb capabilities v0.2
Tarkeeb capabilities v0.2
 
Tns Profile V 12.0
Tns Profile V 12.0Tns Profile V 12.0
Tns Profile V 12.0
 

CV 11122014

  • 1. Alistair F Helm MIET 353 Park Rd Blackpool Lancashire Fy1 6RA Tel No 07427 742074 alistair@tpartnership.com Alistair has over 24 years experience of working in the electronic security industry, his particular area of expertise relates to the design, installation and commissioning of CCTV systems in operational rail and underground environments. He also has extensive experience and product knowledge of Access Control, Fire Installations, PA/VA and Communications Systems. Career Summary Alistair joined Securicor Alarms in 1991 in the role of Intruder and CCTV Surveyor. He left in 1994 to concentrate on major CCTV projects, joining AVS Limited. His role as CCTV Surveyor involved many rail sector projects across the Yorkshire area. In 1996 Alistair joined Swift Security Systems Limited delivering CCTV, Access Control and Fire Installation Systems with a project value of up to £200k. Two years later he joined ADT Fire and Security in the role of Systems Sales Manager but also with responsibility for the project management of the installation. The maximum project value was now £375k. 2000 saw Alistair joining Vicon as Northern Area Sales Manager but he found his skills were better suited to dealing directly with end users and in 2002 joined Euro telecom. His role was to design CCTV and Access Control Equipment on worldwide projects. He gained extensive major network system experience but unfortunately the company went into receivership and Alistair became self-employed before joining Technology Solutions Limited in 2003. His role here was to establish a dedicated Rail Division particularly focussing on CCTV, PA and Access Control but also delivering other electronic security installations. Alistair is approved by Network Rail in production of Form A and Form B detailed design and CRE role in Retail Telecommunications, he has a full understanding of NR standards. This includes concept design to project completion including O & M production and SAT certification. Design and procurement of large integrated security systems which include National Grid, Design and a full understanding of Power fence, perimeter protection, video analytics etc. Design of perimeter security protection, recent project was an aluminium plant in Saudi Arabia, Ras Al Khar. His responsibilities extended to design check sign off.,Project Engineer of the installation of a 17km high security fence that includes audible fence monitoring, microwave detection and CCTV. Fibre optic networks for all security disciplines .Contract Value $23m. The most recent project was a multidiscipline telecoms project for Network Rail as Contractors Responsible Engineer (CRE) Total contract value in excess of £10m. Qualifications City + Guilds Radio + Video Engineering {4 Year Apprenticeship} City + Guilds Radio Communications {Class 1 Licence] Rail Competencies Network Rail Personal Track Safety Form A production Form B production Grip stages Other Competencies OMNLYX Accreditation SDH Major Network System Accredited Bosch Dedicated Micros IOSH CRE
  • 2. Alistair F Helm MIET 353 Park Rd Blackpool Lancashire Fy1 6RA Tel No 07427 742074 alistair@tpartnership.com Specialist Areas of Expertise  Railway CCTV Installations  Security Systems [Fire/Access Control/PAVA]  Telecommunications Systems + Networks  CCTV Product Knowledge  Major Project Integration  Retail Telecommunications Form A, B design  Contractors Responsible Engineer (CRE) PROJECTS  Preston MSCP, Retail Telecommunications Design  Runcorn MSCP, Retail Telecommunications Design  Sandhills Station, Retail Telecommunications Design/PM  Bootle Station, Retail Telecommunications Design  St Albans Station, Retail Telecommunications Design  Laurencskirk Station, Retail Telecommunications Design  Lancaster Station, Retail Telecommunications Design  Carlisle Station, Retail Telecommunications Design  Salford Central Station, Retail Telecommunications Design  Stafford MSCP CRE  Enhanced Security measures 28 signal boxes NR CRE  Rotherham Station CRE  Liverpool Central Design  Long Eaton Station Install/Design  James St Liverpool Install  London Overground 17-stations up-grade Design/PM/CRE  Ras Al Khar, Saudi Arabia 17km High Security Fence Design / PE
  • 3. Alistair F Helm MIET 353 Park Rd Blackpool Lancashire Fy1 6RA Tel No 07427 742074 alistair@tpartnership.com