SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
OBJECTIVE To continually enhance professional competence while contributing to
the growth of the organization through acquired skills.
SUMMARY
Selected as ATM for CMMI Multi Modal SVC/DEV V 1.3 ML 5 in
Birlasoft & successfully accessed.
Successfully completed ATM Training for CMMI Multi Modal
SVC/DEV V 1.3 ML 5 & certified for both by the CMMI Institute.
Certified Lead Auditor for ISO 9001:2008 from Bureau of Indian
Standards (BIS), National Institute of Training for Standardization
(NITS), accredited with IRCA (International Register of Certificated
Auditors), UK.
Six- Sigma Green Belt from Indian Statistical Institute, Delhi
Successfully completed five days internal training on ITIL V3
foundation. Was the 2nd top ranker in the test held by the internal
trainers.
Successfully completed three days CMMI ATM training by SEI for
CMMI Dev 1.2 ML 5 in HCL.
A total experience of around Ten years & one month in ZENITH
computers Ltd, Goa, THOMSON PRESS India Ltd, Faridabad,
HEWITT Softwares (Technology Delivery Centre), Gurgaon,
Fujitsu Consulting India Private Ltd, Noida,Computer Science
Corporation (CSC),Noida,HCL Tech Noida & Birlasoft.
EXPERIENCE • Working in Birlasoft since 17th
Dec’12 as Assistant
Manager-Quality.
• HCL Technologies Noida- 2 Years
• Computer Science Corporation(CSC)
Noida – 1.1 Years
• Fujitsu Consulting India Private Ltd (IT)
Noida – 2.4 Years.
Classification: BirlasoftGDC Internal
VIRAJ SAXENA
Email ID: virajsaxena@gmail.com
Mobile: +919818645056
• HEWITT Softwares (Technology Delivery Centre-IT),
Gurgaon - 7 Months
• THOMSON PRESS India Ltd, Faridabad - 3
Months(Summer Training)
• ZENITH computers Ltd, Goa - 3 Months(Summer
Training)
KEY ROLE Working in Birlasoft as Assistant Manager-Quality.
Company is going for CMMI for Services/Development (Multimodal)
V1.3 Level 5.Extensive preparation for the appraisal is being done
taking each PA & its specific practice into consideration. This involves
hectic parleys/work schedules & changing the mindset of the people
w.r.t Quality. Selected as ATM for the current appraisal.
Successfully assessed for CMMI Multi Modal SVC/DEV V 1.3 ML 5 in
Birlasoft as a ATM.
Worked at HCL Technologies as an Analyst Quality.
CMMI Dev1.2 ML-5 Implementation Experience
HCL is going for CMMI Level 5; Quality related all tasks are under my
belt. Successfully completed IR1, IR2 & CPR is on the way.ATM
training attended. Finally company appraised for CMMI.
Also each year HCL goes for statutory change management financial
audits. Last year it was done by PWC & this time by E&Y (Ernst &
Young).Experience of statutory apart from certification audits is a boon.
Application of ISO/CMMI procedures, auditing, facilitation & changing
mindset of project owners are the main tasks. Active member of SEPG,
Estimation council, Engineering council & Metrics council.
Working experience on working with PMSMART, HCL project
management tool. Regular PCI audits/Initiation/closure of projects,
Facilitation of applications for complete SDLC cycle are some of
the main responsibilities. Quality Analyst for projects.
Worked in Computer Science Corporation (CSC Softwares) as an
Analyst Quality.
The main work areas in which I am involved are:
Working as a BESPOC for WME team which involves activities of QMS
deployment, Facilitation of QMRs, verification of BSCs, making &
presentation of monthly dashboard with senior management. Taking
part in all audits as Auditor & support auditor. All the CSAT & CCMS
CAPA activities. Activities given on need basis.
Worked in Fujitsu Consulting India Private Ltd , Noida as a Senior
Executive Quality (Business Enabler).The main work areas in which
I was involved were:
Classification: BirlasoftGDC Internal
• Working as Quality coordinator for US Quality Department.
• Taking part in audit activities, conducting audit, preparation of
audit reports,Participating in Internal assessment and audits
• Working on metrics, Metrics calculation, Effort variance,
schedule variance & evolution of OBR (Organizational baseline
report).
• Data analysis and interpretation by using statistical techniques
& Minitab
• Data collation, consolidation & verification by using Excel and
macros.
• Working with US client on dashboards, Microsoft Share point.
Dealing with them as a Quality coordinator for improvement of
there quality activities.
SKILL SET
• Applications of TQM, Modern Quality Tools & Techniques
(SPC, SQC, FMEA, QFD, CWQC, JIT, Kanban, Quality
Circle, Kaizen, TPM, Benchmarking).
• Quality Systems Standards (ISO-9001: 2000, QS-9000, ISO-
14001 etc and other ISO series of standards)
• SQA/IQA Audit, Process Capability Analysis, Statistical
Applications, Reliability, Availability & Maintainability.
Taguchi method, DOE, Six Sigma.
• SQA, Quality Assurance, ISO, CMM, CMMi.
• Knowledge of Software Development Life Cycle.
• Quality Standards/Methodologies known: CMM-I, Six-
Sigma.
• SDLC Knowledge: I am familiar with most of well know life
cycle models and complete software life cycle provided on
SDLC.
• Management Skills: Very good Communication, Presentation,
and Interpersonal Communication Skills. Good team player,
responsibility handling.
• Learning Japanese language for the last 7 months and
preparing for JLPT Level 4 worldwide examination.
ACADEMICS
 Selected as ATM for CMMI Multi Modal SVC/DEV V 1.3 ML 5
in Birlasoft.
 SEI CMMI ATM training for CMMI Dev 1.2 ML 5 in HCL
 Certified Lead Auditor from Bureau of Indian Standards
Classification: BirlasoftGDC Internal
(BIS)
 ITIL V3 foundation Training
 Six- Sigma Green Belt from Indian Statistical Institute,
Delhi
 Masters in Total Quality Management (M.T.Q.M.) from
University of Lucknow, (2004-06).
 M.Sc. in Statistics from Lucknow University.
Year of completion: 2004
 Bachelor of Science (B.Sc.) in Physics, Statistics and
Mathematics from Lucknow University.
Year of Completion: 2002.
 Intermediate from I.S.C Board.
Year of Completion: 1998.
 Higher Secondary School from I.C.S.E Board.
Year of Completion: 1996.
TOOLS KNOWN • MS-Office, MS Word, MS Excel, PowerPoint, Minitab, Share
Point, Sales force etc
• Basic language
PERSONAL
SKILLS
 Positive Attitude, Quick learner, Good communication/analytical
Skills.
 An individual with motivation, sincerity & time sense.
 Seek Perfection, People management. Dynamic Quality
Personnel with excellent team building and leadership
abilities.
 Strong communication and interpersonal skills to work in
teams efficiently.
TRAINING &
PROJECTS
HANDLED
Organization : ZENITH computers Ltd.
Department : PRODUCTION
Project Guide : Sr Production Manager Mr.Vinayak Shinde
Project Duration: 16th
May 2005 to 16th
August 2005.
Project I: Statistical Process Control On Assembly Line
Classification: BirlasoftGDC Internal
In this project I used seven quality control tools to find out the
frequency of serious, major, minor defects in the assembly line of
Zenith. I calculated the UCL and LCL to find out what were the
main causes of the defects that were occurring through the use of
quality control tools & brainstorming. After the causes were
found suggestions were given so that the special causes can be
removed and also that they cannot reoccur. After few weeks of
implementation again the process control chart was made & it
was found that the process is in control.
Project II: Time and Motion Study & Cost Benefit Analysis at
Assembly Line
The main objective of the project was to do Time and Motion
Study on the assembly line and to do the cause and benefit
analysis of the assembly line and to tell the loss in manufacturing
to the company due to time loss & suggest ways to decrease the
loss. The data was taken & various statistical tools like
Histogram, Box plot, and Normal probability plot, Descriptive
statistics & I-MR chart was used to give inference about the data.
After inferring that the engineer were not on the right track I did
cause and benefit analysis in which I showed the monthly loss &
after that the yearly loss to the company against the ideal time.
After that brainstorming was done & major causes of loss were
found out and suggestions were given to control the loss. The
suggestions were implemented & profit was gained from the
results.
Project III: Quality Manual (IMS) Based on ISO 9001:2000
& 14001:2004
Organization : THOMSON PRESS India Ltd.
Department : IE & QA
Project Guide : Chief Manager Dr. V.k.singh, Manager
C.Ravi Raj Kumar
Project Duration: 8th
May 2006 to 8th
August 2006.
Project I: Statistical Process Control & Process Capability
Study on Sheet fed Area
In this project the main cause for sheet rejection was found out
using the total quality control tools. Thereafter using the process
capability study I founded out the limits or the least variation
allowed for the densities of the four colours that was the main
Classification: BirlasoftGDC Internal
cause for sheet rejection. For process capability study, descriptive
statistics, ANOVA moving range chart & other statistical tools
were used. After implementation there was a significant reduction
in colour variation.
Project II: Design of Experiment (in completion phase)
In the last week of my training I started a project on Design of
Experiments with the objective of reducing colour variation. I
founded various factors, response variables & treatment. After
this I decided to use a particular experimental design but due to
lack of time the experiments cannot be conducted and the project
was left in the completion phase.
Classification: BirlasoftGDC Internal
cause for sheet rejection. For process capability study, descriptive
statistics, ANOVA moving range chart & other statistical tools
were used. After implementation there was a significant reduction
in colour variation.
Project II: Design of Experiment (in completion phase)
In the last week of my training I started a project on Design of
Experiments with the objective of reducing colour variation. I
founded various factors, response variables & treatment. After
this I decided to use a particular experimental design but due to
lack of time the experiments cannot be conducted and the project
was left in the completion phase.
Classification: BirlasoftGDC Internal

More Related Content

What's hot

ERP Implementation Life Cycle
ERP Implementation Life CycleERP Implementation Life Cycle
ERP Implementation Life CycleApurv Gourav
 
Contracting for Agile Software Development
Contracting for Agile Software DevelopmentContracting for Agile Software Development
Contracting for Agile Software Developmentcspag67
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLCCrysanthus Raharjo, PMP
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysGoLeanSixSigma.com
 
Lean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution EngineLean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution EngineMark Cichonski
 
Presentation on Software process improvement in GSD
Presentation on Software process improvement in GSDPresentation on Software process improvement in GSD
Presentation on Software process improvement in GSDRafi Ullah
 
The new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for itThe new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for itPMIUKChapter
 
Applying Quality to the Project and Product Management Process
Applying Quality to the Project and Product Management ProcessApplying Quality to the Project and Product Management Process
Applying Quality to the Project and Product Management ProcessKaali Dass PMP, PhD.
 
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfP2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfAnne Starr
 
Business Analysis (CBAP) Training
Business Analysis (CBAP) TrainingBusiness Analysis (CBAP) Training
Business Analysis (CBAP) TrainingFizah Ali
 

What's hot (20)

ERP Implementation Life Cycle
ERP Implementation Life CycleERP Implementation Life Cycle
ERP Implementation Life Cycle
 
Contracting for Agile Software Development
Contracting for Agile Software DevelopmentContracting for Agile Software Development
Contracting for Agile Software Development
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLC
 
CBAP Presentation
CBAP PresentationCBAP Presentation
CBAP Presentation
 
Cmmi 2.0 deployment case study
Cmmi 2.0 deployment case studyCmmi 2.0 deployment case study
Cmmi 2.0 deployment case study
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
How to do a Project Audit
How to do a Project AuditHow to do a Project Audit
How to do a Project Audit
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
Notes on CMMI
Notes on CMMINotes on CMMI
Notes on CMMI
 
Lean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution EngineLean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution Engine
 
Presentation on Software process improvement in GSD
Presentation on Software process improvement in GSDPresentation on Software process improvement in GSD
Presentation on Software process improvement in GSD
 
The new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for itThe new PMP, what it is and how to get prepared for it
The new PMP, what it is and how to get prepared for it
 
RRC CMM CMMI
RRC CMM CMMIRRC CMM CMMI
RRC CMM CMMI
 
CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3
 
Cen6070 chapter2
Cen6070 chapter2Cen6070 chapter2
Cen6070 chapter2
 
Applying Quality to the Project and Product Management Process
Applying Quality to the Project and Product Management ProcessApplying Quality to the Project and Product Management Process
Applying Quality to the Project and Product Management Process
 
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfP2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
 
Business Analysis (CBAP) Training
Business Analysis (CBAP) TrainingBusiness Analysis (CBAP) Training
Business Analysis (CBAP) Training
 
CRISC Course Preview
CRISC Course PreviewCRISC Course Preview
CRISC Course Preview
 

Similar to CMMI ISO Quality Expert CV

Similar to CMMI ISO Quality Expert CV (20)

Rashmi Nagaraja_QA
Rashmi Nagaraja_QA Rashmi Nagaraja_QA
Rashmi Nagaraja_QA
 
Kanthreddy Profile_QA_1
Kanthreddy Profile_QA_1Kanthreddy Profile_QA_1
Kanthreddy Profile_QA_1
 
Pawan Kumar_Resume
Pawan Kumar_ResumePawan Kumar_Resume
Pawan Kumar_Resume
 
Vinolie profile new
Vinolie profile newVinolie profile new
Vinolie profile new
 
Resume of Ram Nigam-Quality_Mgmt
Resume of Ram Nigam-Quality_MgmtResume of Ram Nigam-Quality_Mgmt
Resume of Ram Nigam-Quality_Mgmt
 
Poornima_resume_2016
Poornima_resume_2016Poornima_resume_2016
Poornima_resume_2016
 
S.Baktha-QA-Process-Audits
S.Baktha-QA-Process-AuditsS.Baktha-QA-Process-Audits
S.Baktha-QA-Process-Audits
 
Profile Seema Wadhwa
Profile Seema WadhwaProfile Seema Wadhwa
Profile Seema Wadhwa
 
Simaran Singh_Resume
Simaran Singh_ResumeSimaran Singh_Resume
Simaran Singh_Resume
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resume
 
Deepti Debnath_Citi Corp-2015
Deepti Debnath_Citi Corp-2015 Deepti Debnath_Citi Corp-2015
Deepti Debnath_Citi Corp-2015
 
Jaya_Process Analyst_CV
Jaya_Process Analyst_CVJaya_Process Analyst_CV
Jaya_Process Analyst_CV
 
Vikas- Jul 2015
Vikas-  Jul 2015Vikas-  Jul 2015
Vikas- Jul 2015
 
Biodata-Aditi V Nayak
Biodata-Aditi V NayakBiodata-Aditi V Nayak
Biodata-Aditi V Nayak
 
NavinB
NavinBNavinB
NavinB
 
Profile Sumana_Sen
Profile Sumana_SenProfile Sumana_Sen
Profile Sumana_Sen
 
HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3
 
Amit Dutta
Amit DuttaAmit Dutta
Amit Dutta
 
Business Analyst with 3+ years of experience
Business Analyst with 3+ years of experienceBusiness Analyst with 3+ years of experience
Business Analyst with 3+ years of experience
 
SixSigma 【Continuous Study】
SixSigma 【Continuous Study】SixSigma 【Continuous Study】
SixSigma 【Continuous Study】
 

CMMI ISO Quality Expert CV

  • 1. CURRICULUM VITAE OBJECTIVE To continually enhance professional competence while contributing to the growth of the organization through acquired skills. SUMMARY Selected as ATM for CMMI Multi Modal SVC/DEV V 1.3 ML 5 in Birlasoft & successfully accessed. Successfully completed ATM Training for CMMI Multi Modal SVC/DEV V 1.3 ML 5 & certified for both by the CMMI Institute. Certified Lead Auditor for ISO 9001:2008 from Bureau of Indian Standards (BIS), National Institute of Training for Standardization (NITS), accredited with IRCA (International Register of Certificated Auditors), UK. Six- Sigma Green Belt from Indian Statistical Institute, Delhi Successfully completed five days internal training on ITIL V3 foundation. Was the 2nd top ranker in the test held by the internal trainers. Successfully completed three days CMMI ATM training by SEI for CMMI Dev 1.2 ML 5 in HCL. A total experience of around Ten years & one month in ZENITH computers Ltd, Goa, THOMSON PRESS India Ltd, Faridabad, HEWITT Softwares (Technology Delivery Centre), Gurgaon, Fujitsu Consulting India Private Ltd, Noida,Computer Science Corporation (CSC),Noida,HCL Tech Noida & Birlasoft. EXPERIENCE • Working in Birlasoft since 17th Dec’12 as Assistant Manager-Quality. • HCL Technologies Noida- 2 Years • Computer Science Corporation(CSC) Noida – 1.1 Years • Fujitsu Consulting India Private Ltd (IT) Noida – 2.4 Years. Classification: BirlasoftGDC Internal VIRAJ SAXENA Email ID: virajsaxena@gmail.com Mobile: +919818645056
  • 2. • HEWITT Softwares (Technology Delivery Centre-IT), Gurgaon - 7 Months • THOMSON PRESS India Ltd, Faridabad - 3 Months(Summer Training) • ZENITH computers Ltd, Goa - 3 Months(Summer Training) KEY ROLE Working in Birlasoft as Assistant Manager-Quality. Company is going for CMMI for Services/Development (Multimodal) V1.3 Level 5.Extensive preparation for the appraisal is being done taking each PA & its specific practice into consideration. This involves hectic parleys/work schedules & changing the mindset of the people w.r.t Quality. Selected as ATM for the current appraisal. Successfully assessed for CMMI Multi Modal SVC/DEV V 1.3 ML 5 in Birlasoft as a ATM. Worked at HCL Technologies as an Analyst Quality. CMMI Dev1.2 ML-5 Implementation Experience HCL is going for CMMI Level 5; Quality related all tasks are under my belt. Successfully completed IR1, IR2 & CPR is on the way.ATM training attended. Finally company appraised for CMMI. Also each year HCL goes for statutory change management financial audits. Last year it was done by PWC & this time by E&Y (Ernst & Young).Experience of statutory apart from certification audits is a boon. Application of ISO/CMMI procedures, auditing, facilitation & changing mindset of project owners are the main tasks. Active member of SEPG, Estimation council, Engineering council & Metrics council. Working experience on working with PMSMART, HCL project management tool. Regular PCI audits/Initiation/closure of projects, Facilitation of applications for complete SDLC cycle are some of the main responsibilities. Quality Analyst for projects. Worked in Computer Science Corporation (CSC Softwares) as an Analyst Quality. The main work areas in which I am involved are: Working as a BESPOC for WME team which involves activities of QMS deployment, Facilitation of QMRs, verification of BSCs, making & presentation of monthly dashboard with senior management. Taking part in all audits as Auditor & support auditor. All the CSAT & CCMS CAPA activities. Activities given on need basis. Worked in Fujitsu Consulting India Private Ltd , Noida as a Senior Executive Quality (Business Enabler).The main work areas in which I was involved were: Classification: BirlasoftGDC Internal
  • 3. • Working as Quality coordinator for US Quality Department. • Taking part in audit activities, conducting audit, preparation of audit reports,Participating in Internal assessment and audits • Working on metrics, Metrics calculation, Effort variance, schedule variance & evolution of OBR (Organizational baseline report). • Data analysis and interpretation by using statistical techniques & Minitab • Data collation, consolidation & verification by using Excel and macros. • Working with US client on dashboards, Microsoft Share point. Dealing with them as a Quality coordinator for improvement of there quality activities. SKILL SET • Applications of TQM, Modern Quality Tools & Techniques (SPC, SQC, FMEA, QFD, CWQC, JIT, Kanban, Quality Circle, Kaizen, TPM, Benchmarking). • Quality Systems Standards (ISO-9001: 2000, QS-9000, ISO- 14001 etc and other ISO series of standards) • SQA/IQA Audit, Process Capability Analysis, Statistical Applications, Reliability, Availability & Maintainability. Taguchi method, DOE, Six Sigma. • SQA, Quality Assurance, ISO, CMM, CMMi. • Knowledge of Software Development Life Cycle. • Quality Standards/Methodologies known: CMM-I, Six- Sigma. • SDLC Knowledge: I am familiar with most of well know life cycle models and complete software life cycle provided on SDLC. • Management Skills: Very good Communication, Presentation, and Interpersonal Communication Skills. Good team player, responsibility handling. • Learning Japanese language for the last 7 months and preparing for JLPT Level 4 worldwide examination. ACADEMICS  Selected as ATM for CMMI Multi Modal SVC/DEV V 1.3 ML 5 in Birlasoft.  SEI CMMI ATM training for CMMI Dev 1.2 ML 5 in HCL  Certified Lead Auditor from Bureau of Indian Standards Classification: BirlasoftGDC Internal
  • 4. (BIS)  ITIL V3 foundation Training  Six- Sigma Green Belt from Indian Statistical Institute, Delhi  Masters in Total Quality Management (M.T.Q.M.) from University of Lucknow, (2004-06).  M.Sc. in Statistics from Lucknow University. Year of completion: 2004  Bachelor of Science (B.Sc.) in Physics, Statistics and Mathematics from Lucknow University. Year of Completion: 2002.  Intermediate from I.S.C Board. Year of Completion: 1998.  Higher Secondary School from I.C.S.E Board. Year of Completion: 1996. TOOLS KNOWN • MS-Office, MS Word, MS Excel, PowerPoint, Minitab, Share Point, Sales force etc • Basic language PERSONAL SKILLS  Positive Attitude, Quick learner, Good communication/analytical Skills.  An individual with motivation, sincerity & time sense.  Seek Perfection, People management. Dynamic Quality Personnel with excellent team building and leadership abilities.  Strong communication and interpersonal skills to work in teams efficiently. TRAINING & PROJECTS HANDLED Organization : ZENITH computers Ltd. Department : PRODUCTION Project Guide : Sr Production Manager Mr.Vinayak Shinde Project Duration: 16th May 2005 to 16th August 2005. Project I: Statistical Process Control On Assembly Line Classification: BirlasoftGDC Internal
  • 5. In this project I used seven quality control tools to find out the frequency of serious, major, minor defects in the assembly line of Zenith. I calculated the UCL and LCL to find out what were the main causes of the defects that were occurring through the use of quality control tools & brainstorming. After the causes were found suggestions were given so that the special causes can be removed and also that they cannot reoccur. After few weeks of implementation again the process control chart was made & it was found that the process is in control. Project II: Time and Motion Study & Cost Benefit Analysis at Assembly Line The main objective of the project was to do Time and Motion Study on the assembly line and to do the cause and benefit analysis of the assembly line and to tell the loss in manufacturing to the company due to time loss & suggest ways to decrease the loss. The data was taken & various statistical tools like Histogram, Box plot, and Normal probability plot, Descriptive statistics & I-MR chart was used to give inference about the data. After inferring that the engineer were not on the right track I did cause and benefit analysis in which I showed the monthly loss & after that the yearly loss to the company against the ideal time. After that brainstorming was done & major causes of loss were found out and suggestions were given to control the loss. The suggestions were implemented & profit was gained from the results. Project III: Quality Manual (IMS) Based on ISO 9001:2000 & 14001:2004 Organization : THOMSON PRESS India Ltd. Department : IE & QA Project Guide : Chief Manager Dr. V.k.singh, Manager C.Ravi Raj Kumar Project Duration: 8th May 2006 to 8th August 2006. Project I: Statistical Process Control & Process Capability Study on Sheet fed Area In this project the main cause for sheet rejection was found out using the total quality control tools. Thereafter using the process capability study I founded out the limits or the least variation allowed for the densities of the four colours that was the main Classification: BirlasoftGDC Internal
  • 6. cause for sheet rejection. For process capability study, descriptive statistics, ANOVA moving range chart & other statistical tools were used. After implementation there was a significant reduction in colour variation. Project II: Design of Experiment (in completion phase) In the last week of my training I started a project on Design of Experiments with the objective of reducing colour variation. I founded various factors, response variables & treatment. After this I decided to use a particular experimental design but due to lack of time the experiments cannot be conducted and the project was left in the completion phase. Classification: BirlasoftGDC Internal
  • 7. cause for sheet rejection. For process capability study, descriptive statistics, ANOVA moving range chart & other statistical tools were used. After implementation there was a significant reduction in colour variation. Project II: Design of Experiment (in completion phase) In the last week of my training I started a project on Design of Experiments with the objective of reducing colour variation. I founded various factors, response variables & treatment. After this I decided to use a particular experimental design but due to lack of time the experiments cannot be conducted and the project was left in the completion phase. Classification: BirlasoftGDC Internal