SlideShare a Scribd company logo
CURRICULUM VITAE
GODOFREDO SURATOS LICUDAN
Address: 21 3rd Street Felicidad Village 3 San Mateo, Rizal Philippines
Telephone Nos.: 6325701961 (Res.No.) / 0536894813
E-mail: glicudan.c@stc.com.sa/gslicudan@yahoo.com
PROFILE:
I started my career as a Jr. Installer in Philippine Long Distance Telephone Company,
Inc. (PLDT Co. Inc.)subsidiary of SMART Communications Inc. and sustained various
positions up to Business Specialist - Management Level same company and as an
OSP Operation Manager in Fastel Services, Inc. – Telecommunication Contractor,
that I achieved thru Promotions and hardworks, from Seminars and Years of
Experienced. I’ve become more effective team builder with strong leadership
qualities, self-motivated with positive attitude and having excellent interpersonal
skills, to relate to people at any level of management, excellent communication both
in written and oral (fluent in English and Pilipino, my Country’s dialect), innovative
and effective problem-solver with good decision making capabilities, well organized
and attentive to details, a team player with high level of initiative, strong dedication
and with ability to work in constantly changing environment.
Strong knowledgeable in the generation and application of Project Management
Principles, Concepts and Techniques including Procedure Generation, Approval, and
Implementation Knowledgeable of Business Principles and Problem Solving
Techniques using Rigorous and Rapid Management Analysis deriving required
resolutions Knowledgeable of Long Range Project Planning.
All of these Project Management Principles, Concept and Techniques were being
accomplished and represented through one of my strong skills in Computer Soft ware
in Ms Office Apllications (Word, Excel, Power Point, Access, MS Project), MS Outlook.
YEARS OF EXPERIENCED:
 3 years and 7 months in Norconsult Telematics Inc. – consulting firm for STC Inc.
 21 years in Philippine Long Distance Telephone Co. Inc.
 5 years in Fastel Services Inc.
 1 year in Electrical / Electronics Maintenance in Steniel Manufacturing Inc. –
Manufacturer for Corrugated Boxes in the Philippines.
KEY ACHIEVEMENTS:
 Completed various MSI, OSP, ISP projects in Philippine Long Distance Telephone
Co. Inc. subsidiary of SMART Communication, 21 years of service with the
company.
 Completed received contracted projects in OSP - FOC / Copper, Civil works from
Philippine Long Distance Telephone Co. Inc. in my 5 years in Fastel Services, Inc.
– Telecommunication Contractor, as an Operation Manager.
 Consultant for NCH Philippines Inc. that leads in receiving contracted OSP
projects in Philippine Long Distance Telephone Co. Inc. and completed within
timeframe.
 Achieved STC Jizan District FTTH 2012 Scope, completion of 5 FDT Jizan sites.
 Achieved STC Jizan District FTTH 2012 Out of Scope, completion of 2 FDT Jizan
and 4 Abu Arish sites.
 Achieved STC Jizan District FTTH 2013 First Quarter, completion of 2 FDT Jizan
and 4 Sabya sites.
 Achieved STC Jizan District, 8 FTTH HO and 5 FTTH code 19 completion within
target frame.
NORCONSULT TELEMATICS INC. for STC Jizan, KSA
JOB DESCRIPTIONS:
 Monitors and updates scheduled completion of FTTH, Key Account, MSAN, LTE
projects thru MSProject system OSP Handover (Network Projects Tracking
System and Network Financial Tracking System) for STC FNI Departments, Jizan
KSA.
 Inspects quality standards for FTTH, FTTH HO from Civil Works trenching layout,
HDPE installation, FDT, Feeder Cable, Optical Distribution Network Civil works and
Fiber Network installation
 Conduct Pre-PAT with Contractor and to correct any OIL’s, and attain scheduled
PAT for FTTH, FTTH HO and FTTH HO code 19 with Operations.
 Supervise testing of dB losses/OTDR traces of Primary and Secondary Fiber Optic
cable from FTB’s to Exchange and FDT to Exchange.
 Attend in acceptance for FOC related projects such as Key Accounts, FTTM, MSAN
and VDSL with STC Contractors, STC Inspectors and O&M STC Contractors.
 Attend in acceptance for ISP works done by Vendor Huawei and Alcatel Lucent at
Sabya, Jizan and Abu Arish Exchange from GPON OLT cards installation , patching to
OSF 1:2 (Optical Splitter Panel) to splicing ODF panels with dB loss test.
 Attend in acceptance on FTTM cards installation, patching works done by Vendor
Huawei at Exchange from OLT to OSF 2:4 splitter to splicing ODF or existing ODF.
 Provides revision, as built design plan for FTTH to STC Design Network.
 Provides work status of FTTH, KA, LTE and MSAN projects to STC Managements.
 Materials checking and requesting for FTTH, KA, LTE, MSAN projects.
 Coordinates with STC within FTTH or OSP/ISP related issues.
 Coordinates and Supervise STC Contractor for FTTH, KA, LTE, MSAN projects status
to update in NPTS and NFTS system.
 And, others related to FTTH or OSP/ISP projects and or task given by STC higher
Management
 Performs application of MDT in the system.
 Performs uploading of Granites, FJS and others in NPTS.
FASTEL SERVICES INC.
JOB DESCRIPTIONS:
 Performs in the development and implementation of all projects in Fastel Services
Inc. plans in line with the corporate objectives of the company.
 Directly manages Fastel Services Inc. within mandates by providing good
leadership and facilitates works processes in order to achieve high performance
standards.
 Implements and interprets changes by providing guidance and support necessary
for continuous performance.
 Ensures compliance with Company policies, procedures and quality standards to
reach objective goals.
 Represents the Company on meetings with PLDT Engineers, PLDT Executives,
Government Entities regarding Outside Plant projects status.
 Prepares quotation/bids thru SRM portal on OSP projects from PLDT and SMART
Telecoms.
a. Resurvey BOQ proposals.
a.1 FTTH Installation with repair proposals from ODF to LCP/NAP.
a.2 New areas – OSP primary/secondary
a.3 Civil works
a.4 And other related.
 Monitors for the timely completion of new projects from start to acceptance using
chart being prepared by PLDT Executives – FOC, Copper Cable installation (Aerial or
Underground installation), Next Generation Network AG, from Cabinet Basepad
Construction to Primary (FOC) and Secondary cable (Copper) installation and Internet
Protocol Digital Subscriber Line Access Module (IPDSLAM) projects.
NCH Philippines, Inc.
JOB DESCRIPTIONS:
 Provide information regarding Outside Plant operations particularly
Telephone Cross Connect Cabinets, Distribution Point layouts.
 Prepare quotations on Outside Plant projects.
 Attend meetings to different Telecommunication companies.
 Performs training and seminar to NCH crews.
PHILIPPINE LONG DISTANCE CO. INC.
JOB DESCRIPTIONS:
 OUTSIDE PLANT CABLE SPLICING
1. Works on aerial platform ,manhole, and basement of large buildings in splicing
conductors in the cable to keep the circuit continuous.
2. Splices aerial and underground cables , straight bridge or butt splicing, installing
and cable splicing terminals, splicing house cables, splicing loading coils, and
cable transfer.
3. Repairs individual cable trouble and test conductors and cables to ensure proper
connections.
4. Conducts flow analysis and repair leaks, installation of valve and accessories on
pressurized cables to determine/locate cable pressures and leaks.
5. Performs inspection of manhole, optical testing, and splicing of fiber optic cables.
6. Coordinates and assists Central Office ( C.O ) personnel in identifying,
enumerating
testing, and measuring faults in the telephone lines with the use of testing
equipment
to locate and analyze ICT’s and MCT’s.
7. Drives Company service vehicle while in the conduct of performing regular
duties.
 SUBSCRIBER INSTALLATION & MAINTENANCE
1. Installs subscribers’ telephone instrument including the terminal outlet and its
accessories (J-hook, pole clamp, house bracket, line or drop wires, protector,
connecting block, and grounding system) for all types of company provided
telephone instrument.
2. Repairs troubles on subscribers lines using handset; conduct test and restores
service by replacing defective wires, instruments, protectors, or tightening of
looses connections.
3. Performs corrective maintenance by:
 Testing all facilities involved.
 Restore service by temporary change pair.
 Repair of minor faults at XCon, DLC, DP and at MDF Horizontal.
4. Installs and performs operational functional test on Access Subscriber Loop
carrier ( multiplex equipment ); repairs/maintains multiplex equipment by
replacing
defective modules of the following:
 DLC – Digital Loop Carrier
 Subscriber Carrier Equipment
5. Coordinates with Main Distribution Frame (MDF), Repair-Test Dispatch (RTD)
personnel and other sections, as needed, on work development, completion,
and/or new work order and repair tickets.
6. Lists work development, completion, and other data that comprises the
Consumption and Work Report (CWR) and submits to supervisor at the end of
his
duty.
7. Conducts preventive maintenance on submitted plant assessment by supervisor
to
ensure that all installation and repaired telephone lines are within standard
specification set by the Company.
8. Drives Company service vehicle while in the conduct of performing regular
duties.
 PBX INSTALLATION & MAINTENANCE
1. Performs installation, routine maintenance, testing and checking of all types of
Electronics Private Branch Exchange (PABX) and Key Telephone System
(KTS)
including trunk lines and local stations installed at PLDT and customer premise.
2. Repairs all types of PABX and KTS equipment, local stations, trunk lines and
attendant cabinets, switchboards and signaling equipment by localizing trouble
(using special tools such as Test Tones, Lap Top, VMN Tester, etc.) checking
relays, replacing of defective modules, and re-programming, if necessary.
3. Maintains trunk lines of subscriber-owned PABX and KTS equipment.
4. Performs coordination activities with 176 and climbing of poles relative to the
installation and troubleshooting activities on outside cables, tie lines, DID trunk
and DDD trunklines.
5. Drives Company service vehicle while in the conduct of performing regular
duties.
 ADSL INSTALLATION & MAINTENANCE
1. Perform cable parameter testing ( pre-qualification ).
2. Interprets test results based on accepted PLDT standards.
3. Creates cable facilities as appropriate.
4. Verify CPE capability based on subscriber requirement.
5. Install ADSL modem and accessories such as splitter, power adapter, UTP Cat 5
cables, patch cord and telephone line cord.
6. Configures ADSL modem as appropriate.
7. Installs ADSL software and configures CPE.
8. Performs functional test on newly installed ADSL service.
9. Secures approval from subscriber and complete required documents.
10. Drives Company service vehicle while in the conduct of performing regular
duties.
STENIEL MANUFACTURING INC.
JOB DESCRIPTIONS:
 Performs to maintain proper operation of corrugated box making machine like 55
Aglue
Machine, 51B Triple Preheater and Transfer Conveyors (Flexo 90).
a). to check and change defective overload relays, time relays, auxiliary relays
and fuse breakers which secures protection against overload current.
b). to change and troubleshoots control panel modules composed of counters
with magic eye that contains solid state devices to count finish made boxes.
c). to check and change oils and grease of corrugated box making machine.
d). to clean the machine after operations.
 Performs to maintain proper lightings of the company.
a). to check and change busted lamps.
b). to install additional lightings.
c). to check electrical splices; to tape open wires.
d). to check and maintain high voltages generators; checking oil and water
level.
 Performs to maintain proper operation of communications such as telephone, audio
amplifiers,
radios and television sets.
a). to check and change defective telephone lines and sets.
b). to check and troubleshoots audio amplifiers for paging.
c). to troubleshoots defective radios and television sets.
 Performs to maintain proper operations of company vehicles.
a). to check and change old low battery charge batteries.
b). to check, change and install electrical wires of vehicles
c). to check and change busted lights.
EDUCATION:
Bachelor of Science in Electrical Engineering – University of the East (Caloocan City, Phils.)
Year 1986
Electronic Communication Technology – Asian Institute of Applied Electronics (QC Phils.)
Year 1983
Printing Technology – Technological University of the Philippines (Manila, Phils.)
Year 1980
TRAININGS & SEMINARS:
 Huawei FTTH Service Configuration in U2000 (STC-KSA Riyadh) Jan. 27 – 28,
2013.
 Huawei FTTH GPON Fundamentals (STC-KSA Riyadh) Jan. 27 – 28, 2013
 Huawei FTTm GPON Fibre Optic Alternative Connections (STC-KSA) Jan. 27 - 28,
2013
 Huawei Guide to Detecting ODN Links (STC-KSA Riyadh) Jan. 27 – 28, 2013
 Huawei GPON FTTH ONT Introduction (STC-KSA Riyadh) Jan. 27 – 28, 2013
 Huawei SmartAx MA5600T GPON Hardware Description (STC) Jan. 27 -28, 2013
 Alcatel Lucent 7342 ISAM FTTU (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent 5520,5529 AMS Product Family (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent 7342, 7360 ISAM (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent FTTx GPON Fundamentals (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent GPON Essentials (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent ISAM 7342 ONT VoIp Configuration (STC-KSA) Jan. 29, 2013
 Alcatel Lucent PON Technology Overview (STC-KSA Riyadh) Jan. 29, 2013
 Alcatel Lucent FTTH FDOC Granite User Guide (STC-KSA) Jan. 29, 2013
 Network Function Virtualization (NFV) and Software Defined Networks (SDN) –
Webex Seminar – Riyadh
 C/C ++ Programming (Computer Base Training)
 Management Fundamentals (Computer Base Training)
 Interpreting Financial Statements (CBT)
 Fundamental of Data Communications
 Time Based Competition
 ICMS General Provisioning Course (CBT)
 DLC – Fastlink Operation and Maintenance
 Taking Charge of Change/Managing Change Class 990030
 Dynatel hands-on & Trouble Shooting - 3M Phils.
 Copper Splicing Training – 3M Phils. Technical Center
 Billing Process & Billing Quality Class no. 990031
 Cost Center Budget System Class no. 990013
 Basic Fire Brigade Training Class no. 5
 Order Management Course Class no. 980001
 Microsoft Windows 95 Class no. 980030
 HKP 816 KTS Operation and Mtce Class no. 980001
 GSX 1832 KTS Operation and Mtce Class no. 980003
 Outside Plant Cable Cross Training Class no.65
 Lotus 123 w/ PC Orientation & DOS class no. 75
 Management Presentation Skill Class no. 5
 Circle Report Documentation Class no. 6
 Statistical Process Control Class no. 1
 First Aid Training Class no. 3-94
 Basic Life Support Training (CPR)
 Circle Leadership Class no. 2
 Customer Service Improvement Circle
 Advance Station Repair II Class no. 3
 Basic Station Installation Class no. 78
 Radio/TV Technician
PROFESSIONAL MEMBERSHIPS:
Linkeden
INTEREST:
Sports, Music
AWARDS
 Top Performer: 2nd Quarter 1995 – PLDT Co.
 Top Performer: 4th Quarter 1995 – PLDT Co.
 Top Performer Annual Awardee 1995 – PLDT Co.
 Outstanding Productivity and Safety Conscious Plant Employee: Dec 7, 1994 - PLDT
Co.
 Top Performer: 2nd Quarter 1993 – PLDT Co.
 Top Performer: 3rd Quarter 1993 – PLDT Co.
 Top Performer: 4th Quarter 1993 – PLDT Co.
 Top Performer Annual Awardee : 1993 – PLDT Co.
 Deserving Performance: 1993 - PLDT Co.
 Top Performer: 1st Quarter 1992 – PLDT Co.
 Meritorious Performance: 1992 – PLDT Co.
 Top Performer Annual Awardee: 1992 – PLDT Co.
 Meritorious Performance: 1989 – PLDT Co.
 Top Performer: 2nd Quarter 1985 – PLDT Co.
 First Honor Awardee with Medal – Radio/ TV Technician – Lions Pres. League of
Phils./ NMYC

More Related Content

What's hot

Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
Aslam Fahmi
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
Aslam Fahmi
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
safder sultan
 
RESUME 16.3.16 updated
RESUME 16.3.16 updatedRESUME 16.3.16 updated
RESUME 16.3.16 updatedSandeep Tiwari
 
Jesse plunkett
Jesse plunkettJesse plunkett
Jesse plunkett
Jesse Plunkett
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 

What's hot (20)

resume
resumeresume
resume
 
resume
resumeresume
resume
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
NEIL 2015 RESUME
NEIL 2015 RESUMENEIL 2015 RESUME
NEIL 2015 RESUME
 
karunakar.u
karunakar.ukarunakar.u
karunakar.u
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
List_of_Completed_Projects
List_of_Completed_ProjectsList_of_Completed_Projects
List_of_Completed_Projects
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
MAIN RESUME
MAIN RESUMEMAIN RESUME
MAIN RESUME
 
Rashid Mahmood
Rashid MahmoodRashid Mahmood
Rashid Mahmood
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
RESUME 16.3.16 updated
RESUME 16.3.16 updatedRESUME 16.3.16 updated
RESUME 16.3.16 updated
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
Jesse plunkett
Jesse plunkettJesse plunkett
Jesse plunkett
 
Jesse Plunkett
Jesse PlunkettJesse Plunkett
Jesse Plunkett
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
SANTOSH_TELECOM_CV
SANTOSH_TELECOM_CVSANTOSH_TELECOM_CV
SANTOSH_TELECOM_CV
 

Similar to CURRICULUM VITAE

Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama,PMP
 
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV newMydel Berdin
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013Reynaldo Revilla
 
Dean Costello Resume
Dean Costello ResumeDean Costello Resume
Dean Costello ResumeDean Costello
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
Mohammed Athar Malik
 
Keith Francis Dyson Resume 8-8-2016
Keith Francis Dyson Resume 8-8-2016Keith Francis Dyson Resume 8-8-2016
Keith Francis Dyson Resume 8-8-2016Keith Dyson
 
FibreUP
FibreUPFibreUP
FibreUP
ReezaPalm1
 
Garry Nicholas Bunce CV
Garry Nicholas Bunce CVGarry Nicholas Bunce CV
Garry Nicholas Bunce CVGarry Bunce
 

Similar to CURRICULUM VITAE (20)

Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Debasis Mondal
Debasis MondalDebasis Mondal
Debasis Mondal
 
lizardoCV
lizardoCVlizardoCV
lizardoCV
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
Florencio Salvador
Florencio SalvadorFlorencio Salvador
Florencio Salvador
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
 
Resume
ResumeResume
Resume
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
Saeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CVSaeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CV
 
Dean Costello Resume
Dean Costello ResumeDean Costello Resume
Dean Costello Resume
 
MD Saddam Husen
MD Saddam HusenMD Saddam Husen
MD Saddam Husen
 
Resume abhishek
Resume abhishekResume abhishek
Resume abhishek
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Keith Francis Dyson Resume 8-8-2016
Keith Francis Dyson Resume 8-8-2016Keith Francis Dyson Resume 8-8-2016
Keith Francis Dyson Resume 8-8-2016
 
FibreUP
FibreUPFibreUP
FibreUP
 
DR - CURRICULUM VITAE - Novemeber 2014
DR - CURRICULUM VITAE - Novemeber 2014DR - CURRICULUM VITAE - Novemeber 2014
DR - CURRICULUM VITAE - Novemeber 2014
 
Garry Nicholas Bunce CV
Garry Nicholas Bunce CVGarry Nicholas Bunce CV
Garry Nicholas Bunce CV
 

CURRICULUM VITAE

  • 1. CURRICULUM VITAE GODOFREDO SURATOS LICUDAN Address: 21 3rd Street Felicidad Village 3 San Mateo, Rizal Philippines Telephone Nos.: 6325701961 (Res.No.) / 0536894813 E-mail: glicudan.c@stc.com.sa/gslicudan@yahoo.com PROFILE: I started my career as a Jr. Installer in Philippine Long Distance Telephone Company, Inc. (PLDT Co. Inc.)subsidiary of SMART Communications Inc. and sustained various positions up to Business Specialist - Management Level same company and as an OSP Operation Manager in Fastel Services, Inc. – Telecommunication Contractor, that I achieved thru Promotions and hardworks, from Seminars and Years of Experienced. I’ve become more effective team builder with strong leadership qualities, self-motivated with positive attitude and having excellent interpersonal skills, to relate to people at any level of management, excellent communication both in written and oral (fluent in English and Pilipino, my Country’s dialect), innovative and effective problem-solver with good decision making capabilities, well organized and attentive to details, a team player with high level of initiative, strong dedication and with ability to work in constantly changing environment. Strong knowledgeable in the generation and application of Project Management Principles, Concepts and Techniques including Procedure Generation, Approval, and Implementation Knowledgeable of Business Principles and Problem Solving Techniques using Rigorous and Rapid Management Analysis deriving required resolutions Knowledgeable of Long Range Project Planning. All of these Project Management Principles, Concept and Techniques were being accomplished and represented through one of my strong skills in Computer Soft ware in Ms Office Apllications (Word, Excel, Power Point, Access, MS Project), MS Outlook. YEARS OF EXPERIENCED:  3 years and 7 months in Norconsult Telematics Inc. – consulting firm for STC Inc.  21 years in Philippine Long Distance Telephone Co. Inc.  5 years in Fastel Services Inc.  1 year in Electrical / Electronics Maintenance in Steniel Manufacturing Inc. – Manufacturer for Corrugated Boxes in the Philippines.
  • 2. KEY ACHIEVEMENTS:  Completed various MSI, OSP, ISP projects in Philippine Long Distance Telephone Co. Inc. subsidiary of SMART Communication, 21 years of service with the company.  Completed received contracted projects in OSP - FOC / Copper, Civil works from Philippine Long Distance Telephone Co. Inc. in my 5 years in Fastel Services, Inc. – Telecommunication Contractor, as an Operation Manager.  Consultant for NCH Philippines Inc. that leads in receiving contracted OSP projects in Philippine Long Distance Telephone Co. Inc. and completed within timeframe.  Achieved STC Jizan District FTTH 2012 Scope, completion of 5 FDT Jizan sites.  Achieved STC Jizan District FTTH 2012 Out of Scope, completion of 2 FDT Jizan and 4 Abu Arish sites.  Achieved STC Jizan District FTTH 2013 First Quarter, completion of 2 FDT Jizan and 4 Sabya sites.  Achieved STC Jizan District, 8 FTTH HO and 5 FTTH code 19 completion within target frame. NORCONSULT TELEMATICS INC. for STC Jizan, KSA JOB DESCRIPTIONS:  Monitors and updates scheduled completion of FTTH, Key Account, MSAN, LTE projects thru MSProject system OSP Handover (Network Projects Tracking System and Network Financial Tracking System) for STC FNI Departments, Jizan KSA.  Inspects quality standards for FTTH, FTTH HO from Civil Works trenching layout, HDPE installation, FDT, Feeder Cable, Optical Distribution Network Civil works and Fiber Network installation  Conduct Pre-PAT with Contractor and to correct any OIL’s, and attain scheduled PAT for FTTH, FTTH HO and FTTH HO code 19 with Operations.  Supervise testing of dB losses/OTDR traces of Primary and Secondary Fiber Optic cable from FTB’s to Exchange and FDT to Exchange.  Attend in acceptance for FOC related projects such as Key Accounts, FTTM, MSAN and VDSL with STC Contractors, STC Inspectors and O&M STC Contractors.
  • 3.  Attend in acceptance for ISP works done by Vendor Huawei and Alcatel Lucent at Sabya, Jizan and Abu Arish Exchange from GPON OLT cards installation , patching to OSF 1:2 (Optical Splitter Panel) to splicing ODF panels with dB loss test.  Attend in acceptance on FTTM cards installation, patching works done by Vendor Huawei at Exchange from OLT to OSF 2:4 splitter to splicing ODF or existing ODF.  Provides revision, as built design plan for FTTH to STC Design Network.  Provides work status of FTTH, KA, LTE and MSAN projects to STC Managements.  Materials checking and requesting for FTTH, KA, LTE, MSAN projects.  Coordinates with STC within FTTH or OSP/ISP related issues.  Coordinates and Supervise STC Contractor for FTTH, KA, LTE, MSAN projects status to update in NPTS and NFTS system.  And, others related to FTTH or OSP/ISP projects and or task given by STC higher Management  Performs application of MDT in the system.  Performs uploading of Granites, FJS and others in NPTS. FASTEL SERVICES INC. JOB DESCRIPTIONS:  Performs in the development and implementation of all projects in Fastel Services Inc. plans in line with the corporate objectives of the company.  Directly manages Fastel Services Inc. within mandates by providing good leadership and facilitates works processes in order to achieve high performance standards.  Implements and interprets changes by providing guidance and support necessary for continuous performance.  Ensures compliance with Company policies, procedures and quality standards to reach objective goals.  Represents the Company on meetings with PLDT Engineers, PLDT Executives, Government Entities regarding Outside Plant projects status.  Prepares quotation/bids thru SRM portal on OSP projects from PLDT and SMART Telecoms.
  • 4. a. Resurvey BOQ proposals. a.1 FTTH Installation with repair proposals from ODF to LCP/NAP. a.2 New areas – OSP primary/secondary a.3 Civil works a.4 And other related.  Monitors for the timely completion of new projects from start to acceptance using chart being prepared by PLDT Executives – FOC, Copper Cable installation (Aerial or Underground installation), Next Generation Network AG, from Cabinet Basepad Construction to Primary (FOC) and Secondary cable (Copper) installation and Internet Protocol Digital Subscriber Line Access Module (IPDSLAM) projects. NCH Philippines, Inc. JOB DESCRIPTIONS:  Provide information regarding Outside Plant operations particularly Telephone Cross Connect Cabinets, Distribution Point layouts.  Prepare quotations on Outside Plant projects.  Attend meetings to different Telecommunication companies.  Performs training and seminar to NCH crews. PHILIPPINE LONG DISTANCE CO. INC. JOB DESCRIPTIONS:  OUTSIDE PLANT CABLE SPLICING 1. Works on aerial platform ,manhole, and basement of large buildings in splicing conductors in the cable to keep the circuit continuous. 2. Splices aerial and underground cables , straight bridge or butt splicing, installing and cable splicing terminals, splicing house cables, splicing loading coils, and cable transfer. 3. Repairs individual cable trouble and test conductors and cables to ensure proper connections. 4. Conducts flow analysis and repair leaks, installation of valve and accessories on pressurized cables to determine/locate cable pressures and leaks. 5. Performs inspection of manhole, optical testing, and splicing of fiber optic cables. 6. Coordinates and assists Central Office ( C.O ) personnel in identifying, enumerating
  • 5. testing, and measuring faults in the telephone lines with the use of testing equipment to locate and analyze ICT’s and MCT’s. 7. Drives Company service vehicle while in the conduct of performing regular duties.  SUBSCRIBER INSTALLATION & MAINTENANCE 1. Installs subscribers’ telephone instrument including the terminal outlet and its accessories (J-hook, pole clamp, house bracket, line or drop wires, protector, connecting block, and grounding system) for all types of company provided telephone instrument. 2. Repairs troubles on subscribers lines using handset; conduct test and restores service by replacing defective wires, instruments, protectors, or tightening of looses connections. 3. Performs corrective maintenance by:  Testing all facilities involved.  Restore service by temporary change pair.  Repair of minor faults at XCon, DLC, DP and at MDF Horizontal. 4. Installs and performs operational functional test on Access Subscriber Loop carrier ( multiplex equipment ); repairs/maintains multiplex equipment by replacing defective modules of the following:  DLC – Digital Loop Carrier  Subscriber Carrier Equipment 5. Coordinates with Main Distribution Frame (MDF), Repair-Test Dispatch (RTD) personnel and other sections, as needed, on work development, completion, and/or new work order and repair tickets. 6. Lists work development, completion, and other data that comprises the Consumption and Work Report (CWR) and submits to supervisor at the end of his duty. 7. Conducts preventive maintenance on submitted plant assessment by supervisor to ensure that all installation and repaired telephone lines are within standard specification set by the Company. 8. Drives Company service vehicle while in the conduct of performing regular duties.  PBX INSTALLATION & MAINTENANCE 1. Performs installation, routine maintenance, testing and checking of all types of
  • 6. Electronics Private Branch Exchange (PABX) and Key Telephone System (KTS) including trunk lines and local stations installed at PLDT and customer premise. 2. Repairs all types of PABX and KTS equipment, local stations, trunk lines and attendant cabinets, switchboards and signaling equipment by localizing trouble (using special tools such as Test Tones, Lap Top, VMN Tester, etc.) checking relays, replacing of defective modules, and re-programming, if necessary. 3. Maintains trunk lines of subscriber-owned PABX and KTS equipment. 4. Performs coordination activities with 176 and climbing of poles relative to the installation and troubleshooting activities on outside cables, tie lines, DID trunk and DDD trunklines. 5. Drives Company service vehicle while in the conduct of performing regular duties.  ADSL INSTALLATION & MAINTENANCE 1. Perform cable parameter testing ( pre-qualification ). 2. Interprets test results based on accepted PLDT standards. 3. Creates cable facilities as appropriate. 4. Verify CPE capability based on subscriber requirement. 5. Install ADSL modem and accessories such as splitter, power adapter, UTP Cat 5 cables, patch cord and telephone line cord. 6. Configures ADSL modem as appropriate. 7. Installs ADSL software and configures CPE. 8. Performs functional test on newly installed ADSL service. 9. Secures approval from subscriber and complete required documents. 10. Drives Company service vehicle while in the conduct of performing regular duties. STENIEL MANUFACTURING INC. JOB DESCRIPTIONS:  Performs to maintain proper operation of corrugated box making machine like 55 Aglue Machine, 51B Triple Preheater and Transfer Conveyors (Flexo 90). a). to check and change defective overload relays, time relays, auxiliary relays and fuse breakers which secures protection against overload current. b). to change and troubleshoots control panel modules composed of counters with magic eye that contains solid state devices to count finish made boxes. c). to check and change oils and grease of corrugated box making machine. d). to clean the machine after operations.  Performs to maintain proper lightings of the company. a). to check and change busted lamps. b). to install additional lightings. c). to check electrical splices; to tape open wires.
  • 7. d). to check and maintain high voltages generators; checking oil and water level.  Performs to maintain proper operation of communications such as telephone, audio amplifiers, radios and television sets. a). to check and change defective telephone lines and sets. b). to check and troubleshoots audio amplifiers for paging. c). to troubleshoots defective radios and television sets.  Performs to maintain proper operations of company vehicles. a). to check and change old low battery charge batteries. b). to check, change and install electrical wires of vehicles c). to check and change busted lights. EDUCATION: Bachelor of Science in Electrical Engineering – University of the East (Caloocan City, Phils.) Year 1986 Electronic Communication Technology – Asian Institute of Applied Electronics (QC Phils.) Year 1983 Printing Technology – Technological University of the Philippines (Manila, Phils.) Year 1980 TRAININGS & SEMINARS:  Huawei FTTH Service Configuration in U2000 (STC-KSA Riyadh) Jan. 27 – 28, 2013.  Huawei FTTH GPON Fundamentals (STC-KSA Riyadh) Jan. 27 – 28, 2013  Huawei FTTm GPON Fibre Optic Alternative Connections (STC-KSA) Jan. 27 - 28, 2013  Huawei Guide to Detecting ODN Links (STC-KSA Riyadh) Jan. 27 – 28, 2013  Huawei GPON FTTH ONT Introduction (STC-KSA Riyadh) Jan. 27 – 28, 2013  Huawei SmartAx MA5600T GPON Hardware Description (STC) Jan. 27 -28, 2013  Alcatel Lucent 7342 ISAM FTTU (STC-KSA Riyadh) Jan. 29, 2013  Alcatel Lucent 5520,5529 AMS Product Family (STC-KSA Riyadh) Jan. 29, 2013  Alcatel Lucent 7342, 7360 ISAM (STC-KSA Riyadh) Jan. 29, 2013  Alcatel Lucent FTTx GPON Fundamentals (STC-KSA Riyadh) Jan. 29, 2013
  • 8.  Alcatel Lucent GPON Essentials (STC-KSA Riyadh) Jan. 29, 2013  Alcatel Lucent ISAM 7342 ONT VoIp Configuration (STC-KSA) Jan. 29, 2013  Alcatel Lucent PON Technology Overview (STC-KSA Riyadh) Jan. 29, 2013  Alcatel Lucent FTTH FDOC Granite User Guide (STC-KSA) Jan. 29, 2013  Network Function Virtualization (NFV) and Software Defined Networks (SDN) – Webex Seminar – Riyadh  C/C ++ Programming (Computer Base Training)  Management Fundamentals (Computer Base Training)  Interpreting Financial Statements (CBT)  Fundamental of Data Communications  Time Based Competition  ICMS General Provisioning Course (CBT)  DLC – Fastlink Operation and Maintenance  Taking Charge of Change/Managing Change Class 990030  Dynatel hands-on & Trouble Shooting - 3M Phils.  Copper Splicing Training – 3M Phils. Technical Center  Billing Process & Billing Quality Class no. 990031  Cost Center Budget System Class no. 990013  Basic Fire Brigade Training Class no. 5  Order Management Course Class no. 980001  Microsoft Windows 95 Class no. 980030  HKP 816 KTS Operation and Mtce Class no. 980001  GSX 1832 KTS Operation and Mtce Class no. 980003  Outside Plant Cable Cross Training Class no.65  Lotus 123 w/ PC Orientation & DOS class no. 75  Management Presentation Skill Class no. 5  Circle Report Documentation Class no. 6  Statistical Process Control Class no. 1  First Aid Training Class no. 3-94  Basic Life Support Training (CPR)  Circle Leadership Class no. 2  Customer Service Improvement Circle  Advance Station Repair II Class no. 3
  • 9.  Basic Station Installation Class no. 78  Radio/TV Technician PROFESSIONAL MEMBERSHIPS: Linkeden INTEREST: Sports, Music AWARDS  Top Performer: 2nd Quarter 1995 – PLDT Co.  Top Performer: 4th Quarter 1995 – PLDT Co.  Top Performer Annual Awardee 1995 – PLDT Co.  Outstanding Productivity and Safety Conscious Plant Employee: Dec 7, 1994 - PLDT Co.  Top Performer: 2nd Quarter 1993 – PLDT Co.  Top Performer: 3rd Quarter 1993 – PLDT Co.  Top Performer: 4th Quarter 1993 – PLDT Co.  Top Performer Annual Awardee : 1993 – PLDT Co.  Deserving Performance: 1993 - PLDT Co.  Top Performer: 1st Quarter 1992 – PLDT Co.  Meritorious Performance: 1992 – PLDT Co.  Top Performer Annual Awardee: 1992 – PLDT Co.  Meritorious Performance: 1989 – PLDT Co.  Top Performer: 2nd Quarter 1985 – PLDT Co.  First Honor Awardee with Medal – Radio/ TV Technician – Lions Pres. League of Phils./ NMYC