This document describes a Six Sigma project to improve the process of assigning costing sheets to projects. It outlines the current process where project definition forms are submitted without guidelines for selecting the correct costing sheet, sometimes resulting in incorrect assignments. The team developed a costing sheet selection tool in the form of spreadsheets to provide criteria and assist users in choosing the proper costing sheet. This is projected to standardize the process, reduce errors, and cut down on rework from incorrect assignments.
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012swift2
Mariana Bozesans "Impact Investing" leitet die derzeitige Wende im Investitionswesen mit ein - Sinnvolles Investment schlägt Investment, das alleine auf Renditen schielt. Mariana Bozesans slideshare belegt mit Zahlen, inwiefern Impact investing der klassischen Investitionspraxis überlegen ist.
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012swift2
Mariana Bozesans "Impact Investing" leitet die derzeitige Wende im Investitionswesen mit ein - Sinnvolles Investment schlägt Investment, das alleine auf Renditen schielt. Mariana Bozesans slideshare belegt mit Zahlen, inwiefern Impact investing der klassischen Investitionspraxis überlegen ist.
www.onlineassignment.net is a 24*7 online portal dedicated to fulfilling students' need from across the globe. Be it assignment, project or thesis, we can provide you quality solution within the deadline set by you. All levels and from any course of study, you need not worry anymore.
Homework Help | Assignment Help | Project Help | Online Tutoring | Math Help | Programming Help | Engineering | Computer Science | AutoCad
www.onlineassignment.net
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docxbjohn46
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the effort necessary to complete the project. The estimate should be in units of days or fractions of days. All work to determine the effort should be shown. Provided estimate55Included software development tasks in estimate1010Broke down software development tasks1010Included standard software development phases1010Included project management tasks1010Broke down project management tasks1010Included other tasks (e.g., training)1010Used method described in #4552. Assumptions: Document the assumptions made to determine the effort estimate in a list. 10103. Describe the method(s) used to determine the effort estimate. 10104. Identify and describe the advantages and disadvantages of the method(s) used.10100100100Second submission90%90
Sheet3
Windshield Survey
Assignment Guidelines
A. Windshield Survey
The Windshield Survey is comprised of general qualitative observations that give you a snapshot of the community that you can capture as you drive/walk through the community. The demographic data can be obtained online, through the public library, county or township administration buildings. Please address the following in a narrative format following APA guidelines:
1. Geographical description
· Boundaries, geographical, political, or economic, how is it seen.
· Housing an zoning
· Sign of decay
2. Health Resources
a. Type of services available: health department, private MD, dentist, hospital clinic,
b. pharmacy, health promotion, mental health
c. School and occupational health services
d. Official and voluntary services
e. Self help and support groups
f. Service organizations, faith-based programs
g. Stores (grocery, retail, drug, dry cleaning, etc.
h. Transportation
3. Citizen safety and protective services
a. Police and fire
b. Shelters for victims of abuse
c. Others: neighborhood watch etc.
4. Services provided by senior citizens senior centers, meals on wheels, transportation, day care, long term care.
a. Parks and recreational areas
5. Community welfare services beyond city/state aid as provisions for emergency food, shelter and clothing.
Below please see the rubric that will be used to grade your survey and due date instructions.
Assignment must be presented in an essay style using APA format in the required Arial 12 font with minimum of 1000 words.
Project 1 – Estimating Project EffortLearning Objectives
This project has been designed to re-enforce the following concepts of developing software solutions:
· Requirements Elicitation
· Requirements Analysis
· Functional Decomposition
· Task Identification
· Effort Estimating
In addition, students will be introduced to the reality of quickly developing effort estimates with poor, incomplete and possibly conflicting information. Scenario
The Project Management Institute (PMI) has invited your company to respond to their Request for Proposal (RFP) regarding the deve.
The Economics of Scrum - Finance and CapitalizationCprime
• Understand the differences between Capital Expenditures and Operational Expense and the US and International laws which govern them.
• How software developed with Scrum can be used as an financial asset
• The Economics behind Scrum and why it makes sense in financial world
• Why Scrum is better than suited than Waterfall to deliver value and lower costs
• The effect on a company’s bottom line (P&L)
• Metrics which will show Scrum’s ROI and how to Predict future value
• Lesson learned from companies that have implemented Scrum and financial measures to predict value
Running Head Project Overview Statement1Project Overview Stat.docxtodd581
Running Head: Project Overview Statement 1
Project Overview Statement 3
Project Overview Statement
Krishna Marepalli - 170068
Harrisburg University
PMGT 540-50
PROJECT OVERVIEW STATEMENT
Project Name
Hardware Deployment for ABC Company
Project No.
Project Manager
Krishna Marepalli
Problem/Opportunity
ABC company has had serious challenges emanating from its hardware system, which has posed major shortfalls in the proper functioning of the company. The software system cannot function well with the current old-hardware in place. The central processing unit, computer data storage, monitor, motherboard, graphic card, keyboard, and sound card are not completely compatible with the current software and therefore the need to deploy a more current hardware. In the past, the ABC company staffs have been raising complains of non-response from the current hardware to the newly innovated software in the market. There has also been a total failure from some other parts like motherboard and keyboard of the computer system. Therefore, deploying a new hardware system in the company would enable solve the challenges ABC staff were undergoing with the old hardware. The company programs and other activities would run very smoothly with the newly deployed hardware in place (Kerzner & Kerzner, 2017).
Goal
The main goal of the new hardware deployment is to ensure ABC company and their staffs easily get operations executed with advance technological appliances. All its software and hardware are compatible and easy work.
Objectives
· To deploy the most current hardware system to ABC company
· Ensure compatibility between the current software and the newly deployed hardware.
· To provide all ABC Company staffs access the newly deployed hardware system.
· Improve the overall functionality and efficient program progress of ABC Company by hardware deployment.
· Decommission the already existing hardware system.
Success Criteria
· The new hardware is deployed, and all old hardware decommissioned.
· All ABC staff can efficiently work and increase the productivity of the company.
· The new hardware system becomes very reliable and efficient for use by the ABC Company.
· The efficient flow of work is once again assured by the newly deployed hardware (Kerzner & Kerzner, 2017).
Assumptions/Risks/Obstacles.
· A brief training on ABC staff would be carried out for acquaintance with the newly deployed hardware.
· An assumption is that it would take a little longer time for the new hardware to be fully deployed and the staff to get used to it.
· Absenteeism by any staff during the training on the use of the new hardware would be very risky.
· Availability of knowledgeable staff on matters deployment of new hardware would create a major obstacle during the actual deployment (Burgess, 2018).
References.
Burgess, A. (2018). AI in Action. In the Executive Guide to Artificial Intelligence . Deploy systems faster with services that reduce cost & demands on your .
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Costing Sheet R6S
1. 1
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Raytheon Six Sigma Specialist Project:Raytheon Six Sigma Specialist Project:
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
MARCH 2005MARCH 2005
2. 2
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Sponsor: Robert J Given
Mentor: Robert P Tamilio
Team Members:
James J Wright (Specialist Candidate)
Thomas Chase (Specialist)
Carol Prescott (Specialist)
Janet McCue (Specialist)
Karen Campo (Specialist)
Cathy Kurpiel (Specialist)
3. 3
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Visualize Phase
Problem Statement
– It has been identified that some
IDS/NCS projects have been assigned
an incorrect costing sheet, which is a
mechanism used to apply overhead
rates to booked actuals.
Vision Statement
– We will improve and standardize the
assignment of costing sheets with the
creation of a spreadsheet that will
assist in the completion of the Project
Definition Request Form (PDRF).
4. 4
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
• IDS projects should not have a NCS costing
sheet assigned to it.
• Capital costing sheets should only be assigned
to capital projects.
• Incorrect rates will continue to be applied on
Project bases
• OH and G&A rates will be calculated improperly
• Incorrect costs on Projects will lead to errors in
the fee rate calculations
• Incorrect calculations could cause errors on the
Balance Sheet and Income Statement
Examples
of the
Problem
Undesirable
Effects
(UDE)
5. 5
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Commit Phase
Sponsor: Robert Given
Team: Members from a variety of expertise
NESS Finance – Controlling & Burden Rates
NESS Finance – Contracts (Project Definitions)
IDS Budgets & Planning – Costing Sheet expertise
Managed Programs – Project Structure expertise
Metrics for Tracking Improvement:
Reduced amount of Projects with incorrect assignment
Eliminate the possibility of future errors
Reducing the number of man hours worked to correct problems
6. 6
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
1. Current Process Flow
2. Selection of Costing Sheets
3. Criteria on how Costing Sheets are selected
Areas Which
Can Use
Improvement
Prioritized
Focus
1. Develop guidelines on how to assign Costing
Sheets
2. Correct the Projects with more obvious
assignment errors
Prioritize Phase
7. 7
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Characterize Phase
Current Process
Project Definition Request Form (PDRF)
• Submitted electronically via E-mail to Contracts group
• Supporting documentation required depending on type of project
– Customer, IOT, Capital, Internal, or General Ledger
Costing Sheet is indicated on the PDRF
• If left blank, the request is sent back to be resubmitted with all
required fields including respective authorization (Bottleneck)
Managed Programs and Contracts open up projects based
on the PDRF using transaction CJ20N in APEX
10. 10
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Uneducated
requestors
Costing Sheets assigned
incorrectly to Projects?
No Guidelines
set forth to aid in the
selection process
Not easily
identified
Numerous
Costing Sheet
choices
Why?
Why?
Why?
Why?
Why?
Why?
Why? Chosen
mistakenly
on PDRF
Erroneously
entered into
APEX
11. 11
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Brainstorming
• Assist spreadsheet can be obtained
through a link on the website where the
PDRF is located
• Send out a mass e-mail to notify
persons responsible for filling out the
PDRF that there is a Tool to assist in
the selection of Costing Sheets
• Indicate that the Costing Sheet field is
required to submit the PDRF to
eliminate this bottleneck in the process
12. 12
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
• Root Causes
– No Guidelines set forth to aid in the selection process
– Numerous Costing Sheet choices
• Proposed Solution: Desired Option
– Create a spreadsheet to assist accounting and managed programs in
the selection process.
• Alternative Solution: Advanced option considered and not suggested
– Develop the PDRF form using filters that will allow the user to narrow
down the choices as more and more criteria have been selected.
13. 13
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Preliminary
Approach • Create a Costing Sheet Tool that will be used to
assist in assigning a correct CS to a project.
• The Tool will be placed out on the Web for easy
access as well as possibly incorporating it into the
Web Based PDRF Form.
• We only took into consideration the Generic, IDS, and
NCS Costing Sheets when developing this Tool.
14. 14
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Generic Costing Sheet Tool (Partial)Generic Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZNCAP GENERIC CAPITAL ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (Corp) does NOT
burden ANY cost with G&A.
Capital Corporate
ZNDODA
GENERIC DOD
ASSIST WORK
ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization does NOT burden
Performing Organization's cost with Domestic/DoD IOT G&A.
IOT
Other Business or
CAS G&A Pool
ZNNOGA GENERIC NO G&A ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations do NOT apply ANY G&A burdens.
IOT or Internal
Corporate Enterprise
Campaigns or
Business COE
ZNSEL
GENERIC FRINGE
ONLY
ALL
Full Fringe burden on all Labor. NO Overhead burdens on Labor or
Material. Prime and Performing Organizations do NOT apply ANY
G&A burdens.
Internal Any
ZRLI
GENERIC BLANK -
NO LINES
ALL Prime and Performing Organizations do NOT apply ANY burdens.
GL - Raw Mat'l
Inv
Any
• Can be used by any Business Unit
15. 15
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
IDS Costing Sheet Tool (Partial)IDS Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZACAP IDS CAPITAL IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (IDS) also
burdens Performing Organization's cost with Domestic/DoD Major
Sub G&A.
Capital IDS
ZADFS IDS DFS IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their Direct
Foreign G&A. Prime Organization (IDS) also burdens Performing
Organization's cost with Domestic/DoD Major Sub G&A.
Customer Foreign
ZADOD IDS DOD IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization (IDS) also burdens
Performing Organization's cost with Domestic/DoD IOT G&A.
Customer Domestic
ZADODD IDS DOD NO G&A IDS
Full Fringe and Overhead burdens on all Labor and Material.
Performing Organizations burden their costs with their Domestic/DoD
Full G&A. Prime Organization (IDS) does NOT apply ANY G&A
burdens.
IOT
IDS - Within CAS
G&A Pool
16. 16
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
NCS Costing Sheet Tool (Partial)NCS Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZCCAP NCS CAPITAL NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (NCS) also
burdens Performing Organization's cost with Domestic/DoD Major
Sub G&A.
Capital IDS
ZCDFS NCS DFS NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their Direct
Foreign G&A. Prime Organization (NCS) also burdens Performing
Organization's cost with Direct Foreign IOT G&A.
Customer Foreign
ZCDOD NCS DOD NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization (NCS) also burdens
Performing Organization's cost with Domestic/DoD IOT G&A.
Customer Domestic
ZCDODD NCS NO G&A NCS
Full Fringe and Overhead burdens on all Labor and Material.
Performing Organizations burden their costs with their Domestic/DoD
Full G&A. Prime Organization (NCS) does NOT apply ANY G&A
burdens.
IOT
NCS - Within CAS
G&A Pool
17. 17
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Summary
of
Tools
Used
• Brainstorming
– This tool was used to come up with ideas on how to
notify people whom use the PDRF that there are updated
versions and a new tool is available that will assist them
in assigning Costing Sheets to their respective projects.
• Process Flow
– This tool was used to show the Bottleneck in the current
process that requires using more man hours to correct
the problem.
• 5-Whys
– This tool was used to indicate the root cause of incorrect
assignment of Costing Sheets, which realized the need
of a tool to assist in the selection process.
18. 18
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Projected
Benefits
and
Savings
• Benefits
– Reduced potential bottleneck in process where
PDRF’s would have to be sent back because of CS
field left blank
– Reduced number of man hours and number of
projects assigned incorrect Costing Sheets
– Increase in Quality Control where FP&A estimating
will be done more accurately
• Savings
– Estimate of 80 man-hours of effort saved per month
• Based on 160 projects set-up per month
• Other possible benefits
– Costing Sheets have a potential impact on the
Balance Sheet and therefore the Income Statement,
which could affect P&L positively or negatively.
– There are other prospective cost savings not
identified
19. 19
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Recommended
Follow-on
Activity
• Use the Tool to correct projects that have previously
been set-up and assigned incorrect Costing Sheets
• Conduct random checks to make sure that new projects
are being assigned the correct Costing Sheets
– This will ensure people are using the Tool
• To set-up a filter on the PDRF that will be used to assign
Costing Sheets by selection criteria that have been
identified on the CS Tool