 Sponsor: Robert J Given
 Mentor: Robert P Tamilio
 Team Members:
 James J Wright (Specialist Candidate)
 Thomas Chase (Specialist)
 Carol Prescott (Specialist)
 Janet McCue (Specialist)
 Karen Campo (Specialist)
 Cathy Kurpiel (Specialist)
3
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Visualize Phase
 Problem Statement
– It has been identified that some
IDS/NCS projects have been assigned
an incorrect costing sheet, which is a
mechanism used to apply overhead
rates to booked actuals.
 Vision Statement
– We will improve and standardize the
assignment of costing sheets with the
creation of a spreadsheet that will
assist in the completion of the Project
Definition Request Form (PDRF).
4
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
• IDS projects should not have a NCS costing
sheet assigned to it.
• Capital costing sheets should only be assigned
to capital projects.
• Incorrect rates will continue to be applied on
Project bases
• OH and G&A rates will be calculated improperly
• Incorrect costs on Projects will lead to errors in
the fee rate calculations
• Incorrect calculations could cause errors on the
Balance Sheet and Income Statement
Examples
of the
Problem
Undesirable
Effects
(UDE)
5
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Commit Phase
 Sponsor: Robert Given
 Team: Members from a variety of expertise
 NESS Finance – Controlling & Burden Rates
 NESS Finance – Contracts (Project Definitions)
 IDS Budgets & Planning – Costing Sheet expertise
 Managed Programs – Project Structure expertise
 Metrics for Tracking Improvement:
 Reduced amount of Projects with incorrect assignment
 Eliminate the possibility of future errors
 Reducing the number of man hours worked to correct problems
6
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
1. Current Process Flow
2. Selection of Costing Sheets
3. Criteria on how Costing Sheets are selected
Areas Which
Can Use
Improvement
Prioritized
Focus
1. Develop guidelines on how to assign Costing
Sheets
2. Correct the Projects with more obvious
assignment errors
Prioritize Phase
7
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Characterize Phase
 Current Process
 Project Definition Request Form (PDRF)
• Submitted electronically via E-mail to Contracts group
• Supporting documentation required depending on type of project
– Customer, IOT, Capital, Internal, or General Ledger
 Costing Sheet is indicated on the PDRF
• If left blank, the request is sent back to be resubmitted with all
required fields including respective authorization (Bottleneck)
 Managed Programs and Contracts open up projects based
on the PDRF using transaction CJ20N in APEX
8
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
PDRF (Top Half)
9
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
PDRF (Bottom Half)
10
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Uneducated
requestors
Costing Sheets assigned
incorrectly to Projects?
No Guidelines
set forth to aid in the
selection process
Not easily
identified
Numerous
Costing Sheet
choices
Why?
Why?
Why?
Why?
Why?
Why?
Why? Chosen
mistakenly
on PDRF
Erroneously
entered into
APEX
11
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Brainstorming
• Assist spreadsheet can be obtained
through a link on the website where the
PDRF is located
• Send out a mass e-mail to notify
persons responsible for filling out the
PDRF that there is a Tool to assist in
the selection of Costing Sheets
• Indicate that the Costing Sheet field is
required to submit the PDRF to
eliminate this bottleneck in the process
12
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
• Root Causes
– No Guidelines set forth to aid in the selection process
– Numerous Costing Sheet choices
• Proposed Solution: Desired Option
– Create a spreadsheet to assist accounting and managed programs in
the selection process.
• Alternative Solution: Advanced option considered and not suggested
– Develop the PDRF form using filters that will allow the user to narrow
down the choices as more and more criteria have been selected.
13
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Preliminary
Approach • Create a Costing Sheet Tool that will be used to
assist in assigning a correct CS to a project.
• The Tool will be placed out on the Web for easy
access as well as possibly incorporating it into the
Web Based PDRF Form.
• We only took into consideration the Generic, IDS, and
NCS Costing Sheets when developing this Tool.
14
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Generic Costing Sheet Tool (Partial)Generic Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZNCAP GENERIC CAPITAL ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (Corp) does NOT
burden ANY cost with G&A.
Capital Corporate
ZNDODA
GENERIC DOD
ASSIST WORK
ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization does NOT burden
Performing Organization's cost with Domestic/DoD IOT G&A.
IOT
Other Business or
CAS G&A Pool
ZNNOGA GENERIC NO G&A ALL
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations do NOT apply ANY G&A burdens.
IOT or Internal
Corporate Enterprise
Campaigns or
Business COE
ZNSEL
GENERIC FRINGE
ONLY
ALL
Full Fringe burden on all Labor. NO Overhead burdens on Labor or
Material. Prime and Performing Organizations do NOT apply ANY
G&A burdens.
Internal Any
ZRLI
GENERIC BLANK -
NO LINES
ALL Prime and Performing Organizations do NOT apply ANY burdens.
GL - Raw Mat'l
Inv
Any
• Can be used by any Business Unit
15
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
IDS Costing Sheet Tool (Partial)IDS Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZACAP IDS CAPITAL IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (IDS) also
burdens Performing Organization's cost with Domestic/DoD Major
Sub G&A.
Capital IDS
ZADFS IDS DFS IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their Direct
Foreign G&A. Prime Organization (IDS) also burdens Performing
Organization's cost with Domestic/DoD Major Sub G&A.
Customer Foreign
ZADOD IDS DOD IDS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization (IDS) also burdens
Performing Organization's cost with Domestic/DoD IOT G&A.
Customer Domestic
ZADODD IDS DOD NO G&A IDS
Full Fringe and Overhead burdens on all Labor and Material.
Performing Organizations burden their costs with their Domestic/DoD
Full G&A. Prime Organization (IDS) does NOT apply ANY G&A
burdens.
IOT
IDS - Within CAS
G&A Pool
16
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
NCS Costing Sheet Tool (Partial)NCS Costing Sheet Tool (Partial)
Costing
Sheet
Costing Sheet
Description
Bus Unit
Functionality Project Types Customer
ZCCAP NCS CAPITAL NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or
Major Sub G&A (NCS & IDS). Prime Organization (NCS) also
burdens Performing Organization's cost with Domestic/DoD Major
Sub G&A.
Capital IDS
ZCDFS NCS DFS NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their Direct
Foreign G&A. Prime Organization (NCS) also burdens Performing
Organization's cost with Direct Foreign IOT G&A.
Customer Foreign
ZCDOD NCS DOD NCS
Full Fringe and Overhead burdens on all Labor and Material. Prime
and Performing Organizations burden their costs with their
Domestic/DoD Full G&A. Prime Organization (NCS) also burdens
Performing Organization's cost with Domestic/DoD IOT G&A.
Customer Domestic
ZCDODD NCS NO G&A NCS
Full Fringe and Overhead burdens on all Labor and Material.
Performing Organizations burden their costs with their Domestic/DoD
Full G&A. Prime Organization (NCS) does NOT apply ANY G&A
burdens.
IOT
NCS - Within CAS
G&A Pool
17
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Summary
of
Tools
Used
• Brainstorming
– This tool was used to come up with ideas on how to
notify people whom use the PDRF that there are updated
versions and a new tool is available that will assist them
in assigning Costing Sheets to their respective projects.
• Process Flow
– This tool was used to show the Bottleneck in the current
process that requires using more man hours to correct
the problem.
• 5-Whys
– This tool was used to indicate the root cause of incorrect
assignment of Costing Sheets, which realized the need
of a tool to assist in the selection process.
18
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Projected
Benefits
and
Savings
• Benefits
– Reduced potential bottleneck in process where
PDRF’s would have to be sent back because of CS
field left blank
– Reduced number of man hours and number of
projects assigned incorrect Costing Sheets
– Increase in Quality Control where FP&A estimating
will be done more accurately
• Savings
– Estimate of 80 man-hours of effort saved per month
• Based on 160 projects set-up per month
• Other possible benefits
– Costing Sheets have a potential impact on the
Balance Sheet and therefore the Income Statement,
which could affect P&L positively or negatively.
– There are other prospective cost savings not
identified
19
Costing Sheet Assignment ProcessCosting Sheet Assignment Process
Recommended
Follow-on
Activity
• Use the Tool to correct projects that have previously
been set-up and assigned incorrect Costing Sheets
• Conduct random checks to make sure that new projects
are being assigned the correct Costing Sheets
– This will ensure people are using the Tool
• To set-up a filter on the PDRF that will be used to assign
Costing Sheets by selection criteria that have been
identified on the CS Tool

More Related Content

What's hot

Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
guest2aa104
 
Randall.taylor
Randall.taylorRandall.taylor
Randall.taylorNASAPMC
 
2016 Region DC Manager Responsibilities
2016 Region DC Manager Responsibilities2016 Region DC Manager Responsibilities
2016 Region DC Manager ResponsibilitiesGeorge Hayes
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinalNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
Digicom competency pool telecom-vas - ver 1-02
Digicom competency pool   telecom-vas - ver 1-02Digicom competency pool   telecom-vas - ver 1-02
Digicom competency pool telecom-vas - ver 1-02ajeeshch
 
R simpson elee
R simpson eleeR simpson elee
R simpson eleeNASAPMC
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbierNASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.lindaNASAPMC
 

What's hot (10)

Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
 
Randall.taylor
Randall.taylorRandall.taylor
Randall.taylor
 
2016 Region DC Manager Responsibilities
2016 Region DC Manager Responsibilities2016 Region DC Manager Responsibilities
2016 Region DC Manager Responsibilities
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
Digicom competency pool telecom-vas - ver 1-02
Digicom competency pool   telecom-vas - ver 1-02Digicom competency pool   telecom-vas - ver 1-02
Digicom competency pool telecom-vas - ver 1-02
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbier
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 

Viewers also liked

Romeo Poster FINAL spring 2014
Romeo Poster FINAL spring 2014Romeo Poster FINAL spring 2014
Romeo Poster FINAL spring 2014Cristina Romeo
 
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012
Mariana bozesan   impact investing - geld mit sinn salon 26.9.2012Mariana bozesan   impact investing - geld mit sinn salon 26.9.2012
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012
swift2
 
Preparing your child for back to school mb
Preparing your child for back to school mbPreparing your child for back to school mb
Preparing your child for back to school mb
English Online Inc.
 
Sectorul limbă și comunicare 2016
Sectorul limbă și comunicare 2016Sectorul limbă și comunicare 2016
Sectorul limbă și comunicare 2016
ise_md
 
Diseños cualitativos
Diseños cualitativosDiseños cualitativos
Diseños cualitativos
Pilar Orjuela
 
Neuroanatomia pb
Neuroanatomia pbNeuroanatomia pb
Neuroanatomia pb
Monica Sandoval
 
Metodologia Marco teórico-Universidad de Cartagena Ing Civil
Metodologia Marco teórico-Universidad de Cartagena Ing CivilMetodologia Marco teórico-Universidad de Cartagena Ing Civil
Metodologia Marco teórico-Universidad de Cartagena Ing CivilSkepper63
 
Managerial Accounting Assignment
Managerial Accounting AssignmentManagerial Accounting Assignment
Managerial Accounting AssignmentMd. Moazzem Hossain
 
Poetry Project
Poetry ProjectPoetry Project
Poetry Project
gabsters122
 
Introducción a la administración f08
Introducción a la administración f08Introducción a la administración f08
Introducción a la administración f08Skepper63
 
Management Accounting Assignment Help
Management Accounting Assignment HelpManagement Accounting Assignment Help
Management Accounting Assignment Help
Online
 
Análisis de plataformas de e learning "Udemy y Moodle"
Análisis de plataformas de e learning "Udemy y Moodle"Análisis de plataformas de e learning "Udemy y Moodle"
Análisis de plataformas de e learning "Udemy y Moodle"
Ariel Guillén
 
Assignment on management accounting
Assignment on management accountingAssignment on management accounting
Assignment on management accounting
Moshfiqur Rahman
 

Viewers also liked (15)

Romeo Poster FINAL spring 2014
Romeo Poster FINAL spring 2014Romeo Poster FINAL spring 2014
Romeo Poster FINAL spring 2014
 
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012
Mariana bozesan   impact investing - geld mit sinn salon 26.9.2012Mariana bozesan   impact investing - geld mit sinn salon 26.9.2012
Mariana bozesan impact investing - geld mit sinn salon 26.9.2012
 
Tribunal supremo
Tribunal supremoTribunal supremo
Tribunal supremo
 
Preparing your child for back to school mb
Preparing your child for back to school mbPreparing your child for back to school mb
Preparing your child for back to school mb
 
Sectorul limbă și comunicare 2016
Sectorul limbă și comunicare 2016Sectorul limbă și comunicare 2016
Sectorul limbă și comunicare 2016
 
Diseños cualitativos
Diseños cualitativosDiseños cualitativos
Diseños cualitativos
 
Neuroanatomia pb
Neuroanatomia pbNeuroanatomia pb
Neuroanatomia pb
 
Metodologia Marco teórico-Universidad de Cartagena Ing Civil
Metodologia Marco teórico-Universidad de Cartagena Ing CivilMetodologia Marco teórico-Universidad de Cartagena Ing Civil
Metodologia Marco teórico-Universidad de Cartagena Ing Civil
 
Managerial Accounting Assignment
Managerial Accounting AssignmentManagerial Accounting Assignment
Managerial Accounting Assignment
 
Poetry Project
Poetry ProjectPoetry Project
Poetry Project
 
Introducción a la administración f08
Introducción a la administración f08Introducción a la administración f08
Introducción a la administración f08
 
neurodesarrollo
neurodesarrollo neurodesarrollo
neurodesarrollo
 
Management Accounting Assignment Help
Management Accounting Assignment HelpManagement Accounting Assignment Help
Management Accounting Assignment Help
 
Análisis de plataformas de e learning "Udemy y Moodle"
Análisis de plataformas de e learning "Udemy y Moodle"Análisis de plataformas de e learning "Udemy y Moodle"
Análisis de plataformas de e learning "Udemy y Moodle"
 
Assignment on management accounting
Assignment on management accountingAssignment on management accounting
Assignment on management accounting
 

Similar to Costing Sheet R6S

Resume- Purnendu Tiwary_Mainframe_9.4 yrs
Resume- Purnendu Tiwary_Mainframe_9.4 yrsResume- Purnendu Tiwary_Mainframe_9.4 yrs
Resume- Purnendu Tiwary_Mainframe_9.4 yrsPurnendu Tiwary
 
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx
Sheet2ScoresMaxActualComments1.  Effort Estimate.   Estimate the e.docxSheet2ScoresMaxActualComments1.  Effort Estimate.   Estimate the e.docx
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx
bjohn46
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdfGEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
JamesKumar21
 
The Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationThe Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and Capitalization
Cprime
 
Running Head Project Overview Statement1Project Overview Stat.docx
Running Head Project Overview Statement1Project Overview Stat.docxRunning Head Project Overview Statement1Project Overview Stat.docx
Running Head Project Overview Statement1Project Overview Stat.docx
todd581
 
Sasidhar_ 5+ yrs_Testing Profile
Sasidhar_ 5+ yrs_Testing ProfileSasidhar_ 5+ yrs_Testing Profile
Sasidhar_ 5+ yrs_Testing ProfileSasidhar Reddy
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
Anand Bobade
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
ssuser835d1a
 
Benchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development PerformanceBenchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development Performance
DCG Software Value
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
Luis Cabrera
 
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
RomanaVysatova
 

Similar to Costing Sheet R6S (20)

VASUDEO RANE
VASUDEO RANEVASUDEO RANE
VASUDEO RANE
 
Resume- Purnendu Tiwary_Mainframe_9.4 yrs
Resume- Purnendu Tiwary_Mainframe_9.4 yrsResume- Purnendu Tiwary_Mainframe_9.4 yrs
Resume- Purnendu Tiwary_Mainframe_9.4 yrs
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx
Sheet2ScoresMaxActualComments1.  Effort Estimate.   Estimate the e.docxSheet2ScoresMaxActualComments1.  Effort Estimate.   Estimate the e.docx
Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdfGEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
GEP-Supply-Chain-Planning-Guide-Fnl_0.pdf
 
The Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationThe Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and Capitalization
 
Running Head Project Overview Statement1Project Overview Stat.docx
Running Head Project Overview Statement1Project Overview Stat.docxRunning Head Project Overview Statement1Project Overview Stat.docx
Running Head Project Overview Statement1Project Overview Stat.docx
 
Sasidhar_ 5+ yrs_Testing Profile
Sasidhar_ 5+ yrs_Testing ProfileSasidhar_ 5+ yrs_Testing Profile
Sasidhar_ 5+ yrs_Testing Profile
 
5 financial new
5 financial new5 financial new
5 financial new
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 
Suchasmita Padhi Resume
Suchasmita Padhi ResumeSuchasmita Padhi Resume
Suchasmita Padhi Resume
 
Benchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development PerformanceBenchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development Performance
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
 
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
 

Costing Sheet R6S

  • 1. 1 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Raytheon Six Sigma Specialist Project:Raytheon Six Sigma Specialist Project: Costing Sheet Assignment ProcessCosting Sheet Assignment Process MARCH 2005MARCH 2005
  • 2. 2 Costing Sheet Assignment ProcessCosting Sheet Assignment Process  Sponsor: Robert J Given  Mentor: Robert P Tamilio  Team Members:  James J Wright (Specialist Candidate)  Thomas Chase (Specialist)  Carol Prescott (Specialist)  Janet McCue (Specialist)  Karen Campo (Specialist)  Cathy Kurpiel (Specialist)
  • 3. 3 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Visualize Phase  Problem Statement – It has been identified that some IDS/NCS projects have been assigned an incorrect costing sheet, which is a mechanism used to apply overhead rates to booked actuals.  Vision Statement – We will improve and standardize the assignment of costing sheets with the creation of a spreadsheet that will assist in the completion of the Project Definition Request Form (PDRF).
  • 4. 4 Costing Sheet Assignment ProcessCosting Sheet Assignment Process • IDS projects should not have a NCS costing sheet assigned to it. • Capital costing sheets should only be assigned to capital projects. • Incorrect rates will continue to be applied on Project bases • OH and G&A rates will be calculated improperly • Incorrect costs on Projects will lead to errors in the fee rate calculations • Incorrect calculations could cause errors on the Balance Sheet and Income Statement Examples of the Problem Undesirable Effects (UDE)
  • 5. 5 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Commit Phase  Sponsor: Robert Given  Team: Members from a variety of expertise  NESS Finance – Controlling & Burden Rates  NESS Finance – Contracts (Project Definitions)  IDS Budgets & Planning – Costing Sheet expertise  Managed Programs – Project Structure expertise  Metrics for Tracking Improvement:  Reduced amount of Projects with incorrect assignment  Eliminate the possibility of future errors  Reducing the number of man hours worked to correct problems
  • 6. 6 Costing Sheet Assignment ProcessCosting Sheet Assignment Process 1. Current Process Flow 2. Selection of Costing Sheets 3. Criteria on how Costing Sheets are selected Areas Which Can Use Improvement Prioritized Focus 1. Develop guidelines on how to assign Costing Sheets 2. Correct the Projects with more obvious assignment errors Prioritize Phase
  • 7. 7 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Characterize Phase  Current Process  Project Definition Request Form (PDRF) • Submitted electronically via E-mail to Contracts group • Supporting documentation required depending on type of project – Customer, IOT, Capital, Internal, or General Ledger  Costing Sheet is indicated on the PDRF • If left blank, the request is sent back to be resubmitted with all required fields including respective authorization (Bottleneck)  Managed Programs and Contracts open up projects based on the PDRF using transaction CJ20N in APEX
  • 8. 8 Costing Sheet Assignment ProcessCosting Sheet Assignment Process PDRF (Top Half)
  • 9. 9 Costing Sheet Assignment ProcessCosting Sheet Assignment Process PDRF (Bottom Half)
  • 10. 10 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Uneducated requestors Costing Sheets assigned incorrectly to Projects? No Guidelines set forth to aid in the selection process Not easily identified Numerous Costing Sheet choices Why? Why? Why? Why? Why? Why? Why? Chosen mistakenly on PDRF Erroneously entered into APEX
  • 11. 11 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Brainstorming • Assist spreadsheet can be obtained through a link on the website where the PDRF is located • Send out a mass e-mail to notify persons responsible for filling out the PDRF that there is a Tool to assist in the selection of Costing Sheets • Indicate that the Costing Sheet field is required to submit the PDRF to eliminate this bottleneck in the process
  • 12. 12 Costing Sheet Assignment ProcessCosting Sheet Assignment Process • Root Causes – No Guidelines set forth to aid in the selection process – Numerous Costing Sheet choices • Proposed Solution: Desired Option – Create a spreadsheet to assist accounting and managed programs in the selection process. • Alternative Solution: Advanced option considered and not suggested – Develop the PDRF form using filters that will allow the user to narrow down the choices as more and more criteria have been selected.
  • 13. 13 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Preliminary Approach • Create a Costing Sheet Tool that will be used to assist in assigning a correct CS to a project. • The Tool will be placed out on the Web for easy access as well as possibly incorporating it into the Web Based PDRF Form. • We only took into consideration the Generic, IDS, and NCS Costing Sheets when developing this Tool.
  • 14. 14 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Generic Costing Sheet Tool (Partial)Generic Costing Sheet Tool (Partial) Costing Sheet Costing Sheet Description Bus Unit Functionality Project Types Customer ZNCAP GENERIC CAPITAL ALL Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or Major Sub G&A (NCS & IDS). Prime Organization (Corp) does NOT burden ANY cost with G&A. Capital Corporate ZNDODA GENERIC DOD ASSIST WORK ALL Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A. Prime Organization does NOT burden Performing Organization's cost with Domestic/DoD IOT G&A. IOT Other Business or CAS G&A Pool ZNNOGA GENERIC NO G&A ALL Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations do NOT apply ANY G&A burdens. IOT or Internal Corporate Enterprise Campaigns or Business COE ZNSEL GENERIC FRINGE ONLY ALL Full Fringe burden on all Labor. NO Overhead burdens on Labor or Material. Prime and Performing Organizations do NOT apply ANY G&A burdens. Internal Any ZRLI GENERIC BLANK - NO LINES ALL Prime and Performing Organizations do NOT apply ANY burdens. GL - Raw Mat'l Inv Any • Can be used by any Business Unit
  • 15. 15 Costing Sheet Assignment ProcessCosting Sheet Assignment Process IDS Costing Sheet Tool (Partial)IDS Costing Sheet Tool (Partial) Costing Sheet Costing Sheet Description Bus Unit Functionality Project Types Customer ZACAP IDS CAPITAL IDS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or Major Sub G&A (NCS & IDS). Prime Organization (IDS) also burdens Performing Organization's cost with Domestic/DoD Major Sub G&A. Capital IDS ZADFS IDS DFS IDS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Direct Foreign G&A. Prime Organization (IDS) also burdens Performing Organization's cost with Domestic/DoD Major Sub G&A. Customer Foreign ZADOD IDS DOD IDS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A. Prime Organization (IDS) also burdens Performing Organization's cost with Domestic/DoD IOT G&A. Customer Domestic ZADODD IDS DOD NO G&A IDS Full Fringe and Overhead burdens on all Labor and Material. Performing Organizations burden their costs with their Domestic/DoD Full G&A. Prime Organization (IDS) does NOT apply ANY G&A burdens. IOT IDS - Within CAS G&A Pool
  • 16. 16 Costing Sheet Assignment ProcessCosting Sheet Assignment Process NCS Costing Sheet Tool (Partial)NCS Costing Sheet Tool (Partial) Costing Sheet Costing Sheet Description Bus Unit Functionality Project Types Customer ZCCAP NCS CAPITAL NCS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A (SAS), Special Material G&A (RMS), or Major Sub G&A (NCS & IDS). Prime Organization (NCS) also burdens Performing Organization's cost with Domestic/DoD Major Sub G&A. Capital IDS ZCDFS NCS DFS NCS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Direct Foreign G&A. Prime Organization (NCS) also burdens Performing Organization's cost with Direct Foreign IOT G&A. Customer Foreign ZCDOD NCS DOD NCS Full Fringe and Overhead burdens on all Labor and Material. Prime and Performing Organizations burden their costs with their Domestic/DoD Full G&A. Prime Organization (NCS) also burdens Performing Organization's cost with Domestic/DoD IOT G&A. Customer Domestic ZCDODD NCS NO G&A NCS Full Fringe and Overhead burdens on all Labor and Material. Performing Organizations burden their costs with their Domestic/DoD Full G&A. Prime Organization (NCS) does NOT apply ANY G&A burdens. IOT NCS - Within CAS G&A Pool
  • 17. 17 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Summary of Tools Used • Brainstorming – This tool was used to come up with ideas on how to notify people whom use the PDRF that there are updated versions and a new tool is available that will assist them in assigning Costing Sheets to their respective projects. • Process Flow – This tool was used to show the Bottleneck in the current process that requires using more man hours to correct the problem. • 5-Whys – This tool was used to indicate the root cause of incorrect assignment of Costing Sheets, which realized the need of a tool to assist in the selection process.
  • 18. 18 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Projected Benefits and Savings • Benefits – Reduced potential bottleneck in process where PDRF’s would have to be sent back because of CS field left blank – Reduced number of man hours and number of projects assigned incorrect Costing Sheets – Increase in Quality Control where FP&A estimating will be done more accurately • Savings – Estimate of 80 man-hours of effort saved per month • Based on 160 projects set-up per month • Other possible benefits – Costing Sheets have a potential impact on the Balance Sheet and therefore the Income Statement, which could affect P&L positively or negatively. – There are other prospective cost savings not identified
  • 19. 19 Costing Sheet Assignment ProcessCosting Sheet Assignment Process Recommended Follow-on Activity • Use the Tool to correct projects that have previously been set-up and assigned incorrect Costing Sheets • Conduct random checks to make sure that new projects are being assigned the correct Costing Sheets – This will ensure people are using the Tool • To set-up a filter on the PDRF that will be used to assign Costing Sheets by selection criteria that have been identified on the CS Tool