SlideShare a Scribd company logo
Our Record
Speaks For Itself
         December 2012
                  ecem




           TSX: FM; LSE: FQM
Cautionary Note Concerning
Forward-Looking Statements
Some of the statements contained in the following material
are forward looking statements and not statement of facts.
Such statements are based on the current beliefs of
management, as well as assumptions based on management
information currently available. Forward-looking statements
are subject to various risks, uncertainties and other factors
that could cause actual results to differ materially from
expected results. Readers must rely on their own evaluation of
these uncertainties.

Note: all dollar amounts in US dollars unless otherwise indicated


                                                                    2
First Quantum Today
• A significant copper producer
 – 2012E : 285k – 295k tonnes

• A new and growing nickel producer
 – 2012E : 36k– 40k tonnes

• On the cusp of transformational growth
 – Copper : tripling production capacity
 – Nickel : increasing annual production capacity to 125k
   tonnes

• Delivering growth at costs well below industry
  norms
                                                            3
First Quantum Today
Strong Financial Position
                            Sept 30, 2012
                                  $ millions

Cash                               $375
Total Debt                           $55
Undrawn and available            $1,250
financing
Note receivable 2015               $500


                                               4
First Quantum Today
Diversifying the Balance Sheet

• $350 million Senior Notes
• Interest @ 7.25% per annum paid semi-annually




                                                  5
What We have Delivered
Best-in-class Copper Growth   Leading Shareholder Returns*
          2000 – 2011                       2000 – 2011
          Barrick              First Quantum              32%
Southern Copper                          Inmet
                               Southern Peru
  First Quantum         21%       Antofagasta
             Teck                      Norilsk
        Glencore                           Vale
                                  BHP Billiton
         Freeport                         Teck
     Antofagasta                       Eramet
 Anglo American                       Freeport
                                       Hudbay
            BHPB
                                        Lundin
         Codelco                     Rio Tinto
          Norilsk                      Xstrata
                                      Vedanta
           KGHM
                              Anglo American
     Kazakhmys                    Kazakhmys
        Rio Tinto                        ENRC

                               *Annualized                      6
Looking Forward: Our Production Targets
            Copper                         Nickel
800      000’s tonnes                    000’s tonnes
                                90


600                             68


400                             45


200                             23


  0                              0
      '12 '13 '14 '15 '16 '17        '12 '13 '14 '15 '16 '17
        Base    Projects                Base    Projects



                                                               7
A New & Growing Nickel Producer
Ravensthorpe mine, Australia
• Acquired as a decommissioned plant

• First production within 20 months of purchase

• Commercial production declared Dec 28 2011

• Production
 –   Q4’11 : 5,666 tonnes
 –   Q1’12 : 6,617 tonnes
 –   Q2’12 : 8,053 tonnes
 –   Q3’12 : 8,032 tonnes
• C1 cash cost 1H’ 12 : $6.43/payable lb of nickel

                                                     8
A New & Growing Nickel Producer
Kevitsa project, Finland
• Nickel-copper-PGE project

• Commercial production
  achieved on August 18, 2012

• Initial ore feed of 5.5 mt/yr ;
  intention to expand by ~50% in 2013

• Target operations:
 – 10 ktpa nickel @ ~$6.70 - $7.00 /lb
 – 20 ktpa copper @ ~$1.45 - $1.60 /lb


                                         9
A New & Growing Nickel Producer
Enterprise target, Zambia
• Located 12 km northwest of Sentinel

• M&I resource estimate for the Main
  and Southwest Zones of 40.1Mt
  @ 1.07% Ni; plus an additional 7.0 Mt
  @ 0.7% Ni in inferred resources

• Preliminary evaluation:
 – Potential to develop an open pit 4.0 Mtpa operation
 – Average Ni production rate of 38,000 tpa
 – Head grades may be varied to reflect changes in the Ni price cycle
   therefore at certain times production could peak at 60,000 tonnes

                                                                        10
Tripling Copper Production Capacity
Sentinel project, Zambia
• Located ~ 140 km northwest of Solwezi, northern
  Zambia

• M&I resource of 1,027 Mt at
  0.51% Cu grade, containing
  5.2 Mt Cu

• Estimates:
 –   2.2:1 LOM strip ratio
 –   >15 years mine life
 –   $1.7B capex
 –   Annual production up to 300,000 tonnes

                                                    11
Tripling Copper Production Capacity
Sentinel project, Zambia
• Commercial terms for electric power agreed in
  principle

• Board approval granted

• Full-scale development started
  within original timeframe

• Detailed design progressing;
  commitments for long-lead items in place

• Construction completion targeted for late 2014

                                                   12
Tripling Copper Production Capacity
Copper smelter, Zambia
• Processing capacity of 1.2 Mtpa
    —71% Sentinel
    —100% Kansanshi
    —Average copper grade 26%

• Blister copper production
  300,000 tpa; acid production 1.0 Mtpa

• Estimates:
    − Capital cost of US$650M
    − Operating cost US$69/tonne of concentrate
    − Commissioning from mid 2014

                                                  13
Economic Benefits of the Copper Smelter
Total Annual Savings      * US$340 MM – US$510 MM
• Transport
    Kansanshi             * 100% of concentrate to smelter
    Sentinel              * 71% of concentrate to smelter and remainder
                            for export
 Cost savings per annum   * Concentrate @ US$220 /t: US$130 MM –
                            US$200 MM
• Export Levy on Concentrate
  Current                    * 10% of export value
  Blister Production         * 230,000 - 310,000 tpa
  Cost savings per annum     * Cu @ US$7,000 /t: US$160 MM – US$220 MM

• Acid Supply
  Current Consumption     * 1,200 tpd @ US$200 / t: US$90 MM / year
  Increase with AP5       * +900 tpd @ US$200 / t: US$150 MM /year


                                                                      14
Tripling Copper Production Capacity
Haquira project, Peru
• Large scale copper project located in southern Peru
    M&I resource of 3.7 Mt of copper

     equivalent and an inferred
     resource of 2.4 Mt of copper
     equivalent

• Current focus:
    Community relations and

     land access; expanding drill
     program and environmental matters




                                                        15
Building a Portfolio of Early-Stage Projects
• 19.99% ownership stake in Zincore Metals Inc.
 – Mineral exploration company focused mainly on zinc and related
   base metal opportunities in the Americas, namely Peru, Mexico
   and Canada
 – Delores copper porphyry project located ~ 40 km from Haquira


• 19.2% ownership stake in Empire Mining Company
 – Bursa Licenses cover the Demirtepe skarn and Karapinar
   porphyry projects in Western Turkey




                                                                    16
A Significant Copper Producer
Kansanshi mine, Zambia
• Located near Solwezi in the north
  western Province of Zambia

• First production in 2005

• Open pit mining

• Updated Mineral Resource & Reserve Estimates:
 – 121% increase in M&I estimate to 744.3 Mt @ 0.86 TCu
 – 178% increase in Proved and Probable Reserve estimate to 725.6 Mt @
   0.82% TCu
 – Additional Inferred Resource estimate of 365.5 Mt @ 0.71% TCu
 – Mine life extended to 16 years – at the increased 50Mtpa throughput rate

                                                                              17
A Significant Copper Producer
Kansanshi mine, Zambia
• Multi-phase production expansion project underway
  – 2012 – 2015
    60% increase in overall
    production capacity
  – 2012 – 2014
    130% increase in oxide
    production capacity
  – 2014 - 2015
    90% increase in sulphide
    production capacity




                                                      18
A Significant Copper Producer
Guelb Moghrein mine, Mauritania
• 100% ownership

• Located 250 kilometres northeast
  of the nation’s capital, Nouakchott

• As at December 31, 2011, the
  estimated minelife was ~10 years
  (including stockpiles)

• First production in 2006

• Workforce of ~1,200

                                        19
A Significant Copper Producer
Guelb Moghrein mine, Mauritania
• Record quarterly throughput in Q1’12

• Continuous improvement
 – Augmenting mining operations with
   the addition of larger equipment

 – Optimizing flotation performance
   with improved auto control and reagent changes




                                                    20
Within the Top 10 Largest Producers by 2016
Projected 2016 Copper Producer Landscape




                                              21
Capital Intensity – US$/Tonne
      Cobre Panama
             Caracles
           Caserones
        Sierra Gorda
              El Moro
          Telegraphio
           Tampakan
          Toromocho
            Oyu Tolgoi
         Las Bambas
               Salobo
         Los Bronces
         Cerro Verde
 Ministro Mina Hales
   Quebrada Blanca
            Canariaco
           Quellaveco
           Rio Blanco
            Antamina
          Antapaccay
               Galeno
         Buena Vista
              Konkola
              Sentinel            $6,000
Kansanshi Expansion             $5,000
                         -   5,000         10,000   15,000   20,000   25,000

                                                                               22
How We Do Projects
•   Define and plan, set contracting strategy early
•   Identify risks
•   Copy existing designs, duplication, standardization
•   Maximize commonality of equipment                 First Quantum Project
•   Maximize in-house work:                                        By
      −   Project management                                     By
                                                                          Others

      −   Technical involvement                                 FQM

      −   Procurement, expediting, logistics, shipping
      −   Self perform construction
      −   Own tools and equipment
                                                           Traditional Project
      −   FQM construction supervision
•     Efficient construction labour from Indonesia                        Owner

      and Philippines                                         By Others




                                                                                   23
What Our Shareholders Own

The ability and proven    • A substantial copper producer;
                            within the world’s top ten by 2016
track record to add
value through efficient   • An emerging nickel producer;
                            within the world’s top ten by 2016
delivery of growth at
costs below industry      • A strong financial position
norms                     • Production in an industry with
                            strong fundamentals
Our Record
Speaks For Itself




           TSX: FM; LSE: FQM
A New & Growing Nickel Producer
                       Enterprise Nickel Project (Main and SW)
                Mineral Resource Estimate as at 28th November 2012
                              Cut-off grade of 0.15% Ni
                                                                            Contained
                                             Tonnage          Grade
                                                                                 Ni
                                         (million tonnes)     (Ni %)       (kilo tonnes)
Main Zone - Measured                                  2.7          1.51               41
Main Zone - Indicated                                34.3          1.08             372
SW Zone - Indicated                                   3.1          0.60              18
Total Measured & Indicated                           40.1          1.07             431
Main Zone - Inferred                                  2.5          0.92              23
SW Zone - Inferred                                    4.6          0.58               27
Total Inferred                                        7.1          0.70              50
                      Enterprise Nickel Project (Main Zone only)
                         Reserve Estimate November 2012
                                              Tonnage         Grade       Contained Ni
                                          (million tonnes)    (Ni %)      (kilo tonnes)
Proven                                               2.7Mt       1.44%              39.0
Probable                                            30.0Mt       1.08%             324.0
Total Proven & Probable                             32.7Mt       1.10%            363.0

                                                                                           26

More Related Content

What's hot

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012ussilver
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutionalAdnet Communications
 
AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011aldridgeminerals
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011aldridgeminerals
 
June 2011 IR presentation
June 2011 IR presentationJune 2011 IR presentation
June 2011 IR presentationPENTA
 
Corporate Presentation - February 2014
Corporate Presentation - February 2014Corporate Presentation - February 2014
Corporate Presentation - February 2014
FirstQuantum
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012shosein2011
 
2010b
2010b2010b
2010bPENTA
 
First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014FirstQuantum
 
Providing future US niobium/ rare earth supplies
Providing future US niobium/ rare earth suppliesProviding future US niobium/ rare earth supplies
Providing future US niobium/ rare earth supplies
Objective Capital Conferences
 
Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2VMS Ventures
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012shosein2011
 

What's hot (17)

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012Us silver corporatepresentationmay7_ 2012
Us silver corporatepresentationmay7_ 2012
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional
 
AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011
 
June 2011 IR presentation
June 2011 IR presentationJune 2011 IR presentation
June 2011 IR presentation
 
Impact Silver Corp. Presentation
Impact Silver Corp. PresentationImpact Silver Corp. Presentation
Impact Silver Corp. Presentation
 
Corporate Presentation - February 2014
Corporate Presentation - February 2014Corporate Presentation - February 2014
Corporate Presentation - February 2014
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
 
2010b
2010b2010b
2010b
 
First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014
 
Providing future US niobium/ rare earth supplies
Providing future US niobium/ rare earth suppliesProviding future US niobium/ rare earth supplies
Providing future US niobium/ rare earth supplies
 
Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 

Viewers also liked

Investor presentation -_january_-_final
Investor presentation -_january_-_finalInvestor presentation -_january_-_final
Investor presentation -_january_-_finalFirstQuantum
 
First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014
FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
Investor presentation-june
Investor presentation-juneInvestor presentation-june
Investor presentation-juneFirstQuantum
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011FirstQuantum
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
FirstQuantum
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011FirstQuantum
 
Nap investor presentation_feb._2012
Nap investor presentation_feb._2012Nap investor presentation_feb._2012
Nap investor presentation_feb._2012FirstQuantum
 
Investor presentation-june
Investor presentation-juneInvestor presentation-june
Investor presentation-juneFirstQuantum
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
FirstQuantum
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor Presentation
FirstQuantum
 
Investor presentation macquarie
Investor presentation   macquarieInvestor presentation   macquarie
Investor presentation macquarieFirstQuantum
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
FirstQuantum
 

Viewers also liked (16)

Investor presentation -_january_-_final
Investor presentation -_january_-_finalInvestor presentation -_january_-_final
Investor presentation -_january_-_final
 
First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014First Quantum Minerals Corporate Presentation - May 2014
First Quantum Minerals Corporate Presentation - May 2014
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Investor presentation-june
Investor presentation-juneInvestor presentation-june
Investor presentation-june
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011
 
Nap investor presentation_feb._2012
Nap investor presentation_feb._2012Nap investor presentation_feb._2012
Nap investor presentation_feb._2012
 
Investor presentation-june
Investor presentation-juneInvestor presentation-june
Investor presentation-june
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor Presentation
 
Investor presentation macquarie
Investor presentation   macquarieInvestor presentation   macquarie
Investor presentation macquarie
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 

Similar to Corporate Presentation December 2012

Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
Rocky Mountain Rare Metal Belt
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
TVI_Pacific
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
TVI_Pacific
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015
TVI_Pacific
 
Canatuan story presentation january 16 2015 final
Canatuan story presentation january 16 2015 finalCanatuan story presentation january 16 2015 final
Canatuan story presentation january 16 2015 final
TVI Pacific
 
Rio Tinto Plc Agm 2008 Presentation Slides
Rio Tinto Plc Agm 2008 Presentation SlidesRio Tinto Plc Agm 2008 Presentation Slides
Rio Tinto Plc Agm 2008 Presentation SlidesRio Tinto plc
 
Inmet Presentation
Inmet PresentationInmet Presentation
Inmet Presentation
Dogger2000
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015
TVI_Pacific
 
Agm presentation july 11 2011
Agm presentation july 11 2011Agm presentation july 11 2011
Agm presentation july 11 2011aldridgeminerals
 
Los bronces 2007
Los bronces 2007Los bronces 2007
Los bronces 2007
Roberto Salas
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015
Symposium
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019
MomentumPR
 
Corporate Review – April 2011
Corporate Review – April 2011Corporate Review – April 2011
Corporate Review – April 2011PENTA
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
No to mining in Palawan
 

Similar to Corporate Presentation December 2012 (20)

Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015
 
Canatuan story presentation january 16 2015 final
Canatuan story presentation january 16 2015 finalCanatuan story presentation january 16 2015 final
Canatuan story presentation january 16 2015 final
 
20121029 ipt presentation
20121029 ipt presentation20121029 ipt presentation
20121029 ipt presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Rio Tinto Plc Agm 2008 Presentation Slides
Rio Tinto Plc Agm 2008 Presentation SlidesRio Tinto Plc Agm 2008 Presentation Slides
Rio Tinto Plc Agm 2008 Presentation Slides
 
Inmet Presentation
Inmet PresentationInmet Presentation
Inmet Presentation
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015
 
Impact Silver
Impact SilverImpact Silver
Impact Silver
 
Agm presentation july 11 2011
Agm presentation july 11 2011Agm presentation july 11 2011
Agm presentation july 11 2011
 
AGM Presentation
AGM Presentation AGM Presentation
AGM Presentation
 
Los bronces 2007
Los bronces 2007Los bronces 2007
Los bronces 2007
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019
 
Corporate Review – April 2011
Corporate Review – April 2011Corporate Review – April 2011
Corporate Review – April 2011
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
 

More from FirstQuantum

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 final
FirstQuantum
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3
FirstQuantum
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - final
FirstQuantum
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - final
FirstQuantum
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november final
FirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
FirstQuantum
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - final
FirstQuantum
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate Presentation
FirstQuantum
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
FirstQuantum
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - final
FirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
FirstQuantum
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
FirstQuantum
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - final
FirstQuantum
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2
FirstQuantum
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015
FirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
FirstQuantum
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - final
FirstQuantum
 

More from FirstQuantum (17)

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 final
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - final
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - final
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - final
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate Presentation
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - final
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - final
 

Corporate Presentation December 2012

  • 1. Our Record Speaks For Itself December 2012 ecem TSX: FM; LSE: FQM
  • 2. Cautionary Note Concerning Forward-Looking Statements Some of the statements contained in the following material are forward looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently available. Forward-looking statements are subject to various risks, uncertainties and other factors that could cause actual results to differ materially from expected results. Readers must rely on their own evaluation of these uncertainties. Note: all dollar amounts in US dollars unless otherwise indicated 2
  • 3. First Quantum Today • A significant copper producer – 2012E : 285k – 295k tonnes • A new and growing nickel producer – 2012E : 36k– 40k tonnes • On the cusp of transformational growth – Copper : tripling production capacity – Nickel : increasing annual production capacity to 125k tonnes • Delivering growth at costs well below industry norms 3
  • 4. First Quantum Today Strong Financial Position Sept 30, 2012 $ millions Cash $375 Total Debt $55 Undrawn and available $1,250 financing Note receivable 2015 $500 4
  • 5. First Quantum Today Diversifying the Balance Sheet • $350 million Senior Notes • Interest @ 7.25% per annum paid semi-annually 5
  • 6. What We have Delivered Best-in-class Copper Growth Leading Shareholder Returns* 2000 – 2011 2000 – 2011 Barrick First Quantum 32% Southern Copper Inmet Southern Peru First Quantum 21% Antofagasta Teck Norilsk Glencore Vale BHP Billiton Freeport Teck Antofagasta Eramet Anglo American Freeport Hudbay BHPB Lundin Codelco Rio Tinto Norilsk Xstrata Vedanta KGHM Anglo American Kazakhmys Kazakhmys Rio Tinto ENRC *Annualized 6
  • 7. Looking Forward: Our Production Targets Copper Nickel 800 000’s tonnes 000’s tonnes 90 600 68 400 45 200 23 0 0 '12 '13 '14 '15 '16 '17 '12 '13 '14 '15 '16 '17 Base Projects Base Projects 7
  • 8. A New & Growing Nickel Producer Ravensthorpe mine, Australia • Acquired as a decommissioned plant • First production within 20 months of purchase • Commercial production declared Dec 28 2011 • Production – Q4’11 : 5,666 tonnes – Q1’12 : 6,617 tonnes – Q2’12 : 8,053 tonnes – Q3’12 : 8,032 tonnes • C1 cash cost 1H’ 12 : $6.43/payable lb of nickel 8
  • 9. A New & Growing Nickel Producer Kevitsa project, Finland • Nickel-copper-PGE project • Commercial production achieved on August 18, 2012 • Initial ore feed of 5.5 mt/yr ; intention to expand by ~50% in 2013 • Target operations: – 10 ktpa nickel @ ~$6.70 - $7.00 /lb – 20 ktpa copper @ ~$1.45 - $1.60 /lb 9
  • 10. A New & Growing Nickel Producer Enterprise target, Zambia • Located 12 km northwest of Sentinel • M&I resource estimate for the Main and Southwest Zones of 40.1Mt @ 1.07% Ni; plus an additional 7.0 Mt @ 0.7% Ni in inferred resources • Preliminary evaluation: – Potential to develop an open pit 4.0 Mtpa operation – Average Ni production rate of 38,000 tpa – Head grades may be varied to reflect changes in the Ni price cycle therefore at certain times production could peak at 60,000 tonnes 10
  • 11. Tripling Copper Production Capacity Sentinel project, Zambia • Located ~ 140 km northwest of Solwezi, northern Zambia • M&I resource of 1,027 Mt at 0.51% Cu grade, containing 5.2 Mt Cu • Estimates: – 2.2:1 LOM strip ratio – >15 years mine life – $1.7B capex – Annual production up to 300,000 tonnes 11
  • 12. Tripling Copper Production Capacity Sentinel project, Zambia • Commercial terms for electric power agreed in principle • Board approval granted • Full-scale development started within original timeframe • Detailed design progressing; commitments for long-lead items in place • Construction completion targeted for late 2014 12
  • 13. Tripling Copper Production Capacity Copper smelter, Zambia • Processing capacity of 1.2 Mtpa —71% Sentinel —100% Kansanshi —Average copper grade 26% • Blister copper production 300,000 tpa; acid production 1.0 Mtpa • Estimates: − Capital cost of US$650M − Operating cost US$69/tonne of concentrate − Commissioning from mid 2014 13
  • 14. Economic Benefits of the Copper Smelter Total Annual Savings * US$340 MM – US$510 MM • Transport Kansanshi * 100% of concentrate to smelter Sentinel * 71% of concentrate to smelter and remainder for export Cost savings per annum * Concentrate @ US$220 /t: US$130 MM – US$200 MM • Export Levy on Concentrate Current * 10% of export value Blister Production * 230,000 - 310,000 tpa Cost savings per annum * Cu @ US$7,000 /t: US$160 MM – US$220 MM • Acid Supply Current Consumption * 1,200 tpd @ US$200 / t: US$90 MM / year Increase with AP5 * +900 tpd @ US$200 / t: US$150 MM /year 14
  • 15. Tripling Copper Production Capacity Haquira project, Peru • Large scale copper project located in southern Peru  M&I resource of 3.7 Mt of copper equivalent and an inferred resource of 2.4 Mt of copper equivalent • Current focus:  Community relations and land access; expanding drill program and environmental matters 15
  • 16. Building a Portfolio of Early-Stage Projects • 19.99% ownership stake in Zincore Metals Inc. – Mineral exploration company focused mainly on zinc and related base metal opportunities in the Americas, namely Peru, Mexico and Canada – Delores copper porphyry project located ~ 40 km from Haquira • 19.2% ownership stake in Empire Mining Company – Bursa Licenses cover the Demirtepe skarn and Karapinar porphyry projects in Western Turkey 16
  • 17. A Significant Copper Producer Kansanshi mine, Zambia • Located near Solwezi in the north western Province of Zambia • First production in 2005 • Open pit mining • Updated Mineral Resource & Reserve Estimates: – 121% increase in M&I estimate to 744.3 Mt @ 0.86 TCu – 178% increase in Proved and Probable Reserve estimate to 725.6 Mt @ 0.82% TCu – Additional Inferred Resource estimate of 365.5 Mt @ 0.71% TCu – Mine life extended to 16 years – at the increased 50Mtpa throughput rate 17
  • 18. A Significant Copper Producer Kansanshi mine, Zambia • Multi-phase production expansion project underway – 2012 – 2015 60% increase in overall production capacity – 2012 – 2014 130% increase in oxide production capacity – 2014 - 2015 90% increase in sulphide production capacity 18
  • 19. A Significant Copper Producer Guelb Moghrein mine, Mauritania • 100% ownership • Located 250 kilometres northeast of the nation’s capital, Nouakchott • As at December 31, 2011, the estimated minelife was ~10 years (including stockpiles) • First production in 2006 • Workforce of ~1,200 19
  • 20. A Significant Copper Producer Guelb Moghrein mine, Mauritania • Record quarterly throughput in Q1’12 • Continuous improvement – Augmenting mining operations with the addition of larger equipment – Optimizing flotation performance with improved auto control and reagent changes 20
  • 21. Within the Top 10 Largest Producers by 2016 Projected 2016 Copper Producer Landscape 21
  • 22. Capital Intensity – US$/Tonne Cobre Panama Caracles Caserones Sierra Gorda El Moro Telegraphio Tampakan Toromocho Oyu Tolgoi Las Bambas Salobo Los Bronces Cerro Verde Ministro Mina Hales Quebrada Blanca Canariaco Quellaveco Rio Blanco Antamina Antapaccay Galeno Buena Vista Konkola Sentinel $6,000 Kansanshi Expansion $5,000 - 5,000 10,000 15,000 20,000 25,000 22
  • 23. How We Do Projects • Define and plan, set contracting strategy early • Identify risks • Copy existing designs, duplication, standardization • Maximize commonality of equipment First Quantum Project • Maximize in-house work: By − Project management By Others − Technical involvement FQM − Procurement, expediting, logistics, shipping − Self perform construction − Own tools and equipment Traditional Project − FQM construction supervision • Efficient construction labour from Indonesia Owner and Philippines By Others 23
  • 24. What Our Shareholders Own The ability and proven • A substantial copper producer; within the world’s top ten by 2016 track record to add value through efficient • An emerging nickel producer; within the world’s top ten by 2016 delivery of growth at costs below industry • A strong financial position norms • Production in an industry with strong fundamentals
  • 25. Our Record Speaks For Itself TSX: FM; LSE: FQM
  • 26. A New & Growing Nickel Producer Enterprise Nickel Project (Main and SW) Mineral Resource Estimate as at 28th November 2012 Cut-off grade of 0.15% Ni Contained Tonnage Grade Ni (million tonnes) (Ni %) (kilo tonnes) Main Zone - Measured 2.7 1.51 41 Main Zone - Indicated 34.3 1.08 372 SW Zone - Indicated 3.1 0.60 18 Total Measured & Indicated 40.1 1.07 431 Main Zone - Inferred 2.5 0.92 23 SW Zone - Inferred 4.6 0.58 27 Total Inferred 7.1 0.70 50 Enterprise Nickel Project (Main Zone only) Reserve Estimate November 2012 Tonnage Grade Contained Ni (million tonnes) (Ni %) (kilo tonnes) Proven 2.7Mt 1.44% 39.0 Probable 30.0Mt 1.08% 324.0 Total Proven & Probable 32.7Mt 1.10% 363.0 26