E




         Continuing Professional
              Development
                       For
                  Social Workers




    Elevate Training & Development Ltd
    www.SocialWorkProcesses.co.uk


    May,06 2011
www.SocialWorkProcesses.co.uk


Table of Contents

1.      Continuing Professional Development ............................................................................. 3
     1.1 CPD Activities .................................................................................................................................... 3
     1.2 Developing CPD ................................................................................................................................. 4
2.      CPD for Social Workers .................................................................................................... 5
     2.1 General Social Care Council .............................................................................................................. 6
     2.2 National Occupational Standards ...................................................................................................... 6
     2.3 Relationship between Law and Practice ........................................................................................... 9
        2.3.1 Legal Framework of Social Work ............................................................................................................ 10
        2.3.2 Key Legislation on Social Work Practice and Defining Service User Groups ............................................ 10
     2.4 The Regulatory Cycle ....................................................................................................................... 14
        2.4.1 Risk Management and Regulation of Social Work Education ................................................................. 14
        2.4.2 Risk Framework ..................................................................................................................................... 15
     2.5 Requirements for Training and Assessment .................................................................................... 16
        2.5.1 A) Entry Requirements .......................................................................................................................... 16
        2.5.1 B) Teaching, Learning and Assessment .................................................................................................. 17
        2.5.2 Requirements for Social Work Training ................................................................................................. 18
3.      Children’s Workforce Development Council ................................................................... 19
     3.1 Model for Structuring & Professionalisation of the Children’s Social Care Workforce ................... 19
        3.1.1 Staff Groups .......................................................................................................................................... 19
        3.1.2 Related Knowledge, Skills and Experience ............................................................................................. 19
        3.1.3 Harmonising Graduate Preparation ....................................................................................................... 21
        3.1.4 Pathways ............................................................................................................................................... 21
        3.1.5 Interaction with other parts of the Workforce ....................................................................................... 21




                                                                                                                                                               Page | 2
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


1. Continuing Professional Development1

Continuing Professional Development defined as planned learning and development activity
that develops, maintains or extends knowledge, skills, understanding or performance. It can
include a wide range of activity designed to equip a worker to provide quality social care and/or
to support their career development. It is relevant to workers in organisations of all types and
sizes, including micro employers and those who manage their own services.


CPD is therefore:
- Central to developing and improving services
- Essential for good people management
- Key to improving recruitment and retention
- Applicable to all workers, volunteers and managers
- A shared responsibility between workers, managers and employers


1.1 CPD Activities


The learning and development could take a number of different forms, including:
       induction and legally-required training
       learning through supervision and other opportunities supported and provided at work,
          such as in-house courses, job-shadowing, secondment, mentoring and coaching
       qualifications required for social worker registration or to meet care service inspection
          requirements
       post-registration training and learning (PRTL) as required for social workers to maintain
          their professional registration
       post-qualifying training for social workers, which may change as part of social work
          reform

1
    Source: http://www.skillsforcare.org.uk/


                                                                                           Page | 3
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


        formal learning leading to Qualifications and Credit Framework (QCF) recognised
           awards, certificates and diplomas, or higher education qualifications
        informal learning and learning through experience in life and work
        reflecting on what you have learned from planned and unplanned experiences at work.


It is important that you review any CPD activity with your supervisor to ensure that it has
achieved what you expected and that you can apply the learning to your work



1.2 Developing CPD2


The need for a workforce that is flexible and equipped to meet the ever-increasing challenges
involved in providing personalised services is in demand. This includes the growth in the
number of micro employers and people managing their own services. Significant efforts are
made to harmonise various initiatives and policy developments with improved outcomes for
the people, which also stress the importance of CPD in bringing about the changes required and
in supporting the drive for consistently high quality services with improved outcomes.


The integrated approach takes account of key stakeholders and recognises that a number of
different elements need to come together for successful implementation. The following
diagram shows the application of a model to the CPD framework.




2
    Source: http://www.skillsforcare.org.uk/

                                                                                         Page | 4
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




                                       Fig 1- CPD Framework



2. CPD for Social Workers3

The principles and basic components of CPD for social workers are the same as for all other
members of the social care workforce. In March 2010, the government announced a number of
specific developments that will create additional frameworks and requirements. They accepted
the social work taskforce recommendations for protected arrangements for newly qualified
social workers through the introduction of an assessed first year in employment (to be fully in
place by 2016), and the creation of a more coherent and effective national framework for the
continuing professional development of all social workers.
3
 Source: http://www.gscc.org.uk/
http://www.skillsforcare.org.uk/

                                                                                         Page | 5
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


The proposed reform of social work will encourage a shift in culture, which raises expectations
of an entitlement to ongoing learning and development, a single nationally recognised career
structure, the introduction of a licence to practice, and a National College of Social Work.


2.1 General Social Care Council


The General Social Care Council (GSCC) is the regulator of the social work profession and social
work education. It protects the public by requiring high standards of education, conduct and
practice of all social workers. The GSCC has a risk-focused approach to regulating social work
education.


For the moment, the existing registration arrangements through GSCC will continue and these
include specific requirements to evidence CPD through a post-registration training and learning
(PRTL) record. Registered social workers are required to keep their training and learning up-to-
date in order to re-register with the GSCC after the initial three-year period. This can include
many different sorts of learning, such as reading, attending conferences, training courses, or
gaining a post-qualifying award. It is an offence for a person to use the title ‘social worker’ or
imply that he is a qualified social worker if he is not registered with the General Social Care
Council


2.2 National Occupational Standards4


TOPSS, the Social Care Workforce Strategy Body (England), which produced National
Occupational Standards for Social Work, became ‘Skills for Care’ in April 2005. The focus of
Skills for Care is primarily concerned with adult social care, and the new Children’s Workforce
Development Council will focus on the strategy for the children’s services workforce. The
National Occupational Standards for Social Work are organised around areas of competence, or
key roles of social workers. For each of the key roles, there is a requirement to ‘understand,

4
    Source: www.doh.gov.uk/swqualification

                                                                                               Page | 6
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


critically analyse, evaluate, and apply knowledge’ of the legal, social, economic and ecological
context of social work practice, country, UK, EU legislation, statutory codes, standards,
frameworks and guidance relevant to social work practice and related fields, including multi-
disciplinary and multi-organisational practice, data protection and confidentiality of
information. The key roles are:


Key Role 1: Prepare for, and work with individuals, families, carers, groups and communities to
assess their needs and circumstances.
    Prepare for social work contact and involvement
    Work with individuals, families, carers, groups and communities to help them make
       informed decisions
    Assess needs and options to recommend a course of action


Key Role 2: Plan, carry out, review and evaluate social work practice, with individuals, families,
carers, groups, communities and other professionals.
    Respond to crisis situations
    Interact with individuals, families, carers, groups and communities to achieve change
       and development and to improve life opportunities
    Prepare, produce, implement and evaluate plans with individuals, families, carers,
       groups, communities and professional colleagues
    Support the development of networks to meet assessed needs and planned outcomes
    Work with groups to promote individual growth, development and independence
    Address behaviour which presents a risk to individuals, families, carers, groups,
       communities


Key Role 3: Support individuals to represent their needs, views and circumstances.
    Advocate with and on behalf of, individuals, families, carers, groups and communities
    Prepare for, and participate in decision making forums



                                                                                            Page | 7
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


Key Role 4: Manage risk to individuals, families, carers, groups, communities, self and
colleagues.
    Assess and manage risks to individuals, families, carers, groups and communities
    Assess, minimise and manage risk to self and colleagues


Key Role 5: Manage and be accountable, with supervision and support, for your own social
work practice within your organisation.
    Manage and be accountable for your own work
    Contribute to the management of resources and services
    Manage, present and share records and reports
    Work within multi-disciplinary and multi-organisational teams, networks and systems


Key Role 6: Demonstrate professional competence in social work practice.
    Research, analyse, evaluate, and use current knowledge of best social work practice
    Work within agreed standards of social work practice and ensure own professional
       development
    Manage complex ethical issues, dilemmas and conflicts
    Contribute to the promotion of best social work practice


Roles of stakeholders in Programme design and Delivery
The diagram below shows the different kind of roles of the stakeholders such as employers,
students, service users, external examiners, GSCC in Social Work training.




                                                                                        Page | 8
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




                    Fig 2 –Roles of Stakeholders in program Design & delivery



2.3 Relationship between Law and Practice5

The relationship between law and social work practice and the place of law as an element in
taught social work programmes continues to be the subject of ongoing debate. Polarised views
have developed. However, law clearly plays an important role in social work practice today.
Substantial legislation has been passed in recent years which has a profound effect on social
work practice, notably the Children Acts of 1989 and 2004, the National Health Service and
Community Care Act 1990, the Crime and Disorder Act 1998, the Adoption and Children Act
2002 and the Mental Capacity Act 2005. The understanding of law underpins and provides


5
 Source: www.gscc.org.uk
www.basw.co.uk

                                                                                       Page | 9
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


duties and powers for social work and understanding the statutory and legal requirements is
essential for effective and fair social work practice.

2.3.1 Legal Framework of Social Work6

The social work is provided by the Local Authority Social Services Act 1970 (LASSA) as amended.
Section 1 establishes the authorities which have social services functions as county councils,
metropolitan and London boroughs and unitary authorities, but not district councils.
Sections 2–5 of the LASSA are repealed by the Children Act 2004 to give effect to the
organizational changes.
The Children Act 2004 amends personnel requirements specified by the LASSA. The duty to
appoint a Director of Social Services is removed and replaced by a requirement to appoint a
Director of Children’s Services for each children’s services authority, and a Director of Adult
Social Services. The Director of Children’s Services is appointed for the purpose of prescribed
functions including those exercisable by the LEA: social services that relate to children; children
leaving local authority care; the children’s services authority for cooperation, safeguarding and
promoting the welfare of children and information databases; and any health services for
children that are transferred to the local authority. Recently, in some areas children’s and
adults’ services have merged back into a new single department to be led by a single director.
Section 7 of the LASSA 1970 contains a number of important provisions. It provides for the
Secretary of State to produce directions for the exercise of social services establishes
complaints procedures contains the power for the Secretary of State to require an inquiry into
social services functions and provides for the default powers of the Secretary of State. The

2.3.2 Key Legislation on Social Work Practice and Defining Service User Groups


The legislations used for social work practice varies in different sections. The summary below
does not include all legislation which a social worker may encounter in everyday practice. It is,
however, a selection of some of the more important pieces of legislation that directly impact on


6
    Source: www.direct.gov.uk

                                                                                            Page | 10
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


social work practice. There are also areas of overlap as some pieces of legislation could apply,
for example, to children and adults, e.g. the Chronically Sick and Disabled Persons Act 1970,
though it tends to be associated more with adult service users.
General
   Equal Pay Act 1970
   Local Authority Social Services Act 1970
   Local Government Act 1972
   Sex Discrimination Act 1975
   Race Relations Act 1976
   Interpretation Act 1978
   Disability Discrimination Act 1995
   Housing Act 1996
   Data Protection Act 1998
   Human Rights Act 1998
   Access to Justice Act 1999
   Immigration and Asylum Act 1999
   Public Interest Disclosure Act 1999
   Freedom of Information Act 2000
   Local Government Act 2000
   Race Relations (Amendment) Act 2000
   Nationality, Immigration and Asylum Act 2002
   Homelessness Act 2002
   Housing Act 2004
   Civil Partnership Act 2004
   Gender Recognition Act 2004
   Domestic Violence, Crime and Victims Act 2004
   Disability Discrimination Act 2005
   Equality Act 2006
   Safeguarding Vulnerable Groups Act 2006
                                                                                         Page | 11
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


   Health and Social Care Act 2008


Legislation relating to Children and Young Persons
   Children and Young Persons Acts 1963 and 1969
   Family Law Reform Act 1969
   Child Abduction Act 1984
   Children Act 1989
   Human Fertilisation and Embryology Act 1990
   Child Support Act 1991
   Education Act 1996
   Family Law Act 1996
   Protection of Children Act 1999
   Children (Leaving Care) Act 2000
   Special Educational Needs and Disability Act 2001
   Adoption and Children Act 2002
   Children Act 2004
   Children and Adoption Act 2006
   Childcare Act 2006
   Children and Young Persons Act 2008


Legislation relating to Adults’ Services
   National Assistance Act 1948
   National Assistance (Amendment) Act 1951
   Health Services and Public Health Act 1968
   Chronically Sick and Disabled Persons Act 1970
   Mental Health Act 1983
   Disabled Persons (Services, Consultation and Representation) Act 1986
   National Health Service and Community Care Act 1990
   Carers (Recognition and Services) Act 1995
                                                                                       Page | 12
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


   Disability Discrimination Act 1995
   Community Care (Direct Payments) Act 1996
   Care Standards Act 2000
   Carers and Disabled Children Act 2000
   Community Care (Delayed Discharges etc.) Act 2003
   Carers (Equal Opportunities) Act 2004
   Mental Capacity Act 2005
   National Health Service Act 2006
   Mental Health Act 2007


Criminal justice legislation
   Bail Act 1976
   Police and Criminal Evidence Act 1984
   Public Order Act 1986
   Criminal Justice Act 1991
   Probation Service Act 1993
   Criminal Justice and Public Order Act 1994
   Sex Offenders Act 1997
   Protection from Harassment Act 1997
   Crime and Disorder Act 1998
   Youth Justice and Criminal Evidence Act 1999
   Criminal Justice and Court Services Act 2000
   Powers of Criminal Courts (Sentencing) Act 2000
   Sexual Offences Act 2003
   Anti-social Behaviour Act 2003
   Criminal Justice and Immigration Act 2008




                                                                                       Page | 13
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


2.4 The Regulatory Cycle7


GSCC continuously monitors the social work education by the receipt of annual reports from
universities and institutes confirming quality assurance processes, approved by the GSCC, to
ensure that the courses continue to meet the requirements and criteria. In addition to
information provided by universities in relation to course approval and monitoring, other
institution specific information from a range of sources including other regulators reports, QAA
audits, stakeholder feedback, EE feedback and audits specifically relation to complaints. All
information received in relation to approved social work courses is analysed and risk assessed
to provide intelligence for the monitoring and approval of social work courses.


2.4.1 Risk Management and Regulation of Social Work Education


The General Social Care Council (GSCC) under the Care Standards Act 2000 make rules under
which social work training courses are approved and to produce lists of approved courses. The
Care Standards Act 2000 states:


       ‘A course for persons who wish to become social workers shall not be approved under
          this section unless the Council considers that it is such as to enable persons completing
          it to attain the required standard of proficiency in relevant social work.’
       The Approval of courses for the social work degree rules 2002 set out the legal basis for
          our approval of courses
       The learning process for achieving the required standard of proficiency is the curriculum
          for the degree, which includes the National Occupational Standards for social work, the
          Quality Assurance Agency’s benchmark statement for social work degrees and the
          requirements for social work training issued by the Department of Health




7
    Source: www.gscc.org.uk

                                                                                            Page | 14
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


     The degree in social work is a professional social work qualification for social workers in
       all settings (residential, field, day, domiciliary, healthcare and education) and sectors
       (statutory, voluntary and private).
     Social work degrees may be at honours or masters level
     The degree is an England qualification. The requirements for programmes leading to a
       degree provided in Scotland, Wales or Northern Ireland may be different to take
       account of differences in legislation, in language and in the ways that services are
       provided


This document details the risk assessment framework and the associated regulatory
interventions that we will use to regulate the delivery of social work education and training.


The framework is:
   based upon a transparent risk assessment framework which articulates and identifies risks
    to be reduced
   clearly identifies a robust range of regulatory interventions which will be enforceable
   targets intervention proportionately to risks being managed
   transparent and explicit about when and in what situations different regulatory
    interventions are triggered
   includes strategies to minimise risk occurrence and is compliance focused
   aims to reduce the effects of risk via knowledge generation and
   focused upon risks associated with individual providers, risks associated across all social
    work provision and risks associated with regulatory systems and processes


2.4.2 Risk Framework


The management of risk is embedded in regulatory framework. The approach to risk is
underpinned by the principles in International Standard ISO 31000:2009. The diagram below
captures a cycle of regulatory risk assessment.


                                                                                              Page | 15
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




                             Fig3 – Regulatory Risk Assessment Cycle


Information comes into the risk assessment process from a number of sources, is analysed
against risk indicators and evaluated against risk probabilities. Regulatory intervention is an
outcome of this cycle. Importantly, the risk assessment process allows for targeted inspection
activity but also allows regulatory knowledge to be fed back to the regulated environment for
the purposes of enhancement and development.



2.5 Requirements for Training and Assessment


The Requirements for Social Work Training are organised in two sections, entry requirements
and teaching, learning and assessment requirements.

2.5.1 A) Entry Requirements


The Entry requirements must for all providers are:


                                                                                        Page | 16
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


   Satisfy themselves that all entrants have the capability to meet the required standards by
    the end of their training and that they possess appropriate personal and intellectual
    qualities to be social workers
   Ensure that, in addition to the university’s own admission requirements for the degree, all
    entrants have achieved at least Key Skills level 2 in English and mathematics. This would
    normally be equivalent to grade C in the GCSE examination in English and mathematics
   Satisfy themselves that all entrants can understand and make use of written material and
    are able to communicate clearly and accurately in spoken and written English
   Ensure that, as part of the selection procedures, all candidates admitted for training have
    taken part in an individual or group interview.
   Ensure that representatives of stakeholders, particularly service users and employers, are
    involved in the selection process

2.5.1 B) Teaching, Learning and Assessment


The requirements must for all providers are:
   Design the content, structure and delivery of the training to enable social work students to
    demonstrate that they have met the national occupational standards for social work and
    the social work benchmark statement and are suitable for admission to the General Social
    Care Council register of social workers
   Ensure that the teaching of theoretical knowledge, skills and values is based on their
    application in practice
   Ensure that students’ achievement against the required standards is regularly and
    accurately assessed, and confirm that all social work students have been assessed and have
    met all the standards before being awarded the degree in social work
   Ensure that the principles of valuing diversity and equalities awareness are integral to the
    teaching and learning of students
•   Ensure that all social work students spend at least 200 days gaining required experience and
    learning in practice settings
   Each student must have experience:
                                                                                         Page | 17
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


     in at least two practice settings
     of statutory social work tasks involving legal interventions
     of providing services to at least two user groups (e.g. child care and mental health)
   Ensure that all students undergo assessed preparation for direct practice to ensure their
    safety to undertake practice learning in a service delivery setting. This preparation must
    include the opportunity to develop a greater understanding of the experience of service
    users and the opportunity to shadow an experienced social worker
   As well as providing teaching, learning and assessment across the full range of the
    occupational standards and benchmark statement, providers will have to demonstrate that
    all students undertake specific learning and assessment in the following key areas
   Human growth, development, mental health and disability



2.5.2 Requirements for Social Work Training


The requirements are
     Assessment, planning, intervention and review
     Communication skills with children, adults and those with particular communication
       needs
     Law
     Partnership working and information sharing across professional disciplines and
       agencies
   Ensure that the number of hours spent in structured academic learning under the direction
    of an educator is sufficient to ensure that students meet the required level of competence.
    This is expected to be at least 200 days or 1,200 hours
   Ensure that teaching and learning are continually updated to keep abreast of developments
    in legislation, Government policy and best practice




                                                                                          Page | 18
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


3. Children’s Workforce Development Council

The Children’s Workforce Development Council (CWDC) leads change so that the thousands of
people and volunteers working with children and young people across England are able to do
the best job they possibly can. They advise and work in partnership with lots of different
organisations and people who all want the lives of all children and young people to be healthy,
happy and fulfilling. CWDC supports 2.6 million people who work with children, young people
and their families, in sectors including early years, childcare, work with young people, education
welfare, social work and social care.


3.1 Model for Structuring & Professionalisation of the Children’s Social Care
Workforce


3.1.1 Staff Groups


The interviews, the survey and the events together indicated a number of areas of common and
specific knowledge and skill requirements across the three staff groups. These groupings are
loose, with suggested likely constituents, but open to negotiated membership. Some staff work
across more than one group and must not be constrained to single “membership”. Such a
structure must also avoid alienating workers who do not fall neatly into one of the groupings.
Furthermore, the workforce is continually developing and changing, and any structure must be
amenable to responsive development and change in its turn. Related knowledge, skills and
experience


3.1.2 Related Knowledge, Skills and Experience


Each of these groups has an identity engendered by the specific demands of working with
children in particular social and geographical circumstances. The children’s social care
workforce as a whole has much in common within itself and with the rest of the children’s
workforce, but each group also has knowledge and skills which are specific to working with a


                                                                                           Page | 19
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


particular service user group and/or location. Knowledge of child development, legal issues,
safeguarding, and communication with children and young people were the most strongly and
frequently expressed common elements. Skills which were common to all included
partnership/team working, analytical skills, self management, and support for others. A large
number of common personal attributes were identified, particularly patience and empathy,
integrity, being personable, problem-solving ability, leadership, and personal strength. These
would be expected in all practitioners across the children’s social care workforce. Knowledge
and skills specific to each staff group were also identified in the project.




                           Fig 4- Model For Children’s Social Care Workforce




                                                                                       Page | 20
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


3.1.3 Harmonising Graduate Preparation

The model is based on a traditional degree structure of core modules (60 credits at level 6) and
optional modules (60 credits at level 6). The undergraduate pathway is for those seeking a
graduate role either from within the workforce or as a new recruit. However, the degree
structure is such that those within the workforce wishing to enhance their profile in a specific
area (without undertaking the whole programme) can access individual stand-alone modules,
gaining   recognised    credit   and    undertaking     quality-assured    continuing   professional
development. This is a means by which managers might assemble the required breadth of
expertise in teams in response to new challenges or fields of work.
Existing graduates, both within the workforce and joining it, would be able to select core or
optional modules (in negotiation with their manager) to fill gaps in their profile for the specified
field of work and role. Rather than amass additional level 6 credits, an existing graduate could
expect to access the modules at level 7 (masters) with a view to progressing to postgraduate
certificate, postgraduate diploma, or masters degree. It is common for universities to provide
modules with assessments at both level 6 and level 7.


3.1.4 Pathways


It is suggested that each staff group would have essential elements and optional elements
which best match the needs of that part of the workforce. However, it is also envisaged that
managers will wish to establish a balance of skills and expertise in teams, so some variation is
also expected.


3.1.5 Interaction with other parts of the Workforce


A clear identity and purpose, linked to supporting education and career pathways within
children’s social care should facilitate interaction with other groups. The enhanced identity and
status which should follow educational progression and professionalisation will help to reverse
the pervasive feelings of low status and lack of recognition by other professionals.


                                                                                             Page | 21
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


  Training Social Workers Across The World In UK Social Work Processes (CPD)
Our Services ™



Elevate Training and Development is a training company with many years experience of
facilitating the training needs of workers in multi agency and social care & educational settings.



Our training programmes are diverse and cover the range of essential training required to meet
CWDC, Adult services and Continuing Professional Development standards and those
requirements of OFSTED



We have experience of facilitating the development training needs of workers across the UK
and Ireland in Adult and Children’s & Families Teams and Private & Voluntary establishments,
sometimes in conjunction with existing in- house programmes and including bespoke training at
all levels.



We are also instrumental in the training needs of new workers looking and coming to work in
the UK who require a good grounding in British social work processes.



Our trainers are social worker professionals with qualifications in adult learning and experience
of direct work in all fields of social care, spanning many years and at all levels of social work
provision.



Our training programmes reflect the current knowledge and practical application of current day
social care legislation, our resources are focused on direct work with services users and we
offer live examples of every day work practice and issues to enhance the training and
development of workers in the everyday jobs that they do.




                                                                                            Page | 22
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


Our website is full of rich information and tools available for workers to download and with
useful exercises for workers to undertake. We also offer the ability to undertake webinars to
facilitate learning and offer this through our CPD programmes.

We have managed training for large local authorities and provided comprehensive analysis of
training needs and the impact of training for workers and managers to help meet the task of
providing a workforce fit for purpose.



In addition we facilitate large day conferences on topics such as “ Learning from Serious Case
Reviews” “Appreciating social work” “Vicarious Trauma”



Performance Monitoring



Elevate Training and Development Ltd has a quality assurance programme which we follow as
part of our core business: it includes QA of our facilitators, programmes and work with
commissioned authorities and individuals.



All performance is monitored using the agreed performance monitoring forms given to
participants and with our own “Facilitator Feedback Form”. This also includes judgements
about learning outcomes against agreed standards.



Data protection



We hold information about training event securely as per our privacy policy and will inform the
commissioning authority of any issues which may arise including inspections by our regulators.
This also includes information on our website.




                                                                                           Page | 23
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




                                Online Training Programme ™
This takes place by sign up to our online training portal at www.SocialWorkProcesses.co.uk.
Once signed up members have access to the full training program as specified on the website.

This includes our online learning process called -

                           “Read/ Listen/ Discuss/ Action/ Feedback”™

      Read: Up to date legislation and case work examples – handouts, e-course (email) and
       reading list
      Listen: Attendance at live/ replay online webinars hosted by an experienced trainer/
       practitioner
      Discuss: Phone in discussions with colleagues and trainers after webinar/ Website
       Forum
      Action: Workers log book, reflection and evidence of application
      Feedback: email questions to our full time training staff on core learning areas

Access to the self assessment tools – can be completed at anytime

Certificate for each area completed following evidence submission

Delivery

Individual Training Needs Analysis

Core skills for children and adult social workers (helps to ascertain level of training and must be
completed prior to learning and submitted to trainer)

E-course

Bite size e-course is on personal self and development as a worker: As a practitioner, what
triggers them, dealing with stress, high workloads, conflict in the workplace, supervision, career
development.

   1. Email
   2. Video channel
   3. Audio – iTunes download

Workers can choose which courses they can sign up for under personal development but must
demonstrate in their logs how progress has been achieved.


                                                                                             Page | 24
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk


Examples: Diversity “Black Professionals - how to break the glass ceiling”



Core training

14 weeks of webinars on key training for adult and children’s social workers. Workers can
phone in to join in the topic being discussed

Specialist training

12 weeks of training on specialist areas for adult and children’s social workers

Handouts

Fully researched and sourced handouts which add to learning development

Log book

Includes: Test (write about a subject to which we will give you the title i.e. Ethical Dilemmas),
evaluation and reflection, they must be completed after each module (4 weeks) and returned

Certificates

12 certificates are available during the year, but they will only be given to workers who
evidence through their training logs that they have completed the tasks and reflected on their
workers.

Training Dates

Our training is ongoing and workers are sent the dates of the training program when they sign
up to the site. We have a 52 week cycle and workers can join in at any stage of the cycle.

All up dates are put on the site in the update area and workers have full access to ongoing
training and updates to legislation and law, which is also sent to their personal email.

Terms and Conditions

Evidence of completions: Workers must sign up to be members and attend and participate in
each training session before the certificate of attendance can be given

Advice: It is not our intention to offer direct advice on casework in place of supervision from
line manager. Please read disclaimer on website




                                                                                             Page | 25
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




Confidentiality: although cases are discussed names and details of services users or
organisations will not be used or disclosed by us. We ask workers to ensure confidentially is
adhered to at all time.

Due Diligence: Due to the nature of the discussions only vetted by application members are
allowed to access the webinars.

                                       Pricing 2011/2012

Individuals:          £60 per year or £7.99 per month*

Private Companies: £3000 for up to 100 workers or £60 per worker per year

Voluntary groups:     £2500 for up to 100 workers or £55 per worker per year

Payment is in advance, monthly payments is accepted for individuals only

*Individual application requires evidence of suitability due to the nature of the training
Long arm supervision and mentoring service available on request


Gradle Gardner Martin
CQSW/DipSW Cert Management
Director Elevate Training & Development Ltd


To Sign up for Elevate Training and Development CDP courses for social care professionals
please visit www.SocialWorkProcesses.co.uk or ring us on 020 8469 0634




                                                                                             Page | 26
For the personal use of candidates only Elevate Training & Development Ltd copyright
www.SocialWorkProcesses.co.uk




Disclaimer

“The information contained in this document that includes text, graphics and links, are provided on an
“as-is”, "with all faults" and "as available" basis and are without warranty of any kind. While we rely on
sources that are believed to be reliable, it cannot rule out errors in judgment or application. The
document is intended for “information” and “general guidance” purposes only.”

“Investment decisions and/or other decisions based on the conclusions and potential strategies
mentioned in the document are not necessarily endorsed by the Brickwork management. Brickwork does
not represent or warrant that the information provided is accurate, complete or current and will not be
held liable for any damages of any kind arising from the use of this information.”




                                                                                                  Page | 27
For the personal use of candidates only Elevate Training & Development Ltd copyright

Continuing Professional Development For Social Workers

  • 1.
    E Continuing Professional Development For Social Workers Elevate Training & Development Ltd www.SocialWorkProcesses.co.uk May,06 2011
  • 2.
    www.SocialWorkProcesses.co.uk Table of Contents 1. Continuing Professional Development ............................................................................. 3 1.1 CPD Activities .................................................................................................................................... 3 1.2 Developing CPD ................................................................................................................................. 4 2. CPD for Social Workers .................................................................................................... 5 2.1 General Social Care Council .............................................................................................................. 6 2.2 National Occupational Standards ...................................................................................................... 6 2.3 Relationship between Law and Practice ........................................................................................... 9 2.3.1 Legal Framework of Social Work ............................................................................................................ 10 2.3.2 Key Legislation on Social Work Practice and Defining Service User Groups ............................................ 10 2.4 The Regulatory Cycle ....................................................................................................................... 14 2.4.1 Risk Management and Regulation of Social Work Education ................................................................. 14 2.4.2 Risk Framework ..................................................................................................................................... 15 2.5 Requirements for Training and Assessment .................................................................................... 16 2.5.1 A) Entry Requirements .......................................................................................................................... 16 2.5.1 B) Teaching, Learning and Assessment .................................................................................................. 17 2.5.2 Requirements for Social Work Training ................................................................................................. 18 3. Children’s Workforce Development Council ................................................................... 19 3.1 Model for Structuring & Professionalisation of the Children’s Social Care Workforce ................... 19 3.1.1 Staff Groups .......................................................................................................................................... 19 3.1.2 Related Knowledge, Skills and Experience ............................................................................................. 19 3.1.3 Harmonising Graduate Preparation ....................................................................................................... 21 3.1.4 Pathways ............................................................................................................................................... 21 3.1.5 Interaction with other parts of the Workforce ....................................................................................... 21 Page | 2 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 3.
    www.SocialWorkProcesses.co.uk 1. Continuing ProfessionalDevelopment1 Continuing Professional Development defined as planned learning and development activity that develops, maintains or extends knowledge, skills, understanding or performance. It can include a wide range of activity designed to equip a worker to provide quality social care and/or to support their career development. It is relevant to workers in organisations of all types and sizes, including micro employers and those who manage their own services. CPD is therefore: - Central to developing and improving services - Essential for good people management - Key to improving recruitment and retention - Applicable to all workers, volunteers and managers - A shared responsibility between workers, managers and employers 1.1 CPD Activities The learning and development could take a number of different forms, including:  induction and legally-required training  learning through supervision and other opportunities supported and provided at work, such as in-house courses, job-shadowing, secondment, mentoring and coaching  qualifications required for social worker registration or to meet care service inspection requirements  post-registration training and learning (PRTL) as required for social workers to maintain their professional registration  post-qualifying training for social workers, which may change as part of social work reform 1 Source: http://www.skillsforcare.org.uk/ Page | 3 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 4.
    www.SocialWorkProcesses.co.uk  formal learning leading to Qualifications and Credit Framework (QCF) recognised awards, certificates and diplomas, or higher education qualifications  informal learning and learning through experience in life and work  reflecting on what you have learned from planned and unplanned experiences at work. It is important that you review any CPD activity with your supervisor to ensure that it has achieved what you expected and that you can apply the learning to your work 1.2 Developing CPD2 The need for a workforce that is flexible and equipped to meet the ever-increasing challenges involved in providing personalised services is in demand. This includes the growth in the number of micro employers and people managing their own services. Significant efforts are made to harmonise various initiatives and policy developments with improved outcomes for the people, which also stress the importance of CPD in bringing about the changes required and in supporting the drive for consistently high quality services with improved outcomes. The integrated approach takes account of key stakeholders and recognises that a number of different elements need to come together for successful implementation. The following diagram shows the application of a model to the CPD framework. 2 Source: http://www.skillsforcare.org.uk/ Page | 4 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 5.
    www.SocialWorkProcesses.co.uk Fig 1- CPD Framework 2. CPD for Social Workers3 The principles and basic components of CPD for social workers are the same as for all other members of the social care workforce. In March 2010, the government announced a number of specific developments that will create additional frameworks and requirements. They accepted the social work taskforce recommendations for protected arrangements for newly qualified social workers through the introduction of an assessed first year in employment (to be fully in place by 2016), and the creation of a more coherent and effective national framework for the continuing professional development of all social workers. 3 Source: http://www.gscc.org.uk/ http://www.skillsforcare.org.uk/ Page | 5 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 6.
    www.SocialWorkProcesses.co.uk The proposed reformof social work will encourage a shift in culture, which raises expectations of an entitlement to ongoing learning and development, a single nationally recognised career structure, the introduction of a licence to practice, and a National College of Social Work. 2.1 General Social Care Council The General Social Care Council (GSCC) is the regulator of the social work profession and social work education. It protects the public by requiring high standards of education, conduct and practice of all social workers. The GSCC has a risk-focused approach to regulating social work education. For the moment, the existing registration arrangements through GSCC will continue and these include specific requirements to evidence CPD through a post-registration training and learning (PRTL) record. Registered social workers are required to keep their training and learning up-to- date in order to re-register with the GSCC after the initial three-year period. This can include many different sorts of learning, such as reading, attending conferences, training courses, or gaining a post-qualifying award. It is an offence for a person to use the title ‘social worker’ or imply that he is a qualified social worker if he is not registered with the General Social Care Council 2.2 National Occupational Standards4 TOPSS, the Social Care Workforce Strategy Body (England), which produced National Occupational Standards for Social Work, became ‘Skills for Care’ in April 2005. The focus of Skills for Care is primarily concerned with adult social care, and the new Children’s Workforce Development Council will focus on the strategy for the children’s services workforce. The National Occupational Standards for Social Work are organised around areas of competence, or key roles of social workers. For each of the key roles, there is a requirement to ‘understand, 4 Source: www.doh.gov.uk/swqualification Page | 6 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 7.
    www.SocialWorkProcesses.co.uk critically analyse, evaluate,and apply knowledge’ of the legal, social, economic and ecological context of social work practice, country, UK, EU legislation, statutory codes, standards, frameworks and guidance relevant to social work practice and related fields, including multi- disciplinary and multi-organisational practice, data protection and confidentiality of information. The key roles are: Key Role 1: Prepare for, and work with individuals, families, carers, groups and communities to assess their needs and circumstances.  Prepare for social work contact and involvement  Work with individuals, families, carers, groups and communities to help them make informed decisions  Assess needs and options to recommend a course of action Key Role 2: Plan, carry out, review and evaluate social work practice, with individuals, families, carers, groups, communities and other professionals.  Respond to crisis situations  Interact with individuals, families, carers, groups and communities to achieve change and development and to improve life opportunities  Prepare, produce, implement and evaluate plans with individuals, families, carers, groups, communities and professional colleagues  Support the development of networks to meet assessed needs and planned outcomes  Work with groups to promote individual growth, development and independence  Address behaviour which presents a risk to individuals, families, carers, groups, communities Key Role 3: Support individuals to represent their needs, views and circumstances.  Advocate with and on behalf of, individuals, families, carers, groups and communities  Prepare for, and participate in decision making forums Page | 7 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 8.
    www.SocialWorkProcesses.co.uk Key Role 4:Manage risk to individuals, families, carers, groups, communities, self and colleagues.  Assess and manage risks to individuals, families, carers, groups and communities  Assess, minimise and manage risk to self and colleagues Key Role 5: Manage and be accountable, with supervision and support, for your own social work practice within your organisation.  Manage and be accountable for your own work  Contribute to the management of resources and services  Manage, present and share records and reports  Work within multi-disciplinary and multi-organisational teams, networks and systems Key Role 6: Demonstrate professional competence in social work practice.  Research, analyse, evaluate, and use current knowledge of best social work practice  Work within agreed standards of social work practice and ensure own professional development  Manage complex ethical issues, dilemmas and conflicts  Contribute to the promotion of best social work practice Roles of stakeholders in Programme design and Delivery The diagram below shows the different kind of roles of the stakeholders such as employers, students, service users, external examiners, GSCC in Social Work training. Page | 8 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 9.
    www.SocialWorkProcesses.co.uk Fig 2 –Roles of Stakeholders in program Design & delivery 2.3 Relationship between Law and Practice5 The relationship between law and social work practice and the place of law as an element in taught social work programmes continues to be the subject of ongoing debate. Polarised views have developed. However, law clearly plays an important role in social work practice today. Substantial legislation has been passed in recent years which has a profound effect on social work practice, notably the Children Acts of 1989 and 2004, the National Health Service and Community Care Act 1990, the Crime and Disorder Act 1998, the Adoption and Children Act 2002 and the Mental Capacity Act 2005. The understanding of law underpins and provides 5 Source: www.gscc.org.uk www.basw.co.uk Page | 9 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 10.
    www.SocialWorkProcesses.co.uk duties and powersfor social work and understanding the statutory and legal requirements is essential for effective and fair social work practice. 2.3.1 Legal Framework of Social Work6 The social work is provided by the Local Authority Social Services Act 1970 (LASSA) as amended. Section 1 establishes the authorities which have social services functions as county councils, metropolitan and London boroughs and unitary authorities, but not district councils. Sections 2–5 of the LASSA are repealed by the Children Act 2004 to give effect to the organizational changes. The Children Act 2004 amends personnel requirements specified by the LASSA. The duty to appoint a Director of Social Services is removed and replaced by a requirement to appoint a Director of Children’s Services for each children’s services authority, and a Director of Adult Social Services. The Director of Children’s Services is appointed for the purpose of prescribed functions including those exercisable by the LEA: social services that relate to children; children leaving local authority care; the children’s services authority for cooperation, safeguarding and promoting the welfare of children and information databases; and any health services for children that are transferred to the local authority. Recently, in some areas children’s and adults’ services have merged back into a new single department to be led by a single director. Section 7 of the LASSA 1970 contains a number of important provisions. It provides for the Secretary of State to produce directions for the exercise of social services establishes complaints procedures contains the power for the Secretary of State to require an inquiry into social services functions and provides for the default powers of the Secretary of State. The 2.3.2 Key Legislation on Social Work Practice and Defining Service User Groups The legislations used for social work practice varies in different sections. The summary below does not include all legislation which a social worker may encounter in everyday practice. It is, however, a selection of some of the more important pieces of legislation that directly impact on 6 Source: www.direct.gov.uk Page | 10 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 11.
    www.SocialWorkProcesses.co.uk social work practice.There are also areas of overlap as some pieces of legislation could apply, for example, to children and adults, e.g. the Chronically Sick and Disabled Persons Act 1970, though it tends to be associated more with adult service users. General  Equal Pay Act 1970  Local Authority Social Services Act 1970  Local Government Act 1972  Sex Discrimination Act 1975  Race Relations Act 1976  Interpretation Act 1978  Disability Discrimination Act 1995  Housing Act 1996  Data Protection Act 1998  Human Rights Act 1998  Access to Justice Act 1999  Immigration and Asylum Act 1999  Public Interest Disclosure Act 1999  Freedom of Information Act 2000  Local Government Act 2000  Race Relations (Amendment) Act 2000  Nationality, Immigration and Asylum Act 2002  Homelessness Act 2002  Housing Act 2004  Civil Partnership Act 2004  Gender Recognition Act 2004  Domestic Violence, Crime and Victims Act 2004  Disability Discrimination Act 2005  Equality Act 2006  Safeguarding Vulnerable Groups Act 2006 Page | 11 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 12.
    www.SocialWorkProcesses.co.uk  Health and Social Care Act 2008 Legislation relating to Children and Young Persons  Children and Young Persons Acts 1963 and 1969  Family Law Reform Act 1969  Child Abduction Act 1984  Children Act 1989  Human Fertilisation and Embryology Act 1990  Child Support Act 1991  Education Act 1996  Family Law Act 1996  Protection of Children Act 1999  Children (Leaving Care) Act 2000  Special Educational Needs and Disability Act 2001  Adoption and Children Act 2002  Children Act 2004  Children and Adoption Act 2006  Childcare Act 2006  Children and Young Persons Act 2008 Legislation relating to Adults’ Services  National Assistance Act 1948  National Assistance (Amendment) Act 1951  Health Services and Public Health Act 1968  Chronically Sick and Disabled Persons Act 1970  Mental Health Act 1983  Disabled Persons (Services, Consultation and Representation) Act 1986  National Health Service and Community Care Act 1990  Carers (Recognition and Services) Act 1995 Page | 12 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 13.
    www.SocialWorkProcesses.co.uk  Disability Discrimination Act 1995  Community Care (Direct Payments) Act 1996  Care Standards Act 2000  Carers and Disabled Children Act 2000  Community Care (Delayed Discharges etc.) Act 2003  Carers (Equal Opportunities) Act 2004  Mental Capacity Act 2005  National Health Service Act 2006  Mental Health Act 2007 Criminal justice legislation  Bail Act 1976  Police and Criminal Evidence Act 1984  Public Order Act 1986  Criminal Justice Act 1991  Probation Service Act 1993  Criminal Justice and Public Order Act 1994  Sex Offenders Act 1997  Protection from Harassment Act 1997  Crime and Disorder Act 1998  Youth Justice and Criminal Evidence Act 1999  Criminal Justice and Court Services Act 2000  Powers of Criminal Courts (Sentencing) Act 2000  Sexual Offences Act 2003  Anti-social Behaviour Act 2003  Criminal Justice and Immigration Act 2008 Page | 13 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 14.
    www.SocialWorkProcesses.co.uk 2.4 The RegulatoryCycle7 GSCC continuously monitors the social work education by the receipt of annual reports from universities and institutes confirming quality assurance processes, approved by the GSCC, to ensure that the courses continue to meet the requirements and criteria. In addition to information provided by universities in relation to course approval and monitoring, other institution specific information from a range of sources including other regulators reports, QAA audits, stakeholder feedback, EE feedback and audits specifically relation to complaints. All information received in relation to approved social work courses is analysed and risk assessed to provide intelligence for the monitoring and approval of social work courses. 2.4.1 Risk Management and Regulation of Social Work Education The General Social Care Council (GSCC) under the Care Standards Act 2000 make rules under which social work training courses are approved and to produce lists of approved courses. The Care Standards Act 2000 states:  ‘A course for persons who wish to become social workers shall not be approved under this section unless the Council considers that it is such as to enable persons completing it to attain the required standard of proficiency in relevant social work.’  The Approval of courses for the social work degree rules 2002 set out the legal basis for our approval of courses  The learning process for achieving the required standard of proficiency is the curriculum for the degree, which includes the National Occupational Standards for social work, the Quality Assurance Agency’s benchmark statement for social work degrees and the requirements for social work training issued by the Department of Health 7 Source: www.gscc.org.uk Page | 14 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 15.
    www.SocialWorkProcesses.co.uk  The degree in social work is a professional social work qualification for social workers in all settings (residential, field, day, domiciliary, healthcare and education) and sectors (statutory, voluntary and private).  Social work degrees may be at honours or masters level  The degree is an England qualification. The requirements for programmes leading to a degree provided in Scotland, Wales or Northern Ireland may be different to take account of differences in legislation, in language and in the ways that services are provided This document details the risk assessment framework and the associated regulatory interventions that we will use to regulate the delivery of social work education and training. The framework is:  based upon a transparent risk assessment framework which articulates and identifies risks to be reduced  clearly identifies a robust range of regulatory interventions which will be enforceable  targets intervention proportionately to risks being managed  transparent and explicit about when and in what situations different regulatory interventions are triggered  includes strategies to minimise risk occurrence and is compliance focused  aims to reduce the effects of risk via knowledge generation and  focused upon risks associated with individual providers, risks associated across all social work provision and risks associated with regulatory systems and processes 2.4.2 Risk Framework The management of risk is embedded in regulatory framework. The approach to risk is underpinned by the principles in International Standard ISO 31000:2009. The diagram below captures a cycle of regulatory risk assessment. Page | 15 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 16.
    www.SocialWorkProcesses.co.uk Fig3 – Regulatory Risk Assessment Cycle Information comes into the risk assessment process from a number of sources, is analysed against risk indicators and evaluated against risk probabilities. Regulatory intervention is an outcome of this cycle. Importantly, the risk assessment process allows for targeted inspection activity but also allows regulatory knowledge to be fed back to the regulated environment for the purposes of enhancement and development. 2.5 Requirements for Training and Assessment The Requirements for Social Work Training are organised in two sections, entry requirements and teaching, learning and assessment requirements. 2.5.1 A) Entry Requirements The Entry requirements must for all providers are: Page | 16 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 17.
    www.SocialWorkProcesses.co.uk  Satisfy themselves that all entrants have the capability to meet the required standards by the end of their training and that they possess appropriate personal and intellectual qualities to be social workers  Ensure that, in addition to the university’s own admission requirements for the degree, all entrants have achieved at least Key Skills level 2 in English and mathematics. This would normally be equivalent to grade C in the GCSE examination in English and mathematics  Satisfy themselves that all entrants can understand and make use of written material and are able to communicate clearly and accurately in spoken and written English  Ensure that, as part of the selection procedures, all candidates admitted for training have taken part in an individual or group interview.  Ensure that representatives of stakeholders, particularly service users and employers, are involved in the selection process 2.5.1 B) Teaching, Learning and Assessment The requirements must for all providers are:  Design the content, structure and delivery of the training to enable social work students to demonstrate that they have met the national occupational standards for social work and the social work benchmark statement and are suitable for admission to the General Social Care Council register of social workers  Ensure that the teaching of theoretical knowledge, skills and values is based on their application in practice  Ensure that students’ achievement against the required standards is regularly and accurately assessed, and confirm that all social work students have been assessed and have met all the standards before being awarded the degree in social work  Ensure that the principles of valuing diversity and equalities awareness are integral to the teaching and learning of students • Ensure that all social work students spend at least 200 days gaining required experience and learning in practice settings  Each student must have experience: Page | 17 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 18.
    www.SocialWorkProcesses.co.uk  in at least two practice settings  of statutory social work tasks involving legal interventions  of providing services to at least two user groups (e.g. child care and mental health)  Ensure that all students undergo assessed preparation for direct practice to ensure their safety to undertake practice learning in a service delivery setting. This preparation must include the opportunity to develop a greater understanding of the experience of service users and the opportunity to shadow an experienced social worker  As well as providing teaching, learning and assessment across the full range of the occupational standards and benchmark statement, providers will have to demonstrate that all students undertake specific learning and assessment in the following key areas  Human growth, development, mental health and disability 2.5.2 Requirements for Social Work Training The requirements are  Assessment, planning, intervention and review  Communication skills with children, adults and those with particular communication needs  Law  Partnership working and information sharing across professional disciplines and agencies  Ensure that the number of hours spent in structured academic learning under the direction of an educator is sufficient to ensure that students meet the required level of competence. This is expected to be at least 200 days or 1,200 hours  Ensure that teaching and learning are continually updated to keep abreast of developments in legislation, Government policy and best practice Page | 18 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 19.
    www.SocialWorkProcesses.co.uk 3. Children’s WorkforceDevelopment Council The Children’s Workforce Development Council (CWDC) leads change so that the thousands of people and volunteers working with children and young people across England are able to do the best job they possibly can. They advise and work in partnership with lots of different organisations and people who all want the lives of all children and young people to be healthy, happy and fulfilling. CWDC supports 2.6 million people who work with children, young people and their families, in sectors including early years, childcare, work with young people, education welfare, social work and social care. 3.1 Model for Structuring & Professionalisation of the Children’s Social Care Workforce 3.1.1 Staff Groups The interviews, the survey and the events together indicated a number of areas of common and specific knowledge and skill requirements across the three staff groups. These groupings are loose, with suggested likely constituents, but open to negotiated membership. Some staff work across more than one group and must not be constrained to single “membership”. Such a structure must also avoid alienating workers who do not fall neatly into one of the groupings. Furthermore, the workforce is continually developing and changing, and any structure must be amenable to responsive development and change in its turn. Related knowledge, skills and experience 3.1.2 Related Knowledge, Skills and Experience Each of these groups has an identity engendered by the specific demands of working with children in particular social and geographical circumstances. The children’s social care workforce as a whole has much in common within itself and with the rest of the children’s workforce, but each group also has knowledge and skills which are specific to working with a Page | 19 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 20.
    www.SocialWorkProcesses.co.uk particular service usergroup and/or location. Knowledge of child development, legal issues, safeguarding, and communication with children and young people were the most strongly and frequently expressed common elements. Skills which were common to all included partnership/team working, analytical skills, self management, and support for others. A large number of common personal attributes were identified, particularly patience and empathy, integrity, being personable, problem-solving ability, leadership, and personal strength. These would be expected in all practitioners across the children’s social care workforce. Knowledge and skills specific to each staff group were also identified in the project. Fig 4- Model For Children’s Social Care Workforce Page | 20 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 21.
    www.SocialWorkProcesses.co.uk 3.1.3 Harmonising GraduatePreparation The model is based on a traditional degree structure of core modules (60 credits at level 6) and optional modules (60 credits at level 6). The undergraduate pathway is for those seeking a graduate role either from within the workforce or as a new recruit. However, the degree structure is such that those within the workforce wishing to enhance their profile in a specific area (without undertaking the whole programme) can access individual stand-alone modules, gaining recognised credit and undertaking quality-assured continuing professional development. This is a means by which managers might assemble the required breadth of expertise in teams in response to new challenges or fields of work. Existing graduates, both within the workforce and joining it, would be able to select core or optional modules (in negotiation with their manager) to fill gaps in their profile for the specified field of work and role. Rather than amass additional level 6 credits, an existing graduate could expect to access the modules at level 7 (masters) with a view to progressing to postgraduate certificate, postgraduate diploma, or masters degree. It is common for universities to provide modules with assessments at both level 6 and level 7. 3.1.4 Pathways It is suggested that each staff group would have essential elements and optional elements which best match the needs of that part of the workforce. However, it is also envisaged that managers will wish to establish a balance of skills and expertise in teams, so some variation is also expected. 3.1.5 Interaction with other parts of the Workforce A clear identity and purpose, linked to supporting education and career pathways within children’s social care should facilitate interaction with other groups. The enhanced identity and status which should follow educational progression and professionalisation will help to reverse the pervasive feelings of low status and lack of recognition by other professionals. Page | 21 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 22.
    www.SocialWorkProcesses.co.uk TrainingSocial Workers Across The World In UK Social Work Processes (CPD) Our Services ™ Elevate Training and Development is a training company with many years experience of facilitating the training needs of workers in multi agency and social care & educational settings. Our training programmes are diverse and cover the range of essential training required to meet CWDC, Adult services and Continuing Professional Development standards and those requirements of OFSTED We have experience of facilitating the development training needs of workers across the UK and Ireland in Adult and Children’s & Families Teams and Private & Voluntary establishments, sometimes in conjunction with existing in- house programmes and including bespoke training at all levels. We are also instrumental in the training needs of new workers looking and coming to work in the UK who require a good grounding in British social work processes. Our trainers are social worker professionals with qualifications in adult learning and experience of direct work in all fields of social care, spanning many years and at all levels of social work provision. Our training programmes reflect the current knowledge and practical application of current day social care legislation, our resources are focused on direct work with services users and we offer live examples of every day work practice and issues to enhance the training and development of workers in the everyday jobs that they do. Page | 22 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 23.
    www.SocialWorkProcesses.co.uk Our website isfull of rich information and tools available for workers to download and with useful exercises for workers to undertake. We also offer the ability to undertake webinars to facilitate learning and offer this through our CPD programmes. We have managed training for large local authorities and provided comprehensive analysis of training needs and the impact of training for workers and managers to help meet the task of providing a workforce fit for purpose. In addition we facilitate large day conferences on topics such as “ Learning from Serious Case Reviews” “Appreciating social work” “Vicarious Trauma” Performance Monitoring Elevate Training and Development Ltd has a quality assurance programme which we follow as part of our core business: it includes QA of our facilitators, programmes and work with commissioned authorities and individuals. All performance is monitored using the agreed performance monitoring forms given to participants and with our own “Facilitator Feedback Form”. This also includes judgements about learning outcomes against agreed standards. Data protection We hold information about training event securely as per our privacy policy and will inform the commissioning authority of any issues which may arise including inspections by our regulators. This also includes information on our website. Page | 23 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 24.
    www.SocialWorkProcesses.co.uk Online Training Programme ™ This takes place by sign up to our online training portal at www.SocialWorkProcesses.co.uk. Once signed up members have access to the full training program as specified on the website. This includes our online learning process called - “Read/ Listen/ Discuss/ Action/ Feedback”™  Read: Up to date legislation and case work examples – handouts, e-course (email) and reading list  Listen: Attendance at live/ replay online webinars hosted by an experienced trainer/ practitioner  Discuss: Phone in discussions with colleagues and trainers after webinar/ Website Forum  Action: Workers log book, reflection and evidence of application  Feedback: email questions to our full time training staff on core learning areas Access to the self assessment tools – can be completed at anytime Certificate for each area completed following evidence submission Delivery Individual Training Needs Analysis Core skills for children and adult social workers (helps to ascertain level of training and must be completed prior to learning and submitted to trainer) E-course Bite size e-course is on personal self and development as a worker: As a practitioner, what triggers them, dealing with stress, high workloads, conflict in the workplace, supervision, career development. 1. Email 2. Video channel 3. Audio – iTunes download Workers can choose which courses they can sign up for under personal development but must demonstrate in their logs how progress has been achieved. Page | 24 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 25.
    www.SocialWorkProcesses.co.uk Examples: Diversity “BlackProfessionals - how to break the glass ceiling” Core training 14 weeks of webinars on key training for adult and children’s social workers. Workers can phone in to join in the topic being discussed Specialist training 12 weeks of training on specialist areas for adult and children’s social workers Handouts Fully researched and sourced handouts which add to learning development Log book Includes: Test (write about a subject to which we will give you the title i.e. Ethical Dilemmas), evaluation and reflection, they must be completed after each module (4 weeks) and returned Certificates 12 certificates are available during the year, but they will only be given to workers who evidence through their training logs that they have completed the tasks and reflected on their workers. Training Dates Our training is ongoing and workers are sent the dates of the training program when they sign up to the site. We have a 52 week cycle and workers can join in at any stage of the cycle. All up dates are put on the site in the update area and workers have full access to ongoing training and updates to legislation and law, which is also sent to their personal email. Terms and Conditions Evidence of completions: Workers must sign up to be members and attend and participate in each training session before the certificate of attendance can be given Advice: It is not our intention to offer direct advice on casework in place of supervision from line manager. Please read disclaimer on website Page | 25 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 26.
    www.SocialWorkProcesses.co.uk Confidentiality: although casesare discussed names and details of services users or organisations will not be used or disclosed by us. We ask workers to ensure confidentially is adhered to at all time. Due Diligence: Due to the nature of the discussions only vetted by application members are allowed to access the webinars. Pricing 2011/2012 Individuals: £60 per year or £7.99 per month* Private Companies: £3000 for up to 100 workers or £60 per worker per year Voluntary groups: £2500 for up to 100 workers or £55 per worker per year Payment is in advance, monthly payments is accepted for individuals only *Individual application requires evidence of suitability due to the nature of the training Long arm supervision and mentoring service available on request Gradle Gardner Martin CQSW/DipSW Cert Management Director Elevate Training & Development Ltd To Sign up for Elevate Training and Development CDP courses for social care professionals please visit www.SocialWorkProcesses.co.uk or ring us on 020 8469 0634 Page | 26 For the personal use of candidates only Elevate Training & Development Ltd copyright
  • 27.
    www.SocialWorkProcesses.co.uk Disclaimer “The information containedin this document that includes text, graphics and links, are provided on an “as-is”, "with all faults" and "as available" basis and are without warranty of any kind. While we rely on sources that are believed to be reliable, it cannot rule out errors in judgment or application. The document is intended for “information” and “general guidance” purposes only.” “Investment decisions and/or other decisions based on the conclusions and potential strategies mentioned in the document are not necessarily endorsed by the Brickwork management. Brickwork does not represent or warrant that the information provided is accurate, complete or current and will not be held liable for any damages of any kind arising from the use of this information.” Page | 27 For the personal use of candidates only Elevate Training & Development Ltd copyright