Construction site safety
Rules of the City of New York
(RCNY)
Done by,
RUTVIK M. CHABHADIYA
NYU ID :- N16470406
TODAY’S TOPIC
The duty of the site safety manager during Construction or Demolition
 General inspections
 Safety netting inspections
 Maintenance of site and adjacent area inspections
 Housekeeping inspections
 Removal and storage of material inspections
 Protection of sidewalks inspections
 Warning signs and lights inspections
 Scaffolds, structural ramps, runways and platform inspections
 Material handling and hoisting equipment inspections
General inspections
Daily As appropriate
Readiness of standpipe for FDNY At least one elevator or personal hoist in a
state of readiness is available for FDNY
access (a height greater than 75 feet)
The valves are in place at each floor l hoist requires a jump, verify that all
necessary permits are obtained, and
testing performed
Standpipe is capped
Hose connections are not obstructed.
Hose connections are marked by a red
color and sign reading
Interior and exterior guardrails installation
is perfect
All openings and/or holes in the floor are
covered a
Safety netting inspections
Daily Weekly
Horizontal safety netting is maintained
not more than two stories below the
stripping operation floor on concrete
structures
horizontal safety netting in designated
crane and derrick lifting areas is indicated
and approved on the crane application
and the site safety plan.
horizontal safety netting projects outward
horizontally from the edge of the floor a
minimum of 10 feet
steel frame construction, verify that the
vertical safety netting is provided on the
floors at and below the topmost working
metal deck.
vertical safety netting is provided on all
floors below the floor on which horizontal
netting is required.
Maintenance of site and adjacent area inspections
 SSM must ensure that the public areas are kept clear of ice, snow, oil, debris,
equipment, and materials throughout the day.
 Also, SSM must ensure Daily that All exposed, electrically charged, moving, or
other dangerous portions of machines and construction equipment are surrounded
by guards, shields, or barricades to keep the public away.
 Verify that there are no exposed hose lines, wire, rope, or other items that may
constitute a tripping hazard to the public.
 adjoining property is protected when the height of the building exceeds that of the
adjoining property.
 That equipment and tools are stored away from edges and openings while not in
use.
Housekeeping inspections
Daily need to be check by SSM
Floors and stairs are clean from excess debris
Tools and equipment not in use are kept away from edges or openings.
Roof of the sidewalk shed and the street are free of debris.
That sufficient containers for the storage of garbage and debris are provided
Containers are covered and secured when full.
Protection of sidewalks inspections
Check list for sidewalks for SSM
 PERMITS
 Approved drawings
 Designer and/or supplier has certified
 sidewalk sheds extend the entire perimeter of the building
 Building exceeds 100 feet in height, the sidewalk sheds extend 20 feet
 Sidewalks open & close for public use
Warning signs and lights inspections
 SSM have check daily that All hazardous or public-facing areas, as well as places
where work is done close to traffic, are properly marked with warning signs and
lighting.
 Also SSM take step When intermittent activities are conducted on or across areas
exposed to the public, or when other situations necessitate the use of flagmen or
flag women, the required precautions are taken to ensure the public's safety.
Scaffolds, structural ramps, runways and platform inspections
 SSM have to verify that, all structural ramps, scaffolds, runways, and platforms are
equipped with guardrails & netting where they present a risk to the public.
Material handling and hoisting equipment
inspections
 SSM have to check certificates of approval
 Verify that licenses of crane operators are available at the construction site.
 Verify that flagmen/women are present to stop pedestrian and/or vehicular traffic
during the following intermittent operations:
i) During all lifting and hoisting operations
ii) When trucks enter and exit the site
iii) When materials are being lifted over the sidewalk shed
iv) When dangerous operations
Additional Key Points FOR SSM
 The approved site safety plan is on site.
 SSM Manages THE DAILY TRANNING LOG AND TOOL BOX TALK.
 Street or sidewalk closure permits, which are necessary, can be obtained at the
location.
 Notice for installation or removal of a suspended scaffold.
 Pre-shift inspections for all scaffolds, cranes, derricks, hoisting machines.
 Verifying that workers have completed a course of OSHA at least 10 hours &
approved by department.
 Workers are given and using the necessary personal protective equipment (PPE).
 If something happens on site, it is the responsibility of SSM to contact DOB.

More Related Content

Similar to Construction site safety (FINAL).pptx

Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
NMRD Ltd
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
Cervelliere Limited
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
Dwarika Bhushan Sharma
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
NMRD Ltd
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in height
Roman Shrestha
 
Excavation
ExcavationExcavation
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptxCE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
Kyle Devon Strav
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
Sandeep Jain
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Muizz Anibire
 
VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00
Varadharajalu Gopal
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...
Muhammad Saqib
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS
Eiyla Hamdan
 
Excavations Safety Training by Safety Excellence
Excavations Safety Training by Safety ExcellenceExcavations Safety Training by Safety Excellence
Excavations Safety Training by Safety Excellence
Atlantic Training, LLC.
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
Dwarika Bhushan Sharma
 
L8 - Construction Safety.pptx
L8 - Construction Safety.pptxL8 - Construction Safety.pptx
L8 - Construction Safety.pptx
PRACHI DESSAI
 
RULE 1410: CONSTRUCTION SAFETY
RULE 1410: CONSTRUCTION SAFETYRULE 1410: CONSTRUCTION SAFETY
RULE 1410: CONSTRUCTION SAFETY
iammanilyn
 

Similar to Construction site safety (FINAL).pptx (20)

Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in height
 
Excavation
ExcavationExcavation
Excavation
 
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptxCE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
 
VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
Trenching shoring
Trenching shoringTrenching shoring
Trenching shoring
 
6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS
 
Excavations Safety Training by Safety Excellence
Excavations Safety Training by Safety ExcellenceExcavations Safety Training by Safety Excellence
Excavations Safety Training by Safety Excellence
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
 
L8 - Construction Safety.pptx
L8 - Construction Safety.pptxL8 - Construction Safety.pptx
L8 - Construction Safety.pptx
 
RULE 1410: CONSTRUCTION SAFETY
RULE 1410: CONSTRUCTION SAFETYRULE 1410: CONSTRUCTION SAFETY
RULE 1410: CONSTRUCTION SAFETY
 

Recently uploaded

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
ShivajiThube2
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
goswamiyash170123
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 

Recently uploaded (20)

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 

Construction site safety (FINAL).pptx

  • 2. Rules of the City of New York (RCNY) Done by, RUTVIK M. CHABHADIYA NYU ID :- N16470406
  • 3. TODAY’S TOPIC The duty of the site safety manager during Construction or Demolition  General inspections  Safety netting inspections  Maintenance of site and adjacent area inspections  Housekeeping inspections  Removal and storage of material inspections  Protection of sidewalks inspections  Warning signs and lights inspections  Scaffolds, structural ramps, runways and platform inspections  Material handling and hoisting equipment inspections
  • 4. General inspections Daily As appropriate Readiness of standpipe for FDNY At least one elevator or personal hoist in a state of readiness is available for FDNY access (a height greater than 75 feet) The valves are in place at each floor l hoist requires a jump, verify that all necessary permits are obtained, and testing performed Standpipe is capped Hose connections are not obstructed. Hose connections are marked by a red color and sign reading Interior and exterior guardrails installation is perfect All openings and/or holes in the floor are covered a
  • 5. Safety netting inspections Daily Weekly Horizontal safety netting is maintained not more than two stories below the stripping operation floor on concrete structures horizontal safety netting in designated crane and derrick lifting areas is indicated and approved on the crane application and the site safety plan. horizontal safety netting projects outward horizontally from the edge of the floor a minimum of 10 feet steel frame construction, verify that the vertical safety netting is provided on the floors at and below the topmost working metal deck. vertical safety netting is provided on all floors below the floor on which horizontal netting is required.
  • 6. Maintenance of site and adjacent area inspections  SSM must ensure that the public areas are kept clear of ice, snow, oil, debris, equipment, and materials throughout the day.  Also, SSM must ensure Daily that All exposed, electrically charged, moving, or other dangerous portions of machines and construction equipment are surrounded by guards, shields, or barricades to keep the public away.  Verify that there are no exposed hose lines, wire, rope, or other items that may constitute a tripping hazard to the public.  adjoining property is protected when the height of the building exceeds that of the adjoining property.  That equipment and tools are stored away from edges and openings while not in use.
  • 7. Housekeeping inspections Daily need to be check by SSM Floors and stairs are clean from excess debris Tools and equipment not in use are kept away from edges or openings. Roof of the sidewalk shed and the street are free of debris. That sufficient containers for the storage of garbage and debris are provided Containers are covered and secured when full.
  • 8. Protection of sidewalks inspections Check list for sidewalks for SSM  PERMITS  Approved drawings  Designer and/or supplier has certified  sidewalk sheds extend the entire perimeter of the building  Building exceeds 100 feet in height, the sidewalk sheds extend 20 feet  Sidewalks open & close for public use
  • 9. Warning signs and lights inspections  SSM have check daily that All hazardous or public-facing areas, as well as places where work is done close to traffic, are properly marked with warning signs and lighting.  Also SSM take step When intermittent activities are conducted on or across areas exposed to the public, or when other situations necessitate the use of flagmen or flag women, the required precautions are taken to ensure the public's safety.
  • 10. Scaffolds, structural ramps, runways and platform inspections  SSM have to verify that, all structural ramps, scaffolds, runways, and platforms are equipped with guardrails & netting where they present a risk to the public.
  • 11. Material handling and hoisting equipment inspections  SSM have to check certificates of approval  Verify that licenses of crane operators are available at the construction site.  Verify that flagmen/women are present to stop pedestrian and/or vehicular traffic during the following intermittent operations: i) During all lifting and hoisting operations ii) When trucks enter and exit the site iii) When materials are being lifted over the sidewalk shed iv) When dangerous operations
  • 12. Additional Key Points FOR SSM  The approved site safety plan is on site.  SSM Manages THE DAILY TRANNING LOG AND TOOL BOX TALK.  Street or sidewalk closure permits, which are necessary, can be obtained at the location.  Notice for installation or removal of a suspended scaffold.  Pre-shift inspections for all scaffolds, cranes, derricks, hoisting machines.  Verifying that workers have completed a course of OSHA at least 10 hours & approved by department.  Workers are given and using the necessary personal protective equipment (PPE).  If something happens on site, it is the responsibility of SSM to contact DOB.