Comparison between
PMBOK4 and PMBOK5

C R E AT E D B Y:
S A Q I B J AV E D J O H N
( P M P, A C P, I T I L , S C J P, S C W C D )
High Level Comparison
PMBOK 4

PMBOK 5

Released in 2008

Released in 2013

5 Process Groups

5 Process Groups

9 Knowledge Areas

10 Knowledge Areas

42 Processes

47 Processes
Addition in Knowledge Areas
PMBOK 4

PMBOK 5

Integration Management

Integration Management

Scope Management

Scope Management

Time Management

Time Management

Cost Management

Cost Management

Quality Management

Quality Management

Human Resource Management

Human Resource Management

Communication Management

Communication Management

Risk Management

Risk Management

Procurement Management

Procurement Management
Stakeholder Management
Addition in Processes
PMBOK 4

PMBOK 5

I
Integration

P

E

M&C

C

1

1

1

2

1

I
Integration

P

E

M&C

C

1

1

1

2

1

Scope

3

2

Scope

4

2

Time

5

1

Time

6

1

Cost

2

1

Cost

3

1

Quality

1

1

1

Quality

1

1

Human Resource

1

3

Human Resource

1

3

1

2

1

1

Communications

1

1

1

Communications

1

Risk

5
1

1

1

0

1

Risk

5

Procurement

1

1

1

1

Procurement

20

8

10

2

Stakeholder

1

1

1

1

Processes (47)

2

24

8

11

Processes (42)

2

1

I=Initiation
P=Planning
E=Execution
M&E=Monitoring & Controlling

C=Closing

1

2
Integration Management

PMBOK 5

PMBOK 4

Initiation

Planning

Develop Project Develop Project
Charter
Management Plan

Execution

Direct & Manage
Project Execution

Monitoring & Controlling

Closing

• Monitor & Control Project
Work
Close Project or
• Perform Integrated Change
Phase
Control

No Change and its same as in PMBOK4
Scope Management

PMBOK 5

PMBOK 4

Initiation

Planning
• Collect Requirements

• Define scope
• Create WBS

Execution

Monitoring & Controlling

• Verify Scope
• Control Scope

• Plan Scope Management

• Validate Scope

• Collect Requirements

• Verify Scope

• Define scope
• Create WBS

• Control Scope

Closing
Time Management
Initiation

Planning

PMBOK 4

• Define Activities

Execution

Monitoring & Controlling
Control Schedule

• Sequence Activities
• Estimate Activity Resources
• Estimate Activity Duration
• Develop Schedule

PMBOK 5

• Plan Schedule Management
• Define Activities
• Sequence Activities
• Estimate Activity Resources
• Estimate Activity Duration
• Develop Schedule

Control Schedule

Closing
Cost Management

PMBOK 5

PMBOK 4

Initiation

Planning

• Estimate Costs
• Determine Budget

Execution

Monitoring & Controlling

Control Costs

• Plan Cost Management
• Estimate Costs
• Determine Budget

Control Costs

Closing
Quality Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling

Plan Quality

Perform Quality
Assurance

Perform Quality Control

• Plan Quality Management

Perform Quality
Assurance

Perform Quality
Control Quality

Closing
Human Resource Management

PMBOK 5

PMBOK 4

Initiation Planning

Execution
• Acquire Project Team

Develop HR Plan

• Develop Project Team
• Manage Project Team

• Develop HR Plan
• Plan HR Management

• Acquire Project Team
• Develop Project Team
• Manage Project Team

Monitoring & Controlling

Closing
Communication Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling Closing

• Distribute Information
Identify
Stakeholders

Plan Communication • Manage Stakeholders

Report Performance

Expectations

• Distribute Information
Identify
Stakeholders

Plan Communication • Manage Stakeholders

• Report Performance

Management

• Control Communication

Expectations
• Manage Communication
Risk Management
Initiation

Planning

Execution Monitoring & Controlling

PMBOK 4

• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis

Monitor and Control Risks

• Perform Quantitative Risk Analysis
• Plan Risk Responses

PMBOK 5

• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis
• Perform Quantitative Risk Analysis
• Plan Risk Responses

• Monitor and Control Risks
• Control Risks

Closing
Procurement Management

PMBOK 5

PMBOK 4

Initiation Planning

Plan Procurement

Plan Procurement
Management

Execution

Monitoring & Controlling

Closing

Conduct Procurements

Administer Procurement

Close Procurement

• Administer Procurement

Close
Procurement

Conduct Procurements

• Control Procurement
Stakeholder Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling Closing

Stakeholder Management as a separate knowledge area was not the part of PMBOK4

Identify

Plan Stakeholder

Manage Stakeholder

Control Stakeholder

Stakeholder

Management

Engagement

Management
Comparison between PMBOK4 and PMBOK5

More Related Content

What's hot

2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim
PMILebanonChapter
 
Project Management Process Groups 101
Project Management Process Groups 101Project Management Process Groups 101
Project Management Process Groups 101
Tipsographic . com
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge Areas
Mr.Sohail Amin
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
Mohamed Loey
 
Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areaslinajarruti
 
Project management
Project managementProject management
Project management
MohitJaggi1
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
Project management
Project managementProject management
Project management
SudipBarua6
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
SUKAD Group - Project Management Solutions
 
Project Management
Project Management Project Management
Project Management
Al-Hussein Salem
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
Ahmed Yousry Abdelaziz
 
Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3
Highmark Health
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
Sayed Abdellah
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle managementSundasmushtaq
 
Pm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domainsPm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domains
Mannay88
 
Project Management: Knowledge Areas
Project Management: Knowledge Areas Project Management: Knowledge Areas
Project Management: Knowledge Areas
Gregory Mangos
 
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementDiscussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Robert_
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2test prod1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2test prod1
 

What's hot (19)

2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim
 
Project Management Process Groups 101
Project Management Process Groups 101Project Management Process Groups 101
Project Management Process Groups 101
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge Areas
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areas
 
Project management
Project managementProject management
Project management
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Project management
Project managementProject management
Project management
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
Project Management
Project Management Project Management
Project Management
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
 
Pm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domainsPm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domains
 
Project Management: Knowledge Areas
Project Management: Knowledge Areas Project Management: Knowledge Areas
Project Management: Knowledge Areas
 
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementDiscussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
 

Similar to Comparison between PMBOK4 and PMBOK5

Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
Imran Jamil
 
All4pm 4판5판-비교
All4pm 4판5판-비교All4pm 4판5판-비교
All4pm 4판5판-비교
환성 용
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
Ahmed Abdelaziz
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource Management
DavidMcLachlan1
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
DavidMcLachlan1
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
hatemk
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
Amit Gupta
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...
Simplilearn
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
Marco Booij
 
11.5 Plan Risk Responses
11.5 Plan Risk Responses11.5 Plan Risk Responses
11.5 Plan Risk Responses
DavidMcLachlan1
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
Chandrasen Sharma
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
John Khateeb
 
PMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder ManagementPMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder Management
Mohammad Sediq Khair Khwah
 
pmi project management principles.pptx
pmi project management principles.pptxpmi project management principles.pptx
pmi project management principles.pptx
ssusere01f83
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
Mounir Ajam
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
AMIT PAYAL
 
Project Management Course slide 1
Project Management Course slide 1Project Management Course slide 1
Project Management Course slide 1
Ahmed Alageed
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
Daniele Pinto
 
PMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSKPMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSK
Krzysztof Kaminski, PM Navigator
 
Integration Management Presentation
Integration Management Presentation Integration Management Presentation
Integration Management Presentation
TDAKINS319
 

Similar to Comparison between PMBOK4 and PMBOK5 (20)

Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
All4pm 4판5판-비교
All4pm 4판5판-비교All4pm 4판5판-비교
All4pm 4판5판-비교
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource Management
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
 
11.5 Plan Risk Responses
11.5 Plan Risk Responses11.5 Plan Risk Responses
11.5 Plan Risk Responses
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
PMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder ManagementPMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder Management
 
pmi project management principles.pptx
pmi project management principles.pptxpmi project management principles.pptx
pmi project management principles.pptx
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
 
Project Management Course slide 1
Project Management Course slide 1Project Management Course slide 1
Project Management Course slide 1
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
PMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSKPMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSK
 
Integration Management Presentation
Integration Management Presentation Integration Management Presentation
Integration Management Presentation
 

More from Saqib Javed John

Learn to Turn
Learn to TurnLearn to Turn
Learn to Turn
Saqib Javed John
 
Agile or Traditional - How to Choose
Agile or Traditional - How to ChooseAgile or Traditional - How to Choose
Agile or Traditional - How to Choose
Saqib Javed John
 
Why Agile
Why AgileWhy Agile
Why Agile
Saqib Javed John
 
Agile vs Traditional Project Management
Agile vs Traditional Project ManagementAgile vs Traditional Project Management
Agile vs Traditional Project Management
Saqib Javed John
 
Agile Project Management - Part 2
Agile Project Management - Part 2Agile Project Management - Part 2
Agile Project Management - Part 2
Saqib Javed John
 
Agile Project Management - Part 1
Agile Project Management - Part 1Agile Project Management - Part 1
Agile Project Management - Part 1
Saqib Javed John
 
ITIL V3F Overview Part II
ITIL V3F Overview Part II ITIL V3F Overview Part II
ITIL V3F Overview Part II
Saqib Javed John
 
ITIL V3F Overview Part I
ITIL V3F Overview Part IITIL V3F Overview Part I
ITIL V3F Overview Part I
Saqib Javed John
 

More from Saqib Javed John (8)

Learn to Turn
Learn to TurnLearn to Turn
Learn to Turn
 
Agile or Traditional - How to Choose
Agile or Traditional - How to ChooseAgile or Traditional - How to Choose
Agile or Traditional - How to Choose
 
Why Agile
Why AgileWhy Agile
Why Agile
 
Agile vs Traditional Project Management
Agile vs Traditional Project ManagementAgile vs Traditional Project Management
Agile vs Traditional Project Management
 
Agile Project Management - Part 2
Agile Project Management - Part 2Agile Project Management - Part 2
Agile Project Management - Part 2
 
Agile Project Management - Part 1
Agile Project Management - Part 1Agile Project Management - Part 1
Agile Project Management - Part 1
 
ITIL V3F Overview Part II
ITIL V3F Overview Part II ITIL V3F Overview Part II
ITIL V3F Overview Part II
 
ITIL V3F Overview Part I
ITIL V3F Overview Part IITIL V3F Overview Part I
ITIL V3F Overview Part I
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 

Comparison between PMBOK4 and PMBOK5

  • 1. Comparison between PMBOK4 and PMBOK5 C R E AT E D B Y: S A Q I B J AV E D J O H N ( P M P, A C P, I T I L , S C J P, S C W C D )
  • 2. High Level Comparison PMBOK 4 PMBOK 5 Released in 2008 Released in 2013 5 Process Groups 5 Process Groups 9 Knowledge Areas 10 Knowledge Areas 42 Processes 47 Processes
  • 3. Addition in Knowledge Areas PMBOK 4 PMBOK 5 Integration Management Integration Management Scope Management Scope Management Time Management Time Management Cost Management Cost Management Quality Management Quality Management Human Resource Management Human Resource Management Communication Management Communication Management Risk Management Risk Management Procurement Management Procurement Management Stakeholder Management
  • 4. Addition in Processes PMBOK 4 PMBOK 5 I Integration P E M&C C 1 1 1 2 1 I Integration P E M&C C 1 1 1 2 1 Scope 3 2 Scope 4 2 Time 5 1 Time 6 1 Cost 2 1 Cost 3 1 Quality 1 1 1 Quality 1 1 Human Resource 1 3 Human Resource 1 3 1 2 1 1 Communications 1 1 1 Communications 1 Risk 5 1 1 1 0 1 Risk 5 Procurement 1 1 1 1 Procurement 20 8 10 2 Stakeholder 1 1 1 1 Processes (47) 2 24 8 11 Processes (42) 2 1 I=Initiation P=Planning E=Execution M&E=Monitoring & Controlling C=Closing 1 2
  • 5. Integration Management PMBOK 5 PMBOK 4 Initiation Planning Develop Project Develop Project Charter Management Plan Execution Direct & Manage Project Execution Monitoring & Controlling Closing • Monitor & Control Project Work Close Project or • Perform Integrated Change Phase Control No Change and its same as in PMBOK4
  • 6. Scope Management PMBOK 5 PMBOK 4 Initiation Planning • Collect Requirements • Define scope • Create WBS Execution Monitoring & Controlling • Verify Scope • Control Scope • Plan Scope Management • Validate Scope • Collect Requirements • Verify Scope • Define scope • Create WBS • Control Scope Closing
  • 7. Time Management Initiation Planning PMBOK 4 • Define Activities Execution Monitoring & Controlling Control Schedule • Sequence Activities • Estimate Activity Resources • Estimate Activity Duration • Develop Schedule PMBOK 5 • Plan Schedule Management • Define Activities • Sequence Activities • Estimate Activity Resources • Estimate Activity Duration • Develop Schedule Control Schedule Closing
  • 8. Cost Management PMBOK 5 PMBOK 4 Initiation Planning • Estimate Costs • Determine Budget Execution Monitoring & Controlling Control Costs • Plan Cost Management • Estimate Costs • Determine Budget Control Costs Closing
  • 9. Quality Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Plan Quality Perform Quality Assurance Perform Quality Control • Plan Quality Management Perform Quality Assurance Perform Quality Control Quality Closing
  • 10. Human Resource Management PMBOK 5 PMBOK 4 Initiation Planning Execution • Acquire Project Team Develop HR Plan • Develop Project Team • Manage Project Team • Develop HR Plan • Plan HR Management • Acquire Project Team • Develop Project Team • Manage Project Team Monitoring & Controlling Closing
  • 11. Communication Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Closing • Distribute Information Identify Stakeholders Plan Communication • Manage Stakeholders Report Performance Expectations • Distribute Information Identify Stakeholders Plan Communication • Manage Stakeholders • Report Performance Management • Control Communication Expectations • Manage Communication
  • 12. Risk Management Initiation Planning Execution Monitoring & Controlling PMBOK 4 • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis Monitor and Control Risks • Perform Quantitative Risk Analysis • Plan Risk Responses PMBOK 5 • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis • Perform Quantitative Risk Analysis • Plan Risk Responses • Monitor and Control Risks • Control Risks Closing
  • 13. Procurement Management PMBOK 5 PMBOK 4 Initiation Planning Plan Procurement Plan Procurement Management Execution Monitoring & Controlling Closing Conduct Procurements Administer Procurement Close Procurement • Administer Procurement Close Procurement Conduct Procurements • Control Procurement
  • 14. Stakeholder Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Closing Stakeholder Management as a separate knowledge area was not the part of PMBOK4 Identify Plan Stakeholder Manage Stakeholder Control Stakeholder Stakeholder Management Engagement Management