SlideShare a Scribd company logo
1 of 20
Download to read offline
PROJECT TWO 
BRIEFING
PROJECT TWO: LANDSCAPE PROJECT: SITE ANALYSIS 
20% group work 
+ 10% individual 
Submission Date: 
Week 11, 13th Oct 2014 
No presentation, it is a submission of work only 
4 weeks to complete 
An initial stage of landscape project development 
Small scale project 
inventory & analysis 
Is a “problem-solving process”
1.You are required to form a group of 7 to 8 members. Select one leader. 
2.You have to choose ONE residence that has LAWN area, and a BASE PLAN (consists of house plan + lawn area). 
3.If the base plan is not supplied by the owner, you have to measure everything and produce the base plan in scale. 
4.Organize a site visit and do the site survey. 
5.Conduct a site inventory and analysis (will be taught in class). 
6.Produce the inventory and analysis diagram/drawing. 
GROUP TASK
Example of Base Plan 
Entrance 
Site boundary 
Floor plan 
Existing structure 
Driveway 
Window openings 
Window openings 
Backyard 
Front yard 
North point 
** Must be in scale 
Existing vegetation 
Roadside
Example of Base Map
Site Inventory 
Site Analysis 
•Identify and record existing condition. 
•Named as “data collection”. 
•Note what it is, where it is. 
•Analyze the data. 
•Named as “data evaluation”. 
•Evaluate or make judgment about worth/importance of the condition. Is it good or bad? Is it functional or not?
Information needed for SITE INVENTORY AND ANALYSIS: 
1.SITE LOCATION AND CONTEXT - Identify location of the house and land uses surrounding it. (e.g; next to main road, at the corner, near to school etc.) 
-To produce the location plan. 
2.TOPOGRAPHY 
-Identify the existing landform & slope condition. (e.g; is it a flat area or gentle slope etc.) 
-Identify elevation changes (if any) (e.g; existing step or retaining walls etc.) 
3.DRAINAGE 
-Identify the location of drainage and water spots on land. 
4.VEGETATION 
-Identify existing vegetation (all types of softscape). 
5.MICROCLIMATE - Identify direction of sunrise, sunset and wind direction
6.EXISTING STRUCTURE 
-Identify existing structure. (e.g; swimming pool, driveway/porch/garage, steps, fences, pathway, gazebo, fish pond etc.) 
-Identify location of rubbish bin/dumping spot, cloth line etc. 
7.VIEWS 
-Observe and identify views from inside the house looking out. (e.g; view from hall, or from room etc.) 
-Observe and identify views from off the site looking on (e.g; views from different sides of the house, views from street, where is the best/ worst views etc.)
Example of Site Inventory & Analysis Diagram
Example of Site Inventory Diagram
Example of Site Inventory Diagram
Example of Site Inventory Diagram
Example of Site Analysis Diagram
Example of Site Analysis Diagram
Example of Site Analysis Diagram
1.You need produce an individual site synthesis diagram. Site synthesis also called as “design solutions”. 
2.To scribble/sketch/doodle/draw the design solutions corresponding to the site analysis. 
3.Individual design interpretation and decision making, therefore it should be different from others. 
INDIVIDUAL TASK
Example of Site Synthesis Diagram
SUBMISSION REQUIREMENTS 
Group + Individual Task: 
1.A3 booklet of Site Inventory and Analysis (for group) and Site Synthesis (for individual), with a cover page and title block. The title block format will be given. Group and individual booklet should be prepared separately. 
2.The material of paper is bond paper (photostat paper). You may use butter paper as progress to be shown during tutorial but it is not to be the final submission. 
3.No page limit as long as all content is included. 
4.The page layout should be orientated consistently. 
5.The booklet should be stapled/comb bound for submission. 
6.The diagram should be hand written and hand drawn except for site images. 
7.The diagram should incorporate landscape graphics communication (will be taught in class). 
8.Submission date is on 13th OCTOBER 2014, at class venue.
PROJECT GANTT CHART 
WEEK 7 
15/09/2014 
WEEK 8 
22/09/2014 
WEEK 9 
29/09/2014 
WEEK 10 
06/10/2014 
WEEK 11 
13/10/2014 
-Project briefing 
-Form a group 
-To discuss site selection 
-To acquire base plan 
-Organize site visit 
Tutorial: 
-Bring the base plan 
-Initial data collection (esp. site location & context). 
-Some images of the site 
-Data collection checklist 
Tutorial: 
-Preliminary site inventory and analysis diagram. 
-Diagram with graphics & information needed already finalized. 
-Arrangement or layout design of booklet. 
Tutorial: 
-Site inventory and analysis diagram is finalized. 
-To be compiled after consultation. 
-Preliminary site synthesis diagram with graphics. 
Submission time is during tutorial at class venue.
If you can dream it, you can do it!

More Related Content

Viewers also liked

How to validate server certificate
How to validate server certificateHow to validate server certificate
How to validate server certificatecodeandyou forums
 
Sistema regolatorio europeo - Sicurezza prodotto
Sistema regolatorio europeo - Sicurezza prodottoSistema regolatorio europeo - Sicurezza prodotto
Sistema regolatorio europeo - Sicurezza prodottoMassimiliano Vurro
 
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products Massimiliano Vurro
 
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...Mohamed Badry
 
Case Study Paper Topic Proposal
Case Study Paper Topic ProposalCase Study Paper Topic Proposal
Case Study Paper Topic ProposalJoyeeLee0131
 
Building Science 2 (Project 2)
Building Science 2 (Project 2)Building Science 2 (Project 2)
Building Science 2 (Project 2)Soh Shing
 
Marco Fazzini XVKK5X
Marco Fazzini XVKK5XMarco Fazzini XVKK5X
Marco Fazzini XVKK5XMarco Fazzini
 
Stratebi Big Data
Stratebi Big DataStratebi Big Data
Stratebi Big DataStratebi
 
Lightning Talk #11: Designer spaces by Alastair Simpson
Lightning Talk #11: Designer spaces by Alastair SimpsonLightning Talk #11: Designer spaces by Alastair Simpson
Lightning Talk #11: Designer spaces by Alastair Simpsonux singapore
 
Taboola's experience with Apache Spark (presentation @ Reversim 2014)
Taboola's experience with Apache Spark (presentation @ Reversim 2014)Taboola's experience with Apache Spark (presentation @ Reversim 2014)
Taboola's experience with Apache Spark (presentation @ Reversim 2014)tsliwowicz
 
Cursos Big Data Open Source
Cursos Big Data Open SourceCursos Big Data Open Source
Cursos Big Data Open SourceStratebi
 
Curso de creación de Dashboards Open Source
Curso de creación de Dashboards Open SourceCurso de creación de Dashboards Open Source
Curso de creación de Dashboards Open SourceStratebi
 
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...ux singapore
 
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTable
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTableRecsys 2015: Making Meaningful Restaurant Recommendations at OpenTable
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTableSudeep Das, Ph.D.
 

Viewers also liked (15)

How to validate server certificate
How to validate server certificateHow to validate server certificate
How to validate server certificate
 
Sistema regolatorio europeo - Sicurezza prodotto
Sistema regolatorio europeo - Sicurezza prodottoSistema regolatorio europeo - Sicurezza prodotto
Sistema regolatorio europeo - Sicurezza prodotto
 
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products
Dal regolamento REACH alle nuove direttive RoHS e Energy Related Products
 
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...
Developing Innovative Marketing Plan to Augment the Visitation of Egyptian Wo...
 
Report-10th Dec,2015
Report-10th Dec,2015Report-10th Dec,2015
Report-10th Dec,2015
 
Case Study Paper Topic Proposal
Case Study Paper Topic ProposalCase Study Paper Topic Proposal
Case Study Paper Topic Proposal
 
Building Science 2 (Project 2)
Building Science 2 (Project 2)Building Science 2 (Project 2)
Building Science 2 (Project 2)
 
Marco Fazzini XVKK5X
Marco Fazzini XVKK5XMarco Fazzini XVKK5X
Marco Fazzini XVKK5X
 
Stratebi Big Data
Stratebi Big DataStratebi Big Data
Stratebi Big Data
 
Lightning Talk #11: Designer spaces by Alastair Simpson
Lightning Talk #11: Designer spaces by Alastair SimpsonLightning Talk #11: Designer spaces by Alastair Simpson
Lightning Talk #11: Designer spaces by Alastair Simpson
 
Taboola's experience with Apache Spark (presentation @ Reversim 2014)
Taboola's experience with Apache Spark (presentation @ Reversim 2014)Taboola's experience with Apache Spark (presentation @ Reversim 2014)
Taboola's experience with Apache Spark (presentation @ Reversim 2014)
 
Cursos Big Data Open Source
Cursos Big Data Open SourceCursos Big Data Open Source
Cursos Big Data Open Source
 
Curso de creación de Dashboards Open Source
Curso de creación de Dashboards Open SourceCurso de creación de Dashboards Open Source
Curso de creación de Dashboards Open Source
 
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...
Lightning Talk #7: Outwards and Inwards Experiential Transformation: A KASKUS...
 
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTable
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTableRecsys 2015: Making Meaningful Restaurant Recommendations at OpenTable
Recsys 2015: Making Meaningful Restaurant Recommendations at OpenTable
 

Similar to CL Project 2 brief

Project02 briefing
Project02 briefingProject02 briefing
Project02 briefingWadeLim
 
Project02 CL
Project02 CLProject02 CL
Project02 CLhirensiva
 
Constructed Landscape Project Brief 2
Constructed Landscape Project Brief 2Constructed Landscape Project Brief 2
Constructed Landscape Project Brief 2EricaGloriaChin
 
Cl project02 briefing
Cl project02 briefingCl project02 briefing
Cl project02 briefingKailyn Lee
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefingrivenhau
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefingGynie
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysishazel_crisostomo
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfgabchin29
 
CL Project 2 Brief
CL Project 2 BriefCL Project 2 Brief
CL Project 2 BriefBolin Loong
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisTrace96
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfBridget Hsu
 

Similar to CL Project 2 brief (20)

cl project 2 brief
cl project 2 briefcl project 2 brief
cl project 2 brief
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefing
 
Project02 CL
Project02 CLProject02 CL
Project02 CL
 
Constructed Landscape Project Brief 2
Constructed Landscape Project Brief 2Constructed Landscape Project Brief 2
Constructed Landscape Project Brief 2
 
Cl project02 briefing
Cl project02 briefingCl project02 briefing
Cl project02 briefing
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefing
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefing
 
CL Project 2 Briefing
CL Project 2 BriefingCL Project 2 Briefing
CL Project 2 Briefing
 
Project02 briefing
Project02 briefingProject02 briefing
Project02 briefing
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
2A
2A2A
2A
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
CL Project 2 Brief
CL Project 2 BriefCL Project 2 Brief
CL Project 2 Brief
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdfproject2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
project2designprocessresearchanalysis-141209223425-conversion-gate02.pdf
 

More from ForestedTiger

Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 reportForestedTiger
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and contextForestedTiger
 
Urban landscape Quality Index Report
Urban landscape Quality Index ReportUrban landscape Quality Index Report
Urban landscape Quality Index ReportForestedTiger
 
Theories comparison essay
Theories comparison essayTheories comparison essay
Theories comparison essayForestedTiger
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report ForestedTiger
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 reportForestedTiger
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportForestedTiger
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2ForestedTiger
 
Amphitheatre studio 2
Amphitheatre studio 2Amphitheatre studio 2
Amphitheatre studio 2ForestedTiger
 
Area and Volume Exercises
Area and Volume ExercisesArea and Volume Exercises
Area and Volume ExercisesForestedTiger
 
MATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTERMATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTERForestedTiger
 

More from ForestedTiger (20)

Building science 2 PJT 1 report
Building science 2 PJT 1 reportBuilding science 2 PJT 1 report
Building science 2 PJT 1 report
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and context
 
Urban landscape Quality Index Report
Urban landscape Quality Index ReportUrban landscape Quality Index Report
Urban landscape Quality Index Report
 
Theories comparison essay
Theories comparison essayTheories comparison essay
Theories comparison essay
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
PROJECT 3 DRAWINGS
PROJECT 3 DRAWINGSPROJECT 3 DRAWINGS
PROJECT 3 DRAWINGS
 
Stadium negara report history2
Stadium negara report history2Stadium negara report history2
Stadium negara report history2
 
Northeast kl
Northeast klNortheast kl
Northeast kl
 
Amphitheatre studio 2
Amphitheatre studio 2Amphitheatre studio 2
Amphitheatre studio 2
 
Rose seidler house
Rose seidler houseRose seidler house
Rose seidler house
 
BCON PJT 1
BCON PJT 1BCON PJT 1
BCON PJT 1
 
DPJs Brief
DPJs BriefDPJs Brief
DPJs Brief
 
Maths exercise
Maths exerciseMaths exercise
Maths exercise
 
Area and Volume Exercises
Area and Volume ExercisesArea and Volume Exercises
Area and Volume Exercises
 
MATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTERMATHS INFOGRAPHIC POSTER
MATHS INFOGRAPHIC POSTER
 

CL Project 2 brief

  • 2. PROJECT TWO: LANDSCAPE PROJECT: SITE ANALYSIS 20% group work + 10% individual Submission Date: Week 11, 13th Oct 2014 No presentation, it is a submission of work only 4 weeks to complete An initial stage of landscape project development Small scale project inventory & analysis Is a “problem-solving process”
  • 3. 1.You are required to form a group of 7 to 8 members. Select one leader. 2.You have to choose ONE residence that has LAWN area, and a BASE PLAN (consists of house plan + lawn area). 3.If the base plan is not supplied by the owner, you have to measure everything and produce the base plan in scale. 4.Organize a site visit and do the site survey. 5.Conduct a site inventory and analysis (will be taught in class). 6.Produce the inventory and analysis diagram/drawing. GROUP TASK
  • 4. Example of Base Plan Entrance Site boundary Floor plan Existing structure Driveway Window openings Window openings Backyard Front yard North point ** Must be in scale Existing vegetation Roadside
  • 6. Site Inventory Site Analysis •Identify and record existing condition. •Named as “data collection”. •Note what it is, where it is. •Analyze the data. •Named as “data evaluation”. •Evaluate or make judgment about worth/importance of the condition. Is it good or bad? Is it functional or not?
  • 7. Information needed for SITE INVENTORY AND ANALYSIS: 1.SITE LOCATION AND CONTEXT - Identify location of the house and land uses surrounding it. (e.g; next to main road, at the corner, near to school etc.) -To produce the location plan. 2.TOPOGRAPHY -Identify the existing landform & slope condition. (e.g; is it a flat area or gentle slope etc.) -Identify elevation changes (if any) (e.g; existing step or retaining walls etc.) 3.DRAINAGE -Identify the location of drainage and water spots on land. 4.VEGETATION -Identify existing vegetation (all types of softscape). 5.MICROCLIMATE - Identify direction of sunrise, sunset and wind direction
  • 8. 6.EXISTING STRUCTURE -Identify existing structure. (e.g; swimming pool, driveway/porch/garage, steps, fences, pathway, gazebo, fish pond etc.) -Identify location of rubbish bin/dumping spot, cloth line etc. 7.VIEWS -Observe and identify views from inside the house looking out. (e.g; view from hall, or from room etc.) -Observe and identify views from off the site looking on (e.g; views from different sides of the house, views from street, where is the best/ worst views etc.)
  • 9. Example of Site Inventory & Analysis Diagram
  • 10. Example of Site Inventory Diagram
  • 11. Example of Site Inventory Diagram
  • 12. Example of Site Inventory Diagram
  • 13. Example of Site Analysis Diagram
  • 14. Example of Site Analysis Diagram
  • 15. Example of Site Analysis Diagram
  • 16. 1.You need produce an individual site synthesis diagram. Site synthesis also called as “design solutions”. 2.To scribble/sketch/doodle/draw the design solutions corresponding to the site analysis. 3.Individual design interpretation and decision making, therefore it should be different from others. INDIVIDUAL TASK
  • 17. Example of Site Synthesis Diagram
  • 18. SUBMISSION REQUIREMENTS Group + Individual Task: 1.A3 booklet of Site Inventory and Analysis (for group) and Site Synthesis (for individual), with a cover page and title block. The title block format will be given. Group and individual booklet should be prepared separately. 2.The material of paper is bond paper (photostat paper). You may use butter paper as progress to be shown during tutorial but it is not to be the final submission. 3.No page limit as long as all content is included. 4.The page layout should be orientated consistently. 5.The booklet should be stapled/comb bound for submission. 6.The diagram should be hand written and hand drawn except for site images. 7.The diagram should incorporate landscape graphics communication (will be taught in class). 8.Submission date is on 13th OCTOBER 2014, at class venue.
  • 19. PROJECT GANTT CHART WEEK 7 15/09/2014 WEEK 8 22/09/2014 WEEK 9 29/09/2014 WEEK 10 06/10/2014 WEEK 11 13/10/2014 -Project briefing -Form a group -To discuss site selection -To acquire base plan -Organize site visit Tutorial: -Bring the base plan -Initial data collection (esp. site location & context). -Some images of the site -Data collection checklist Tutorial: -Preliminary site inventory and analysis diagram. -Diagram with graphics & information needed already finalized. -Arrangement or layout design of booklet. Tutorial: -Site inventory and analysis diagram is finalized. -To be compiled after consultation. -Preliminary site synthesis diagram with graphics. Submission time is during tutorial at class venue.
  • 20. If you can dream it, you can do it!