SlideShare a Scribd company logo
1 of 20
Download to read offline
PROJECT TWO
BRIEFING
PROJECT TWO:
LANDSCAPE PROJECT: SITE ANALYSIS
20% group work
+ 10% individual
Submission Date:
Week 11, 13th Oct 2014
No presentation, it is a
submission of work only
4 weeks to complete
An initial stage of
landscape project
development
Small scale project
inventory & analysis
Is a “problem-solving
process”
1. You are required to form a group of 7
to 8 members. Select one leader.
2. You have to choose ONE residence
that has LAWN area, and a BASE PLAN
(consists of house plan + lawn area).
3. If the base plan is not supplied by the
owner, you have to measure
everything and produce the base
plan in scale.
4. Organize a site visit and do the site
survey.
5. Conduct a site inventory and analysis
(will be taught in class).
6. Produce the inventory and analysis
diagram/drawing.
GROUP
TASK
Example of Base Plan
Entrance
Site boundary
Floor plan
Existing
structure
Driveway
Window
openings
Window
openings
Backyard
Front yard
North point
** Must be in scale
Existing
vegetation
Roadside
Example of Base Map
Site
Inventory
Site
Analysis
• Identify and record existing
condition.
• Named as “data collection”.
• Note what it is, where it is.
• Analyze the data.
• Named as “data evaluation”.
• Evaluate or make judgment about
worth/importance of the condition.
Is it good or bad? Is it functional or
not?
Information needed for SITE INVENTORY AND ANALYSIS:
1. SITE LOCATION AND CONTEXT
- Identify location of the house and land uses surrounding it. (e.g; next to
main road, at the corner, near to school etc.)
- To produce the location plan.
2. TOPOGRAPHY
- Identify the existing landform & slope condition. (e.g; is it a flat area or
gentle slope etc.)
- Identify elevation changes (if any) (e.g; existing step or retaining walls
etc.)
3. DRAINAGE
- Identify the location of drainage and water spots on land.
4. VEGETATION
- Identify existing vegetation (all types of softscape).
5. MICROCLIMATE
- Identify direction of sunrise, sunset and wind direction
6. EXISTING STRUCTURE
- Identify existing structure. (e.g; swimming pool,
driveway/porch/garage, steps, fences, pathway, gazebo, fish pond
etc.)
- Identify location of rubbish bin/dumping spot, cloth line etc.
7. VIEWS
- Observe and identify views from inside the house looking out. (e.g;
view from hall, or from room etc.)
- Observe and identify views from off the site looking on (e.g; views from
different sides of the house, views from street, where is the best/ worst
views etc.)
Example of Site Inventory & Analysis Diagram
Example of Site Inventory Diagram
Example of Site Inventory Diagram
Example of Site Inventory Diagram
Example of Site Analysis Diagram
Example of Site Analysis Diagram
Example of Site Analysis Diagram
1. You need produce an individual
site synthesis diagram. Site
synthesis also called as “design
solutions”.
2. To scribble/sketch/doodle/draw
the design solutions
corresponding to the site
analysis.
3. Individual design interpretation
and decision making, therefore
it should be different from others.
INDIVIDUAL
TASK
Example of Site Synthesis Diagram
SUBMISSION REQUIREMENTS
Group + Individual Task:
1. A3 booklet of Site Inventory and Analysis (for group) and Site
Synthesis (for individual), with a cover page and title block. The
title block format will be given. Group and individual booklet
should be prepared separately.
2. The material of paper is bond paper (photostat paper). You
may use butter paper as progress to be shown during tutorial
but it is not to be the final submission.
3. No page limit as long as all content is included.
4. The page layout should be orientated consistently.
5. The booklet should be stapled/comb bound for submission.
6. The diagram should be hand written and hand drawn except
for site images.
7. The diagram should incorporate landscape graphics
communication (will be taught in class).
8. Submission date is on 13th OCTOBER 2014, at class venue.
PROJECT GANTT CHART
WEEK 7
15/09/2014
WEEK 8
22/09/2014
WEEK 9
29/09/2014
WEEK 10
06/10/2014
WEEK 11
13/10/2014
- Project
briefing
- Form a
group
- To discuss
site
selection
- To acquire
base plan
- Organize
site visit
Tutorial:
- Bring the
base plan
- Initial data
collection
(esp. site
location &
context).
- Some
images of
the site
- Data
collection
checklist
Tutorial:
- Preliminary
site inventory
and analysis
diagram.
- Diagram with
graphics &
information
needed
already
finalized.
- Arrangement
or layout
design of
booklet.
Tutorial:
- Site
inventory
and analysis
diagram is
finalized.
- To be
compiled
after
consultation.
- Preliminary
site synthesis
diagram
with
graphics.
Submission
time is
during
tutorial at
class
venue.
If you can dream it,
you can do it!

More Related Content

Similar to Cl project02 briefing

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Leon Lim
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Jian Leo
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
chuenmin
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892
KY Quah
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Amelisa Collins
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Zheng Chee Cham
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Gynie
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Quo Ming
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Louise Foong
 
Project2designprocessresearchanalysis 150622174530-lva1-app6891
Project2designprocessresearchanalysis 150622174530-lva1-app6891Project2designprocessresearchanalysis 150622174530-lva1-app6891
Project2designprocessresearchanalysis 150622174530-lva1-app6891
Kz Ng
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Madeline Liew
 

Similar to Cl project02 briefing (20)

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
2A
2A2A
2A
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Cl project 2A design process research analysis
Cl project 2A design process research  analysisCl project 2A design process research  analysis
Cl project 2A design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892
 
Project 2A Brief
Project 2A BriefProject 2A Brief
Project 2A Brief
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project2designprocessresearchanalysis 150622174530-lva1-app6891
Project2designprocessresearchanalysis 150622174530-lva1-app6891Project2designprocessresearchanalysis 150622174530-lva1-app6891
Project2designprocessresearchanalysis 150622174530-lva1-app6891
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design-process-research-analysis
Project 2 design-process-research-analysisProject 2 design-process-research-analysis
Project 2 design-process-research-analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 

More from Kailyn Lee

More from Kailyn Lee (20)

Software
Software Software
Software
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating various types of estimating
Estimating various types of estimatingEstimating various types of estimating
Estimating various types of estimating
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Buildingservices2 bld60503
Buildingservices2 bld60503Buildingservices2 bld60503
Buildingservices2 bld60503
 
People's dynamic individual (autosaved)
People's dynamic individual (autosaved)People's dynamic individual (autosaved)
People's dynamic individual (autosaved)
 
Safety individual final
Safety individual finalSafety individual final
Safety individual final
 
Traffic management safety six key issues
Traffic management safety   six key issuesTraffic management safety   six key issues
Traffic management safety six key issues
 
Bs 2 individual
Bs 2 individualBs 2 individual
Bs 2 individual
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Ss report-2-field-data-latest
Ss report-2-field-data-latestSs report-2-field-data-latest
Ss report-2-field-data-latest
 
Ss field-data
Ss field-dataSs field-data
Ss field-data
 
Bs1 final report_templaterecovered
Bs1 final report_templaterecoveredBs1 final report_templaterecovered
Bs1 final report_templaterecovered
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Psycho video-slides
Psycho video-slidesPsycho video-slides
Psycho video-slides
 
Psycho slides-1 (1)
Psycho slides-1 (1)Psycho slides-1 (1)
Psycho slides-1 (1)
 

Cl project02 briefing

  • 2. PROJECT TWO: LANDSCAPE PROJECT: SITE ANALYSIS 20% group work + 10% individual Submission Date: Week 11, 13th Oct 2014 No presentation, it is a submission of work only 4 weeks to complete An initial stage of landscape project development Small scale project inventory & analysis Is a “problem-solving process”
  • 3. 1. You are required to form a group of 7 to 8 members. Select one leader. 2. You have to choose ONE residence that has LAWN area, and a BASE PLAN (consists of house plan + lawn area). 3. If the base plan is not supplied by the owner, you have to measure everything and produce the base plan in scale. 4. Organize a site visit and do the site survey. 5. Conduct a site inventory and analysis (will be taught in class). 6. Produce the inventory and analysis diagram/drawing. GROUP TASK
  • 4. Example of Base Plan Entrance Site boundary Floor plan Existing structure Driveway Window openings Window openings Backyard Front yard North point ** Must be in scale Existing vegetation Roadside
  • 6. Site Inventory Site Analysis • Identify and record existing condition. • Named as “data collection”. • Note what it is, where it is. • Analyze the data. • Named as “data evaluation”. • Evaluate or make judgment about worth/importance of the condition. Is it good or bad? Is it functional or not?
  • 7. Information needed for SITE INVENTORY AND ANALYSIS: 1. SITE LOCATION AND CONTEXT - Identify location of the house and land uses surrounding it. (e.g; next to main road, at the corner, near to school etc.) - To produce the location plan. 2. TOPOGRAPHY - Identify the existing landform & slope condition. (e.g; is it a flat area or gentle slope etc.) - Identify elevation changes (if any) (e.g; existing step or retaining walls etc.) 3. DRAINAGE - Identify the location of drainage and water spots on land. 4. VEGETATION - Identify existing vegetation (all types of softscape). 5. MICROCLIMATE - Identify direction of sunrise, sunset and wind direction
  • 8. 6. EXISTING STRUCTURE - Identify existing structure. (e.g; swimming pool, driveway/porch/garage, steps, fences, pathway, gazebo, fish pond etc.) - Identify location of rubbish bin/dumping spot, cloth line etc. 7. VIEWS - Observe and identify views from inside the house looking out. (e.g; view from hall, or from room etc.) - Observe and identify views from off the site looking on (e.g; views from different sides of the house, views from street, where is the best/ worst views etc.)
  • 9. Example of Site Inventory & Analysis Diagram
  • 10. Example of Site Inventory Diagram
  • 11. Example of Site Inventory Diagram
  • 12. Example of Site Inventory Diagram
  • 13. Example of Site Analysis Diagram
  • 14. Example of Site Analysis Diagram
  • 15. Example of Site Analysis Diagram
  • 16. 1. You need produce an individual site synthesis diagram. Site synthesis also called as “design solutions”. 2. To scribble/sketch/doodle/draw the design solutions corresponding to the site analysis. 3. Individual design interpretation and decision making, therefore it should be different from others. INDIVIDUAL TASK
  • 17. Example of Site Synthesis Diagram
  • 18. SUBMISSION REQUIREMENTS Group + Individual Task: 1. A3 booklet of Site Inventory and Analysis (for group) and Site Synthesis (for individual), with a cover page and title block. The title block format will be given. Group and individual booklet should be prepared separately. 2. The material of paper is bond paper (photostat paper). You may use butter paper as progress to be shown during tutorial but it is not to be the final submission. 3. No page limit as long as all content is included. 4. The page layout should be orientated consistently. 5. The booklet should be stapled/comb bound for submission. 6. The diagram should be hand written and hand drawn except for site images. 7. The diagram should incorporate landscape graphics communication (will be taught in class). 8. Submission date is on 13th OCTOBER 2014, at class venue.
  • 19. PROJECT GANTT CHART WEEK 7 15/09/2014 WEEK 8 22/09/2014 WEEK 9 29/09/2014 WEEK 10 06/10/2014 WEEK 11 13/10/2014 - Project briefing - Form a group - To discuss site selection - To acquire base plan - Organize site visit Tutorial: - Bring the base plan - Initial data collection (esp. site location & context). - Some images of the site - Data collection checklist Tutorial: - Preliminary site inventory and analysis diagram. - Diagram with graphics & information needed already finalized. - Arrangement or layout design of booklet. Tutorial: - Site inventory and analysis diagram is finalized. - To be compiled after consultation. - Preliminary site synthesis diagram with graphics. Submission time is during tutorial at class venue.
  • 20. If you can dream it, you can do it!