This document provides information on CKG Architects including their staff, services, projects, and qualifications. It lists Lennox Caruth and Francis Cuthbertson as the two principal registered architects among six total staff. It then describes various completed and ongoing projects across multiple sectors such as office, sports, transit, residential, education, and more, with details on construction values, fees, schedules and CKG's role on each project.
In excess of 20 years of multi disciplinary experience in architecture and construction on a variety of high quality construction projects in the public, commercial, retail and residential sectors, including the last 5 years overseas in Construction Delivery and Project/Delivery Management assignments in 3 different continents. He has an in-depth knowledge of construction processes and packages and use these practical and theoretical skills to achieve successful outcomes by driving each phase of the construction process from start to finish.
In excess of 20 years of multi disciplinary experience in architecture and construction on a variety of high quality construction projects in the public, commercial, retail and residential sectors, including the last 5 years overseas in Construction Delivery and Project/Delivery Management assignments in 3 different continents. He has an in-depth knowledge of construction processes and packages and use these practical and theoretical skills to achieve successful outcomes by driving each phase of the construction process from start to finish.
This presentation is prepared by gallerist.in team, explaining basics of Arts in short. Gallerist.in is an online art gallery to buy and sell paintings online.
In the master thesis ‘A Project for Valencia’ I observed the strategic spatial planning changes and a vast development of Valencian large urban projects in the last 20 years. Subsequently I estimated the effects of such processes in the current times of economy recession and real estate development stagnation and from my findings and observations I identified two main problems, which I have researched in my thesis:
- Unequal distribution of public gains from the large urban projects in Valencia.
- Emerging spatial problems of social vulnerability.
In order to cope with the mentioned main problems, I developed a strategy which reveals the possibilities of stimulating the stagnant real estate development and proposes intervention projects in order to capture the synergy of the existing and future large urban projects. In addition, these interventions improve the spatial conditions of socially vulnerable areas and directly benefit the locals and their living quality. Two key intervention projects were studied in more detail and a design proposal for them was proposed. This made it possible to open up a discussion of the actual development possibilities even in the times of the economic scarcity and real estate market stagnation. Participation and cooperation of the local public authorities, third party investors and local inhabitants was engaged towards the processes of urban growth.
Gente Que Necesita Trabajo.
Asesoría para Búsqueda de Empleo.
http://mx.linkedin.com/in/asesoriabusquedadeempleo/
Dirigida a profesionales que están en búsqueda laboral, por pérdida de empleo, o que desean cambiar. El propósito principal es apoyar al profesional en técnicas cuantitativas, minimizar el período de transición y aterrizar la contratación.
A scrambled talk on some of the major issues I am working on at Adobe, including HTTPbis, DNT, advice on the REST architectural style and API versioning, software evolvability, and a sneak peek at a potential feature for Adobe AEM (CQ) to support continuous deployment.
LA RELACION ENTRE EL DIBUJO Y LAS LETRAS material para la lecto escritura del idioma español par el Tercer grado de pre escolar o para el primer grado de educacion primaria en mexico
Partnerschaftliche, platonische, Selbst- oder Nächstenliebe - ein großes Wort mit vielen Facetten? Was verstehen die Deutschen unter Liebe und welchen Einstellungen vertreten sie?
Credera is a proud sponsor of SharePoint Fest Denver 2012.
One of the featured speakers is Jesus Salazar, a Principal with Credera and member of Microsoft’s SharePoint Development Advisory Council, who will present on Information Architecture: From Small Businesses to Global Enterprises.
At ADCPL, we employ advanced computational techniques to model and offer an evolutionary approach towards creating form, structure, and organization in physical and virtual architecture. We have an extensive portfolio of prestigious and challenging projects, undertaken both in and outside Delhi, with our team of experts catering to Residentials Township projects for individuals and organizations alike.
Glimpses Of some few Residential Projects.
At ADCPL, we employ advanced computational techniques to model and offer an evolutionary approach towards creating form, structure, and organization in physical and virtual architecture. We have an extensive portfolio of prestigious and challenging projects, undertaken both in and outside Delhi, with our team of experts catering to Residentials Township projects for individuals and organizations alike.
Unleash Your Inner Demon with the "Let's Summon Demons" T-Shirt. Calling all fans of dark humor and edgy fashion! The "Let's Summon Demons" t-shirt is a unique way to express yourself and turn heads.
https://dribbble.com/shots/24253051-Let-s-Summon-Demons-Shirt
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Mansi Shah
This study examines cattle rearing in urban and rural settings, focusing on milk production and consumption. By exploring a case in Ahmedabad, it highlights the challenges and processes in dairy farming across different environments, emphasising the need for sustainable practices and the essential role of milk in daily consumption.
Expert Accessory Dwelling Unit (ADU) Drafting ServicesResDraft
Whether you’re looking to create a guest house, a rental unit, or a private retreat, our experienced team will design a space that complements your existing home and maximizes your investment. We provide personalized, comprehensive expert accessory dwelling unit (ADU)drafting solutions tailored to your needs, ensuring a seamless process from concept to completion.
Hello everyone! I am thrilled to present my latest portfolio on LinkedIn, marking the culmination of my architectural journey thus far. Over the span of five years, I've been fortunate to acquire a wealth of knowledge under the guidance of esteemed professors and industry mentors. From rigorous academic pursuits to practical engagements, each experience has contributed to my growth and refinement as an architecture student. This portfolio not only showcases my projects but also underscores my attention to detail and to innovative architecture as a profession.
Transforming Brand Perception and Boosting Profitabilityaaryangarg12
In today's digital era, the dynamics of brand perception, consumer behavior, and profitability have been profoundly reshaped by the synergy of branding, social media, and website design. This research paper investigates the transformative power of these elements in influencing how individuals perceive brands and products and how this transformation can be harnessed to drive sales and profitability for businesses.
Through an exploration of brand psychology and consumer behavior, this study sheds light on the intricate ways in which effective branding strategies, strategic social media engagement, and user-centric website design contribute to altering consumers' perceptions. We delve into the principles that underlie successful brand transformations, examining how visual identity, messaging, and storytelling can captivate and resonate with target audiences.
Methodologically, this research employs a comprehensive approach, combining qualitative and quantitative analyses. Real-world case studies illustrate the impact of branding, social media campaigns, and website redesigns on consumer perception, sales figures, and profitability. We assess the various metrics, including brand awareness, customer engagement, conversion rates, and revenue growth, to measure the effectiveness of these strategies.
The results underscore the pivotal role of cohesive branding, social media influence, and website usability in shaping positive brand perceptions, influencing consumer decisions, and ultimately bolstering sales and profitability. This paper provides actionable insights and strategic recommendations for businesses seeking to leverage branding, social media, and website design as potent tools to enhance their market position and financial success.
Can AI do good? at 'offtheCanvas' India HCI preludeAlan Dix
Invited talk at 'offtheCanvas' IndiaHCI prelude, 29th June 2024.
https://www.alandix.com/academic/talks/offtheCanvas-IndiaHCI2024/
The world is being changed fundamentally by AI and we are constantly faced with newspaper headlines about its harmful effects. However, there is also the potential to both ameliorate theses harms and use the new abilities of AI to transform society for the good. Can you make the difference?
1. Lennox A Caruth Sr AIA NCARB Francis Cuthbertson Jr RA
36 + Years Experience NCARB
26 + Years Experience
2. CKG ARCHITECTS STAFF
(3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) Cadd
Drafter/(1) ADMINISTRATIVE ASSISTANT
Lennox A Caruth
Sr AIA-NCARB
Principal
Francis C
Cuthbertson Jr
RA-NCARB
Principal
Peggy Merry
Administrative
Assistant
Joseph McCarthy
Douglas Poole
Construction Cynthia Ayarza Ola Alhaffar Joseph Crumlish
Senior Project
Administration Project Architect Project Architect Auto Cadd Drafter
Architect
RA
2
7. CKG PERFORMED IN THE
FOLLOWING ROLES:
Prime Architect=Performed all Architectural
Duties directly for the Client
Sole Architect=Teamed with an Engineering Firm,
Performing all Architectural Duties directly for the Client
Sub-Consultant Architect=Under contract by
an Engineering or Architectural Firm, sharing
Architectural Duties
7
8. OFFICE/COMMERCIAL/GOVERNMENT
Greater Philadelphia Health Action
– Construction Value = $1.5 million
– CKG Design Fee=$50,000.00
– Design Schedule-July 2009-May 2010
– Project Responsibility-Architectural Design for an existing 10,500
square foot building into a full service Healthcare Facility.
– Design Team Role-Prime Architect
8
9. OFFICE/COMMERCIAL/GOVERNMENT
Bristol-Meyers-Squibb Computer Room Entry
– Construction Value = $125,000.00
– CKG Design Fee=$22,000.00
– Design Schedule-June-September 2009
– Project Responsibility-Architectural Design for the upgrade of an
existing minimum security computer room entry area
– Design Team Role-Sole Architect
No Photos or Drawings Allowed due to Security Guidelines by the Owner
9
10. OFFICE/COMMERCIAL/GOVERNMENT
Williamsport Readiness Center
– Construction Value = $18 million
– CKG Design Fee=$40,000.00
– Design Schedule-March-September 2009
– Project Responsibility-Assisted with the Architectural Design for
the Toilet, Locker & Shower Rooms for two new Air National
Guard Readiness Centers
– Design Team Role-Sub-Consultant Architect
10
11. OFFICE/COMMERCIAL/GOVERNMENT
City of Philadelphia Firehouse and Police Roof Renovation
Project
– Construction Value = $1.2 million
– CKG Design Fee=$30,000.00
– Design Schedule-February-June 2009
– Project Responsibility-Field surveys and assistance with
Architectural Design
– Design Team Role-Sub-Consultant Architect
11
12. OFFICE/COMMERCIAL/GOVERNMENT
PRWT Services, Inc. - Interior Office Renovations
– Construction Value = $275,000.00
– CKG Design Fee=$35,000.00
– Design Schedule-July-October 2007
– Project Responsibility-Architectural Design for a 4500 square foot
interior office and Elevator Lobby renovation
– Design Team Role-Prime Architect
12
13. OFFICE/COMMERCIAL/GOVERNMENT
Renovations to Philadelphia City Hall Room 153
– Construction Value = $1.1 million
– CKG Design Fee=$38,000.00
– Design Schedule-November 2007 June-2009
– Project Responsibility-Construction documents for a 5600 square
foot interior renovation
– Design Team Role-Sole Architect
13
14. OFFICE/COMMERCIAL/GOVERNMENT
Bristol-Meyers-Squibb Central Monitoring Room
– Construction Value = $650,000.00
– CKG Design Fee=$30,000.00
– Design Schedule-August-December 2008
– Project Responsibility-Construction documents for a 1100 square
foot Security Monitoring room in an existing building
– Design Team Role-Sole Architect
No Photos or Drawings Allowed due to Security Guidelines by the
Owner
14
15. OFFICE/COMMERCIAL/GOVERNMENT
Oxford Valley Mall Toilet Room
– Construction Value = $200,000.00
– CKG Design Fee=$12,500.00
– Design Schedule-August-December 2008
– Project Responsibility-Construction documents for designing new
Floor, Wall and Ceiling finishes in four public restrooms
– Design Team Role-Prime Architect
15
16. OFFICE/COMMERCIAL/GOVERNMENT
Dr. Warren E. Smith Health Centers - 2514-18 N. Broad Str.
– Construction Value = $1.3 million
– CKG Design Fee=$45,500.00
– Design Schedule-January-September 2006
– Project Responsibility-Construction documents for a 1400 square
foot Behavioral Health Clinic
– Design Team Role-Prime Architect
16
17. OFFICE/COMMERCIAL/GOVERNMENT
Haddington Progress Plaza
– Construction Value = $275,000.00
– CKG Design Fee=$22,500.00
– Design Schedule-July 2004-November 2005
– Project Responsibility-Construction documents for refurbishing an
existing shopping center
– Design Team Role-Prime Architect
17
18. OFFICE/COMMERCIAL/GOVERNMENT
21st Century Office Interior Fitout Project
– Construction Value = $780,000.00
– CKG Design Fee=$35,500.00
– Design Schedule-January-May 2002
– Project Responsibility-Construction documents for the Interior
design of a new 8500 square foot tenant space
– Design Team Role-Prime Architect
18
19. SPORTS and ENTERTAINMENT
New Meadowlands Stadium, East Rutherford, NJ
– Construction Value = $850 million
– CKG Design Fee=$162,000.00
– Design Schedule-April 2007-December 2009
– Project Responsibility-Exterior wall components and partial
interior work
– Design Team Role-Sub-Consultant Architect
19
20. SPORTS and ENTERTAINMENT
Foxwoods Casino, Philadelphia, PA
– Construction Value = $275 million
– CKG Design Fee=$275,000.00
– Design Schedule-March 2007-June 2008
– Project Responsibility-Interior Rest Room Finishes, Stair Well
layouts, Loading Dock design.
– Design Team Role-Sub-Consultant Architect
20
21. SPORTS and ENTERTAINMENT
– Example of CKG Work on Foxwoods
Roof Core & Shell Column Enclosure
Details
21
22. SPORTS and ENTERTAINMENT
Citizens Bank Park, Philadelphia, PA
– Construction Value = $335 million
– CKG Design Fee=$390,000.00
– Design Schedule-April 2000-June 2001
– Project Responsibility-Interior Design support of Phillies
Administrative Offices, Concourse and Luxury Suites
– Design Team Role-Sub-Consultant Architect
22
23. SPORTS and ENTERTAINMENT
Citizens Bank Park, Philadelphia, PA
– Example of CKG Work on Citizens Bank Park
Luxury Box Mock-Ups
Ceiling Luxury Box
Finishes Finishes
Mock-Ups
23
24. MASS TRANSIT
SEPTA: Margaret-Orthodox Station Renovations
– Construction Value = $20 million
– CKG Design Fee=$250,000.00
– Design Schedule-August 2008-March 2010
– Project Responsibility-Full Mass Transit Station Renovation
including ADA upgrades.
– Design Team Role-Sole Architect
24
25. MASS TRANSIT
SEPTA: Berridge-Wyoming Roof Replacement
– Construction Value = $10 million
– CKG Design Fee=$130,000.00
– Design Schedule-August 2009-May 2010
– Project Responsibility-Construction Documents for a 100,000+
Square Foot Full Roof Replacement.
– Design Team Role-Sole Architect
25
26. MASS TRANSIT
SEPTA: Smart Stations Phase 1
– Construction Value = $25 million
– CKG Design Fee=$569,000.00
– Design Schedule-September 2004-March 2006
– Project Responsibility-Construction Documents for 21 Mass
Transit Smart Station Renovations
– Design Team Role-Sole Architect
26
27. MASS TRANSIT
SEPTA: Smart Stations Phase 2
– Construction Value = $36 million
– CKG Design Fee=$890,000.00
– Design Schedule-June 2006-December 2007
– Project Responsibility-Construction Documents for 36 Mass
Transit Smart Station Renovations
– Design Team Role-Sole Architect
27
28. MASS TRANSIT
SEPTA: 69th Street Station Motor Shop Window
Replacements
– Construction Value = $500,000.00
– CKG Design Fee=$31,000.00
– Design Schedule-January-May 2009
– Project Responsibility-Construction Documents for the
Replacement of Windows for a Motor Shop Building
– Design Team Role-Sole Architect
28
29. MASS TRANSIT
SEPTA: Midvale Yard Site Improvements
– Construction Value = $45 million
– CKG Design Fee=$40,000.00
– Design Schedule-October-January 2009
– Project Description-Schematic Design Documents for a 46,000
and 105,000 square foot Maintenance and Storage Facility
buildings
– Design Team Role-Sole Architect
29
30. MASS TRANSIT
PATCO: Walnut-Locust Stations Interior Renovations
– Construction Value = $450,000.00
– CKG Design Fee=$35,000.00
– Design Schedule-September 1996-March 1997
– Project Responsibility-Construction Administration services for the
Platform Floor, Wall & Ceiling Finishes and Railing installation
– Design Team Role-Sole Architect
30
31. MASS TRANSIT
SEPTA: York-Dauphin-Tioga & Somerset Station Renovations
– Construction Value = $25 million
– CKG Design Fee=$225,000.00
– Design Schedule-June 1993-January 1995
– Project Responsibility-Construction Administration services for
three Mass Transit Station Renovations including ADA upgrades.
– Design Team Role-Sole Architect
31
32. RESIDENTIAL/MULTI-FAMILY
5135 Judson Drive
– Construction Value = $75,000.00
– CKG Design Fee=$6,000.00
– Design Schedule-July-December 2009
– Project Responsibility-Zoning and construction documentation for
adding 800 square feet with existing interior renovations to an
existing single family home
– Design Team Role-Prime Architect
32
34. RESIDENTIAL/MULTI-FAMILY
Philadelphia Housing Authority -Blumberg Apartments
– Construction Value = $675,000.00
– CKG Design Fee=$25,000.00
– Design Schedule-October-December 2006
– Project Responsibility-Schematic documentation and cost
estimate for replacing three existing Guard Booths with one
central Guard Booth
– Design Team Role-Sole Architect
34
35. RESIDENTIAL/MULTI-FAMILY
1221-23 Shackamaxon Court
– Construction Value = $875,000.00
– CKG Design Fee=$35,000.00
– Design Schedule-January 2005-December 2006
– Project Responsibility-Zoning and construction documentation for
six townhome style condominiums
– Design Team Role-Prime Architect
35
36. RESIDENTIAL/MULTI-FAMILY
Trenton Housing Authority -Scattered Renovations to 39
Units
– Construction Value = $560,000.00
– CKG Design Fee=$51,000.00
– Design Schedule-September 2004-May 2005
– Project Responsibility-Construction documentation for renovating
the kitchens, bathrooms and living spaces for 39 units
– Design Team Role-Prime Architect
36
37. RESIDENTIAL/MULTI-FAMILY
Philadelphia Housing Authority -Westpark Apartments
– Construction Value = $1.2 million
– CKG Design Fee=$55,000.00
– Design Schedule-August 2004-February 2005
– Project Responsibility-Schematic documentation and cost
estimate for renovating three entry area Elevator Lobbies
– Design Team Role-Sole Architect
37
38. RESIDENTIAL/MULTI-FAMILY
Trenton Housing Authority -Campus Utility Study
– Construction Value = $750,000.00
– CKG Design Fee=$28,000.00
– Design Schedule-May 2004-September 2004
– Project Responsibility-Coordination for a report of the existing
utility distribution for a Public Housing Complex
– Design Team Role-Prime Architect
38
39. RESIDENTIAL/MULTI-FAMILY
1302-12 West Cumberland Street
– Construction Value = $850,000.00
– CKG Design Fee=$40,000.00
– Design Schedule-January 2004-September 2004
– Project Responsibility-Zoning and construction documentation for
renovating an existing warehouse into 17 condominium units
– Design Team Role-Prime Architect
39
40. RESIDENTIAL/MULTI-FAMILY
Philadelphia Housing Authority -Germantown House
Apartments
– Construction Value = $13 million
– CKG Design Fee=$56,000.00
– Design Schedule-April-August 2003
– Project Responsibility-Schematic documentation and cost
estimate for upgrading 240 studio units into 141 ADA compliant
units
– Design Team Role-Sole Architect
40
41. RESIDENTIAL/MULTI-FAMILY
University of Pennsylvania-Kings Court Apartments
– Construction Value = $275,000.00
– CKG Design Fee=$25,000.00
– Design Schedule-May-September 2002
– Project Responsibility-Construction documentation for the
renovation of a one bedroom apartment
– Design Team Role-Sole Architect
41
42. RESIDENTIAL/MULTI-FAMILY
Neighborhood Transformation Initiative (NTI), Philadelphia,
PA
– Construction Value = $125 million
– CKG Design Fee=$225,000.00
– Design Schedule-August 2001-November 2005
– Project Responsibility-On-Call Architect for supporting General
Contractor in the field demolition and clearing of vacant
properties
– Design Team Role-Sub-Consultant Architect
42
43. EDUCATIONAL/INSTITUTIONAL/DAYCARE
Pennsylvania Hospital On-Call Services
– Construction Value = $275,000.00
– CKG Design Fee=$25,000.00
– Design Schedule-May-September 2002
– Project Responsibility-Maintain base plans for all buildings on the
Hospital Campus
– Design Team Role-Sub-Consultant Architect
43
44. EDUCATIONAL/INSTITUTIONAL/DAYCARE
African-American Museum
– Construction Value = $750,000.00
– CKG Design Fee=$45,000.00
– Design Schedule-November 2009-May 2010
– Project Responsibility-Construction documentation for a full
Museum Renovation
– Design Team Role-Sole Architect
44
45. EDUCATIONAL/INSTITUTIONAL/DAYCARE
Temple University Bio-Life Sciences Library
– Construction Value = $450,000.00
– CKG Design Fee=$25,000.00
– Design Schedule-August 2005-January 2006
– Project Responsibility-Construction documentation for full re-
design of a Main Entry Lobby
– Design Team Role-Prime Architect
45
46. EDUCATIONAL/INSTITUTIONAL/DAYCARE
West Grove Daycare Center
– Construction Value = $385,000.00
– CKG Design Fee=$25,000.00
– Design Schedule-January-July 2006
– Project Responsibility-Construction documentation for renovation of a
Church into a Daycare Center
– Design Team Role-Prime Architect
46
47. EDUCATIONAL/INSTITUTIONAL/DAYCARE
Philadelphia School District Buildings Assessment Study
– Construction Value = $94 million
– CKG Design Fee=$97,000.00
– Design Schedule-January-November 2004
– Project Responsibility- Participated in the general construction
assessment for all City of Philadelphia Public Schools
– Design Team Role-Sub-Consultant Architect
47
48. EDUCATIONAL/INSTITUTIONAL/DAYCARE
Philadelphia School District Renaissance Charter School
– Construction Value = $1.5 million
– CKG Design Fee=$65,000.00
– Design Schedule-March-September 2002
– Project Responsibility-Construction Documents for an interior
fitout of converting for a private Charter School
– Design Team Role-Prime Architect
48
49. Religious Institutions
Williams Temple CME Church
– Construction Value = $2 million
– CKG Design Fee=$120,000.00
– Design Schedule-May-August-2010
– Project Responsibility-Architectural Design for a new 12,500
square foot Church with a Worship Space, Offices, Meeting
Room, and Classrooms all meeting current ADA guidelines.
– Design Team Role-Prime Architect
49
50. Religious Institutions
Zion Baptist Church
– Construction Value = $155,000.00
– CKG Design Fee=$22,000.00
– Design Schedule-May-August-2009
– Project Responsibility-Architectural Design for a 5000 square foot
Roof Renovation.
– Design Team Role-Prime Architect
50
51. Religious Institutions
Mt. Airy Presbyterian Church
– Construction Value = $40,000.00
– CKG Design Fee=$10,000.00
– Design Schedule-October-November-2009
– Project Responsibility-Architectural Design for the replacement
of an existing railing on an ADA compliant Ramp.
– Design Team Role-Prime Architect
`
51
52. Religious Institutions
Mt. Calvary Church
– Construction Value = $150,000.00
– CKG Design Fee=$20,000.00
– Design Schedule-February-June-2008
– Project Responsibility-Architectural Design for the replacement
of an existing railing on an ADA compliant Ramp.
– Design Team Role-Prime Architect
52
53. Religious Institutions
Buddhist Temple
– Construction Value = $750,000.00
– CKG Design Fee=$41,000.00
– Design Schedule-November-2005-August-2006
– Project Responsibility-Architectural Design for the renovation of
an existing Church into a Buddhist Temple.
– Design Team Role-Prime Architect
53
54. Religious Institutions
Hope Church Christian School
– Construction Value = $50,000.00
– CKG Design Fee=$27,000.00
– Design Schedule-November-2004-September-2005
– Project Responsibility-Architectural Report for the legalization of
the School Certificate of Occupancy.
– Design Team Role-Prime Architect
54
55. Religious Institutions
Zion Baptist Church Bell Tower Renovation
– Construction Value = $60,000.00
– CKG Design Fee=$8,000.00
– Design Schedule-November-2009-Febraury-2010
– Project Responsibility-Architectural Report and Design for the
stabilization of roof top Stone Bell Tower.
– Design Team Role-Prime Architect
55
56. CKG HAS TEAMED WITH THE
FOLLOWING FIRMS
Ewing Cole Maida Engineers
– Citizens Bank Park – Bristol-Meyers-Squibb;
– Foxwoods Casino Central Monitoring Room
– New York Giants Stadium Computer Entry
Gillian & Hartmann Parsons Transportation Group
– Room 153 City Hall – SEPTA Phase 1 & 2 Projects
– Phila. Prison Multi-Purpose Center – SEPTA Margaret-Orthodox Station
– Phila. Prison Mezzanine The Ingermann Group
CSA Group – Manor Heights Project
– AMTRAK Coatesville Station The Burns Group
– SEPTA York-Dauphin, Tioga & – Midvale
Somerset Stations – 69th Street Motor Shop
– Philadelphia Housing Authority; – Berridge Roof
Germantown House L. Robert Kimball & Associates
Blumberg Apartments – Williamsport Readiness Center
West Park Apartments NTH Consultants Group
– Trenton Housing Authority; – Nine (9) Firehouse & Police Roof
39 Scattered Units Renovations
Utility Study Highland Associates
Hill International – Philadelphia School District-Field
– Neighborhood Transformation Survey of existing Buildings 56
Initiative
57. MEASURE of SUCCESS
CKG Architects measures its success by:
– Recurring alliances it has established
with reputable Engineering firms and
Architectural firms
– Repeat business
– Referrals
57
58. THANK YOU
CKG ARCHITECTS
5443 Germantown Avenue
First Floor
Philadelphia, PA 19144-2215
215-844-5191 (ph)
215-844-5196 (fax)
archphily@aol.com (email)
58