CHRISTIAN G. RUFO
Address: Jeddah (21352 K.S.A
Contact Number: +966-54-441-7657 / +966-57-120-2339
Email: christian.rufo25@gmail.com
christian.guia@rootssteel.com
Current:
Electrical Engineer / Electromechanical Draftsman @ Roots Steel International
Jeddah (21352) K.S.A
Previous:
Electrical/ Telecom/ Mechanical Draftsman @ Azmeel Contracting Company
Jubail Industrial City K.S.A
Hardware Test Engineer @ Ionics Ems Plant II
Carmelray Industrial Park II Calamba Laguna Philippines
Education:
Bachelor of Science in Computer Engineer S.Y 2008-2009
Manuel S. Enverga University Foundation Candelaria Incoporated
Candelaria Quezon Philippines
Career Objective:
To join the group of a highly professional and dynamic organization where I can utilize my skills
& experience towards the growth of organization.
Professional Strength:
 Advance Auto Cad Skills.
 Profound work experience as a draftsman at renown organizations
 Absolute and accurate knowledge the drafting procedures and general conventions
 Total command over mathematical formulation and their application, including algebra,
geometry, calculus and arithmetic
 Proficiency in handling computer, web and drafting software.
 Comprehensive knowledge of IP routing, Frame Relay, VPN technology and
telecommunications circuit installation and operation
 Possess excellent troubleshooting, analytical and communication skills
Work Experience:
Company: Roots Steel International Jeddah (21352) K.S.A
Duration: June 2014 - Present
Designation: Jr. Electrical Engr./ Electromechanical Draftsman
Department: Organizational Development
Project: Roots Steel International, Bahra Steel Factory
Location: Jeddah 21352 K.S.A
Scope of works:
 Project Conceptualization
 Overall Project Planning
Duties & Responsibilities:
 Responsible to all electrical & mechanical design in coordination with project consultants.
 Conceptualizing drawings & layouts for the whole steel factory (Plan & 3d Models)
 Assisting Project planner with regards to project cost & estimates
 Assisting Purchaser with regards all machine specification needed in factory
 Conducting research and study with regards to all required equipment’s & machineries
Company: Azmeel Contracting Company, Jubail Industrial City K.S.A
Duration: October 2011 – April 2014
Designation: Draftsman / Quantity Surveyor
Project: GOSI Investment residential complex 2
Client: General Organization for Social Insurance (GOSI)
Location: Jubail Industrial City K.S.A
Scope of works:
 Site Development Underground Utilities Including Layout for Storm Drainage, Potable
Water, Sanitary, Irrigation line, Electrical & Telecom cable.
 Building’s Mechanical & Electrical Layout.
Duties & Responsibilities:
 Studying and Discussing a design project with the engineers and determining the detailed
specifications of the model
 Determining the scope of the design and choosing the initial parameters accordingly
 Dividing the whole design in sufficient number of subparts and designing each subpart
independently
 Consulting with the engineers during the design phase and using their feedbacks for
modification of the design
 Preparing detailed technical content describing the in and out of the draft
 Submitting the finalized shop drawing to the concerned senior officials
Company: Azmeel Contracting Company, Jubail Industrial City K.S.A
Duration: May 2011 – October 2011
Designation: Draftsman (Mechanical, Electrical & Telecom)
Project’s: Administrator Building / Specialized clinic for families & society
Client: Kingdom of Saudi Arabia Dammam University
Location: Dammam K.S.A
Scope of works:
 Electrical / Mechanical Coordination Drawing including Sanitary, Potable, Fire fighting,
HVAC, Electrical & Telecom Cable Tray layout.
Duties & Responsibilities:
 Gathering all data that are needed for preparing the coordination of all utilities.
 Checking and studying all the drawings and give feedback to engineers.
 Giving proposals and idea to be discuss for the improvement of the design.
 Preparing the final coordination drawing to be submit to in-charge officials
Company: Ionics Ems
Duration: June 2009 – October 2010
Designation: Hardware Test Engineer
Project’s: Plug Computer / Remote Proctor / Satellite TV Receiver
Client’s: Marvell Semiconductor / Cypress Perform
Location: Carmelray Industrial Park II Calamba Laguna Philippines
Duties & Responsibilities:
 Prepare production test process and develop test plans.
 Administer various debug tools to conduct failure analysis.
 Develop test and debugging tools to analyze the functionality of hardware systems.
 Provide training to new employees to implement test procedure.
 Analyze all products to identify any manufacturing defect and resolve all hardware issue
in coordination with development engineers.
 Prepare plans for validation methods, tools and processes for various tests.
 Prepare and submit reports on progress and status of all testing procedure.
 Ensure compliance to electrical safety procedures and rules are strictly adhered.
 Provide training to factory workers on testing and debugging products.
Training & Seminars:
 Certificate for completion AutoCAD 2009 2d & 3d drafting @ Microcadd - 2009
 Basic Electrical Circuits and Security Camera @ Benguet Electric Company – 2009
 Introduction to fiber optics @ Digitel Philippines – 2009
 Digital & Data telecommunication (Multiplexing & De Multiplexing) @ PLDT – 2008
 Philippine Youth Congress in Information Technology (Outlook for the Philippine I.T
Industry, Biomedical Robotics, Broadband Technology) @ UP Diliman – 2008
 Mechatronics and Robotics Society of the Philippines (Programmable Logic Control &
Switching Boards) - 2007
Graduate Project: Vending Machine
Pens and Paper Vending Machine: This project was created as a part of our design
project which is included in our curriculum. It was design using Programmable Integrated Circuit
(PIC) with assembly programming language. The machine was composed of DC Geared motors,
rollers, fiber optic sensor, coin counter, coin dispenser and other electronic parts. My fellow
students in our university are the primary beneficiary of this machine, they can easily purchase
pens and paper through that vending machine without hustling their time to go to school supply
store because the machine was located inside the school building.
Personal Particulars:
Age: 28 years old
Date of Birth: February 10, 1987
Gender: Male
Nationality: Filipino
Marital Status: Single
Education:
 Manuel S. Enverga University Foundation Candelaria Incorporated (MSEUFCI)
Candelaria Quezon Philippines.
Bachelor of Science, Computer Engineering (BSCOE) 2004 – 2009
 Manuel S. Enverga University Foundation Candelaria Incorporated (MSEUFCI)
Candelaria Quezon Philippines.
High School 1999-2003
 Candelaria Elementary School (CES – MAIN) Candelaria Quezon Philippines.
1993 – 1999
Awards & Affiliations:
 Bachelor of Science, Computer Engineering Graduate Academic Award
 Dean’s Lister Award (G.W.A 1.46) S.Y. 2006 -2007
 Elected Representative – Supreme Student Council (SSC) Computer Engineering Rep.
S.Y 2007-2008
 Elected President – Enverga Candelaria Computer Engineering Society (ECCOES)
S.Y 2006-2007
 Mechatronics and Robotics Society of the Philippines Member since 2007
Personal References:
 Engr. Ernesto Manuel (Electrical Superintendent)Azmeel Const. (+966-50-947-0824)
 Wilson Mendoza (H.R. Manager) RSI K.S.A (+966-59-659-9659)
 Engr. Victor Dagaraga (Planning Engineer) RSI K.S.A (+966-56-184-6753)
 Engr. Joselito Santillan (Planning Engineer) Azmeel Const. (+966-54-951-1841)
 Engr. Christopher C. Perez (Test Engineer Head) Ionics EMS
 Engr. Dario A. Daz (Mechanical Engr.) Azmeel Contracting Company
Christian G. Rufo
Computer Engineer
Passport No. EC1086854
IQAMA No. 2367724974

CHRISTIAN RUFO RESUME

  • 1.
    CHRISTIAN G. RUFO Address:Jeddah (21352 K.S.A Contact Number: +966-54-441-7657 / +966-57-120-2339 Email: christian.rufo25@gmail.com christian.guia@rootssteel.com Current: Electrical Engineer / Electromechanical Draftsman @ Roots Steel International Jeddah (21352) K.S.A Previous: Electrical/ Telecom/ Mechanical Draftsman @ Azmeel Contracting Company Jubail Industrial City K.S.A Hardware Test Engineer @ Ionics Ems Plant II Carmelray Industrial Park II Calamba Laguna Philippines Education: Bachelor of Science in Computer Engineer S.Y 2008-2009 Manuel S. Enverga University Foundation Candelaria Incoporated Candelaria Quezon Philippines Career Objective: To join the group of a highly professional and dynamic organization where I can utilize my skills & experience towards the growth of organization. Professional Strength:  Advance Auto Cad Skills.  Profound work experience as a draftsman at renown organizations  Absolute and accurate knowledge the drafting procedures and general conventions  Total command over mathematical formulation and their application, including algebra, geometry, calculus and arithmetic  Proficiency in handling computer, web and drafting software.  Comprehensive knowledge of IP routing, Frame Relay, VPN technology and telecommunications circuit installation and operation  Possess excellent troubleshooting, analytical and communication skills
  • 2.
    Work Experience: Company: RootsSteel International Jeddah (21352) K.S.A Duration: June 2014 - Present Designation: Jr. Electrical Engr./ Electromechanical Draftsman Department: Organizational Development Project: Roots Steel International, Bahra Steel Factory Location: Jeddah 21352 K.S.A Scope of works:  Project Conceptualization  Overall Project Planning Duties & Responsibilities:  Responsible to all electrical & mechanical design in coordination with project consultants.  Conceptualizing drawings & layouts for the whole steel factory (Plan & 3d Models)  Assisting Project planner with regards to project cost & estimates  Assisting Purchaser with regards all machine specification needed in factory  Conducting research and study with regards to all required equipment’s & machineries Company: Azmeel Contracting Company, Jubail Industrial City K.S.A Duration: October 2011 – April 2014 Designation: Draftsman / Quantity Surveyor Project: GOSI Investment residential complex 2 Client: General Organization for Social Insurance (GOSI) Location: Jubail Industrial City K.S.A Scope of works:  Site Development Underground Utilities Including Layout for Storm Drainage, Potable Water, Sanitary, Irrigation line, Electrical & Telecom cable.  Building’s Mechanical & Electrical Layout. Duties & Responsibilities:  Studying and Discussing a design project with the engineers and determining the detailed specifications of the model  Determining the scope of the design and choosing the initial parameters accordingly  Dividing the whole design in sufficient number of subparts and designing each subpart independently  Consulting with the engineers during the design phase and using their feedbacks for modification of the design
  • 3.
     Preparing detailedtechnical content describing the in and out of the draft  Submitting the finalized shop drawing to the concerned senior officials Company: Azmeel Contracting Company, Jubail Industrial City K.S.A Duration: May 2011 – October 2011 Designation: Draftsman (Mechanical, Electrical & Telecom) Project’s: Administrator Building / Specialized clinic for families & society Client: Kingdom of Saudi Arabia Dammam University Location: Dammam K.S.A Scope of works:  Electrical / Mechanical Coordination Drawing including Sanitary, Potable, Fire fighting, HVAC, Electrical & Telecom Cable Tray layout. Duties & Responsibilities:  Gathering all data that are needed for preparing the coordination of all utilities.  Checking and studying all the drawings and give feedback to engineers.  Giving proposals and idea to be discuss for the improvement of the design.  Preparing the final coordination drawing to be submit to in-charge officials Company: Ionics Ems Duration: June 2009 – October 2010 Designation: Hardware Test Engineer Project’s: Plug Computer / Remote Proctor / Satellite TV Receiver Client’s: Marvell Semiconductor / Cypress Perform Location: Carmelray Industrial Park II Calamba Laguna Philippines Duties & Responsibilities:  Prepare production test process and develop test plans.  Administer various debug tools to conduct failure analysis.  Develop test and debugging tools to analyze the functionality of hardware systems.  Provide training to new employees to implement test procedure.  Analyze all products to identify any manufacturing defect and resolve all hardware issue in coordination with development engineers.  Prepare plans for validation methods, tools and processes for various tests.  Prepare and submit reports on progress and status of all testing procedure.  Ensure compliance to electrical safety procedures and rules are strictly adhered.  Provide training to factory workers on testing and debugging products.
  • 4.
    Training & Seminars: Certificate for completion AutoCAD 2009 2d & 3d drafting @ Microcadd - 2009  Basic Electrical Circuits and Security Camera @ Benguet Electric Company – 2009  Introduction to fiber optics @ Digitel Philippines – 2009  Digital & Data telecommunication (Multiplexing & De Multiplexing) @ PLDT – 2008  Philippine Youth Congress in Information Technology (Outlook for the Philippine I.T Industry, Biomedical Robotics, Broadband Technology) @ UP Diliman – 2008  Mechatronics and Robotics Society of the Philippines (Programmable Logic Control & Switching Boards) - 2007 Graduate Project: Vending Machine Pens and Paper Vending Machine: This project was created as a part of our design project which is included in our curriculum. It was design using Programmable Integrated Circuit (PIC) with assembly programming language. The machine was composed of DC Geared motors, rollers, fiber optic sensor, coin counter, coin dispenser and other electronic parts. My fellow students in our university are the primary beneficiary of this machine, they can easily purchase pens and paper through that vending machine without hustling their time to go to school supply store because the machine was located inside the school building. Personal Particulars: Age: 28 years old Date of Birth: February 10, 1987 Gender: Male Nationality: Filipino Marital Status: Single Education:  Manuel S. Enverga University Foundation Candelaria Incorporated (MSEUFCI) Candelaria Quezon Philippines. Bachelor of Science, Computer Engineering (BSCOE) 2004 – 2009  Manuel S. Enverga University Foundation Candelaria Incorporated (MSEUFCI) Candelaria Quezon Philippines. High School 1999-2003  Candelaria Elementary School (CES – MAIN) Candelaria Quezon Philippines. 1993 – 1999 Awards & Affiliations:  Bachelor of Science, Computer Engineering Graduate Academic Award
  • 5.
     Dean’s ListerAward (G.W.A 1.46) S.Y. 2006 -2007  Elected Representative – Supreme Student Council (SSC) Computer Engineering Rep. S.Y 2007-2008  Elected President – Enverga Candelaria Computer Engineering Society (ECCOES) S.Y 2006-2007  Mechatronics and Robotics Society of the Philippines Member since 2007 Personal References:  Engr. Ernesto Manuel (Electrical Superintendent)Azmeel Const. (+966-50-947-0824)  Wilson Mendoza (H.R. Manager) RSI K.S.A (+966-59-659-9659)  Engr. Victor Dagaraga (Planning Engineer) RSI K.S.A (+966-56-184-6753)  Engr. Joselito Santillan (Planning Engineer) Azmeel Const. (+966-54-951-1841)  Engr. Christopher C. Perez (Test Engineer Head) Ionics EMS  Engr. Dario A. Daz (Mechanical Engr.) Azmeel Contracting Company Christian G. Rufo Computer Engineer Passport No. EC1086854 IQAMA No. 2367724974