Chapter 6
Risk Management
2
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Project Risks
What can go wrong?
What is the likelihood?
What will the damage be?
What can we do about it?
3
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Reactive Risk Management
 project team reacts to risks when they occur
 mitigation—plan for additional resources in anticipation
of fire fighting
 fix on failure—resource are found and applied when the
risk strikes
 crisis management—failure does not respond to applied
resources and project is in jeopardy
4
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Proactive Risk Management
formal risk analysis is performed
organization corrects the root causes of
risk
TQM concepts and statistical SQA
examining risk sources that lie beyond the bounds of
the software
developing the skill to manage change
5
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
RISK
Risk Management Paradigm
control
identify
analyze
plan
track
6
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Risk Due to Product Size
• estimated size of the product in LOC or FP?
• estimated size of product in number of programs,
files, transactions?
• percentage deviation in size of product from
average for previous products?
• size of database created or used by the product?
• number of users of the product?
• number of projected changes to the requirements
for the product? before delivery? after delivery?
• amount of reused software?
Attributes that affect risk:
7
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Risk Due to Business Impact
• affect of this product on company revenue?
• visibility of this product by senior management?
• reasonableness of delivery deadline?
• number of customers who will use this product
• interoperability constraints
• sophistication of end users?
• amount and quality of product documentation that
must be produced and delivered to the customer?
• governmental constraints
• costs associated with late delivery?
• costs associated with a defective product?
Attributes that affect risk:
8
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Risks Due to the Customer
• Have you worked with the customer in the past?
• Does the customer have a solid idea of requirements?
• Has the customer agreed to spend time with you?
• Is the customer willing to participate in reviews?
• Is the customer technically sophisticated?
• Is the customer willing to let your people do their
job—that is, will the customer resist looking over your
shoulder during technically detailed work?
• Does the customer understand the software
engineering process?
Questions that must be answered:
9
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Risks Due to Process Maturity
• Have you established a common process framework?
• Is it followed by project teams?
• Do you have management support for
software engineering
• Do you have a proactive approach to SQA?
• Do you conduct formal technical reviews?
• Are CASE tools used for analysis, design and
testing?
• Are the tools integrated with one another?
• Have document formats been established?
Questions that must be answered:
10
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Technology Risks
• Is the technology new to your organization?
• Are new algorithms, I/O technology required?
• Is new or unproven hardware involved?
• Does the application interface with new software?
• Is a specialized user interface required?
• Is the application radically different?
• Are you using new software engineering methods?
• Are you using unconventional software development
methods, such as formal methods, AI-based approaches,
artificial neural networks?
• Are there significant performance constraints?
• Is there doubt the functionality requested is "do-able?"
Questions that must be answered:
11
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Staff/People Risks
• Are the best people available?
• Does staff have the right skills?
• Are enough people available?
• Are staff committed for entire duration?
• Will some people work part time?
• Do staff have the right expectations?
• Have staff received necessary training?
• Will turnover among staff be low?
Questions that must be answered:
12
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Impact Assessment
See Figure 6.1 – impact assessment table
13
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Building a Risk Table
Risk Probability Impact RMMM
Risk
Mitigation
Monitoring
&
Management
14
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Building the Risk Table
Estimate the probability of occurrence
Estimate the impact on the project on a
scale of 1 to 5, where
 1 = low impact on project success
 5 = catastrophic impact on project success
 sort the table by probability and impact
15
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Risk Referent Level
Triplet
[ri, li, xi]
Ri = risk
Li = likelihood
Xi = impact
Then chart like in Figure 6.4 to decide where
project termination point is
16
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
mitigation—how can we avoid the risk?
monitoring—what factors can we track
that will enable us to determine if the risk
is becoming more or less likely?
management—what contingency plans
do we have if the risk becomes a reality?
Risk Mitigation, Monitoring,
and Management
17
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are
provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001
Project: Embedded software for XYZ system
Risk type: schedule risk
Priority (1 low ... 5 critical): 4
Risk factor: Project completion will depend on tests which require
hardware component under development. Hardware component
delivery may be delayed
Probability: 60 %
Impact: Project completion will be delayed for each day that
hardware is unavailable for use in software testing
Monitoring approach:
Scheduled milestone reviews with hardware group
Contingency plan:
Modification of testing strategy to accommodate delay using
software simulation
Estimated resources: 6 additional person months beginning 7-1-96
Recording Risk Information

More Related Content

What's hot

What are the common Test Environment today
What are the common Test Environment todayWhat are the common Test Environment today
What are the common Test Environment today
Doris Robinson
 
Environments management - A Critical Support Function
Environments management - A Critical Support FunctionEnvironments management - A Critical Support Function
Environments management - A Critical Support Function
Thyagarajan Krishnan
 
Defect Prevention & Predictive Analytics - XBOSoft Webinar
Defect Prevention & Predictive Analytics - XBOSoft WebinarDefect Prevention & Predictive Analytics - XBOSoft Webinar
Defect Prevention & Predictive Analytics - XBOSoft Webinar
XBOSoft
 
Test Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CDTest Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CD
DevOps.com
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
Accendo Reliability
 
Fundamental test process endang
Fundamental test process endangFundamental test process endang
Fundamental test process endang
endang setianingsih
 
Risk and Testing
Risk and TestingRisk and Testing
Risk and Testing
NolaCita
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
Accendo Reliability
 
Root Cause Analysis for Software Testers
Root Cause Analysis for Software TestersRoot Cause Analysis for Software Testers
Root Cause Analysis for Software Testers
TechWell
 
Fundamental test process_rendi_saputra_infosys_USR
Fundamental test process_rendi_saputra_infosys_USRFundamental test process_rendi_saputra_infosys_USR
Fundamental test process_rendi_saputra_infosys_USR
Rendi Saputra
 
Introduction to reliability management webinar
Introduction to reliability management webinarIntroduction to reliability management webinar
Introduction to reliability management webinar
Accendo Reliability
 
John Brennen - Red Hot Testing in a Green World
John Brennen - Red Hot Testing in a Green WorldJohn Brennen - Red Hot Testing in a Green World
John Brennen - Red Hot Testing in a Green World
TEST Huddle
 
Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...
SlideTeam
 
Iwsm2014 mispredicting software reliability (rakesh rana)
Iwsm2014   mispredicting software reliability (rakesh rana)Iwsm2014   mispredicting software reliability (rakesh rana)
Iwsm2014 mispredicting software reliability (rakesh rana)
Nesma
 
Fundamentals of Risk-based Testing
Fundamentals of Risk-based TestingFundamentals of Risk-based Testing
Fundamentals of Risk-based Testing
TechWell
 
Risk-based Testing
Risk-based TestingRisk-based Testing
Risk-based Testing
Johan Hoberg
 
Effective Test Estimation
Effective Test EstimationEffective Test Estimation
Effective Test Estimation
TechWell
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
OSP International LLC
 
The Business Case for Test Environment Management Services
The Business Case for Test Environment Management ServicesThe Business Case for Test Environment Management Services
The Business Case for Test Environment Management Services
Cognizant
 

What's hot (20)

What are the common Test Environment today
What are the common Test Environment todayWhat are the common Test Environment today
What are the common Test Environment today
 
Environments management - A Critical Support Function
Environments management - A Critical Support FunctionEnvironments management - A Critical Support Function
Environments management - A Critical Support Function
 
Defect Prevention & Predictive Analytics - XBOSoft Webinar
Defect Prevention & Predictive Analytics - XBOSoft WebinarDefect Prevention & Predictive Analytics - XBOSoft Webinar
Defect Prevention & Predictive Analytics - XBOSoft Webinar
 
Test Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CDTest Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CD
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
Fundamental test process endang
Fundamental test process endangFundamental test process endang
Fundamental test process endang
 
Risk and Testing
Risk and TestingRisk and Testing
Risk and Testing
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
 
Root Cause Analysis for Software Testers
Root Cause Analysis for Software TestersRoot Cause Analysis for Software Testers
Root Cause Analysis for Software Testers
 
Fundamental test process_rendi_saputra_infosys_USR
Fundamental test process_rendi_saputra_infosys_USRFundamental test process_rendi_saputra_infosys_USR
Fundamental test process_rendi_saputra_infosys_USR
 
Introduction to reliability management webinar
Introduction to reliability management webinarIntroduction to reliability management webinar
Introduction to reliability management webinar
 
John Brennen - Red Hot Testing in a Green World
John Brennen - Red Hot Testing in a Green WorldJohn Brennen - Red Hot Testing in a Green World
John Brennen - Red Hot Testing in a Green World
 
Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...
 
Iwsm2014 mispredicting software reliability (rakesh rana)
Iwsm2014   mispredicting software reliability (rakesh rana)Iwsm2014   mispredicting software reliability (rakesh rana)
Iwsm2014 mispredicting software reliability (rakesh rana)
 
Fundamentals of Risk-based Testing
Fundamentals of Risk-based TestingFundamentals of Risk-based Testing
Fundamentals of Risk-based Testing
 
Risk-based Testing
Risk-based TestingRisk-based Testing
Risk-based Testing
 
Effective Test Estimation
Effective Test EstimationEffective Test Estimation
Effective Test Estimation
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
The Business Case for Test Environment Management Services
The Business Case for Test Environment Management ServicesThe Business Case for Test Environment Management Services
The Business Case for Test Environment Management Services
 
Neil Routledge CV
Neil Routledge CVNeil Routledge CV
Neil Routledge CV
 

Similar to Chapter 06wht

Risk Management by Roger S. Pressman
Risk Management by Roger S. PressmanRisk Management by Roger S. Pressman
Risk Management by Roger S. Pressman
Rogerio P C do Nascimento
 
Risk Management by Roger Pressman
Risk Management by Roger PressmanRisk Management by Roger Pressman
Risk Management by Roger Pressman
Rogerio P C do Nascimento
 
Risk Management by Roger Pressman
Risk Management by Roger PressmanRisk Management by Roger Pressman
Risk Management by Roger Pressman
Rogerio P C do Nascimento
 
the product.ppt
the product.pptthe product.ppt
the product.ppt
SACHINMAURYA57
 
Chapter_01wht.pdf
Chapter_01wht.pdfChapter_01wht.pdf
Chapter_01wht.pdf
paijitk
 
Ch03 process models
Ch03 process modelsCh03 process models
Ch03 process models
Noor Ul Hudda Memon
 
Bab 2 Rekayasa Perangkat Lunak 3
Bab 2   Rekayasa Perangkat Lunak  3Bab 2   Rekayasa Perangkat Lunak  3
Bab 2 Rekayasa Perangkat Lunak 3Dimara Hakim
 
Ch04 agile development models
Ch04 agile development modelsCh04 agile development models
Ch04 agile development models
Noor Ul Hudda Memon
 
software
softwaresoftware
software
ssuser2d043c
 

Similar to Chapter 06wht (20)

Chapter06
Chapter06Chapter06
Chapter06
 
Risk Management by Roger S. Pressman
Risk Management by Roger S. PressmanRisk Management by Roger S. Pressman
Risk Management by Roger S. Pressman
 
Risk Management by Roger Pressman
Risk Management by Roger PressmanRisk Management by Roger Pressman
Risk Management by Roger Pressman
 
Risk Management by Roger Pressman
Risk Management by Roger PressmanRisk Management by Roger Pressman
Risk Management by Roger Pressman
 
Chapter03
Chapter03Chapter03
Chapter03
 
Chapter03
Chapter03Chapter03
Chapter03
 
Chapter04
Chapter04Chapter04
Chapter04
 
Chapter04
Chapter04Chapter04
Chapter04
 
Chapter05
Chapter05Chapter05
Chapter05
 
Chapter05
Chapter05Chapter05
Chapter05
 
the product.ppt
the product.pptthe product.ppt
the product.ppt
 
Chapter_01wht.pdf
Chapter_01wht.pdfChapter_01wht.pdf
Chapter_01wht.pdf
 
Ch03 process models
Ch03 process modelsCh03 process models
Ch03 process models
 
Bab 2 Rekayasa Perangkat Lunak 3
Bab 2   Rekayasa Perangkat Lunak  3Bab 2   Rekayasa Perangkat Lunak  3
Bab 2 Rekayasa Perangkat Lunak 3
 
Ch04 agile development models
Ch04 agile development modelsCh04 agile development models
Ch04 agile development models
 
Chapter01
Chapter01Chapter01
Chapter01
 
Chapter01
Chapter01Chapter01
Chapter01
 
Chapter02
Chapter02Chapter02
Chapter02
 
Chapter02
Chapter02Chapter02
Chapter02
 
software
softwaresoftware
software
 

Recently uploaded

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

Chapter 06wht

  • 1. 1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Chapter 6 Risk Management
  • 2. 2 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?
  • 3. 3 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Reactive Risk Management  project team reacts to risks when they occur  mitigation—plan for additional resources in anticipation of fire fighting  fix on failure—resource are found and applied when the risk strikes  crisis management—failure does not respond to applied resources and project is in jeopardy
  • 4. 4 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Proactive Risk Management formal risk analysis is performed organization corrects the root causes of risk TQM concepts and statistical SQA examining risk sources that lie beyond the bounds of the software developing the skill to manage change
  • 5. 5 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 RISK Risk Management Paradigm control identify analyze plan track
  • 6. 6 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Due to Product Size • estimated size of the product in LOC or FP? • estimated size of product in number of programs, files, transactions? • percentage deviation in size of product from average for previous products? • size of database created or used by the product? • number of users of the product? • number of projected changes to the requirements for the product? before delivery? after delivery? • amount of reused software? Attributes that affect risk:
  • 7. 7 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Due to Business Impact • affect of this product on company revenue? • visibility of this product by senior management? • reasonableness of delivery deadline? • number of customers who will use this product • interoperability constraints • sophistication of end users? • amount and quality of product documentation that must be produced and delivered to the customer? • governmental constraints • costs associated with late delivery? • costs associated with a defective product? Attributes that affect risk:
  • 8. 8 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risks Due to the Customer • Have you worked with the customer in the past? • Does the customer have a solid idea of requirements? • Has the customer agreed to spend time with you? • Is the customer willing to participate in reviews? • Is the customer technically sophisticated? • Is the customer willing to let your people do their job—that is, will the customer resist looking over your shoulder during technically detailed work? • Does the customer understand the software engineering process? Questions that must be answered:
  • 9. 9 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risks Due to Process Maturity • Have you established a common process framework? • Is it followed by project teams? • Do you have management support for software engineering • Do you have a proactive approach to SQA? • Do you conduct formal technical reviews? • Are CASE tools used for analysis, design and testing? • Are the tools integrated with one another? • Have document formats been established? Questions that must be answered:
  • 10. 10 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Technology Risks • Is the technology new to your organization? • Are new algorithms, I/O technology required? • Is new or unproven hardware involved? • Does the application interface with new software? • Is a specialized user interface required? • Is the application radically different? • Are you using new software engineering methods? • Are you using unconventional software development methods, such as formal methods, AI-based approaches, artificial neural networks? • Are there significant performance constraints? • Is there doubt the functionality requested is "do-able?" Questions that must be answered:
  • 11. 11 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Staff/People Risks • Are the best people available? • Does staff have the right skills? • Are enough people available? • Are staff committed for entire duration? • Will some people work part time? • Do staff have the right expectations? • Have staff received necessary training? • Will turnover among staff be low? Questions that must be answered:
  • 12. 12 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Impact Assessment See Figure 6.1 – impact assessment table
  • 13. 13 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Building a Risk Table Risk Probability Impact RMMM Risk Mitigation Monitoring & Management
  • 14. 14 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Building the Risk Table Estimate the probability of occurrence Estimate the impact on the project on a scale of 1 to 5, where  1 = low impact on project success  5 = catastrophic impact on project success  sort the table by probability and impact
  • 15. 15 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Referent Level Triplet [ri, li, xi] Ri = risk Li = likelihood Xi = impact Then chart like in Figure 6.4 to decide where project termination point is
  • 16. 16 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 mitigation—how can we avoid the risk? monitoring—what factors can we track that will enable us to determine if the risk is becoming more or less likely? management—what contingency plans do we have if the risk becomes a reality? Risk Mitigation, Monitoring, and Management
  • 17. 17 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Project: Embedded software for XYZ system Risk type: schedule risk Priority (1 low ... 5 critical): 4 Risk factor: Project completion will depend on tests which require hardware component under development. Hardware component delivery may be delayed Probability: 60 % Impact: Project completion will be delayed for each day that hardware is unavailable for use in software testing Monitoring approach: Scheduled milestone reviews with hardware group Contingency plan: Modification of testing strategy to accommodate delay using software simulation Estimated resources: 6 additional person months beginning 7-1-96 Recording Risk Information