In the current issue of Economy Matters, we cover the implications of Brexit for Britain and India, update on recent forecasts by World Bank, economic prospects of US economy and European Central Bank’s policy stance in the section on Global Trends. In Domestic Trends, Mr. Ajay Shriram, Past President, CII writes an article on the two years of Modi Government. Additionally, we also analyse the trends emanating out of the recent releases on GDP, IIP, Inflation, Monetary Policy, Trade and Balance of Payments. In Corporate Performance section we examine the corporate profitability trends for firms for the year FY16. From this issue, we have introduced a new section named as Policy Focus, in which we analyse the key policy documents released during the May-June 2016. In Focus of the Month, we cover the topic ‘India’s Trade & International Alliances’.
In the current issue of Economy Matters, we cover the implications of Brexit for Britain and India, update on recent forecasts by World Bank, economic prospects of US economy and European Central Bank’s policy stance in the section on Global Trends. In Domestic Trends, Mr. Ajay Shriram, Past President, CII writes an article on the two years of Modi Government. Additionally, we also analyse the trends emanating out of the recent releases on GDP, IIP, Inflation, Monetary Policy, Trade and Balance of Payments. In Corporate Performance section we examine the corporate profitability trends for firms for the year FY16. From this issue, we have introduced a new section named as Policy Focus, in which we analyse the key policy documents released during the May-June 2016. In Focus of the Month, we cover the topic ‘India’s Trade & International Alliances’.
Označení New 52 už není tak nové, jak se může zdát. Proto se podíváme na komiksy, které se vyrojily za posledních pár let, řekneme si zásadní události a hlavně se dozvíte, které komiksy číst a kterým se raději vyvarovat.
West Consulting Network Design SummaryNTC320 v31West Consul.docxhelzerpatrina
West Consulting Network Design Summary
NTC/320 v3
1
West Consulting Network Design SummaryWest Consulting Business Description
West Consulting is a graphic design and printing company. It is growing in consumer and sales volume and therefore, is expanding its local campus in Houston, Texas and adding a test location in China.Business Problem
As a graphics design and printing company, West Consulting runs bandwidth-intensive applications from servers housed at their headquarters in Houston, Texas. IT leadership has determined that the current network continuously runs in a degraded state and users experience heavy latency when accessing the servers that house their customer Computer Aided Design (CAD) software.
Due to increased sales of their CAD designs, they need to expand their facilities. The company headquarters currently has 1,000 unique users amongst their two buildings and has decided to add another building and 500 users.
In addition, leadership has decided to expand into China to enable them to test their designs in a new and growing market. The footprint in China will be relatively small; approximately 30 people.
Solution
You are a Network Consultant for West Consulting. You are tasked with proposing an improved network design to support their growth and expansion plans.Requirements
1. A secure WLAN solution in the new building for half of the users and recommendations to upgrade their existing WLAN infrastructure to keep wiring costs down.
2. Recommendations on a Unified Communications system that meets traffic demands, with minimal interruptions, due to the frequency of international videoconferencing calls that will occur.
3. An IP solution that can accommodate the new users in all locations.
4. Recommendations to upgrade their switch bandwidth to 10GB fiber uplinks between backbone switches, a 10GB connection to each of the servers, and add-in options for redundancy. High availability access to these critical servers is a must because of the expected traffic increase and load on the servers.
5. Proposal for a data center solution that takes advantage of both network and server virtualization technologies to reduce their costs in acquiring and maintaining hardware.
6. Improvements to the link speed to the internet.
7. Options for implementing greater security for their Intranet servers that their partners and employees heavily use and for their overall network infrastructure, as they have had attacks on their DMZ.
8. Have proof that these improvements will be completed within a 4- to 6-month timeline.
Network Configuration Details
The Network Engineer verbally shared the configuration details of their network, as follows:Headquarters:
· Bldg. 1 and Bldg. 2 are located about 1000 ft. apart. Switches:
· Bldg. 1 has one 6500 backbone switch installed; which supports users from both buildings.
· Bldg. 2 has a connection to the backbone switch via a 10GB fiber connection (10G Base LR) from uplink port on a Cisco 38 ...
ITIL and DevOps at War in the Enterprise - DevOpsDays Amsterdam 2014Jan-Joost Bouwman
The journey from ITIL/CMMi to DevOps in the corporate setting of ING Netherlands. Presentation by Mark Heistek and Jan-Joost Bouwman at DevOpsDays Amsterdam 2014.
Označení New 52 už není tak nové, jak se může zdát. Proto se podíváme na komiksy, které se vyrojily za posledních pár let, řekneme si zásadní události a hlavně se dozvíte, které komiksy číst a kterým se raději vyvarovat.
West Consulting Network Design SummaryNTC320 v31West Consul.docxhelzerpatrina
West Consulting Network Design Summary
NTC/320 v3
1
West Consulting Network Design SummaryWest Consulting Business Description
West Consulting is a graphic design and printing company. It is growing in consumer and sales volume and therefore, is expanding its local campus in Houston, Texas and adding a test location in China.Business Problem
As a graphics design and printing company, West Consulting runs bandwidth-intensive applications from servers housed at their headquarters in Houston, Texas. IT leadership has determined that the current network continuously runs in a degraded state and users experience heavy latency when accessing the servers that house their customer Computer Aided Design (CAD) software.
Due to increased sales of their CAD designs, they need to expand their facilities. The company headquarters currently has 1,000 unique users amongst their two buildings and has decided to add another building and 500 users.
In addition, leadership has decided to expand into China to enable them to test their designs in a new and growing market. The footprint in China will be relatively small; approximately 30 people.
Solution
You are a Network Consultant for West Consulting. You are tasked with proposing an improved network design to support their growth and expansion plans.Requirements
1. A secure WLAN solution in the new building for half of the users and recommendations to upgrade their existing WLAN infrastructure to keep wiring costs down.
2. Recommendations on a Unified Communications system that meets traffic demands, with minimal interruptions, due to the frequency of international videoconferencing calls that will occur.
3. An IP solution that can accommodate the new users in all locations.
4. Recommendations to upgrade their switch bandwidth to 10GB fiber uplinks between backbone switches, a 10GB connection to each of the servers, and add-in options for redundancy. High availability access to these critical servers is a must because of the expected traffic increase and load on the servers.
5. Proposal for a data center solution that takes advantage of both network and server virtualization technologies to reduce their costs in acquiring and maintaining hardware.
6. Improvements to the link speed to the internet.
7. Options for implementing greater security for their Intranet servers that their partners and employees heavily use and for their overall network infrastructure, as they have had attacks on their DMZ.
8. Have proof that these improvements will be completed within a 4- to 6-month timeline.
Network Configuration Details
The Network Engineer verbally shared the configuration details of their network, as follows:Headquarters:
· Bldg. 1 and Bldg. 2 are located about 1000 ft. apart. Switches:
· Bldg. 1 has one 6500 backbone switch installed; which supports users from both buildings.
· Bldg. 2 has a connection to the backbone switch via a 10GB fiber connection (10G Base LR) from uplink port on a Cisco 38 ...
ITIL and DevOps at War in the Enterprise - DevOpsDays Amsterdam 2014Jan-Joost Bouwman
The journey from ITIL/CMMi to DevOps in the corporate setting of ING Netherlands. Presentation by Mark Heistek and Jan-Joost Bouwman at DevOpsDays Amsterdam 2014.
Table of Contents Capstone Project Summary ................docxssuserf9c51d
Table of Contents
Capstone Project Summary ........................................................................................................ 1
Review of Other Work ............................................................................................................... 3
Project Rationale ........................................................................................................................ 5
Systems Analysis and Methodology .......................................................................................... 7
Goals and Objectives ................................................................................................................ 10
Project Deliverables ................................................................................................................. 15
Project Timeline ....................................................................................................................... 21
Project Development ................................................................................................................ 21
Conclusion ................................................................................................................................ 26
Appendix A: Implementation Configuration Documentation ................................................. 28
Appendix B: Testing Documentation ...................................................................................... 29
Appendix C: Maintenance Procedures .................................................................................... 32
References ................................................................................................................................ 34
Configuring Active Directory Authentication for Force 10 Switches Page 1
Capstone Project Summary
I have been employed with a medium sized financial
institution, as a Network and Data Center Administrator for the last five years. The company has
a headquarters location and seven branch locations. Some of my assigned duties are the
management of network devices, management of Microsoft Windows servers, and access control
management for user account access to network resources. The company’s security policy
requires all users to change their user account passwords every forty days. The policy includes
all network access user accounts including the accounts of the network administrators that
manage devices.
The security policy is actively enforced on Microsoft Active Directory user
accounts. There is a Group Policy set up in Active Directory that causes each user account
password to expire after forty days forcing users to change their passwords. The user accounts
used by network administrators to manage the company’s network switches were not the same as
their Active Directory user accounts and the policy was only passively enforced. Each switch
was configured to use a ...
Oracle Ebiz R12.2 Features -- Ravi Sagaramravisagaram
The deck provides the new features with Oracle Ebiz R12.2 released in Sept 2013. It compares the new features in R12.2 with prior release R12.1.3 and provides setups. The deck was presented at NCOAUG in March 2014.
[Webinar] - Adopt QAD & Progress DBA Global Shared Services to Deliver Cost O...JK Tech
In the post-COVID–19 era, it is anticipated that the Enterprises running QAD & Progress ERP/Application/DB Systems across the globe will be contemplating to:
- Drive down costs of ownership & maintenance with quantifiable long-term cost optimization outcomes.
- Automation & Support Service/Solution Agility to deliver Flexibility & Adaptability.
- Improve Overall Operational Efficiency with Productivity Gains.
KEY TAKEAWAYS:
- How will the Shared Services model fulfill the Flexibility/Adaptability needs of my Enterprise Application & Database landscape?
- What levels of Automation can I expect to see in the Shared Services model?
- How does the Shared Services Model address my Data Security & Compliance needs of my Enterprise?
- What will be expected outcomes derived from adopting Shared Services?
Visit our page for more info: https://jktech.com/insight/webinar/adopt-qad-progress-dba-global-shared-services-to-deliver-cost-optimization/
Similar to CCRv1.2SR588 Auto Load Service Locations Into Banner CCR1v1.2 (20)
CCRv1.2SR588 Auto Load Service Locations Into Banner CCR1v1.2
1. Client Change Request (CCR) dcca572a-5dad-40d6-97d1-6d941d0b02ec-
161020174352.doc
Client Change Request
Project Name: SR588 – Auto Load Service Location into Banner
Document Title: SR588 Client Change Request-1
Document Version: 1.2
Author: Bridget Milton
Date: 02/17/2013
Document Status: Final-Internal
1 Description of Change:
This Client Change Request (CCR) encompasses updates across all phases of SR588 due
to the following:
• DBRD the document is in its final phase of GNG approval.
• Scope changes since the original Design through Implementation SOW was
delivered, including:
o GNG will send the AGL World CD data in a format to be agreed upon on a
monthly basis.
o Vertex to take the AGL World CD data and create a data source that can be
queried by the CRR team.
o Vertex will develop a query that has 3-4 field variables that can be input to
develop the initial account list.
o Vertex CRR team to output the list and review the list against the Rent Roll and
general data that will be supplied by GNG.
o GNG to supply guidance on how to create and work/verify the list vs. the rent-roll.
o Vertex CRR team creates a final, update account list that will be used as the data
to upload the list of accounts into Banner.
2 Reasons for Change / Business Benefits of Change:
The benefits / reasons for this Client Change Request (CCR) are the following:
Compliance with PSC regulations governing the treatment of Prepay customers.
3 Related Impacts:
This CCR impacts the following items:
• Updates to SR588 Detailed Business Requirements Document
• Updates SOW SR588 Design-Implementation Phase
• Construction phase scope
• Test Phase will consist of one set of Test Conditions. There will not be separate
Function Test and System Test Conditions.
Vertex Business Services Proprietary and Confidential
Last Saved: 10/20/2016 17:44:03 a10/p10 Page 1 of 3
2. Client Change Request (CCR) dcca572a-5dad-40d6-97d1-6d941d0b02ec-
161020174352.doc
4 Effort and cost estimate
The following estimate provides for completion of the Change Request. This CCR must
be approved by 03/15/2013 to maintain the planned project schedule.
Phase Hours Notes
Project Management
40 Hours increased to support the
requirements in this CCR.
Requirements
24 Hours increased the effort to
update the DBRD system
requirements, assumptions,
and dependencies sections.
Design
80 This CCR increases the
design, construction, test
effort, training and business
process document updates for
the phases of SR588.
Construction
200 Hours increased to support the
requirements in this CCR.
Testing
120 This CCR increases the test
effort for SR588.
Training
40 Hours increased to support the
requirements in this CCR.
NOTE: This estimate assumes
training will not be performed
by Vertex Development,
Business Analyst.
Deployment (and Monitoring)
40 This CCR increases the
deployment &/monitoring
phase of SR588. CCR1
requires new/modified
business processes for creating
units.
Totals
544 Hours increased to support the
request in this CCR.
Additional Remarks:
Hours increased on Requirements and SOW Design-Implementation phases to support
requirements in this CCR.
Vertex Business Services Proprietary and Confidential
Last Saved: 10/20/2016 17:43:53 a10/p10 Page 2 of 3
3. Client Change Request (CCR) dcca572a-5dad-40d6-97d1-6d941d0b02ec-
161020174352.doc
5 Approval signature
By signing this CCR, you are authorizing Vertex Business Services to proceed with the
work outlined in this document and guaranteeing full payment to Vertex Business Services
for the work performed.
Date: Date:
Project Manager
Vertex Business Services
Project Owner
Georgia Natural Gas
Date: Date:
Business Owner
Georgia Natural Gas
Date: Date:
Service Quality Owner
Georgia Natural Gas
Date: Date:
Vertex Business Services Proprietary and Confidential
Last Saved: 10/20/2016 17:44:03 a10/p10 Page 3 of 3