Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 1 of 195
Compiled by:
Revision #
00
COMPETENCY BASED LEARNING MATERIAL
Sector :
Qualification Title/ Level :
Unit of competency :
Module Title :
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 2 of 195
Compiled by:
Revision #
00
HOW TO USE THIS COMPETENCY BASED LEARNING MATERIAL
Welcome to the Module “Computer Hardware Servicing NC II”. This
module contains training materials and activities for you to complete.
The unit of competency “Diagnose and Troubleshoot Computer Systems”
contains knowledge, skills and attitudes required for a Computer Hardware
Servicing NC II course.
You are required to go through a series of learning activities in order to
complete each of the learning outcomes of the module. In each learning
outcome there are Information Sheets, Job Sheets, Operation Sheets, and
Activity Sheets. Follow these activities on your own and answer the Self-Check
at the end of each learning activity.
If you have questions, don’t hesitate to ask your teacher for assistance.
Recognition of Prior Learning (RPL)
You may already have some of the knowledge and skills covered in this
module because you have:
o been working for some time
o Already have completed training in this area.
If you can demonstrate to your teacher that you are competent in a
particular skill or skills, talk to him/her about having them formally recognized
so you don’t have to do he same training again. If you have a qualification or
Certificate of Competency from previous trainings show it to your trainer. If the
skills you acquired are still current and relevant to this module, they may
become part of the evidence you can present for RPL. If you are not sure about
the currency of your skills, discuss it with your trainer.
After completing this module ask your teacher to assess your
competency. Result of your assessment will be recorded in your competency
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 3 of 195
Compiled by:
Revision #
00
profile. All the learning activities are designed for you to complete at your own
pace.
Inside this module you will find the activities for you to complete followed
by relevant information sheets for each learning outcome. Each learning
outcome may have more than one learning activity.
This module is prepared to help you achieve the required competency, in
diagnosing and troubleshooting computer systems. This will be the source of
information that will enable you to acquire the knowledge and skills
independently at your own pace or with minimum supervision or help from
your teacher.
When you feel confident that you have had sufficient practice, ask you
trainer to evaluate you. The results of your assessment will be recorded in
your Progress Chart and Accomplishment Chart.
You need to complete this module before you can perform the next
module
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 4 of 195
Compiled by:
Revision #
00
LIST OF COMPETENCIES
No. Unit of Competency Module Title Code
1
2
3
4
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 5 of 195
Compiled by:
Revision #
00
MODULE CONTENT
UNIT OF COMPETENCY :
MODULE TITLE :
MODULE DESCRIPTOR :
SUMMARY OF LEARNING OUTCOMES
1.
Assessment Criteria:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
.
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 6 of 195
Compiled by:
Revision #
00
LEARNING OUTCOME SUMMARY
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 7 of 195
Compiled by:
Revision #
00
LEARNING OUTCOME ___
CONTENTS:
ASSESSMENT CRITERIA:
1.
CONDITION:
ASSESSMENT METHOD:
LEARNING EXPERIENCES
Learning Outcome ____
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 8 of 195
Compiled by:
Revision #
00
Learning Activities Special Instructions
1.
INFORMATION SHEET 2.1-1
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 9 of 195
Compiled by:
Revision #
00
TITLE
Learning Objective:
Introduction:
Content:
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 10 of 195
Compiled by:
Revision #
00
SELF CHECK _____
Direction:
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 11 of 195
Compiled by:
Revision #
00
ANSWER KEY TO SELF CHECK _____
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 12 of 195
Compiled by:
Revision #
00
TASK SHEET ______
TITLE :
Performance Objective:
Supplies/ Materials :
Equipment:
Steps and Procedure:
1.
Assessment Method :
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 13 of 195
Compiled by:
Revision #
00
PERFORMANCE CRITERIA CHECKLIST
Title
Trainee’s Name: _____________________ Date: ______________________
CRITERIA YES NO
Comments/Suggestions:
Trainer’s Name: ______________________ Date: ____________________
Mogpog
National
Comprehensive
High School
Computer
Hardware
Servicing NCII
Date Compiled:
October 2014
Document No.
Issued by:
Page 14 of 195
Compiled by:
Revision #
00
References:

Installing computer systems and networks Module

  • 1.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 1 of 195 Compiled by: Revision # 00 COMPETENCY BASED LEARNING MATERIAL Sector : Qualification Title/ Level : Unit of competency : Module Title :
  • 2.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 2 of 195 Compiled by: Revision # 00 HOW TO USE THIS COMPETENCY BASED LEARNING MATERIAL Welcome to the Module “Computer Hardware Servicing NC II”. This module contains training materials and activities for you to complete. The unit of competency “Diagnose and Troubleshoot Computer Systems” contains knowledge, skills and attitudes required for a Computer Hardware Servicing NC II course. You are required to go through a series of learning activities in order to complete each of the learning outcomes of the module. In each learning outcome there are Information Sheets, Job Sheets, Operation Sheets, and Activity Sheets. Follow these activities on your own and answer the Self-Check at the end of each learning activity. If you have questions, don’t hesitate to ask your teacher for assistance. Recognition of Prior Learning (RPL) You may already have some of the knowledge and skills covered in this module because you have: o been working for some time o Already have completed training in this area. If you can demonstrate to your teacher that you are competent in a particular skill or skills, talk to him/her about having them formally recognized so you don’t have to do he same training again. If you have a qualification or Certificate of Competency from previous trainings show it to your trainer. If the skills you acquired are still current and relevant to this module, they may become part of the evidence you can present for RPL. If you are not sure about the currency of your skills, discuss it with your trainer. After completing this module ask your teacher to assess your competency. Result of your assessment will be recorded in your competency
  • 3.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 3 of 195 Compiled by: Revision # 00 profile. All the learning activities are designed for you to complete at your own pace. Inside this module you will find the activities for you to complete followed by relevant information sheets for each learning outcome. Each learning outcome may have more than one learning activity. This module is prepared to help you achieve the required competency, in diagnosing and troubleshooting computer systems. This will be the source of information that will enable you to acquire the knowledge and skills independently at your own pace or with minimum supervision or help from your teacher. When you feel confident that you have had sufficient practice, ask you trainer to evaluate you. The results of your assessment will be recorded in your Progress Chart and Accomplishment Chart. You need to complete this module before you can perform the next module
  • 4.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 4 of 195 Compiled by: Revision # 00 LIST OF COMPETENCIES No. Unit of Competency Module Title Code 1 2 3 4
  • 5.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 5 of 195 Compiled by: Revision # 00 MODULE CONTENT UNIT OF COMPETENCY : MODULE TITLE : MODULE DESCRIPTOR : SUMMARY OF LEARNING OUTCOMES 1. Assessment Criteria: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. .
  • 6.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 6 of 195 Compiled by: Revision # 00 LEARNING OUTCOME SUMMARY
  • 7.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 7 of 195 Compiled by: Revision # 00 LEARNING OUTCOME ___ CONTENTS: ASSESSMENT CRITERIA: 1. CONDITION: ASSESSMENT METHOD: LEARNING EXPERIENCES Learning Outcome ____
  • 8.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 8 of 195 Compiled by: Revision # 00 Learning Activities Special Instructions 1. INFORMATION SHEET 2.1-1
  • 9.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 9 of 195 Compiled by: Revision # 00 TITLE Learning Objective: Introduction: Content:
  • 10.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 10 of 195 Compiled by: Revision # 00 SELF CHECK _____ Direction:
  • 11.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 11 of 195 Compiled by: Revision # 00 ANSWER KEY TO SELF CHECK _____
  • 12.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 12 of 195 Compiled by: Revision # 00 TASK SHEET ______ TITLE : Performance Objective: Supplies/ Materials : Equipment: Steps and Procedure: 1. Assessment Method :
  • 13.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 13 of 195 Compiled by: Revision # 00 PERFORMANCE CRITERIA CHECKLIST Title Trainee’s Name: _____________________ Date: ______________________ CRITERIA YES NO Comments/Suggestions: Trainer’s Name: ______________________ Date: ____________________
  • 14.
    Mogpog National Comprehensive High School Computer Hardware Servicing NCII DateCompiled: October 2014 Document No. Issued by: Page 14 of 195 Compiled by: Revision # 00 References: