Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
What Does the Active Steering Malfunction Warning Mean for Your BMWTanner Motors
Discover the reasons why your BMW’s Active Steering malfunction warning might come on. From electrical glitches to mechanical failures and software anomalies, addressing these promptly with professional inspection and maintenance ensures continued safety and performance on the road, maintaining the integrity of your driving experience.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
2. Shutdown SIS
Previous Screen
Product: INDUSTRIAL ENGINE
Model: C18 INDUSTRIAL ENGINE BDN
Configuration: C18 Industrial Engine BDN00001-UP
Disassembly and Assembly
CX38–P892 Petroleum Transmission
Media Number -M0086381-00 Publication Date -01/10/2018 Date Updated -23/10/2018
i07566675
Pump Drive - Remove
SMCS - 3108-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 421-5662 Eyebolt Lifting Assembly 4
Start By:
a. Remove the torque converter. Refer to Disassembly and Assembly, "Torque Converter - Remove".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, PERJ1017, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
1/3(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. Dispose of all fluids according to local regulations and mandates.
Illustration 1 g06242572
1. Remove O-ring seal (1). Remove bolts (2).
2. Remove flywheel adapter (3).
Illustration 2 g06242733
2/3(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. 3. Disconnect hose assembly (4). Disconnect hose assembly (5).
Illustration 3 g06242748
4. The weight of torque converter housing (7) is approximately 136 kg (300 lb). Attach tooling (A) and
a suitable lifting device to torque converter housing (7). Remove bolts (6).
5. Remove torque converter housing (7) and place on suitable cribbing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 17 17:15:56 UTC+0800 2020
3/3(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. Shutdown SIS
Previous Screen
Product: INDUSTRIAL ENGINE
Model: C18 INDUSTRIAL ENGINE BDN
Configuration: C18 Industrial Engine BDN00001-UP
Disassembly and Assembly
CX38–P892 Petroleum Transmission
Media Number -M0086381-00 Publication Date -01/10/2018 Date Updated -23/10/2018
i07566677
Pump Drive - Disassemble - Integral
SMCS - 3108-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 421-5662 Eyebolt Lifting Assembly 4
B 1P-2420 Transmission Repair Stand 1
C
1U-9895 Cross Block 1
123-4370 Puller Stud (M20 x 2.5) 1
FT-1408 Spacer 2
6V-7742 Nut 1
D 439-3939 Link Bracket Assembly 1
E 154-6181 Forcing Bolt 2
F 8B-7551 Bearing Puller Gp 1
Start By:
a. Remove the pump drive. Refer to Disassembly and Assembly, "Pump Drive - Remove".
1/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Illustration 1 g06243397
1. With torque converter housing (3) placed on suitable cribbing, attach Tooling (A) to torque converter
housing (3). The weight of torque converter housing (3) is approximately 104 kg (230 lb).
2. Support bearing cage assembly (2) with suitable cribbing, allowing access to bolts (1). Remove bolts
(1). Use a suitable lifting device to remove torque converter housing (3) and place on Tooling (B).
Illustration 2 g06243494
3. Remove retaining ring (4). Remove gear assembly (5).
2/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
7. Illustration 3 g06244466
4. Remove bearing cone (6) and bearing cup (7). Repeat this step for the opposite side.
Illustration 4 g06244467
5. Remove retaining rings (8).
3/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 7 g06243781
8. Remove idler gear assembly (11) and bearing assembly (12).
Illustration 8 g06243791
9. Attach tooling (D) to torque converter housing (3). Use a suitable lifting device to reposition torque
converter housing (3) 180 degrees on Tooling (B). The weight of torque converter housing (3) is
approximately 91 kg (200 lb).
5/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 9 g06243810
10. Remove bolts (13).
Illustration 10 g06243817
11. Attach Tooling (E) to location (X). Remove pump adapter (14) and remove the shims.
6/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. Illustration 11 g06244061
12. Remove bearing race (15). Remove O-ring seal (16).
Illustration 12 g06244481
13. Remove bearing cup (17).
7/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Illustration 13 g06244206
14. Remove bolt (18).
15. Remove speed sensor (19) and the O-ring seal.
Illustration 14 g06244435
16. Remove pump drive gear (20).
8/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. Illustration 15 g06244453
17. Remove ring seal (21).
Illustration 16 g06244457
18. Use Tooling (F) to remove bearing cone (22). Repeat this step for the remaining bearing cone.
9/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. Illustration 17 g06244224
19. Remove bearing race (23).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 17 17:16:52 UTC+0800 2020
10/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. Shutdown SIS
Previous Screen
Product: INDUSTRIAL ENGINE
Model: C18 INDUSTRIAL ENGINE BDN
Configuration: C18 Industrial Engine BDN00001-UP
Disassembly and Assembly
CX38–P892 Petroleum Transmission
Media Number -M0086381-00 Publication Date -01/10/2018 Date Updated -23/10/2018
i07566805
Pump Drive - Assemble - Integral
SMCS - 3108-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3939 Link Bracket Assembly 1
B 8T-5096 Dial Indicator Gp 1
C 1U-9895 Cross Block 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
16. Illustration 1 g06244224
1. Lower the temperature of bearing cup (23). Install bearing race (23).
Illustration 2 g06244833
2. Raise the temperature of bearing cone (22). Install bearing cone (22). Repeat this step for the
remaining bearing cone.
2/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
17. Illustration 3 g06244453
3. Install ring seal (21).
Illustration 4 g06244435
4. Install pump drive gear (20).
3/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. Illustration 5 g06244206
5. Install the O-ring seal onto speed sensor (19). Install speed sensor (19).
6. Install bolt (18). Tighten bolt (18) to a torque of 14 ± 3 N·m (124 ± 26.5 lb in)
Illustration 6 g06244481
7. Lower the temperature of bearing cup (17). Install bearing cup (17). Install the cover plate.
4/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. Illustration 7 g06244061
8. Install O-ring seal (16). Install bearing race (15).
Illustration 8 g06245552
9. Install pump adapter (14).
10. Install bolts (13). Tighten bolts (13) to a torque of 55 ± 10 N·m (41 ± 7.4 lb ft).
11. Install Tooling (A). Use suitable lifting device to reposition torque converter housing (3) 180
degrees. The weight of the torque converter housing (3) is approximately 104 kg (230 lb).
5/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
20. Illustration 9 g06245561
Note: Typical Example.
12. Use Tooling (B) to measure the end play of pump drive gear (20). The end play measurement must
be 0.10 to 0.20 mm (0.004 to 0.008 inch). Add or remove shims in order to obtain the correct end
play.
13. Repeat steps for the remaining pump drive gear.
Illustration 10 g06243781
14. Install bearing assembly (12).
6/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. 15. Install idler gear assembly (11).
Illustration 11 g06244917
16. Lower the temperature of idler shaft (10). Install idler shaft (10).
17. Install bolt (9).
Illustration 12 g06244467
18. Install retaining rings (8) on the gear assembly.
7/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. Illustration 13 g06244466
19. Lower the temperature of bearing cup (7). Install bearing cup (7). Install bearing cone (6). Repeat
this step for the opposite side.
Illustration 14 g06243494
20. Install gear assembly (5).
21. Install retaining ring (4).
8/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Illustration 15 g06245324
Illustration 16 g06245240
22. Use Tooling (C) and a suitable lifting device to position bearing cage assembly (2). The weight of
bearing cage assembly (2) is approximately 38 kg (84 lb).
23. Install bolts (1).
End By:
a. Install the pump drive. Refer to Disassembly and Assembly, "Pump Drive - Install".
9/10(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
24. Shutdown SIS
Previous Screen
Product: INDUSTRIAL ENGINE
Model: C18 INDUSTRIAL ENGINE BDN
Configuration: C18 Industrial Engine BDN00001-UP
Disassembly and Assembly
CX38–P892 Petroleum Transmission
Media Number -M0086381-00 Publication Date -01/10/2018 Date Updated -23/10/2018
i07566979
Pump Drive - Install
SMCS - 3108-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 421-5662 Eyebolt Lifting Assembly 4
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: Inspect the O-ring seals, the seals, and the gaskets. Replace the O-ring seals, the seals, and the
gaskets that are worn or damaged.
Note: Lubricate O-ring seals lightly with the lubricant that is being sealed.
1/3(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
25. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
26. Illustration 1 g06242748
1. The weight of torque converter housing (7) is approximately 136 kg (300 lb). Attach tooling (A) and
a suitable lifting device to torque converter housing (7).
2. Install torque converter housing (7).Install bolts (6).
Illustration 2 g06242733
3. Connect hose assembly (5). Connect hose assembly (4).
2/3(W)
w
2020/6/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...