The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar cat 315 c l excavator (prefix cft) service repair manual (cft0000...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded parts.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...fjjsekkdmme
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the travel motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded or sealed components.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, plates and shafts. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing springs and seals. Tools required for specific steps are also listed.
Caterpillar cat 315 c l excavator (prefix cft) service repair manual (cft0000...fjjsekkdmme
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the travel motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded or sealed components.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar cat 315 c l excavator (prefix cft) service repair manual (cft0000...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded parts.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...fjjsekkdmme
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the travel motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded or sealed components.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, plates and shafts. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing springs and seals. Tools required for specific steps are also listed.
Caterpillar cat 315 c l excavator (prefix cft) service repair manual (cft0000...fjjsekkdmme
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the travel motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded or sealed components.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...jdksmmdmdd
The document provides instructions for disassembling and assembling the travel motor of a 315C excavator. It lists 28 steps for disassembly, which include removing bolts, seals, plates, pistons, bearings and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembly. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, plates and more. It then describes 26 steps for reassembling the motor by installing these components in reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing springs and seals. Tools required for the process are also listed.
This document provides assembly instructions for a piston pump used in a wheeled excavator model M320F. It consists of 50 steps to assemble the various components of the pump in the correct order. The components include springs, retainers, seals, valves, plates, bushings, shafts, and other parts. Precautions are provided for parts that are spring loaded to prevent injury during assembly.
The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M320F wheeled excavator. It lists the required tools and gives step-by-step procedures for removing and installing components such as the carrier housing, planetary gears, brake discs, seals, and bearings. Clearances for the brake discs are also specified to ensure proper functioning.
This document provides assembly instructions for an M318 excavator transmission. It lists required tools and parts, and provides step-by-step instructions to assemble the transmission components, including gears, shafts, seals, bearings, and housing. Proper end play is checked at several steps. Lubricants are specified, and cleanliness during assembly is emphasized.
Caterpillar Cat M315 Excavator (Prefix 7ML) Service Repair Manual (7ML00001-0...orrf0370383
This document provides instructions for removing and installing a swing motor and swing drive on an M315 excavator. It describes releasing hydraulic pressure, draining oil, disconnecting hoses, and removing and installing various components like bolts, seals, and motors. Safety precautions are provided regarding containing fluids, releasing pressure, and preventing personal injury. Detailed step-by-step instructions are given for disassembly and reassembly.
The document provides removal and installation instructions for a precooler, water temperature regulator housing, water pump, and other engine components. It includes notices about containing fluids, keeping parts clean, and lists required tools. The step-by-step instructions describe disconnecting hoses and electrical connections, removing mounting bolts and components, and installing parts in reverse order while applying sealant compounds as needed. Illustrations show the component locations and part numbers.
This document provides instructions for installing and removing components of the front gear group of a C18 industrial engine. It describes:
1. Cleaning and inspecting components before installation and removing components in reverse order of installation.
2. Installing the front plate and gears, including adjusting backlash between gears.
3. Lubricating and torquing fasteners to specified values.
This document provides instructions for removing and installing a flywheel housing on a C18 Industrial Engine WJB. It is a 3-page service manual excerpt that describes:
1) Required tools and safety notices
2) Removal procedure which includes supporting the engine, removing bolts and lifting the housing off
3) Installation procedure which includes cleaning, applying sealant, positioning the housing and tightening bolts in a specific sequence and torque.
The document provides instructions for installing an engine oil filter base which includes:
1. Lubricating the O-rings and installing them on the engine oil filter base.
2. Positioning the engine oil filter base and installing bolts to secure it.
3. Reconnecting any disconnected tubes.
The instructions are intended for technicians and include safety warnings for containing fluids and wearing protective equipment when working with pressurized parts.
1) The document provides disassembly and assembly instructions for removing and installing various components of a C18 industrial engine, including the power take-off drive group, vibration damper and pulley, crankshaft front seal, and front cover.
2) The instructions include lists of required tools and detailed step-by-step procedures with accompanying illustrations.
3) Special notes are provided regarding keeping parts clean, inspecting components, and not using lubricants during certain installation procedures.
The document provides instructions for removing and installing various fuel system components on a C18 Industrial Engine, including:
- Removing and installing the fuel priming pump.
- Removing the fuel filter base and disassembling/assembling its components.
- Removing and installing the fuel transfer pump.
- Removing the electronic unit injectors.
The summaries provide concise overviews of the removal and installation procedures for each component in 3 sentences or less.
This document provides instructions for removing and installing various fuel system components on a Caterpillar C18 Industrial Engine, including:
1) Removing and installing the fuel priming pump, fuel filter base, fuel transfer pump, and electronic unit injectors.
2) Disassembling and assembling the fuel filter base to replace seals and fittings.
3) Procedures include disconnecting fuel lines and electrical connections, marking parts for reinstallation, and applying thread lock compounds. Safety notices advise containing fluids and preventing contamination.
This service repair manual provides instructions for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, and the engine oil filter base on a Caterpillar C11 industrial engine. The procedures describe using various tools to remove and install components in a specific sequence, and include notices about keeping parts clean and containing fluids.
This document provides instructions for removing and installing various engine components on a Caterpillar C11 Industrial Engine. It describes procedures for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, the engine oil filter base, and the engine oil cooler. The document contains illustrations and lists required tools for each procedure.
This document provides instructions for removing and installing a unit injector, unit injector sleeve, and turbocharger from a C9.3 Industrial Engine. The unit injector removal procedure involves disconnecting electrical and fuel lines, loosening mounting bolts, and extracting the injector. Installation requires cleaning, lubricating seals, and tightening bolts. The sleeve procedure includes draining coolant, cutting threads to remove the old sleeve, cleaning the bore, applying retaining compound to the new sleeve, and installing with a hammer and driver. The turbocharger removal involves disconnecting coolant and air lines and removing mounting nuts. Installation requires applying anti-seize to bolts and tightening clamps and nuts.
More Related Content
Similar to Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001 and up).pdf
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...jdksmmdmdd
The document provides instructions for disassembling and assembling the travel motor of a 315C excavator. It lists 28 steps for disassembly, which include removing bolts, seals, plates, pistons, bearings and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembly. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, plates and more. It then describes 26 steps for reassembling the motor by installing these components in reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing springs and seals. Tools required for the process are also listed.
Similar to Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001 and up).pdf (8)
This document provides assembly instructions for a piston pump used in a wheeled excavator model M320F. It consists of 50 steps to assemble the various components of the pump in the correct order. The components include springs, retainers, seals, valves, plates, bushings, shafts, and other parts. Precautions are provided for parts that are spring loaded to prevent injury during assembly.
The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M320F wheeled excavator. It lists the required tools and gives step-by-step procedures for removing and installing components such as the carrier housing, planetary gears, brake discs, seals, and bearings. Clearances for the brake discs are also specified to ensure proper functioning.
This document provides assembly instructions for an M318 excavator transmission. It lists required tools and parts, and provides step-by-step instructions to assemble the transmission components, including gears, shafts, seals, bearings, and housing. Proper end play is checked at several steps. Lubricants are specified, and cleanliness during assembly is emphasized.
Caterpillar Cat M315 Excavator (Prefix 7ML) Service Repair Manual (7ML00001-0...orrf0370383
This document provides instructions for removing and installing a swing motor and swing drive on an M315 excavator. It describes releasing hydraulic pressure, draining oil, disconnecting hoses, and removing and installing various components like bolts, seals, and motors. Safety precautions are provided regarding containing fluids, releasing pressure, and preventing personal injury. Detailed step-by-step instructions are given for disassembly and reassembly.
The document provides removal and installation instructions for a precooler, water temperature regulator housing, water pump, and other engine components. It includes notices about containing fluids, keeping parts clean, and lists required tools. The step-by-step instructions describe disconnecting hoses and electrical connections, removing mounting bolts and components, and installing parts in reverse order while applying sealant compounds as needed. Illustrations show the component locations and part numbers.
This document provides instructions for installing and removing components of the front gear group of a C18 industrial engine. It describes:
1. Cleaning and inspecting components before installation and removing components in reverse order of installation.
2. Installing the front plate and gears, including adjusting backlash between gears.
3. Lubricating and torquing fasteners to specified values.
This document provides instructions for removing and installing a flywheel housing on a C18 Industrial Engine WJB. It is a 3-page service manual excerpt that describes:
1) Required tools and safety notices
2) Removal procedure which includes supporting the engine, removing bolts and lifting the housing off
3) Installation procedure which includes cleaning, applying sealant, positioning the housing and tightening bolts in a specific sequence and torque.
The document provides instructions for installing an engine oil filter base which includes:
1. Lubricating the O-rings and installing them on the engine oil filter base.
2. Positioning the engine oil filter base and installing bolts to secure it.
3. Reconnecting any disconnected tubes.
The instructions are intended for technicians and include safety warnings for containing fluids and wearing protective equipment when working with pressurized parts.
1) The document provides disassembly and assembly instructions for removing and installing various components of a C18 industrial engine, including the power take-off drive group, vibration damper and pulley, crankshaft front seal, and front cover.
2) The instructions include lists of required tools and detailed step-by-step procedures with accompanying illustrations.
3) Special notes are provided regarding keeping parts clean, inspecting components, and not using lubricants during certain installation procedures.
The document provides instructions for removing and installing various fuel system components on a C18 Industrial Engine, including:
- Removing and installing the fuel priming pump.
- Removing the fuel filter base and disassembling/assembling its components.
- Removing and installing the fuel transfer pump.
- Removing the electronic unit injectors.
The summaries provide concise overviews of the removal and installation procedures for each component in 3 sentences or less.
This document provides instructions for removing and installing various fuel system components on a Caterpillar C18 Industrial Engine, including:
1) Removing and installing the fuel priming pump, fuel filter base, fuel transfer pump, and electronic unit injectors.
2) Disassembling and assembling the fuel filter base to replace seals and fittings.
3) Procedures include disconnecting fuel lines and electrical connections, marking parts for reinstallation, and applying thread lock compounds. Safety notices advise containing fluids and preventing contamination.
This service repair manual provides instructions for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, and the engine oil filter base on a Caterpillar C11 industrial engine. The procedures describe using various tools to remove and install components in a specific sequence, and include notices about keeping parts clean and containing fluids.
This document provides instructions for removing and installing various engine components on a Caterpillar C11 Industrial Engine. It describes procedures for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, the engine oil filter base, and the engine oil cooler. The document contains illustrations and lists required tools for each procedure.
This document provides instructions for removing and installing a unit injector, unit injector sleeve, and turbocharger from a C9.3 Industrial Engine. The unit injector removal procedure involves disconnecting electrical and fuel lines, loosening mounting bolts, and extracting the injector. Installation requires cleaning, lubricating seals, and tightening bolts. The sleeve procedure includes draining coolant, cutting threads to remove the old sleeve, cleaning the bore, applying retaining compound to the new sleeve, and installing with a hammer and driver. The turbocharger removal involves disconnecting coolant and air lines and removing mounting nuts. Installation requires applying anti-seize to bolts and tightening clamps and nuts.
This document provides instructions for disassembling and assembling the freewheel stator component of a torque converter. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. Cleanliness is emphasized. The assembly process reverses the disassembly steps and provides additional details like proper orientation and torque specifications for reinstalling components.
This document provides instructions for disassembling and assembling the torque converter of a 966H wheel loader. It begins with required tools and safety notices. The disassembly instructions describe removing over 30 individual parts in multiple steps, including the torque converter housing, impeller, stator, carrier shaft, and turbine. The assembly section then lists the components and provides the reverse steps for reassembling the torque converter. Cleanliness is emphasized as important during disassembly and assembly.
This document provides instructions for removing and installing the rear gear group and flywheel on a Caterpillar C11 engine. The removal procedure involves using various tools to remove 12 different components in 11 steps. The installation procedure involves 14 steps of reinstalling components and includes notes about matching dimensions and applying threadlock. Tools, torque specifications, and cautions are provided.
This document provides instructions for disassembling and assembling the piston pump of the steering system on a Caterpillar 962K wheel loader. The disassembly procedure outlines 28 steps to remove components like bolts, valves, spools, springs, and bearings. The assembly procedure describes 34 steps and cautions to install these components in reverse order and ensure proper spring tension, seals, and shaft clearance. Precautions are included to prevent injury from released spring forces.
This document provides instructions for assembling and disassembling parts of a 962K wheel loader. It includes 37 steps to assemble a piston pump, with diagrams showing each step. It also provides procedures for removing and installing a main control valve and electrohydraulic control components, with warnings about releasing pressure before servicing hydraulic systems.
The document provides instructions for removing and installing a secondary steering pump and electric motor on a Caterpillar 962K wheel loader. It outlines 28 steps for disassembly of the pump which includes removing valves, spools, plugs, springs, and other internal components. The assembly section details 34 steps for reinstalling these parts in the reverse order and adjusting axial shaft end play.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CJC
Configuration: 315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01959727
Travel Motor - Disassemble
SMCS - 4351-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
B 1P-0074 Slide Hammer 1
C 9S-9152 Bearing Puller 1
D
1U-9895 Crossblock 1
3H-0465 Push-Puller Plate 2
8T-0649 Bolt 2
9X-8257 Washer 2
E 5P-0975 Plate 1
Start By:
a. Remove the piston motor (travel). Refer to Disassembly and Assembly, "Piston Motor
(Travel) - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
1/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: Put identification marks on the motor and on all hose assemblies for installation purposes
and for the purpose of orientation. Plug all hose assemblies. This will help to prevent fluid loss
and this helps to keep contaminants from entering the system.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Illustration 1 g00779154
1. Remove bolts (1).
Illustration 2 g00779159
2/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 2. Remove bolts (2) from the traction control valve in order to install Tooling (A).
Illustration 3 g00779163
3. Remove traction control valve (3) and travel motor (4) from the final drive.
Illustration 4 g00779215
4. Remove Tooling (A). Remove four bolts (2). Remove traction control valve (3).
Illustration 5 g01018464
5. Remove socket head bolts (5). Remove O-ring seal (6) and O-ring seals (7). Remove head
(8).
3/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00779238
6. Remove shim (9).
Illustration 7 g00779248
7. Remove bearing (10).
Illustration 8 g00779259
8. Remove plugs (11) and the O-ring seals.
4/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g01018466
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
9. Remove adapter (14) and the O-ring seal. Remove spool (13) and spring (12) from head (8).
Illustration 10 g00779279
10. Remove washer set (15).
5/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g00779289
11. Remove port plate (16).
Illustration 12 g00780482
Illustration 13 g01020385
12. Remove three small O-ring seals (17). Install Tooling (D) and Tooling (E), as shown.
Tooling (E) provides a protective cover for the barrel assembly. Tooling (E) prevents
Tooling (D) from damaging the surface of the barrel assembly.
6/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 13. Retain piston (18) with Tooling (D) and apply approximately 517 kPa (75 psi) of shop air
pressure to brake release port (Y). Brake piston (18) will move out of the piston guide.
Remove brake piston (18) from the main housing.
Illustration 14 g00779307
14. Remove O-ring seal (19) and the backup ring and remove O-ring seal (20) and the backup
ring.
Illustration 15 g00779310
15. Remove piston guide (21). Remove O-ring seal (22).
Illustration 16 g00779341
7/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 16. Remove O-ring seal (23) and backup ring (24).
Illustration 17 g00779343
17. Lay the travel motor housing on one side in order to remove rotating group (25) and brake
pack (26) as a unit.
Illustration 18 g00780107
18. Remove brake pack (26).
Illustration 19 g00780290
8/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. NOTICE
In order to ensure that each piston assembly is installed into its original
bore, identify and mark each piston assembly, retaining plate and the
barrel before removing the piston assembly.
To avoid damage to the barrel assembly parts, do not allow the parts to
separate from the assembly during removal or installation.
19. Remove pistons (27) and retainer plate (28) from barrel (29) as a unit. Separate the pistons
from the retainer plate.
Illustration 20 g00780317
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
20. Remove guide (30), spacer (31), and nine springs (32) from the barrel.
9/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00780328
21. Remove swashplate (33).
Illustration 22 g00780348
22. Use a magnet in order to remove keys (34) and pistons (35).
Illustration 23 g00780352
23. Use a magnet in order to remove pins (36).
10/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 24 g00780345
24. Remove shaft assembly (37). Remove plugs (38) and the O-ring seals.
Illustration 25 g01020388
25. Use Tooling (B) in order to remove seal (39).
Illustration 26 g00780494
26. Remove retaining rings (40) from each side of the bearing.
11/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 27 g00780502
27. Use a suitable press in order to remove bearing assembly (41) from shaft (42).
Illustration 28 g00780544
28. Use a suitable press and Tooling (C) in order to remove inner race (43) from shaft (42).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Oct 31 09:01:07 UTC+0800 2020
12/12
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CJC
Configuration: 315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01959745
Travel Motor - Assemble
SMCS - 4351-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
F 1P-0510 Driver Group 1
G 206-3689 Turning Tool 1
H 5P-0960 Molybdenum Grease 1
Note: Replace all O-ring seals and gaskets. Apply a light film of "10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 1 g00780677
1. Raise the temperature of inner race (43). Lower the temperature of shaft (42). Use a soft
hammer in order to install inner race (43) on shaft (42).
Illustration 2 g00780698
2. Raise the temperature of bearing assembly (41). Lower the temperature of shaft (42). Install
bearing assembly (41) on shaft (42).
Illustration 3 g00780494
3. Install retaining rings (40) on each side of the bearing.
2/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 4 g01018474
4. Use Tooling (F) in order to install seal (39).
Illustration 5 g00780715
5. Use a soft hammer in order to install shaft assembly (37).
Illustration 6 g00780723
6. Install plugs (38) and the O-ring seals. Tighten plugs (38) to a torque of 140 ± 14 N·m
(103 ± 10 lb ft).
3/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 7 g00780352
7. Use a magnet in order to install pins (36).
Illustration 8 g00780839
NOTICE
The locating pin on each key is not centered. In order to prevent
damage to the barrel assembly during assembly of the travel motor, the
keys must be installed as shown. Also, the keys must be installed in the
key's original location in the body of the travel motor.
8. Install pistons (34) and keys (35).
4/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 9 g00780328
9. Install swashplate (33).
Illustration 10 g00780317
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
10. Install nine springs (32), spacer (31), and guide (30) into the barrel.
5/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 11 g00780290
11. Install pistons (27) into the retainer plate (28). Install pistons (27) and retainer plate (28) as
a unit into barrel (29) .
Note: Use string in order to keep the rotating group from separating during installation.
Illustration 12 g00780870
12. Install rotating group (25).
Illustration 13 g00780887
13. Install brake pack (26).
6/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 14 g00780817
14. Install O-ring seal (23) and backup ring (24) on piston guide (21).
Illustration 15 g00779310
15. Install piston guide (21). Install O-ring seal (22).
7/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 16 g00779307
16. Install O-ring seal (19) and the backup ring and install O-ring seal (20) and the backup ring.
Illustration 17 g00797765
Note: Make sure that brake piston (18) is thoroughly clean and free of dirt and debris.
17. Install three small O-ring seals (17). Install piston (18).
Illustration 18 g00779289
18. Install port plate (16).
8/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 19 g00779279
19. Install washer set (15).
Illustration 20 g01018466
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
20. Install spring (12) and spool (13) into head (8). Install adapter (14) and the O-ring seal into
head (8).
Illustration 21 g00779259
21. Install plugs (11) and the O-ring seals.
9/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Engine...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. Illustration 22 g00779248
22. Lower the temperature of bearing (10) and install bearing (10).
Illustration 23 g00779238
23. Use a shim or shims (9) so that the following requirements are met.
Note: During the following checks, turn the travel motor output shaft in a clockwise
direction.
Illustration 24 g01018475
10/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. a. Use Tooling (G) in order to turn the output shaft. The travel motor output shaft does
not rotate with an applied torque of 440 N·m (325 lb ft) with the parking brake release
port open.
Illustration 25 g01018476
b. Apply the air pressure at orifice (X). Use Tooling (G) in order to turn the output shaft
when the parking brake release port is pressurized to 780 kPa (115 psi). Perform this
procedure with the inlet port and the outlet port open to the hydraulic oil tank. The
travel motor output shaft rotates with an applied torque of 29 N·m (21 lb ft) or less.
Note: It may be necessary to remove head (8) several times in order to determine the correct
thickness of shim or shims (9) that are used to adjust the rolling torque of the travel motor
output shaft.
24. Apply a thin layer of Tooling (H) on shim or shims (9). Install the shim or shims on the
head. The grease will hold the shim or shims in place during the installation of the head.
Install the head on the body of the travel motor.
Illustration 26 g01018464
NOTICE
To prevent possible damage to the travel motor, fill the unit with oil at
least to the fill port before operating the machine. Refer to the
Operation and Maintenance Manual for the correct oil specification.
11/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. 25. Install O-ring seal (6) and O-ring seals (7). Install head (8 ). Install socket head bolts (5).
Tighten bolts (5) to a torque of 177 ± 18 N·m (131 ± 13 lb ft).
Illustration 27 g00779215
26. Install Tooling (A). Install traction control valve (3). Remove Tooling (A). Install six bolts
(2). Tighten bolts (2) to a torque of 80 ± 8 N·m (59 ± 6 lb ft).
Illustration 28 g00779163
27. Install traction control valve (3) and travel motor (4) into the final drive as a unit.
12/13
315C & 315C L Excavators CJC00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/10/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...