The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the travel motor by removing components like bolts, seals, bearings, pistons, and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants, and take care when installing spring-loaded parts.
Caterpillar cat 315 c excavator (prefix cjc) service repair manual (cjc00001 ...fjsekdmmeed
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. It then lists 25 steps for reassembly, instructing technicians to clean parts, replace seals, apply lubricants, and reinstall components in reverse order using various tools. Technicians are advised to mark parts for orientation and take precautions when working with pressurized or spring-loaded components.
Caterpillar cat 315 c excavator (prefix ake) service repair manual (ake00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of a 315C excavator. It lists 28 steps for disassembly, beginning with removing the piston motor and ending by taking apart the shaft assembly. It then lists 25 steps for reassembly in reverse order, starting with pressing the inner race back onto the shaft and ending by installing the port plate. Precautions are provided regarding cleanliness, identification marks, and pressurized springs. Tools required include link brackets, a slide hammer, bearing puller, and molybdenum grease.
Caterpillar cat 315 c excavator (prefix btl) service repair manual (btl00001 ...fjskekdmjekm
This document provides instructions for disassembling and assembling the travel motor on a 315C Excavator. The disassembly process involves removing 27 individual parts in 28 steps, including removing bolts, seals, bearings, pistons, and other internal components. The assembly process reverses the disassembly steps and includes applying lubricant to parts and ensuring proper installation of springs, seals, and other components. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 390 d excavator (prefix byp) service repair manual (byp00001 ...fujskekfmsme
This document provides disassembly and assembly instructions for the travel motor on a 390D Excavator. It details 40 steps to disassemble the travel motor by removing components like the head, relief valves, pistons, springs, seals, plates, and bearings. It then lists 13 steps for reassembling the travel motor, applying oil to components and ensuring cleanliness during assembly.
This document provides instructions for disassembling various components of an excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists the required tools and safety precautions, and outlines multi-step procedures to remove each part, such as draining fluids, loosening fittings and bolts, using pullers to remove bearings, and noting part locations and orientations for reassembly. Detailed illustrations accompany each step to show how to properly disassemble the excavator systems.
This document provides instructions for disassembling various components of an excavator including the final drive, travel motor, counterbalance valve, and travel motor. It lists required tools and safety precautions and provides a step-by-step process with illustrations for disassembling each component and removing seals, springs, plates, and other parts. Detailed instructions are given for draining fluids and carefully removing heavy components to prepare them for cleaning or replacement.
Caterpillar cat 390 f l excavator (prefix gay) service repair manual (gay0000...fujskekfmsme
This document provides instructions to disassemble a travel motor on a 390F L excavator. It lists 40 steps to completely disassemble the travel motor, removing components like the head, relief valves, pistons, springs, seals, plates, and bearings. Detailed illustrations accompany each step to show how to position the component for removal and what tools are required. Safety notices are included to warn of potential hazards like stored energy in springs.
This document provides disassembly instructions for the final drive, travel motor, and other components of excavator models 312D2 and 312D2 L. It outlines 16 steps to disassemble the final drive which include draining fluids, removing fittings and valves, and using various tools. It then details 14 steps to disassemble the travel motor which involve removing seals, pistons, plates and other parts. Safety notices are included throughout to warn of potential injuries from springs, fluids and heavy components.
Caterpillar cat 315 c excavator (prefix cjc) service repair manual (cjc00001 ...fjsekdmmeed
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. It then lists 25 steps for reassembly, instructing technicians to clean parts, replace seals, apply lubricants, and reinstall components in reverse order using various tools. Technicians are advised to mark parts for orientation and take precautions when working with pressurized or spring-loaded components.
Caterpillar cat 315 c excavator (prefix ake) service repair manual (ake00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of a 315C excavator. It lists 28 steps for disassembly, beginning with removing the piston motor and ending by taking apart the shaft assembly. It then lists 25 steps for reassembly in reverse order, starting with pressing the inner race back onto the shaft and ending by installing the port plate. Precautions are provided regarding cleanliness, identification marks, and pressurized springs. Tools required include link brackets, a slide hammer, bearing puller, and molybdenum grease.
Caterpillar cat 315 c excavator (prefix btl) service repair manual (btl00001 ...fjskekdmjekm
This document provides instructions for disassembling and assembling the travel motor on a 315C Excavator. The disassembly process involves removing 27 individual parts in 28 steps, including removing bolts, seals, bearings, pistons, and other internal components. The assembly process reverses the disassembly steps and includes applying lubricant to parts and ensuring proper installation of springs, seals, and other components. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 390 d excavator (prefix byp) service repair manual (byp00001 ...fujskekfmsme
This document provides disassembly and assembly instructions for the travel motor on a 390D Excavator. It details 40 steps to disassemble the travel motor by removing components like the head, relief valves, pistons, springs, seals, plates, and bearings. It then lists 13 steps for reassembling the travel motor, applying oil to components and ensuring cleanliness during assembly.
This document provides instructions for disassembling various components of an excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists the required tools and safety precautions, and outlines multi-step procedures to remove each part, such as draining fluids, loosening fittings and bolts, using pullers to remove bearings, and noting part locations and orientations for reassembly. Detailed illustrations accompany each step to show how to properly disassemble the excavator systems.
This document provides instructions for disassembling various components of an excavator including the final drive, travel motor, counterbalance valve, and travel motor. It lists required tools and safety precautions and provides a step-by-step process with illustrations for disassembling each component and removing seals, springs, plates, and other parts. Detailed instructions are given for draining fluids and carefully removing heavy components to prepare them for cleaning or replacement.
Caterpillar cat 390 f l excavator (prefix gay) service repair manual (gay0000...fujskekfmsme
This document provides instructions to disassemble a travel motor on a 390F L excavator. It lists 40 steps to completely disassemble the travel motor, removing components like the head, relief valves, pistons, springs, seals, plates, and bearings. Detailed illustrations accompany each step to show how to position the component for removal and what tools are required. Safety notices are included to warn of potential hazards like stored energy in springs.
This document provides disassembly instructions for the final drive, travel motor, and other components of excavator models 312D2 and 312D2 L. It outlines 16 steps to disassemble the final drive which include draining fluids, removing fittings and valves, and using various tools. It then details 14 steps to disassemble the travel motor which involve removing seals, pistons, plates and other parts. Safety notices are included throughout to warn of potential injuries from springs, fluids and heavy components.
Caterpillar cat 312 d excavator (prefix jbc) service repair manual (jbc00001 ...fksjksmmde
This document provides instructions for disassembling the final drive, travel motor, and counterbalance valve of a 312D or 312D L excavator. It lists the required tools and gives step-by-step procedures for removing components such as sprockets, valves, gears, plates, seals, and other parts. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized fluids. Detailed illustrations supplement the text to show how to take each component apart.
This document provides instructions for disassembling various components of a 313D2 excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists required tools and outlines multi-step procedures involving draining fluids, removing fittings and fasteners, using pullers to remove bearings, and noting part locations and orientations for reassembly. Safety notices are included to warn of potential injuries from pressurized fluids, heavy lifting, and released spring forces.
Caterpillar cat 320 c excavator (prefix ega) service repair manual (ega00001 ...ufjjsejkkemmd
This document provides instructions for disassembling and assembling the travel motor on a 320C excavator. It includes 28 steps for disassembly and 27 steps for assembly. Key steps include removing the piston motor, traction control valve, various seals, bearings, and internal components. Assembly involves installing these parts in reverse order and adjusting shims to ensure the output shaft meets torque and rotation requirements during checks. Proper cleaning, lubrication, and torque specifications are noted throughout.
The document provides disassembly instructions for the final drive, travel motor, and other components of a 313D2 excavator. It lists over 30 detailed steps to disassemble parts like the final drive, counterbalance valve, travel motor, and planetary gear assemblies. Safety notices are included throughout to warn of hazards like parts propelled by springs, hydraulic pressure, and heavy component weights. Required tools are listed in a table at the beginning.
Caterpillar cat 313 d excavator (prefix kxd) service repair manual (kxd00001 ...fjskekdmjekm
This document provides instructions for disassembling various components of a 313D excavator, including the final drive, travel motor, counterbalance valve, and travel motor. It lists the required tools and outlines 16 steps to disassemble parts like the sprockets, valves, pistons, plates, springs, and seals. Safety notices are included to warn of potential injuries from fluids, pressures, and released spring forces when handling or disassembling parts.
The document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of an excavator model 313D2. It lists over 30 detailed steps to disassemble components like the final drive housing, travel motor barrel assembly, piston assemblies, gears, seals and other parts. Tools required include link brackets, a transmission repair stand, bolts, pullers, retaining ring pliers and other specialized tools. Safety notices are provided to properly release pressures and contain fluids.
This document provides the disassembly and assembly procedures for a travel motor on 336D2 XE and 336D2 LXE excavator models. It outlines 30 steps to disassemble the travel motor down to its core components. It then provides 19 steps to reassemble the travel motor. The document includes illustrations and notes on proper assembly order and tooling required. Safety precautions are provided throughout for tasks involving spring tension or component installation.
The document provides instructions for disassembling the travel motor of an excavator model 326D2. It involves 28 steps including removing the head, brake piston, plates and discs, seals, bearings, and other components. Various tools are required including an adapter, bolts, retaining ring pliers, and a bearing puller group. Safety precautions are provided regarding spring forces.
Caterpillar cat 365 c l hydraulic excavator (prefix par) service repair manua...fjkskedmme
This document provides instructions for disassembling and assembling the travel motor of a 365C excavator. The disassembly process involves 29 steps to remove components like springs, plates, pistons, seals, and bearings. The assembly process describes 31 steps and requires tools to reinstall these components in the reverse order and adjust shims to ensure proper clearance is achieved. Precautions are provided to wear protective equipment when working with spring loaded components.
The document provides disassembly instructions for the final drive, travel motor, and other components of a 313D2 excavator. It lists over 30 detailed steps to disassemble parts like the final drive, counterbalance valve, travel motor, and planetary gear assemblies. Safety notices are included throughout to warn of potential injuries from parts under spring tension or residual fluid pressure. Dismantling requires specialty tools and careful tracking of part locations for reassembly.
Caterpillar cat 313 f lgc excavator (prefix hdk) service repair manual (hdk00...fjkskefksmeme
1) The document provides disassembly instructions for components of a 313F LGC excavator, including the final drive, travel motor, and counterbalance valve.
2) It lists required tools and safety precautions and provides a step-by-step process to remove each part, noting identification numbers where applicable.
3) Detailed illustrations accompany each step to show how to remove components like sprockets, valves, springs, gears, seals and other parts while taking care to mark locations for reassembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...fuusejkddmmd3e
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts, replace seals, apply lubricant and heat components as needed. Precautions are provided to prevent injury from spring forces and properly identify parts during disassembly and reassembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...jdksmmdmdd
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...orrf0370383
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...dujkdksmdmdm
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar cat 315 c l excavator (prefix cjc) service repair manual (cjc0000...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual Instant D...rishang96299
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, apply lubricants, and properly set bearing temperatures and torque specifications. Safety notices are included throughout to warn of spring forces and contain fluids.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual Instant D...kubei069369925
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar cat 312 d excavator (prefix jbc) service repair manual (jbc00001 ...fksjksmmde
This document provides instructions for disassembling the final drive, travel motor, and counterbalance valve of a 312D or 312D L excavator. It lists the required tools and gives step-by-step procedures for removing components such as sprockets, valves, gears, plates, seals, and other parts. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized fluids. Detailed illustrations supplement the text to show how to take each component apart.
This document provides instructions for disassembling various components of a 313D2 excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists required tools and outlines multi-step procedures involving draining fluids, removing fittings and fasteners, using pullers to remove bearings, and noting part locations and orientations for reassembly. Safety notices are included to warn of potential injuries from pressurized fluids, heavy lifting, and released spring forces.
Caterpillar cat 320 c excavator (prefix ega) service repair manual (ega00001 ...ufjjsejkkemmd
This document provides instructions for disassembling and assembling the travel motor on a 320C excavator. It includes 28 steps for disassembly and 27 steps for assembly. Key steps include removing the piston motor, traction control valve, various seals, bearings, and internal components. Assembly involves installing these parts in reverse order and adjusting shims to ensure the output shaft meets torque and rotation requirements during checks. Proper cleaning, lubrication, and torque specifications are noted throughout.
The document provides disassembly instructions for the final drive, travel motor, and other components of a 313D2 excavator. It lists over 30 detailed steps to disassemble parts like the final drive, counterbalance valve, travel motor, and planetary gear assemblies. Safety notices are included throughout to warn of hazards like parts propelled by springs, hydraulic pressure, and heavy component weights. Required tools are listed in a table at the beginning.
Caterpillar cat 313 d excavator (prefix kxd) service repair manual (kxd00001 ...fjskekdmjekm
This document provides instructions for disassembling various components of a 313D excavator, including the final drive, travel motor, counterbalance valve, and travel motor. It lists the required tools and outlines 16 steps to disassemble parts like the sprockets, valves, pistons, plates, springs, and seals. Safety notices are included to warn of potential injuries from fluids, pressures, and released spring forces when handling or disassembling parts.
The document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of an excavator model 313D2. It lists over 30 detailed steps to disassemble components like the final drive housing, travel motor barrel assembly, piston assemblies, gears, seals and other parts. Tools required include link brackets, a transmission repair stand, bolts, pullers, retaining ring pliers and other specialized tools. Safety notices are provided to properly release pressures and contain fluids.
This document provides the disassembly and assembly procedures for a travel motor on 336D2 XE and 336D2 LXE excavator models. It outlines 30 steps to disassemble the travel motor down to its core components. It then provides 19 steps to reassemble the travel motor. The document includes illustrations and notes on proper assembly order and tooling required. Safety precautions are provided throughout for tasks involving spring tension or component installation.
The document provides instructions for disassembling the travel motor of an excavator model 326D2. It involves 28 steps including removing the head, brake piston, plates and discs, seals, bearings, and other components. Various tools are required including an adapter, bolts, retaining ring pliers, and a bearing puller group. Safety precautions are provided regarding spring forces.
Caterpillar cat 365 c l hydraulic excavator (prefix par) service repair manua...fjkskedmme
This document provides instructions for disassembling and assembling the travel motor of a 365C excavator. The disassembly process involves 29 steps to remove components like springs, plates, pistons, seals, and bearings. The assembly process describes 31 steps and requires tools to reinstall these components in the reverse order and adjust shims to ensure proper clearance is achieved. Precautions are provided to wear protective equipment when working with spring loaded components.
The document provides disassembly instructions for the final drive, travel motor, and other components of a 313D2 excavator. It lists over 30 detailed steps to disassemble parts like the final drive, counterbalance valve, travel motor, and planetary gear assemblies. Safety notices are included throughout to warn of potential injuries from parts under spring tension or residual fluid pressure. Dismantling requires specialty tools and careful tracking of part locations for reassembly.
Caterpillar cat 313 f lgc excavator (prefix hdk) service repair manual (hdk00...fjkskefksmeme
1) The document provides disassembly instructions for components of a 313F LGC excavator, including the final drive, travel motor, and counterbalance valve.
2) It lists required tools and safety precautions and provides a step-by-step process to remove each part, noting identification numbers where applicable.
3) Detailed illustrations accompany each step to show how to remove components like sprockets, valves, springs, gears, seals and other parts while taking care to mark locations for reassembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...fuusejkddmmd3e
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts, replace seals, apply lubricant and heat components as needed. Precautions are provided to prevent injury from spring forces and properly identify parts during disassembly and reassembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...jdksmmdmdd
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...orrf0370383
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual (CJC00001...dujkdksmdmdm
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
Caterpillar cat 315 c l excavator (prefix cjc) service repair manual (cjc0000...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual Instant D...rishang96299
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, apply lubricants, and properly set bearing temperatures and torque specifications. Safety notices are included throughout to warn of spring forces and contain fluids.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual Instant D...kubei069369925
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 315 c excavator (prefix cjc) service repair manual (cjc00001 ...dkdmidkkdk
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor on 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricants. Special tools and safety precautions are noted throughout.
Caterpillar Cat 315C L Excavator (Prefix CJC) Service Repair Manual Instant D...shanruliu7360
The document provides step-by-step instructions for disassembling and assembling the travel motor of 315C and 315C L excavators. It lists 28 steps for disassembly, which include removing bolts, valves, seals, pistons, springs and other components. The 27 steps for assembly describe installing these same components in reverse order, making sure to clean parts, replace seals, and apply lubricant. Precautions are given to identify parts, contain fluids, and be aware of spring forces during disassembly and assembly.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 28 steps to remove components like bolts, valves, seals, pistons, springs, and bearings. The assembly process reverses the disassembly with 27 steps, applying grease and torque specifications, and includes heating and pressing components during installation. Cleanliness is emphasized throughout to prevent contamination.
Similar to Caterpillar cat 315 c l excavator (prefix cft) service repair manual (cft00001 and up) (17)
Caterpillar cat 345 c l excavator (prefix wde) service repair manual (wde0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing 28 parts in 28 steps, including removing the final drive cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure involves installing 29 parts in 29 steps in the reverse order, adjusting bearing preload using shims, and applying anti-seize compound and thread lock to ensure proper assembly. Tools such as retaining ring pliers, eyebolts, and a transmission stand are required.
Caterpillar cat 345 c l excavator (prefix spc) service repair manual (spc0000...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with disassembly steps including removing the head, pins, plates, seals, brake piston, separator plates, disks, and rotating group. It then details removing components from the rotating group like the shaft assembly, bearings, and piston assemblies. The assembly section provides steps to reinstall these components in reverse order and includes precautions like cleaning, applying lubricant, and ensuring proper orientation of parts.
Caterpillar cat 345 c l excavator (prefix scn) service repair manual (scn0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C L excavator. The disassembly process involves removing over 20 individual parts from the final drive including the cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly section outlines installing new seals, pressing in bearing cups, adjusting shims to set proper bearing preload, and reinstalling all parts in reverse order. Precise positioning of stamped identification marks on gears is required for correct reassembly.
Caterpillar cat 345 c l excavator (prefix s5m) service repair manual (s5m0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C L excavator. The disassembly procedure involves removing over 20 components of the final drive including the cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure instructs to clean all parts, apply anti-seize compound, install bearing cups and cones, and adjust the bearing preload using shims to achieve the proper load. Precise positioning of identification marks is required to reinstall parts in their original locations.
Caterpillar cat 345 c hydraulic excavator (prefix tdg) service repair manual ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It lists 31 steps for disassembly, removing components like the head, plates, seals, pistons, and housing pieces. It then lists 13 steps for assembly, replacing components in reverse order and noting to clean all parts, apply lubricant, and measure clearances during assembly to ensure proper operation. Tools required are listed for both disassembly and assembly.
Caterpillar cat 345 c excavator (prefix wde) service repair manual (wde00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing 28 parts in 28 steps, including removing the final drive cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure involves installing 29 parts in 29 steps in the reverse order, adjusting bearing preload using shims, and applying anti-seize compound and thread lock to ensure proper assembly. Tools such as retaining ring pliers, eyebolts, and a transmission stand are required.
Caterpillar cat 345 c excavator (prefix spc) service repair manual (spc00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with disassembly steps including removing the head, pins, plates, seals, brake piston, separator plates, disks, and rotating group components. Assembly steps are then listed in reverse order and include installing seals, spacers, piston assemblies, springs and other components back into the travel motor housing. Precautions are given such as cleaning parts and applying lubricant before assembly.
Caterpillar cat 345 c excavator (prefix dhp) service repair manual (dhp00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with removing external components like the displacement change valve and head. Internal components like the brake piston, disks, and rotating group are then removed. Individual parts in the rotating group like the piston assemblies and barrel are also taken apart. Precise identification and reinstallation of parts is emphasized. The assembly section provides instructions for reinstalling components in reverse order and ensuring proper placement and torque of parts.
Caterpillar cat 345 b series ii excavator (prefix dcw) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing the cylinder head on a 345B Series II Excavator with a 3176 engine. The removal procedure involves disconnecting sensors, tubes, wiring harnesses, and fuel filters before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning surfaces, installing new gaskets and seals, tightening bolts in a specific sequence, and reconnecting all components in reverse order. Tools required include wrenches, taps, and a strap wrench.
Caterpillar cat 345 b series ii excavator (prefix ccc) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing the cylinder head on a 345B Series II Excavator with a 3176C engine. The removal process involves disconnecting various sensors and tubes, removing bolts, and lifting the cylinder head off. The installation involves cleaning surfaces, installing new gaskets and seals, lifting the cylinder head into place, and torquing the head bolts to the specified sequence and values. Proper cleaning, lubrication, and torque procedures are emphasized to ensure correct installation.
Caterpillar cat 345 b series ii excavator (prefix ald) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing a lifter group on a 3176C engine. The removal process involves taking out bolts and separating the lifter assembly into sections to remove individual components like brackets, lifters and injector lifters. The installation is the reverse of removal, requiring cleaning of parts and reinstallation in the proper order and orientation. Precautions are provided to contain fluids and dispose of them according to regulations.
Caterpillar cat 345 b l excavator (prefix 9cw) service repair manual (9cw0000...fjsekdmmeed
This document provides instructions for removing and installing a cylinder head on a Caterpillar 345B L excavator engine. It details removing components like the valve mechanism cover, rocker shaft, and pushrods. It then explains how to remove the cylinder head by disconnecting sensors and tubes, and removing bolts. Reinstallation involves cleaning surfaces, installing new gaskets and seals, tightening bolts in a specific sequence, and reconnecting all removed components and hoses. Tools required are also listed.
Caterpillar cat 345 b l excavator (prefix 8rw) service repair manual (8rw0000...fjsekdmmeed
The document provides instructions for removing and installing a cylinder head and lifter group on a Caterpillar 345B L EXCAVATOR engine. It describes disconnecting various engine components and sensors, removing bolts and gaskets, and lifting the cylinder head off the engine block. It then details cleaning surfaces, installing new gaskets and seals, bolting the head back onto the block, and reconnecting all components in reverse order. Proper torque specifications are provided for all fasteners.
Caterpillar cat 345 b excavator (prefix ayr) service repair manual (ayr00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of an excavator model 345B. It describes removing components such as the travel motor, final drive, ring gear, and carrier assemblies. Detailed steps are provided to disassemble each assembly into individual parts. The assembly section instructs cleaning and inspecting parts, applying anti-seize compound, and installing components in reverse order using lifting tools and following markings made during disassembly. Proper bearing preload is set by measuring clearance with shims.
Caterpillar cat 345 b excavator (prefix amn) service repair manual (amn00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 345B. It lists 31 steps to disassemble parts like the head, plates, seals, pistons, and housing. It then lists 27 steps to reassemble these parts in reverse order, making sure to clean parts and apply lubricant. Proper installation of seals, washers, and keys is emphasized.
Caterpillar cat 345 b excavator (prefix amj) service repair manual (amj00001 ...fjsekdmmeed
This document provides assembly instructions for installing a travel motor on a 345B Excavator. It outlines 33 steps to assemble parts like seals, pistons, plates, and shafts inside the travel motor housing. It then describes 4 steps to install the assembled travel motor onto the final drive, including cleaning surfaces, replacing an O-ring seal, and using lifting tools to maneuver the motor into position. Proper torque specifications are given for tightening fasteners.
Caterpillar cat 345 b excavator (prefix amd) service repair manual (amd00001 ...fjsekdmmeed
This document provides assembly instructions for a travel motor on a 345B Excavator. It outlines 33 steps to assemble internal components like pistons, seals, plates and housing pieces. Measurement checks are included to ensure correct assembly. The instructions also cover installing the assembled travel motor by cleaning mating surfaces, replacing an O-ring seal, and using lifting tools to slide the motor into position in the final drive housing.
Caterpillar cat 345 b excavator (prefix 8kw) service repair manual (8kw00001 ...fjsekdmmeed
This document provides instructions for removing and installing a cylinder head on a 345B excavator engine. It includes 14 steps to remove the head, such as removing sensors, tubes, and bolts. The 20 step installation procedure describes cleaning surfaces, installing gaskets and seals, tightening bolts in a specific sequence, and reconnecting related components like sensors and tubes. Special tools are listed for tasks like removing the fuel filter. Cautions are provided about containing fluids and keeping parts clean to prevent damage and wear.
Caterpillar cat 345 b excavator (prefix 6mw) service repair manual (6mw00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 345B. It lists the required tools and parts. The disassembly instructions include removing components like the brake cover, brake assembly, springs, gears, and barrel assembly. The assembly instructions list installing components like bushings, bearings, seals and rings in reverse order of disassembly. Safety notices are provided to keep parts clean and prevent hydraulic system contamination.
Caterpillar cat 340 f excavator (prefix sgh) service repair manual (sgh00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the swing drive of a 340F Excavator. The disassembly procedure involves removing 27 parts from the swing drive including the cover, sun gear, carrier assembly, planetary gears, ring gear, and pinion shaft. The assembly procedure instructs installing lip seals and bearings on the cage and pinion shaft and pressing the cage into the swing drive housing.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFT
Configuration: 315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01959727
Travel Motor - Disassemble
SMCS - 4351-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
B 1P-0074 Slide Hammer 1
C 9S-9152 Bearing Puller 1
D
1U-9895 Crossblock 1
3H-0465 Push-Puller Plate 2
8T-0649 Bolt 2
9X-8257 Washer 2
E 5P-0975 Plate 1
Start By:
a. Remove the piston motor (travel). Refer to Disassembly and Assembly, "Piston Motor
(Travel) - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
1/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: Put identification marks on the motor and on all hose assemblies for installation purposes
and for the purpose of orientation. Plug all hose assemblies. This will help to prevent fluid loss
and this helps to keep contaminants from entering the system.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Illustration 1 g00779154
1. Remove bolts (1).
Illustration 2 g00779159
2/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 2. Remove bolts (2) from the traction control valve in order to install Tooling (A).
Illustration 3 g00779163
3. Remove traction control valve (3) and travel motor (4) from the final drive.
Illustration 4 g00779215
4. Remove Tooling (A). Remove four bolts (2). Remove traction control valve (3).
Illustration 5 g01018464
5. Remove socket head bolts (5). Remove O-ring seal (6) and O-ring seals (7). Remove head
(8).
3/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00779238
6. Remove shim (9).
Illustration 7 g00779248
7. Remove bearing (10).
Illustration 8 g00779259
8. Remove plugs (11) and the O-ring seals.
4/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g01018466
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
9. Remove adapter (14) and the O-ring seal. Remove spool (13) and spring (12) from head (8).
Illustration 10 g00779279
10. Remove washer set (15).
5/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g00779289
11. Remove port plate (16).
Illustration 12 g00780482
Illustration 13 g01020385
12. Remove three small O-ring seals (17). Install Tooling (D) and Tooling (E), as shown.
Tooling (E) provides a protective cover for the barrel assembly. Tooling (E) prevents
Tooling (D) from damaging the surface of the barrel assembly.
6/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 13. Retain piston (18) with Tooling (D) and apply approximately 517 kPa (75 psi) of shop air
pressure to brake release port (Y). Brake piston (18) will move out of the piston guide.
Remove brake piston (18) from the main housing.
Illustration 14 g00779307
14. Remove O-ring seal (19) and the backup ring and remove O-ring seal (20) and the backup
ring.
Illustration 15 g00779310
15. Remove piston guide (21). Remove O-ring seal (22).
Illustration 16 g00779341
7/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 16. Remove O-ring seal (23) and backup ring (24).
Illustration 17 g00779343
17. Lay the travel motor housing on one side in order to remove rotating group (25) and brake
pack (26) as a unit.
Illustration 18 g00780107
18. Remove brake pack (26).
Illustration 19 g00780290
8/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. NOTICE
In order to ensure that each piston assembly is installed into its original
bore, identify and mark each piston assembly, retaining plate and the
barrel before removing the piston assembly.
To avoid damage to the barrel assembly parts, do not allow the parts to
separate from the assembly during removal or installation.
19. Remove pistons (27) and retainer plate (28) from barrel (29) as a unit. Separate the pistons
from the retainer plate.
Illustration 20 g00780317
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
20. Remove guide (30), spacer (31), and nine springs (32) from the barrel.
9/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00780328
21. Remove swashplate (33).
Illustration 22 g00780348
22. Use a magnet in order to remove keys (34) and pistons (35).
Illustration 23 g00780352
23. Use a magnet in order to remove pins (36).
10/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 24 g00780345
24. Remove shaft assembly (37). Remove plugs (38) and the O-ring seals.
Illustration 25 g01020388
25. Use Tooling (B) in order to remove seal (39).
Illustration 26 g00780494
26. Remove retaining rings (40) from each side of the bearing.
11/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 27 g00780502
27. Use a suitable press in order to remove bearing assembly (41) from shaft (42).
Illustration 28 g00780544
28. Use a suitable press and Tooling (C) in order to remove inner race (43) from shaft (42).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Nov 12 16:01:33 UTC+0800 2020
12/12
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFT
Configuration: 315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01959745
Travel Motor - Assemble
SMCS - 4351-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
F 1P-0510 Driver Group 1
G 206-3689 Turning Tool 1
H 5P-0960 Molybdenum Grease 1
Note: Replace all O-ring seals and gaskets. Apply a light film of "10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 1 g00780677
1. Raise the temperature of inner race (43). Lower the temperature of shaft (42). Use a soft
hammer in order to install inner race (43) on shaft (42).
Illustration 2 g00780698
2. Raise the temperature of bearing assembly (41). Lower the temperature of shaft (42). Install
bearing assembly (41) on shaft (42).
Illustration 3 g00780494
3. Install retaining rings (40) on each side of the bearing.
2/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 4 g01018474
4. Use Tooling (F) in order to install seal (39).
Illustration 5 g00780715
5. Use a soft hammer in order to install shaft assembly (37).
Illustration 6 g00780723
6. Install plugs (38) and the O-ring seals. Tighten plugs (38) to a torque of 140 ± 14 N·m
(103 ± 10 lb ft).
3/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 7 g00780352
7. Use a magnet in order to install pins (36).
Illustration 8 g00780839
NOTICE
The locating pin on each key is not centered. In order to prevent
damage to the barrel assembly during assembly of the travel motor, the
keys must be installed as shown. Also, the keys must be installed in the
key's original location in the body of the travel motor.
8. Install pistons (34) and keys (35).
4/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 9 g00780328
9. Install swashplate (33).
Illustration 10 g00780317
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
10. Install nine springs (32), spacer (31), and guide (30) into the barrel.
5/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 11 g00780290
11. Install pistons (27) into the retainer plate (28). Install pistons (27) and retainer plate (28) as
a unit into barrel (29) .
Note: Use string in order to keep the rotating group from separating during installation.
Illustration 12 g00780870
12. Install rotating group (25).
Illustration 13 g00780887
13. Install brake pack (26).
6/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 14 g00780817
14. Install O-ring seal (23) and backup ring (24) on piston guide (21).
Illustration 15 g00779310
15. Install piston guide (21). Install O-ring seal (22).
7/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 16 g00779307
16. Install O-ring seal (19) and the backup ring and install O-ring seal (20) and the backup ring.
Illustration 17 g00797765
Note: Make sure that brake piston (18) is thoroughly clean and free of dirt and debris.
17. Install three small O-ring seals (17). Install piston (18).
Illustration 18 g00779289
18. Install port plate (16).
8/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 19 g00779279
19. Install washer set (15).
Illustration 20 g01018466
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
20. Install spring (12) and spool (13) into head (8). Install adapter (14) and the O-ring seal into
head (8).
Illustration 21 g00779259
21. Install plugs (11) and the O-ring seals.
9/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 22 g00779248
22. Lower the temperature of bearing (10) and install bearing (10).
Illustration 23 g00779238
23. Use a shim or shims (9) so that the following requirements are met.
Note: During the following checks, turn the travel motor output shaft in a clockwise
direction.
Illustration 24 g01018475
10/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. a. Use Tooling (G) in order to turn the output shaft. The travel motor output shaft does
not rotate with an applied torque of 440 N·m (325 lb ft) with the parking brake release
port open.
Illustration 25 g01018476
b. Apply the air pressure at orifice (X). Use Tooling (G) in order to turn the output shaft
when the parking brake release port is pressurized to 780 kPa (115 psi). Perform this
procedure with the inlet port and the outlet port open to the hydraulic oil tank. The
travel motor output shaft rotates with an applied torque of 29 N·m (21 lb ft) or less.
Note: It may be necessary to remove head (8) several times in order to determine the correct
thickness of shim or shims (9) that are used to adjust the rolling torque of the travel motor
output shaft.
24. Apply a thin layer of Tooling (H) on shim or shims (9). Install the shim or shims on the
head. The grease will hold the shim or shims in place during the installation of the head.
Install the head on the body of the travel motor.
Illustration 26 g01018464
NOTICE
To prevent possible damage to the travel motor, fill the unit with oil at
least to the fill port before operating the machine. Refer to the
Operation and Maintenance Manual for the correct oil specification.
11/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. 25. Install O-ring seal (6) and O-ring seals (7). Install head (8 ). Install socket head bolts (5).
Tighten bolts (5) to a torque of 177 ± 18 N·m (131 ± 13 lb ft).
Illustration 27 g00779215
26. Install Tooling (A). Install traction control valve (3). Remove Tooling (A). Install six bolts
(2). Tighten bolts (2) to a torque of 80 ± 8 N·m (59 ± 6 lb ft).
Illustration 28 g00779163
27. Install traction control valve (3) and travel motor (4) into the final drive as a unit.
12/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 29 g00779154
28. Install bolts (1). Tighten bolts (1) to a torque of 240 ± 40 N·m (177 ± 30 lb ft).
End By:
a. Install the travel motor. Refer to Disassembly and Assembly, "Travel Motor - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Nov 12 16:02:29 UTC+0800 2020
13/13
315C & 315C L Excavators CFT00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...