Case Study
Walney OWF (2013) – Remedial work 1 PCC cable,
Cost Effective Turnkey Solution
In spring 2013 CT Offshore was contracted to carry out remedial work at 1 PCC cable at the Walney
OWF. The cable laying vessel was rapidly de-mobilised from her work at the London Array OWF, and
prepared for this new task.
The project was carried out in a very cost effective way, smooth and professional, to the satisfaction of
both ourselves and the client.
1. Scope of Work
Remedial work at 1 PCC cable including cable recovery, scrap of old cable and replacement of new.
 Scrap cable recovery
 Cable load out
 Pre-lay Multibeam survey (MBES)
 Cable installation
 Post-lay inspection (PLI)
 Optical time delay reflection (OTDR) test before termination
 Post-lay burial (PLB)
 Post-burial inspection (PLI)
 ROV post-burial survey
CT Offshore provided documentation for all Procedures, HSE Statements, Project Management, Site
Management incl. management of the works performed by subcontractors.
• Rigging and pull-in team, incl. rigging arrangement winch etc.
• Dive spread
• Crew vessels: 1 x VPii or MPC 20 t.
• Tester/termination team
Vessels and equipment utilized
Cable Installation: CLV SIA
Survey: MV SANDER 2
Trenching: MV NICO (ROV CTO 103)
Execution period 2 May – 6 June 2013 (12 days charter in total)
Cable load out, harbour Handled from Hartlepool, UK.
Source: WPAP system, Walney P-13-002. Total hrs. of operation: 101 hrs. 33 min. (ex. mob./de-mob)
26%
39%
15%
12%
8%
Time spent in %
Scrap Cable Recovery, SIA Cable Installation, SIA
Cable load-out, SIA PLB, NICO
PLBI survey, SANDER 2
Page 2 / 2
CLV SIA installing the PCC cable at Substation, Walney OWF – May 2013.
MV SANDER 2 assisted with PLI MBES survey
To carry out the post lay burial inspection (PLBI) our
survey vessel MV SANDER 2 assisted.

More Related Content

Viewers also liked

3조프레젠테이션
3조프레젠테이션3조프레젠테이션
3조프레젠테이션
수민 오
 
Tamanhos no universo
Tamanhos no universoTamanhos no universo
Tamanhos no universoNelson Hfilho
 
Presentaciieselfoix2011 12
Presentaciieselfoix2011 12Presentaciieselfoix2011 12
Presentaciieselfoix2011 12
ragustinpardo
 
Apresentação comercial bustv jan 2011.27 01
Apresentação comercial bustv jan 2011.27 01Apresentação comercial bustv jan 2011.27 01
Apresentação comercial bustv jan 2011.27 01Canal BUSTV
 

Viewers also liked (7)

ECE Hossein
ECE HosseinECE Hossein
ECE Hossein
 
3조프레젠테이션
3조프레젠테이션3조프레젠테이션
3조프레젠테이션
 
Tamanhos no universo
Tamanhos no universoTamanhos no universo
Tamanhos no universo
 
Práctica de word
Práctica de wordPráctica de word
Práctica de word
 
Presentaciieselfoix2011 12
Presentaciieselfoix2011 12Presentaciieselfoix2011 12
Presentaciieselfoix2011 12
 
Apresentação comercial bustv jan 2011.27 01
Apresentação comercial bustv jan 2011.27 01Apresentação comercial bustv jan 2011.27 01
Apresentação comercial bustv jan 2011.27 01
 
Presentación2
Presentación2Presentación2
Presentación2
 

Similar to Case study_Walney_rev1

Case study_GYM_rev1
Case study_GYM_rev1Case study_GYM_rev1
Case study_GYM_rev1Rune Kaltoft
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey
 
Inteligencia Windfarms.pptx
Inteligencia Windfarms.pptxInteligencia Windfarms.pptx
Inteligencia Windfarms.pptx
Leyneth1
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninettScott Miller
 
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
AbdalmoedAlaiashy2
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expandedPaul Burns
 
Austroads Bridge Conference 2017
Austroads Bridge Conference 2017Austroads Bridge Conference 2017
Austroads Bridge Conference 2017
Eric Boothman
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
Egyptian Engineers Association
 
ICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentationICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentationFranklin Martin
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
Jerry Brown
 
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
Sergey Korneev
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirris
 
Proof loading of existing bridges
Proof loading of existing bridges Proof loading of existing bridges
Proof loading of existing bridges
Eva Lantsoght
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Mike Bisland
 

Similar to Case study_Walney_rev1 (20)

Case study_GYM_rev1
Case study_GYM_rev1Case study_GYM_rev1
Case study_GYM_rev1
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015
 
Inteligencia Windfarms.pptx
Inteligencia Windfarms.pptxInteligencia Windfarms.pptx
Inteligencia Windfarms.pptx
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninett
 
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expanded
 
Austroads Bridge Conference 2017
Austroads Bridge Conference 2017Austroads Bridge Conference 2017
Austroads Bridge Conference 2017
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
ICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentationICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentation
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Short Resume
Short Resume Short Resume
Short Resume
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
 
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
AUV-based Cathodic Protection (CP) Automatic Inspection Technology for offsho...
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-Power
 
Proof loading of existing bridges
Proof loading of existing bridges Proof loading of existing bridges
Proof loading of existing bridges
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 

Case study_Walney_rev1

  • 1. Page 1 / 2 Case Study Walney OWF (2013) – Remedial work 1 PCC cable, Cost Effective Turnkey Solution In spring 2013 CT Offshore was contracted to carry out remedial work at 1 PCC cable at the Walney OWF. The cable laying vessel was rapidly de-mobilised from her work at the London Array OWF, and prepared for this new task. The project was carried out in a very cost effective way, smooth and professional, to the satisfaction of both ourselves and the client. 1. Scope of Work Remedial work at 1 PCC cable including cable recovery, scrap of old cable and replacement of new.  Scrap cable recovery  Cable load out  Pre-lay Multibeam survey (MBES)  Cable installation  Post-lay inspection (PLI)  Optical time delay reflection (OTDR) test before termination  Post-lay burial (PLB)  Post-burial inspection (PLI)  ROV post-burial survey CT Offshore provided documentation for all Procedures, HSE Statements, Project Management, Site Management incl. management of the works performed by subcontractors. • Rigging and pull-in team, incl. rigging arrangement winch etc. • Dive spread • Crew vessels: 1 x VPii or MPC 20 t. • Tester/termination team Vessels and equipment utilized Cable Installation: CLV SIA Survey: MV SANDER 2 Trenching: MV NICO (ROV CTO 103) Execution period 2 May – 6 June 2013 (12 days charter in total) Cable load out, harbour Handled from Hartlepool, UK. Source: WPAP system, Walney P-13-002. Total hrs. of operation: 101 hrs. 33 min. (ex. mob./de-mob) 26% 39% 15% 12% 8% Time spent in % Scrap Cable Recovery, SIA Cable Installation, SIA Cable load-out, SIA PLB, NICO PLBI survey, SANDER 2
  • 2. Page 2 / 2 CLV SIA installing the PCC cable at Substation, Walney OWF – May 2013. MV SANDER 2 assisted with PLI MBES survey To carry out the post lay burial inspection (PLBI) our survey vessel MV SANDER 2 assisted.