SlideShare a Scribd company logo
case study



Outsourcing - Real Estate Industry




    Re-engineering of processes, alignment of people and
    technology.
    Summary                                     What we found

    The facility management of a real estate    Utilisation of facility assistance was poor      Handheld PCs were used to track work
    company was failing to achieve industry     and only 30% of call-outs to repairs were        outstanding and utilisation of employees.
    benchmark efficiency levels. It was         closed at the initial visit.                     The maintenance processes were re-
    decided to outsource the facility                                                            engineered according to SLAs and match
    management as a substantial invest-         The employee skill levels were inconsist-        of service expectations.
    ment was required to achieve the            ent and the tracking and reporting of
    benchmark efficiency.                       maintenance requests and completed               Employees in the facility management
                                                work was not systematic and consistent           function were TUPEed following an
    A sourcing partner was selected             across all sites.                                evaluation and training according to skill
    through a pilot and a cross functional                                                       levels and capacity requirements.
    project team was created to implement       The budget versus actual of repair;
    the outsourcing which included the          maintenance; and upgrades was not                Spend analysis & benchmark of all
    related procurement activities.             traceable through reporting systems.             categories was carried out and a category
                                                                                                 and implementation strategy was
    The project team defined; service levels;   Spend on consumable and durable                  developed. Subsequently a small number
    developed the contract requirements;        materials was decentralised and prices           of framework agreements were
    and re-defined processes and systems        were not optimised.                              implemented across the country.
    as an integrated management system
    between the two companies.                  What we did                                      What we achieved

    The benefits included financial savings     Following the selection of the outsourcing       The number of employees required to
    of £2.2 m equivalent to 30% of the cost     partner, a pilot was carried out which           carry out the facility management was
    base, to be delivered within a year.        proved that benefit case and service level       reduced significantly and the cost of
                                                expectations was feasible.                       labour was reduced by 25%.

                 fficiencommon place.           A cross organisational project team was          Through category management and
                 e of the projects                           Cost Base
                                                assembled including representatives from:        framework agreements the spend was on        Cost
                                                               £9.0M
                                                                  70                             target to be reduced by 35%.
                                                •    Operations (Process re-engineering)
                                                •                          15%
                                                     IS (technology for reporting)   30%         On top of the £2.2 m financial saving
                                                                          increase Reduced       estimate, end customer satisfaction was
                                                •    Procurement (framework
                                                              £6.0M
                                                                 60
                                                                        Emp.                     greatly improved due to improved first-
                                                     agreements)
                                                                        Costs                    contact-repairs and transparency when
                                                •    Human Resource (Training and                rechargeable work was carried out.
                                                     TUPE)
                                                              £3.0M
                                                                 50
                                                •    Commercial (contractual
                                                     outsourcing)      Spend

                                                                  £0
                                                                  40
                                                                           Before       After
                                                                          Boxwood      Boxwood




  GIC -General Implementation Consultancy
   PERFORMANCE IMPROVEMENT, CHANGE MANAGEMENT AND OUTSOURCING

More Related Content

Viewers also liked

Pinnacle sunway services
Pinnacle sunway services Pinnacle sunway services
Pinnacle sunway services
Celine Tan
 
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case StudyHennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Loren Abraham
 
Music Industry Case Study
Music Industry Case StudyMusic Industry Case Study
Music Industry Case Study
bluebirdsyd
 
Building services-report
Building services-reportBuilding services-report
Building services-report
ZIyeeTan
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
Chee Lee
 
Building services report
Building services report Building services report
Building services report
Soh Shing
 
Case study -country resort
Case study -country resortCase study -country resort
Case study -country resortArjun Ajay
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
Ar. Sahid Akhtar
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
Vinay M
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
Imtiaz Ahmad
 
Corporate Strategy - Case Study - Google
Corporate Strategy - Case Study - GoogleCorporate Strategy - Case Study - Google
Corporate Strategy - Case Study - Google
V. Castel
 
Building management system (bms)
Building management system (bms)Building management system (bms)
Building management system (bms)
AHMED NADIM JILANI
 
Crises Management: Trendsspotting Insights On Dominos Case Study
Crises Management: Trendsspotting Insights On Dominos Case StudyCrises Management: Trendsspotting Insights On Dominos Case Study
Crises Management: Trendsspotting Insights On Dominos Case Study
Taly Weiss
 

Viewers also liked (13)

Pinnacle sunway services
Pinnacle sunway services Pinnacle sunway services
Pinnacle sunway services
 
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case StudyHennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case Study
 
Music Industry Case Study
Music Industry Case StudyMusic Industry Case Study
Music Industry Case Study
 
Building services-report
Building services-reportBuilding services-report
Building services-report
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
 
Building services report
Building services report Building services report
Building services report
 
Case study -country resort
Case study -country resortCase study -country resort
Case study -country resort
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
Corporate Strategy - Case Study - Google
Corporate Strategy - Case Study - GoogleCorporate Strategy - Case Study - Google
Corporate Strategy - Case Study - Google
 
Building management system (bms)
Building management system (bms)Building management system (bms)
Building management system (bms)
 
Crises Management: Trendsspotting Insights On Dominos Case Study
Crises Management: Trendsspotting Insights On Dominos Case StudyCrises Management: Trendsspotting Insights On Dominos Case Study
Crises Management: Trendsspotting Insights On Dominos Case Study
 

Similar to Case study facility management

Client Successes: McDaniel Consulting
Client Successes: McDaniel ConsultingClient Successes: McDaniel Consulting
Client Successes: McDaniel Consulting
gnemcda
 
Att consulting external deck
Att consulting external deckAtt consulting external deck
Att consulting external deck
Eric Sineath
 
Orange case study v0 04 lar 210110
Orange case study v0 04 lar 210110Orange case study v0 04 lar 210110
Orange case study v0 04 lar 210110
Transition Consulting Limited, India
 
IT Practice Leadership
IT Practice LeadershipIT Practice Leadership
IT Practice Leadership
vsb75
 
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
alan masterton
 
Sourcing lecture 1 ITSM class
Sourcing lecture 1 ITSM classSourcing lecture 1 ITSM class
Sourcing lecture 1 ITSM class
Frank Willems
 
Energy Ms Co Cc Ss
Energy Ms Co Cc SsEnergy Ms Co Cc Ss
Energy Ms Co Cc Ss
Evalyn Elliott
 
Periodic Reassessment, Continuous Improvement of Finance Operations
Periodic Reassessment, Continuous Improvement of Finance OperationsPeriodic Reassessment, Continuous Improvement of Finance Operations
Periodic Reassessment, Continuous Improvement of Finance Operations
Cognizant
 
SP_BTPM
SP_BTPMSP_BTPM
SP_BTPM
Syam Puli
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)
habibfathi
 
Direct Spend Management
Direct Spend ManagementDirect Spend Management
Direct Spend Management
Genpact Ltd
 
Document Composition Case Study
Document Composition Case StudyDocument Composition Case Study
Document Composition Case Study
I.T. Computing Resources Inc.
 
SciamuS presentation
SciamuS presentationSciamuS presentation
SciamuS presentation
SciamuS
 
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case StudyProcess Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
Nat Evans
 
Energy Desk Presentation.Pptx
Energy Desk Presentation.PptxEnergy Desk Presentation.Pptx
Energy Desk Presentation.Pptx
lauraclaredavies
 
Operations and Maintenance for Sustainable Facility Management
Operations and Maintenance for Sustainable Facility ManagementOperations and Maintenance for Sustainable Facility Management
Operations and Maintenance for Sustainable Facility Management
Green Initiatives 绿色倡议
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames Water
Institute of Consulting
 
BT Sustainability
BT SustainabilityBT Sustainability
BT Sustainability
wellbelove
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 

Similar to Case study facility management (20)

Client Successes: McDaniel Consulting
Client Successes: McDaniel ConsultingClient Successes: McDaniel Consulting
Client Successes: McDaniel Consulting
 
Att consulting external deck
Att consulting external deckAtt consulting external deck
Att consulting external deck
 
Orange case study v0 04 lar 210110
Orange case study v0 04 lar 210110Orange case study v0 04 lar 210110
Orange case study v0 04 lar 210110
 
IT Practice Leadership
IT Practice LeadershipIT Practice Leadership
IT Practice Leadership
 
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
Applying Global Benchmarking To Fm And Service Alan Masterton Aug 08
 
Sourcing lecture 1 ITSM class
Sourcing lecture 1 ITSM classSourcing lecture 1 ITSM class
Sourcing lecture 1 ITSM class
 
Energy Ms Co Cc Ss
Energy Ms Co Cc SsEnergy Ms Co Cc Ss
Energy Ms Co Cc Ss
 
Periodic Reassessment, Continuous Improvement of Finance Operations
Periodic Reassessment, Continuous Improvement of Finance OperationsPeriodic Reassessment, Continuous Improvement of Finance Operations
Periodic Reassessment, Continuous Improvement of Finance Operations
 
SP_BTPM
SP_BTPMSP_BTPM
SP_BTPM
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)
 
Direct Spend Management
Direct Spend ManagementDirect Spend Management
Direct Spend Management
 
Document Composition Case Study
Document Composition Case StudyDocument Composition Case Study
Document Composition Case Study
 
SciamuS presentation
SciamuS presentationSciamuS presentation
SciamuS presentation
 
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case StudyProcess Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
 
Energy Desk Presentation.Pptx
Energy Desk Presentation.PptxEnergy Desk Presentation.Pptx
Energy Desk Presentation.Pptx
 
Operations and Maintenance for Sustainable Facility Management
Operations and Maintenance for Sustainable Facility ManagementOperations and Maintenance for Sustainable Facility Management
Operations and Maintenance for Sustainable Facility Management
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames Water
 
BT Sustainability
BT SustainabilityBT Sustainability
BT Sustainability
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 

Recently uploaded

HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
VickyAulakh1
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
jwhrsngh23
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 

Recently uploaded (15)

HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 

Case study facility management

  • 1. case study Outsourcing - Real Estate Industry Re-engineering of processes, alignment of people and technology. Summary What we found The facility management of a real estate Utilisation of facility assistance was poor Handheld PCs were used to track work company was failing to achieve industry and only 30% of call-outs to repairs were outstanding and utilisation of employees. benchmark efficiency levels. It was closed at the initial visit. The maintenance processes were re- decided to outsource the facility engineered according to SLAs and match management as a substantial invest- The employee skill levels were inconsist- of service expectations. ment was required to achieve the ent and the tracking and reporting of benchmark efficiency. maintenance requests and completed Employees in the facility management work was not systematic and consistent function were TUPEed following an A sourcing partner was selected across all sites. evaluation and training according to skill through a pilot and a cross functional levels and capacity requirements. project team was created to implement The budget versus actual of repair; the outsourcing which included the maintenance; and upgrades was not Spend analysis & benchmark of all related procurement activities. traceable through reporting systems. categories was carried out and a category and implementation strategy was The project team defined; service levels; Spend on consumable and durable developed. Subsequently a small number developed the contract requirements; materials was decentralised and prices of framework agreements were and re-defined processes and systems were not optimised. implemented across the country. as an integrated management system between the two companies. What we did What we achieved The benefits included financial savings Following the selection of the outsourcing The number of employees required to of £2.2 m equivalent to 30% of the cost partner, a pilot was carried out which carry out the facility management was base, to be delivered within a year. proved that benefit case and service level reduced significantly and the cost of expectations was feasible. labour was reduced by 25%. fficiencommon place. A cross organisational project team was Through category management and e of the projects Cost Base assembled including representatives from: framework agreements the spend was on Cost £9.0M 70 target to be reduced by 35%. • Operations (Process re-engineering) • 15% IS (technology for reporting) 30% On top of the £2.2 m financial saving increase Reduced estimate, end customer satisfaction was • Procurement (framework £6.0M 60 Emp. greatly improved due to improved first- agreements) Costs contact-repairs and transparency when • Human Resource (Training and rechargeable work was carried out. TUPE) £3.0M 50 • Commercial (contractual outsourcing) Spend £0 40 Before After Boxwood Boxwood GIC -General Implementation Consultancy PERFORMANCE IMPROVEMENT, CHANGE MANAGEMENT AND OUTSOURCING