Mission Impossible?
Making the University More Cost Effective
Larry Conrad
Vice Chancellor, IT
and CIO
Mike Patil
Executive Director
Carolina Counts
its.unc.edu 2
Background
and Introduction
its.unc.edu 3
About UNC Chapel Hill
first public university in the US, founded  1793
28,570 students
3,600 faculty
8,600 staff 
$2.4 billion overall budget
$1.2 billion in contracts/grants/ services
its.unc.edu 4
Consultant Study‐ Historical Timeline
•Consultant hired      Spring 2008
•Economy does deep dive    Fall 2008
•Consultant report 2009  Summer 
2009 
($167M in potential savings)
its.unc.edu 5
Consultant Report Follow‐up
• Establish a program, Carolina Counts, to realize 
the cost savings
• Identify and act on high‐potential saving areas
• Use data based methodologies
• Get community involved in the program
its.unc.edu 6
About the Program
its.unc.edu 7
Mission
To make the University of North Carolina 
at Chapel Hill the most collaborative, 
well‐managed university in the country.
its.unc.edu 8
Objectives
• streamline and automate campus operations
• implement more responsive, less costly 
processes
• reduce bureaucracy and create a more 
satisfying work environment
its.unc.edu 9
February 2010
“There’s no reason we can’t conduct nonacademic
functions as efficiently as possible.”
11/15/09www.nytimes.com ALL THE NEWS THAT’S FIT TO PRINT
UNIVERSITIES TURN TO CONSULTANTS TO
TRIM BUDGETS
Holden Thorp, Chancellor
The New Normal?
its.unc.edu 10
Remarks by the President
on Higher Education and Economy.
August 9,2010
..responsibility for controlling these (college) costs
falls on our colleges and universities. ..institutions
like the University of Maryland, University of North
Carolina, Cornell, are all finding ways to combat
rising tuition without compromising on quality.
The New Normal?
its.unc.edu 11
Program Scope‐ areas of improvement
Teaching, Research
& Public Service
University
Operations
Admin Support
2.Procurement
3.IT
4.HR
5.Finance
6.Utilities
7.Facilities
8.Space
9.Centers &
Institutes
10.Research &
Compliance
1. Overall University Structure and Strategy
its.unc.edu 12
Leadership, Project Selection,
Timeline, Results
Project Team Management,
Reporting
Oversight, Direction,
Decision Making
Guidance, Know-how,
Progress Tracking, Coordination
Initiative Champions
Project Team Leader
Oversight Committee
Carolina Counts
(Program Office)
Role Major Responsibilities
Program Structure and Roles
its.unc.edu 13
its.unc.edu 14
Process/Tools/
Tactical
Change
Competency/
Organizational
Change
Strategic/
Cultural Change
Year
1
Year
3
Year
5
Design
Develop
Execute
Design
Develop
Execute
Design
Develop
Execute
Targets and Milestones 
its.unc.edu 15
Mission Possible?
Information Technology
its.unc.edu 16
~1100 IT FTEs, >85% in
ITS/ERP and academic units
0
20
40
60
80
100%
Percent of IT FTEs
ITS/ERP
Information Technology Services
Enterprise Resource Planning
487
Academic
Libraries
Sch Business
Sch Education
Sch Medicine
Sch Pub Hlth
Arts & Sciences
Sch Info & Lib
Provost
Sch Pharmacy
Other (5)
Sch Dentistry
Sch Nursing
Sch Govt
464
C&Is
Ofcof
ResearchIS
Carolina
Population
Center
FPGChild
Development
Inst
Other
Other
VCRED
Sheps
Ctr for
Hlth
Serv Res
102
Central
Admin
VCAdvancementAssocVCCampSvcVCHumanResources
Other
VCStudentAffairs
54
Total = 1,107
11812 7
its.unc.edu 17
0
20
40
60
80
100%
ITS/ERP
Other sources
Internal UNC customers
F&A and tuition & fees
State Appropriations
$52M
Academic
Other sources
Research Contracts & Grants
Endowments & Private Gifts
Internal UNC customers
F&A and tuition & fees
State Appropriations
$32M
C&Is
Other sources
ResearchContracts&Grants
Internal
F&A
and
tuition
& fees
State
App.
$8M
Central
Admin
OthersourcesEndowments&PrivateGifts
F&Aand
tuition&feesStateAppropriations
$4M
Percent of IT personnel spend Total = $97M
UNC spend ~$100M
annually on IT personnel
Spend per FTE* $82K$70K$108K
($94K if excl. cont’rs)
$71K
its.unc.edu 18
0
20
40
60
80
100%
ITS/ERP
Admin
IT Mgt
Security
Network Mgt
System monitoring
Systems Admin/Maint
End-User Support
Admin/Biz Apps
Research Apps
Acad/Inst Apps
487
Academic
Other
Admin
IT Mgt
Project Mgt
Security
Network Mgt
System monitoring
Systems Admin/Maint
End-User Support
Admin/Biz Apps
Research Apps
Acad/Inst Apps
464
C&Is
Other
Admin
IT Mgt
Project Mgt
Security
Network Mgt
Systems
Admin/Maint
End-User
Support
Admin/Biz
Apps
ResearchApps
102
Central
Admin
Other
Admin
IT
Mgt
Project
Mgt
Security
Systems
Admin/MaintEnd-UserSupport
Admin/
BizApps
54
Percent of IT FTEs Total = 1,107
24%
40%
Staffing Levels by Functions
by Organizations
Potential
Savings
$4-6m
$3-4m
≈$1m
its.unc.edu 19
Carolina Counts IT Process
Engaged the Carolina IT community: formed planning 
committee with ITS, campus IT directors (ITEC), and campus 
IT staff (CTC) reps
Have generated 32 proposed projects which can directly or 
indirectly impact IT costs
One key project is to define which functions should be 
centralized vs. which should be distributed
Created the Carolina Counts IT Partnership Program to 
drive adoption of the projects by campus units
Zeroed in on a subset of “priority” projects which hold the 
most promise of delivering savings
its.unc.edu 20
Proposed Model for Rebalancing
Central vs. Distributed
Communications infrastructure (network and phone system, phone conferencing) 4.9
Data Center space and access 4.5
Email and Calendar 4.5
User account management 4.5
Campus‐wide business applications 4.4
Help desk support 4.1
Web site hosting 4.1
Research computing facilities 4
Server hosting and virtualization 4
Data storage 4
Software Licensing 3.9
Instructional facilities 3.86
IT Security 3.4
Central
Distributed
its.unc.edu 21
Collaboration applications (Sharepoint, wiki, web conferencing) 3.4
Video conferencing 3.4
Database administration and support 3
System administration 3
IT Training 2.9
Instructional applications 2.86
Research computing support 2.71
Instructional support 2.71
Research computing applications 2.6
Web site development 2.6
On site support 2.3
Web site support 2.1
Unit‐specific business applications 1.8
Specialized discipline or unit‐based support 1.36
Central
Distributed
Proposed Model for Rebalancing
Central vs. Distributed
its.unc.edu 22
IT Partnership Program
Design
Target the program individually for each unit
Focus on “priority” projects for greatest ROI
Meet with unit IT leadership in advance of 
“entrance” meeting
“Entrance” meeting with unit executives and IT 
leadership to determine greatest needs
Form joint team to examine opportunities for 
savings
“Exit” meeting with unit executives and IT leadership 
to lay out plan for adoption
its.unc.edu 23
IT Partnership Program
Priority Projects
Clearer articulation of 
central services
Better definition of what 
“should” be central vs. 
distributed
Server housing/hosting 
services
24/7 Help Desk 
consolidation
Network Attached Storage
Virtualized servers
Consolidate e‐mail and 
calendaring services in MS 
Exchange
Increased use of software 
site licensing
Virtual computing labs
its.unc.edu 24
Status
Need further vetting of central vs. distributed model
“Savings” can include
•Reductions (e.g., consolidation, budget cuts) 
•Cost avoidance (e.g., info security)
ITS customer service initiative put in place
Have begun IT Partnership Program meetings with 
campus units
Have generated one‐pager service summaries to 
showcase the various IT projects
its.unc.edu 25
Sample of
one-page
service
summaries
its.unc.edu 26
Complexity of
UNC organization
its.unc.edu 272
7
02_26
S
Spans and Layers:
Information Technology Services
Number of supervised units
No supervised units
1-3 units
4-7 units
> 7 units
Source: ITS HR data, Jan 2010
Note: analysis excludes 5 administrative
personnel;
Center point represents Layer 3 (CIO)
FTEs:
Mgrs:
Span:
419
73
5.7
Research Computing
User Support
& Engagement
Communication
Technologies
Teaching &
Learning
Deputy CIO
Enterprise Applications and ERP
Infrastructure
& Operations
Eliminated Layer
8 altogetherEliminated exec.
position with 2
direct reports
its.unc.edu 28
Improving Efficiency
ITS has eliminated 34 filled positions with minimal 
impact on customers
…that includes 5 executive level positions
ITS spans and layers:
•Increased average span slightly from 5.4 to 5.7
•Eliminated “layer 8” altogether
its.unc.edu 29
Results to Date
Consolidate (Med School) Help Desk: $120K/yr;   
servers in ITS computer room: $150K non‐recurring
Reduce use of “on‐call” pay: $700K/yr
Improved staff efficiency/spans and layers: 
•$3.8M in ITS –includes FY2010‐11 budget cuts
•$1.9M in campus IT –not included FY2010‐11 
budget cuts
For a total of: $6.5M/yr (plus $150K non‐recurring)
New IT governance structure put in place
its.unc.edu 30
Mission
Challenges
Bain survey of IT personnel: 
~1100 IT personnel, $100m in personnel
Applications, end‐user support, and system 
admin./maint. are largest components
Bain pressed a traditional corp. model:
consolidate staffing and top‐down directives
Collides with Carolina culture…
How do we drive adoption of the IT projects 
which could save units money?
its.unc.edu 31
Program Enablers 
and Challenges
its.unc.edu 32
•Input and buy‐in from the constituents
•Tracked results, and accountability for the results
•Open and transparent process and measurements
•Public scrutiny through community involvement
•Published comparative benchmarks
•Technical /tactical support from program office
Program Success Factors
its.unc.edu 33
Over three years:
Research Funding Growth‐ 165%
Faculty Growth‐ 60%
Budget Growth‐ 68%
Staff Growth‐ negative 18% 
Infrastructure cost Percentage‐ under 11%
Recommended as a model for UNC 
Accomplishments in
one school- An Example
its.unc.edu 34
Lessons Learned:
Cautions/ Roadblocks
• “We are different”
• Stay within the comfort zone
• Complacent with “low hanging fruit”
• “Already have done everything that could be done”
• Delegate too far down resulting in inaction
• Procrastinate till this will go away
• Lack of desire or disincentive to make unpopular 
decisions
its.unc.edu 35
•Aggressive “marketing ” effort: present a value 
proposition to make solutions attractive
•Build “Trust” through frequent communications 
minimizing fears of arbitrary/self serving solutions 
•Frequent reemphasis by the top management
•Routinely assess the program and perform course 
correction as needed
Program Sustainability
its.unc.edu 36
Questions?

More Related Content

Viewers also liked

Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
Marketing Festival
 
In memory computing
In memory computingIn memory computing
In memory computing
Gagan Reddy
 
David guetta
David guettaDavid guetta
David guetta
sam_beecham
 
Getting Started - MongoDB
Getting Started - MongoDBGetting Started - MongoDB
Getting Started - MongoDB
Wildan Maulana
 
Node JS
Node JSNode JS
Node JS
Ynon Perek
 
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBoosterDigital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
Webanalisten .nl
 
Datomic
DatomicDatomic
Datomic
Jordan Leigh
 
Jim rohn
Jim  rohnJim  rohn
Datomic
DatomicDatomic
Datomic
DatomicDatomic
Datomic
jperkelens
 
Waldorf Education
Waldorf EducationWaldorf Education
Waldorf Education
xMerodi
 
Tesco
TescoTesco
Selena Gomez
Selena GomezSelena Gomez
Selena Gomez
guest5fa9931
 
Management Consulting
Management ConsultingManagement Consulting
Management Consulting
Alexandros Chatzopoulos
 
Oprah Winfrey
Oprah WinfreyOprah Winfrey
Oprah Winfrey
Utkarsh Haldia
 
Clojure
ClojureClojure
Clojure
Rohit Vaidya
 
Medical devices
Medical devicesMedical devices
Medical devices
Somnath Zambare
 
Cerebral Palsy
Cerebral PalsyCerebral Palsy
Cerebral Palsy
eKindling.org
 

Viewers also liked (18)

Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
Simo Ahava - Tag Management Solutions – Best. Data. Ever. MKTFEST 2014
 
In memory computing
In memory computingIn memory computing
In memory computing
 
David guetta
David guettaDavid guetta
David guetta
 
Getting Started - MongoDB
Getting Started - MongoDBGetting Started - MongoDB
Getting Started - MongoDB
 
Node JS
Node JSNode JS
Node JS
 
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBoosterDigital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
Digital Data Tips Tuesday #1 - Tag Management: Simo Ahava - NetBooster
 
Datomic
DatomicDatomic
Datomic
 
Jim rohn
Jim  rohnJim  rohn
Jim rohn
 
Datomic
DatomicDatomic
Datomic
 
Datomic
DatomicDatomic
Datomic
 
Waldorf Education
Waldorf EducationWaldorf Education
Waldorf Education
 
Tesco
TescoTesco
Tesco
 
Selena Gomez
Selena GomezSelena Gomez
Selena Gomez
 
Management Consulting
Management ConsultingManagement Consulting
Management Consulting
 
Oprah Winfrey
Oprah WinfreyOprah Winfrey
Oprah Winfrey
 
Clojure
ClojureClojure
Clojure
 
Medical devices
Medical devicesMedical devices
Medical devices
 
Cerebral Palsy
Cerebral PalsyCerebral Palsy
Cerebral Palsy
 

Similar to Carolina Counts: An Update on the Bain Consulting Report

OneIS CANHEIT V03 NN
OneIS CANHEIT V03 NNOneIS CANHEIT V03 NN
OneIS CANHEIT V03 NN
Mark Roman
 
Chris Vanderweylan
Chris VanderweylanChris Vanderweylan
Chris Vanderweylan
ozewai
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Public
dmader
 
Work Portfolio_2015
Work Portfolio_2015Work Portfolio_2015
Work Portfolio_2015
Steve Marquie
 
Work portfolio 2015
Work portfolio 2015Work portfolio 2015
Work portfolio 2015
Steve Marquie
 
UAEU - Phase I Project Report
UAEU - Phase I Project ReportUAEU - Phase I Project Report
UAEU - Phase I Project Report
Michael Dobe, Ph.D.
 
Intro Imms Final
Intro Imms FinalIntro Imms Final
Intro Imms Final
hcrawford64
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
Arantico Ltd
 
IT Best Practices for Community Colleges Part 2: Business Continuity 2010
IT Best Practices for Community Colleges Part 2: Business Continuity 2010IT Best Practices for Community Colleges Part 2: Business Continuity 2010
IT Best Practices for Community Colleges Part 2: Business Continuity 2010
Donald E. Hester
 
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS EnergyIntegration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
TheAnfieldGroup
 
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS EnergyIntegration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
stacybre
 
Ignou MCA mini project report
Ignou MCA mini project reportIgnou MCA mini project report
Ignou MCA mini project report
Hitesh Jangid
 
End-to-End Grant Management
End-to-End Grant ManagementEnd-to-End Grant Management
End-to-End Grant Management
StreamLinkSoftware
 
ProcessWorld_2010_WashingtonDC_Governance
ProcessWorld_2010_WashingtonDC_GovernanceProcessWorld_2010_WashingtonDC_Governance
ProcessWorld_2010_WashingtonDC_Governance
John Suzanne
 
How CIOs Take Control of IT Investments with Integrated Portfolio Management
How CIOs Take Control of IT Investments with Integrated Portfolio ManagementHow CIOs Take Control of IT Investments with Integrated Portfolio Management
How CIOs Take Control of IT Investments with Integrated Portfolio Management
UMT360
 
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Kuali Days UK
 
Green it and audit
Green it and auditGreen it and audit
Green it and audit
KAMLESH SONI
 
Chris wallace digital_trends_11
Chris wallace digital_trends_11Chris wallace digital_trends_11
Chris wallace digital_trends_11
Hellenic Professionals Informatics Society
 
Leveraging Your Security System to Impact Your Bottom line
Leveraging Your Security System to Impact Your Bottom lineLeveraging Your Security System to Impact Your Bottom line
Leveraging Your Security System to Impact Your Bottom line
guidepostsolutions
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
2014 Florida Public Works Expo
 

Similar to Carolina Counts: An Update on the Bain Consulting Report (20)

OneIS CANHEIT V03 NN
OneIS CANHEIT V03 NNOneIS CANHEIT V03 NN
OneIS CANHEIT V03 NN
 
Chris Vanderweylan
Chris VanderweylanChris Vanderweylan
Chris Vanderweylan
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Public
 
Work Portfolio_2015
Work Portfolio_2015Work Portfolio_2015
Work Portfolio_2015
 
Work portfolio 2015
Work portfolio 2015Work portfolio 2015
Work portfolio 2015
 
UAEU - Phase I Project Report
UAEU - Phase I Project ReportUAEU - Phase I Project Report
UAEU - Phase I Project Report
 
Intro Imms Final
Intro Imms FinalIntro Imms Final
Intro Imms Final
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
 
IT Best Practices for Community Colleges Part 2: Business Continuity 2010
IT Best Practices for Community Colleges Part 2: Business Continuity 2010IT Best Practices for Community Colleges Part 2: Business Continuity 2010
IT Best Practices for Community Colleges Part 2: Business Continuity 2010
 
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS EnergyIntegration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
 
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS EnergyIntegration of Technology & Compliance Presented by John Heintz, CPS Energy
Integration of Technology & Compliance Presented by John Heintz, CPS Energy
 
Ignou MCA mini project report
Ignou MCA mini project reportIgnou MCA mini project report
Ignou MCA mini project report
 
End-to-End Grant Management
End-to-End Grant ManagementEnd-to-End Grant Management
End-to-End Grant Management
 
ProcessWorld_2010_WashingtonDC_Governance
ProcessWorld_2010_WashingtonDC_GovernanceProcessWorld_2010_WashingtonDC_Governance
ProcessWorld_2010_WashingtonDC_Governance
 
How CIOs Take Control of IT Investments with Integrated Portfolio Management
How CIOs Take Control of IT Investments with Integrated Portfolio ManagementHow CIOs Take Control of IT Investments with Integrated Portfolio Management
How CIOs Take Control of IT Investments with Integrated Portfolio Management
 
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
 
Green it and audit
Green it and auditGreen it and audit
Green it and audit
 
Chris wallace digital_trends_11
Chris wallace digital_trends_11Chris wallace digital_trends_11
Chris wallace digital_trends_11
 
Leveraging Your Security System to Impact Your Bottom line
Leveraging Your Security System to Impact Your Bottom lineLeveraging Your Security System to Impact Your Bottom line
Leveraging Your Security System to Impact Your Bottom line
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
 

Carolina Counts: An Update on the Bain Consulting Report