The document provides information on career options after 10th and 12th standards in various fields such as engineering, aviation, shipping, architecture, agriculture, mining, petroleum, plastics, polymers, rubber, tool and die making, ceramics, and textiles. It discusses the nature of work, required personality and courses available for different careers. Specific careers discussed include commercial pilot, aircraft mechanic, air traffic controller, merchant navy officer, architect, civil engineer, electronics engineer, agricultural engineer, mining engineer, petroleum engineer, plastic engineer and ceramic engineer. Courses range from diplomas to B.Tech and M.Tech degrees offered by various institutes.