Queues and Batches
PLAYBOOK LEAN PRODUCT DEVELOPMENT SERIES

PLAYBOOKHQ.co
@PLAYBOOKHQ
PLAYBOOK LEAN PRODUCT DEVELOPMENT SERIES
This series is for anyone interested in Lean, Agile and team principles
and how they can be applied in new product development scenarios
to increase innovation, improve delivery times and create engaged,
happy, high-performing teams.

PLAYBOOKHQ.co
@PLAYBOOKHQ
Notes:
1. A queue is where the flow of anything stops to wait for something else to happen.
a. People waiting in line at the grocery store.
b. ECOs in an Approver’s inbox.
c. Parts waiting for inspection.
2. What examples did you think of?
a. ____________________________________________________
b. ____________________________________________________
c. ____________________________________________________

d. ____________________________________________________
3. There are many examples throughout product development.
Notes:
1. The majority of New Product Development time is spent in _______________.
2. Queue Time is typically _______________ than Server Time.
a. Does the image shown in the slide make sense?
b. Do you believe it?
c. Examples:
i.

ECOs sit in someone’s inbox waiting to be reviewed and signed.

ii. Information waits in someone’s head waiting to be shared with someone
that needs it.
3. What would happen if all of the top-priority project’s tasks were processed
immediately?
___________________________________________________________________.
4. The perceived problem is that every other project in the system would get
_______________. Is this really a problem?
a. Is it bad to delay a lower priority project in order to speed up a higher priority
project?
b. Where is the highest cost of delay? How will you make the most money?
c. What is the alternative?
5. Queues can be managed in ways that will speed up execution of all projects.
6. In order to better manage queues, you need to understand what creates them.
Notes:
1. In this example Arrival Rate = 2 items/unit time and Departure Rate = 1 item/unit
time.
2. Let’s say the items are Engineering drawings entering into Document Control for
release and the unit of time is days.
3. After 10 days, how many drawings will there be in the queue (i.e. WIP inventory)?
________.
4. Assuming nothing changes, how long would you expect to wait for Document Control
to release the drawings in the queue on Day 10 (i.e. Cycle Time)?
__________________.
5. What makes this queue go away?
______________________________________________.
Notes:
1. The first source of queues is when the system is _______________.
a. Too many shoppers in line at the grocery store.
b. Too many ECOs in Document Control’s or an Approver’s inbox.
2. System loading relates to how much the resources are utilized.
3. Capacity Utilization has a non-linear effect on cycle time.
a. Non-linear indicates a _______________ point.
b. Small changes can have a big impact (positive or negative).
4. When the arrival rate consistently exceeds the processing rate, a _______________
will form and never go away, and the system will be at 100% utilization forever.
Notes:
1. As the system becomes more loaded, it takes _______________ to get through it.
2. The image above shows the non-linear effect of capacity utilization on duration.
a. Wherever you are on the curve, go halfway to 100% and you
_______________ cycle time.
b. Increase utilization from 60% to 80% and double the time it takes to get
through the system.
c. Increase utilization from 80% to 90% and double it again.
d. Notice how quickly cycle time rises at high levels of capacity utilization.

e. What percent capacity utilization do you think Product Development is at?
_________.
3. The roads and highways are a good analogy…
a. At rush hour a highway is at high utilization.

b. By blocking 1 lane of 4, we further increase the “loading” of the remaining 3
lanes by 33%.
c. How far does a 33% increase move you if you were initially at 20% loaded?
_________.
d. How far does a 33% increase move you if you were initially at 75% loaded?
_________.
e. What’s the relative difference in the cycle time of the system in each case?
______________ and ______________.
Notes (continued):
4. Duration = Work/Availability
a. How long something takes (Duration) is determined by how much work is
involved (Work) and how much time you have to perform that work
(Availability).
b. The more utilized you are, the less available you are, and therefore it will take
longer.
5. What happens to Duration as Availability goes to 0?_______________.
6. This is one of the keys to Lean Product Development…
a. _______________ is more Profitable than Efficiency!
b. If you want to get projects done faster and be more profitable, keep resource
utilization low!
c. The increase in profit from faster projects more than pays for the extra
capacity.
d. You cannot make more profit by working on more things!
e. Everything takes longer!
Notes:
1. Variability has many impacts on queues.
2. Variability can be from…
a. ________________ rate
b. ________________ time
3. Product development has a lot of variability….
a. How long will it take to determine a requirement?
b. How long will it take to complete a design?
c. How long will it take to troubleshoot a circuit board?
4. Variability makes it more difficult to optimize a system.
5. Techniques for reducing variability include…
a. _______________ processes
b. _______________ designs
c. _______________ tools and processes
d. _______________ batch sizes
6. Variability causes the Capacity Utilization curve to rise sooner, which means you
have to run the system with even more spare _______________.
7. Not all variability is bad… you can’t create new and innovative products without
variability…
8. What are examples of bad variability? _______________.
Notes:
9. There’s uncertainty in the amount of Work. How accurate do you think your Work
estimates are (plus or minus %)?
10.There’s uncertainty in your Availability. How certain are you in your Availability (plus
or minus%)?
Notes:
1. One source of variability AND queues are large batches. Examples:
a. Baking cookies.
b. A long line of cars trying to enter the highway.
c. A large number of drawings on one ECO.
2. A batch can load that part of the system to _______________ utilization.
a. The system will remain overloaded until the batch has been completely
processed.
b. Any hiccups (i.e. additional variability) can cause major slowdowns.
c. This will result in batches piling up into a _______________ queue state which
takes a long time to clear.
3. The positive effect of small batch size is one of the reasons for the metering lights at
highway on-ramps.
4. Items in a batch typically spend time in two queues.
a. Inbox queue
Example: for ECOs with multiple drawings, all drawings except the first have
to wait while the first one is being reviewed by the approver.
b. Outbox queue
Example: for ECOs with multiple drawings, once the first drawing has been
completed, it must wait for all of the others to be completed .
5. And every queue ____________ the flow! And time is again wasted waiting in line.
6. One piece flow is the ultimate goal of Lean Manufacturing. In Product Development
easy to use tools and systems that utilize smaller batch sizes must be developed and
implemented.
Notes:
1. Remember: If the arrival rate slope = 2 items/unit time and the departure rate
slope = 1 item/unit time, then after 10 units of time, how many will I have in my
queue? _______________.
2. What happens if suddenly, someone puts a large batch of work into the system?
___________________________________________________________________.
Notes:
1. We can manage and reduce the queues, and increase the flow (throughput) as a
result.
2. Let’s look at each of these in more detail.
a. Increase Capacity
i.

Very _______________

ii. _______________ cost
iii. The work in the system will expand to fill it unless active limits are put in
place.

b. Manage Demand
i.

This can reduce customer offerings or increase risk by eliminating tasks.

ii. Be careful not to batch to create _______________ efficiencies. They
hurt much more than they help.
c. Reduce Variability

i.

You cannot eliminate all variability and still develop _______________
new products.

ii. Variability reduction can be expensive.
d. Use Control Systems
i.

This option is very effective, but can require active management and
attention.

e. Batch size _______________ is the most effective, least cost option.
Notes:
1. Throttling Demand controls the cadence at which work is put into the system.
2. Highways throttle demand at times of high capacity by slowing the rate at which
vehicles can enter the highway at on-ramps using metering lights.
a. Decreases congestion and breaks up ‘platoons’ of vehicles.
i.

Platoons are groups of vehicles traveling in close proximity to each other,
such as a group released by a traffic signal changing from red to green.

ii. Platoons are an example of _______________.
b. Improves _______________ through the bottleneck prone region.
3. Work in Progress (WIP) constraints limit the amount of work in any part of the
system.
a. The total number of vehicles allowed on the highway at one time could be
limited. Once the limit is reached, on-ramp gates could be closed until a certain
number of vehicles exited the highway at which time the on-ramp gates could
re-open and allow more vehicles to enter the system.
b. Companies could limit the number of active projects in Development to a fixed
number of projects. Future projects can begin only when a previous project has
been completed (i.e. as resources are available).
c. To be effective, WIP Constraints require everyone’s discipline from Senior
Management down.
Notes:
1. When reorganized as shown, Projects A & B have the benefit of an early completion,
thus increasing their profit potential.
2. Projects C & D have the benefit of a late start… information learned by completing
Projects A & B is applied.
Notes:
Push vs. Pull Systems
1. A traditional Push system is one in which work is pushed or loaded on the resources
as soon as it exists.
2. Pushing work slows down the system as it:
a. Overloads the resources
b. Creates queues
c. Encourages multitasking
d. All of which result in higher cycle times (lower throughput).
3. In Pull systems resources pull work from a limited, small backlog of prioritized work
as they have spare capacity.
a. In order to give someone work, other work has to be completed or removed
first.
b. In this way Pull systems naturally constrain WIP
4. As a result Pull systems:
a. Don’t overload resources
b. Minimize queues
c. Don’t encourage multitasking
d. All of which result in lower cycle times (higher throughput).
5. This is one principle of Lean Manufacturing that has great benefit in Product
Development.
Notes (continued):
Push vs. Pull Systems
6. For Example, back to our cafeteria:
a. Even if people arrive at predefined times, lines (queues) will form due to
variability in processing time.
i. John arrived on schedule but he ordered lunch for the 4 other people in his
meeting…
OR
ii. The cash register runs out of receipt paper or needs to get change or the
credit card machine breaks down…
iii. As a result Bill arrives at his predefined time to find there’s a line and he
has to wait to place his order and get his lunch
iv. A push system lacks active monitoring of the system’s capacity and
continues to unknowingly load the system
b. In a Pull system the number of people in line at any time would be actively
monitored and demand managed
i.

A text message or other form of notification would be sent to the next
person to be served lunch when the cafeteria can handle more people

ii. This would keep lines shorter and processing times shorter
Overview
1.

The game represents stages of any process.

2.

Players receive a batch of items, process that batch, and pass the batch to the
next person in the process.

3.

A roll of a die will determine how much work each person gets done each day.

Setup
1.
Organize into groups of 4 players.
2.

Each group assigns each player one of the following roles:
Engineer, Document Control, Approver I, and Approver II (for groups of 3,
Approver I & Approver II are the same player).

3.

Arrange players in the following sequence:

4.

Each player has an Inbox and an Outbox.

5.

The Engineer places 30 Drawings in his Inbox, i.e. 3 stacks of 10 poker chips.

6.

Approver II plays and keeps track the of team’s progress on the Score Sheet.
How to Play
1.

On Day 1 the Engineer roles the die and moves the rolled amount of drawings from
his Inbox to his Outbox. On the Score Sheet Approver II notes in the Day 1 row on
the number of drawings moved.

2.

If the Engineer doesn’t have a batch of 10 drawings in his Outbox, he continues his
work on Day 2 by rolling the die and moving the rolled amount of drawings from
his Inbox to his Outbox. Approver II notes in the Day 2 row on the Score Sheet
the number of drawings moved.

3.

When the Engineer has a batch of 10 drawings in his Outbox, then, and only
then, he moves 1 stack of 10 drawings to Document Control’s Inbox.

4. On the same day Document Control rolls the die and moves the rolled amount
from his Inbox to his Outbox. Approver II notes in the appropriate Day row the
number of drawings moved.
5.

If Document Control doesn’t have a batch of 10 drawings in his Outbox, play
continues on the next day starting again with the Engineer.
Note: Each player plays, one at a time, in sequential order only, not in parallel
(i.e. No playing while others are rolling their die).

6.

When Document Control has a batch of 10 drawings, then, and only then, he
moves 1 stack of 10 drawings to Approver I’s Inbox.

7. On the same day Approver I rolls the die and moves the rolled amount from her
Inbox to her Outbox. Approver II notes the number of drawings moved.
8.

If Approver I doesn’t have a batch of 10 drawings in his Outbox, play continues on
the next day starting again with the Engineer, followed by Document Control, then
Approver I. Play continues until all 4 players are processing drawings.

9.

When Approver II has a batch of 10 drawings in his Outbox, then, and only then,
he notes it as a Completed Batch on the Score Sheet on the same day.

10. The game is over when all of 30 drawings, 3 batches of 10, have been completed.
11. Each group will play two games:
Game #1: Drawings = 30, Batch size = 10
Game #2: Drawings = 30, Batch size = 2
12. Complete Game #1 before starting Game #2.
13. Compare and contrast the games and be prepared to discuss with everyone.
What did you notice?
1. After Game 1 (batch size = 10)
a. How long did it take to get the 1st batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel?
d. Let’s say there is a problem with drawing #2 that only Approver II can identify.
i.

How long did it take to find out there was a problem (i.e. how long is the
learning delayed)?

ii. How long would it take to get drawing #2 back through the process to
where you were assuming it had to go through the same process (i.e.
Engineer diagnose/correct, Document Control process, Approver I reviews,
Approver II reviews)?
e. What’s the impact of Approver II waiting to go through Approver I?
f.

What happens if either Approver only had 30 min on a day to review drawings?

2. After Game 2 (batch size = 2)

a. How long did it take to get the 1st batch and last batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel in comparison to Game 1?
d. Let’s say there is a problem with drawing #2 that only Approver II can identify.
i.

How long did it take to find out there was a problem? How long is the
learning delayed?

ii. How long would it take to get drawing #2 back through the process to
where you were assuming it had to go through the same process (i.e.
Engineer diagnose/correct, Document Control process, Approver I reviews,
Approver II reviews)?

e. What’s the impact of Approver II waiting to go through Approver I?
f.

What happens if either Approver only had 30 min on a day to review drawings?
Notes:
1. Each game simulates a different approach to increasing the throughput of a system
(i.e. reducing system cycle time).
2. Use the same guidelines to play each game.
3. Print the score sheets for each and record your results.

4. Compare and contrast the games and be prepared to discuss with everyone.
What did you notice?
1. Increase Capacity (Batch size = 10; Add 1 to each roll to increase capacity 33%)
a. How long did it take to get the 1st batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel? Did you feel less overloaded?
d. Let’s say there is a problem with drawing #2 that only Approver II can identify.
i.

How long did it take to find out there was a problem (i.e. how long is the learning
delayed)?

ii. How long would it take to get drawing #2 back through the process to where you
were assuming it had to go through the same process (i.e. Engineer diagnose/correct,
Document Control process, Approver I reviews, Approver II reviews)?
2. Manage Demand (Batch size = 10; #drawings reduced by 33% to 20)
a. How long did it take to get the 1st batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel? Did you feel less overloaded?
d. The main benefit of managing demand is that you would most likely not work on one stack
of drawings at a time, instead you’ll multitask and further slow down the system.
Therefore, managing demand helps minimize multitasking.
3. Reduce Variability (All rolls ≤ 3 = 3; All rolls ≥ 4 =4)
a. How long did it take to get the 1st batch through the system?

b. How long did it take to get the last batch through the system?
c. How did you feel? Did you feel less overloaded?
d. Should this have done us any good?
e. Time Blocking promotes the same benefit (details in the Visual Work Management class).

4. Reduce Batch Size & Increase Work (Increase Work 20% to 36 drawings; Batch size = 2)
a. How long did it take to get the 1st batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel? Did you feel less overloaded?
d. We got 20% more work done in the same amount of time (or less) than the baseline game
(Game 1).
e. Some of the added work is in the form of transaction cost, not only the drawings.
f. Was the cost of operating higher or lower than the baseline game?
5. Flexible Resources (When there are 7 or more drawings in your Inbox, roll twice. Except for the
Engineer.)
a. How long did it take to get the 1st batch through the system?
b. How long did it take to get the last batch through the system?
c. How did you feel? Did you feel less overloaded?
d. What do you need to have in place in order to be able to utilize flexible resources?
e. Was the cost of operating higher or lower than the baseline game?
Notes:
1. The Total Cost Curve (U-shaped) applies to ___________________ batches.
2. Cost of Delay rises with ___________________ size.

3. You don’t have to be perfect because the bottom of the total cost curve is fairly
___________________.
4. If you approach the sharp incline on the left, your total cost ___________________
dramatically.
5. Most companies are too far to the ___________________ in most areas.
6. We try to save a little ___________________ by batching things, but we lose
___________________ than we save from the delay that the batch causes.
7. Focus on reducing ___________________ and you will reduce costs
8. If you reduce costs, you increase _______________.
Key Takeaways
1. A queue stops the flow
– Slows the development process
– Find and reduce the queues and you will speed up
development

2. Duration varies greatly with resource availability
–

–

You lose more time when a resource’s availability goes
down than you gain back when it goes up by an
equivalent amount.
Keeping availability above 50% will ensure much more
accurate task duration estimates.

3. What’s the most effective, least expensive way
to reduce queues? Reduce Batch Sizes!
PLAYBOOKHQ.co
@PLAYBOOKHQ
THANK YOU!

PLAYBOOKHQ.co
@PLAYBOOKHQ

PLAYBOOKHQ.co
@PLAYBOOKHQ

More Related Content

What's hot

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingJitesh Gaurav
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROAnastasia Krylova
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsTKMG, Inc.
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3TKMG, Inc.
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniquesHakeem-Ur- Rehman
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20Kyle Bakken
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsTKMG, Inc.
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolbhanutomar
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingShaunak Kale
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)Mohamed Effat
 
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...Steve Rogalsky
 

What's hot (19)

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PRO
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service Environments
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
 
VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Lean section 2
Lean section 2Lean section 2
Lean section 2
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...
Using Value Stream Mapping to make the case for Acceptance Test Driven Develo...
 

Viewers also liked

Magazine anotations
Magazine anotationsMagazine anotations
Magazine anotationsdangleeson
 
Audience profile
Audience profileAudience profile
Audience profiledangleeson
 
Camera editing ppt
Camera editing pptCamera editing ppt
Camera editing pptdangleeson
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysisdangleeson
 
Target audience
Target audienceTarget audience
Target audiencedangleeson
 
Survey results
Survey resultsSurvey results
Survey resultsdangleeson
 
Magazine institutions
Magazine institutionsMagazine institutions
Magazine institutionsdangleeson
 
Clearing Silverlight Application Storage
Clearing Silverlight Application StorageClearing Silverlight Application Storage
Clearing Silverlight Application StoragePlaybook
 
Props and costumes
Props and costumesProps and costumes
Props and costumesdangleeson
 
Promotional methods
Promotional methodsPromotional methods
Promotional methodsdangleeson
 
Information Theory in New Product Development
 Information Theory in New Product Development Information Theory in New Product Development
Information Theory in New Product DevelopmentPlaybook
 
Target audience
Target audienceTarget audience
Target audiencedangleeson
 
Codes and conventions
Codes and conventionsCodes and conventions
Codes and conventionsdangleeson
 
Connotations of colour
Connotations of colourConnotations of colour
Connotations of colourdangleeson
 

Viewers also liked (20)

Magazine anotations
Magazine anotationsMagazine anotations
Magazine anotations
 
Audience profile
Audience profileAudience profile
Audience profile
 
Equipment
EquipmentEquipment
Equipment
 
Camera editing ppt
Camera editing pptCamera editing ppt
Camera editing ppt
 
Equipment
EquipmentEquipment
Equipment
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Target audience
Target audienceTarget audience
Target audience
 
Survey results
Survey resultsSurvey results
Survey results
 
Film editing
Film editingFilm editing
Film editing
 
Semiotics
SemioticsSemiotics
Semiotics
 
Magazine institutions
Magazine institutionsMagazine institutions
Magazine institutions
 
Clearing Silverlight Application Storage
Clearing Silverlight Application StorageClearing Silverlight Application Storage
Clearing Silverlight Application Storage
 
Talleres y tareas
Talleres y tareasTalleres y tareas
Talleres y tareas
 
Props and costumes
Props and costumesProps and costumes
Props and costumes
 
Promotional methods
Promotional methodsPromotional methods
Promotional methods
 
Information Theory in New Product Development
 Information Theory in New Product Development Information Theory in New Product Development
Information Theory in New Product Development
 
Equipment
EquipmentEquipment
Equipment
 
Target audience
Target audienceTarget audience
Target audience
 
Codes and conventions
Codes and conventionsCodes and conventions
Codes and conventions
 
Connotations of colour
Connotations of colourConnotations of colour
Connotations of colour
 

Similar to Queues & Batches in Product Development

Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Critical Chain Project Management
Critical Chain Project ManagementCritical Chain Project Management
Critical Chain Project ManagementPlaybook
 
0205 Product Design - Part II.docxProduct Design – Part II.docx
0205 Product Design - Part II.docxProduct Design – Part II.docx0205 Product Design - Part II.docxProduct Design – Part II.docx
0205 Product Design - Part II.docxProduct Design – Part II.docxmercysuttle
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateyearstart1
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateramuaa124
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)ramuaa130
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comdonaldzs34
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataramuaa128
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...ramuaa127
 
Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018ramuaa124
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...ramuaa124
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...yearstart1
 
PMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperPMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperThanh Nguyen
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesramuaa124
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesyearstart1
 

Similar to Queues & Batches in Product Development (20)

Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Critical Chain Project Management
Critical Chain Project ManagementCritical Chain Project Management
Critical Chain Project Management
 
Agile survival kit
Agile survival kitAgile survival kit
Agile survival kit
 
0205 Product Design - Part II.docxProduct Design – Part II.docx
0205 Product Design - Part II.docxProduct Design – Part II.docx0205 Product Design - Part II.docxProduct Design – Part II.docx
0205 Product Design - Part II.docxProduct Design – Part II.docx
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
Is Python still production ready ? Ludovic Gasc
Is Python still production ready ? Ludovic GascIs Python still production ready ? Ludovic Gasc
Is Python still production ready ? Ludovic Gasc
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.com
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following data
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...
 
Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...
 
PMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperPMI ACP Classroom Question Paper
PMI ACP Classroom Question Paper
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 

More from Playbook

Benefits of Visual Project Management Software
Benefits of Visual Project Management SoftwareBenefits of Visual Project Management Software
Benefits of Visual Project Management SoftwarePlaybook
 
Playbook Lean and Agile Project Management Software and Methods Presentation
Playbook Lean and Agile Project Management Software and Methods PresentationPlaybook Lean and Agile Project Management Software and Methods Presentation
Playbook Lean and Agile Project Management Software and Methods PresentationPlaybook
 
Project Risk Management in Product Development
Project Risk Management in Product DevelopmentProject Risk Management in Product Development
Project Risk Management in Product DevelopmentPlaybook
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementPlaybook
 
Visual Work Management in Product Development
Visual Work Management in Product DevelopmentVisual Work Management in Product Development
Visual Work Management in Product DevelopmentPlaybook
 
Project Economics in New Product Development
Project Economics in New Product DevelopmentProject Economics in New Product Development
Project Economics in New Product DevelopmentPlaybook
 

More from Playbook (6)

Benefits of Visual Project Management Software
Benefits of Visual Project Management SoftwareBenefits of Visual Project Management Software
Benefits of Visual Project Management Software
 
Playbook Lean and Agile Project Management Software and Methods Presentation
Playbook Lean and Agile Project Management Software and Methods PresentationPlaybook Lean and Agile Project Management Software and Methods Presentation
Playbook Lean and Agile Project Management Software and Methods Presentation
 
Project Risk Management in Product Development
Project Risk Management in Product DevelopmentProject Risk Management in Product Development
Project Risk Management in Product Development
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Visual Work Management in Product Development
Visual Work Management in Product DevelopmentVisual Work Management in Product Development
Visual Work Management in Product Development
 
Project Economics in New Product Development
Project Economics in New Product DevelopmentProject Economics in New Product Development
Project Economics in New Product Development
 

Recently uploaded

Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 

Queues & Batches in Product Development

  • 1. This work is licensed under a Creative Commons Attribution-NoDerivs 3.0 Unported License. Queues and Batches PLAYBOOK LEAN PRODUCT DEVELOPMENT SERIES PLAYBOOKHQ.co @PLAYBOOKHQ
  • 2. PLAYBOOK LEAN PRODUCT DEVELOPMENT SERIES This series is for anyone interested in Lean, Agile and team principles and how they can be applied in new product development scenarios to increase innovation, improve delivery times and create engaged, happy, high-performing teams. PLAYBOOKHQ.co @PLAYBOOKHQ
  • 3. Notes: 1. A queue is where the flow of anything stops to wait for something else to happen. a. People waiting in line at the grocery store. b. ECOs in an Approver’s inbox. c. Parts waiting for inspection. 2. What examples did you think of? a. ____________________________________________________ b. ____________________________________________________ c. ____________________________________________________ d. ____________________________________________________ 3. There are many examples throughout product development.
  • 4. Notes: 1. The majority of New Product Development time is spent in _______________. 2. Queue Time is typically _______________ than Server Time. a. Does the image shown in the slide make sense? b. Do you believe it? c. Examples: i. ECOs sit in someone’s inbox waiting to be reviewed and signed. ii. Information waits in someone’s head waiting to be shared with someone that needs it. 3. What would happen if all of the top-priority project’s tasks were processed immediately? ___________________________________________________________________. 4. The perceived problem is that every other project in the system would get _______________. Is this really a problem? a. Is it bad to delay a lower priority project in order to speed up a higher priority project? b. Where is the highest cost of delay? How will you make the most money? c. What is the alternative? 5. Queues can be managed in ways that will speed up execution of all projects. 6. In order to better manage queues, you need to understand what creates them.
  • 5. Notes: 1. In this example Arrival Rate = 2 items/unit time and Departure Rate = 1 item/unit time. 2. Let’s say the items are Engineering drawings entering into Document Control for release and the unit of time is days. 3. After 10 days, how many drawings will there be in the queue (i.e. WIP inventory)? ________. 4. Assuming nothing changes, how long would you expect to wait for Document Control to release the drawings in the queue on Day 10 (i.e. Cycle Time)? __________________. 5. What makes this queue go away? ______________________________________________.
  • 6. Notes: 1. The first source of queues is when the system is _______________. a. Too many shoppers in line at the grocery store. b. Too many ECOs in Document Control’s or an Approver’s inbox. 2. System loading relates to how much the resources are utilized. 3. Capacity Utilization has a non-linear effect on cycle time. a. Non-linear indicates a _______________ point. b. Small changes can have a big impact (positive or negative). 4. When the arrival rate consistently exceeds the processing rate, a _______________ will form and never go away, and the system will be at 100% utilization forever.
  • 7. Notes: 1. As the system becomes more loaded, it takes _______________ to get through it. 2. The image above shows the non-linear effect of capacity utilization on duration. a. Wherever you are on the curve, go halfway to 100% and you _______________ cycle time. b. Increase utilization from 60% to 80% and double the time it takes to get through the system. c. Increase utilization from 80% to 90% and double it again. d. Notice how quickly cycle time rises at high levels of capacity utilization. e. What percent capacity utilization do you think Product Development is at? _________. 3. The roads and highways are a good analogy… a. At rush hour a highway is at high utilization. b. By blocking 1 lane of 4, we further increase the “loading” of the remaining 3 lanes by 33%. c. How far does a 33% increase move you if you were initially at 20% loaded? _________. d. How far does a 33% increase move you if you were initially at 75% loaded? _________. e. What’s the relative difference in the cycle time of the system in each case? ______________ and ______________.
  • 8. Notes (continued): 4. Duration = Work/Availability a. How long something takes (Duration) is determined by how much work is involved (Work) and how much time you have to perform that work (Availability). b. The more utilized you are, the less available you are, and therefore it will take longer. 5. What happens to Duration as Availability goes to 0?_______________. 6. This is one of the keys to Lean Product Development… a. _______________ is more Profitable than Efficiency! b. If you want to get projects done faster and be more profitable, keep resource utilization low! c. The increase in profit from faster projects more than pays for the extra capacity. d. You cannot make more profit by working on more things! e. Everything takes longer!
  • 9. Notes: 1. Variability has many impacts on queues. 2. Variability can be from… a. ________________ rate b. ________________ time 3. Product development has a lot of variability…. a. How long will it take to determine a requirement? b. How long will it take to complete a design? c. How long will it take to troubleshoot a circuit board? 4. Variability makes it more difficult to optimize a system. 5. Techniques for reducing variability include… a. _______________ processes b. _______________ designs c. _______________ tools and processes d. _______________ batch sizes 6. Variability causes the Capacity Utilization curve to rise sooner, which means you have to run the system with even more spare _______________. 7. Not all variability is bad… you can’t create new and innovative products without variability… 8. What are examples of bad variability? _______________.
  • 10. Notes: 9. There’s uncertainty in the amount of Work. How accurate do you think your Work estimates are (plus or minus %)? 10.There’s uncertainty in your Availability. How certain are you in your Availability (plus or minus%)?
  • 11. Notes: 1. One source of variability AND queues are large batches. Examples: a. Baking cookies. b. A long line of cars trying to enter the highway. c. A large number of drawings on one ECO. 2. A batch can load that part of the system to _______________ utilization. a. The system will remain overloaded until the batch has been completely processed. b. Any hiccups (i.e. additional variability) can cause major slowdowns. c. This will result in batches piling up into a _______________ queue state which takes a long time to clear. 3. The positive effect of small batch size is one of the reasons for the metering lights at highway on-ramps. 4. Items in a batch typically spend time in two queues. a. Inbox queue Example: for ECOs with multiple drawings, all drawings except the first have to wait while the first one is being reviewed by the approver. b. Outbox queue Example: for ECOs with multiple drawings, once the first drawing has been completed, it must wait for all of the others to be completed . 5. And every queue ____________ the flow! And time is again wasted waiting in line. 6. One piece flow is the ultimate goal of Lean Manufacturing. In Product Development easy to use tools and systems that utilize smaller batch sizes must be developed and implemented.
  • 12. Notes: 1. Remember: If the arrival rate slope = 2 items/unit time and the departure rate slope = 1 item/unit time, then after 10 units of time, how many will I have in my queue? _______________. 2. What happens if suddenly, someone puts a large batch of work into the system? ___________________________________________________________________.
  • 13. Notes: 1. We can manage and reduce the queues, and increase the flow (throughput) as a result. 2. Let’s look at each of these in more detail. a. Increase Capacity i. Very _______________ ii. _______________ cost iii. The work in the system will expand to fill it unless active limits are put in place. b. Manage Demand i. This can reduce customer offerings or increase risk by eliminating tasks. ii. Be careful not to batch to create _______________ efficiencies. They hurt much more than they help. c. Reduce Variability i. You cannot eliminate all variability and still develop _______________ new products. ii. Variability reduction can be expensive. d. Use Control Systems i. This option is very effective, but can require active management and attention. e. Batch size _______________ is the most effective, least cost option.
  • 14. Notes: 1. Throttling Demand controls the cadence at which work is put into the system. 2. Highways throttle demand at times of high capacity by slowing the rate at which vehicles can enter the highway at on-ramps using metering lights. a. Decreases congestion and breaks up ‘platoons’ of vehicles. i. Platoons are groups of vehicles traveling in close proximity to each other, such as a group released by a traffic signal changing from red to green. ii. Platoons are an example of _______________. b. Improves _______________ through the bottleneck prone region. 3. Work in Progress (WIP) constraints limit the amount of work in any part of the system. a. The total number of vehicles allowed on the highway at one time could be limited. Once the limit is reached, on-ramp gates could be closed until a certain number of vehicles exited the highway at which time the on-ramp gates could re-open and allow more vehicles to enter the system. b. Companies could limit the number of active projects in Development to a fixed number of projects. Future projects can begin only when a previous project has been completed (i.e. as resources are available). c. To be effective, WIP Constraints require everyone’s discipline from Senior Management down.
  • 15. Notes: 1. When reorganized as shown, Projects A & B have the benefit of an early completion, thus increasing their profit potential. 2. Projects C & D have the benefit of a late start… information learned by completing Projects A & B is applied.
  • 16. Notes: Push vs. Pull Systems 1. A traditional Push system is one in which work is pushed or loaded on the resources as soon as it exists. 2. Pushing work slows down the system as it: a. Overloads the resources b. Creates queues c. Encourages multitasking d. All of which result in higher cycle times (lower throughput). 3. In Pull systems resources pull work from a limited, small backlog of prioritized work as they have spare capacity. a. In order to give someone work, other work has to be completed or removed first. b. In this way Pull systems naturally constrain WIP 4. As a result Pull systems: a. Don’t overload resources b. Minimize queues c. Don’t encourage multitasking d. All of which result in lower cycle times (higher throughput). 5. This is one principle of Lean Manufacturing that has great benefit in Product Development.
  • 17. Notes (continued): Push vs. Pull Systems 6. For Example, back to our cafeteria: a. Even if people arrive at predefined times, lines (queues) will form due to variability in processing time. i. John arrived on schedule but he ordered lunch for the 4 other people in his meeting… OR ii. The cash register runs out of receipt paper or needs to get change or the credit card machine breaks down… iii. As a result Bill arrives at his predefined time to find there’s a line and he has to wait to place his order and get his lunch iv. A push system lacks active monitoring of the system’s capacity and continues to unknowingly load the system b. In a Pull system the number of people in line at any time would be actively monitored and demand managed i. A text message or other form of notification would be sent to the next person to be served lunch when the cafeteria can handle more people ii. This would keep lines shorter and processing times shorter
  • 18. Overview 1. The game represents stages of any process. 2. Players receive a batch of items, process that batch, and pass the batch to the next person in the process. 3. A roll of a die will determine how much work each person gets done each day. Setup 1. Organize into groups of 4 players. 2. Each group assigns each player one of the following roles: Engineer, Document Control, Approver I, and Approver II (for groups of 3, Approver I & Approver II are the same player). 3. Arrange players in the following sequence: 4. Each player has an Inbox and an Outbox. 5. The Engineer places 30 Drawings in his Inbox, i.e. 3 stacks of 10 poker chips. 6. Approver II plays and keeps track the of team’s progress on the Score Sheet.
  • 19. How to Play 1. On Day 1 the Engineer roles the die and moves the rolled amount of drawings from his Inbox to his Outbox. On the Score Sheet Approver II notes in the Day 1 row on the number of drawings moved. 2. If the Engineer doesn’t have a batch of 10 drawings in his Outbox, he continues his work on Day 2 by rolling the die and moving the rolled amount of drawings from his Inbox to his Outbox. Approver II notes in the Day 2 row on the Score Sheet the number of drawings moved. 3. When the Engineer has a batch of 10 drawings in his Outbox, then, and only then, he moves 1 stack of 10 drawings to Document Control’s Inbox. 4. On the same day Document Control rolls the die and moves the rolled amount from his Inbox to his Outbox. Approver II notes in the appropriate Day row the number of drawings moved. 5. If Document Control doesn’t have a batch of 10 drawings in his Outbox, play continues on the next day starting again with the Engineer. Note: Each player plays, one at a time, in sequential order only, not in parallel (i.e. No playing while others are rolling their die). 6. When Document Control has a batch of 10 drawings, then, and only then, he moves 1 stack of 10 drawings to Approver I’s Inbox. 7. On the same day Approver I rolls the die and moves the rolled amount from her Inbox to her Outbox. Approver II notes the number of drawings moved. 8. If Approver I doesn’t have a batch of 10 drawings in his Outbox, play continues on the next day starting again with the Engineer, followed by Document Control, then Approver I. Play continues until all 4 players are processing drawings. 9. When Approver II has a batch of 10 drawings in his Outbox, then, and only then, he notes it as a Completed Batch on the Score Sheet on the same day. 10. The game is over when all of 30 drawings, 3 batches of 10, have been completed. 11. Each group will play two games: Game #1: Drawings = 30, Batch size = 10 Game #2: Drawings = 30, Batch size = 2 12. Complete Game #1 before starting Game #2. 13. Compare and contrast the games and be prepared to discuss with everyone.
  • 20.
  • 21.
  • 22. What did you notice? 1. After Game 1 (batch size = 10) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? d. Let’s say there is a problem with drawing #2 that only Approver II can identify. i. How long did it take to find out there was a problem (i.e. how long is the learning delayed)? ii. How long would it take to get drawing #2 back through the process to where you were assuming it had to go through the same process (i.e. Engineer diagnose/correct, Document Control process, Approver I reviews, Approver II reviews)? e. What’s the impact of Approver II waiting to go through Approver I? f. What happens if either Approver only had 30 min on a day to review drawings? 2. After Game 2 (batch size = 2) a. How long did it take to get the 1st batch and last batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel in comparison to Game 1? d. Let’s say there is a problem with drawing #2 that only Approver II can identify. i. How long did it take to find out there was a problem? How long is the learning delayed? ii. How long would it take to get drawing #2 back through the process to where you were assuming it had to go through the same process (i.e. Engineer diagnose/correct, Document Control process, Approver I reviews, Approver II reviews)? e. What’s the impact of Approver II waiting to go through Approver I? f. What happens if either Approver only had 30 min on a day to review drawings?
  • 23. Notes: 1. Each game simulates a different approach to increasing the throughput of a system (i.e. reducing system cycle time). 2. Use the same guidelines to play each game. 3. Print the score sheets for each and record your results. 4. Compare and contrast the games and be prepared to discuss with everyone.
  • 24.
  • 25.
  • 26.
  • 27. What did you notice? 1. Increase Capacity (Batch size = 10; Add 1 to each roll to increase capacity 33%) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? Did you feel less overloaded? d. Let’s say there is a problem with drawing #2 that only Approver II can identify. i. How long did it take to find out there was a problem (i.e. how long is the learning delayed)? ii. How long would it take to get drawing #2 back through the process to where you were assuming it had to go through the same process (i.e. Engineer diagnose/correct, Document Control process, Approver I reviews, Approver II reviews)? 2. Manage Demand (Batch size = 10; #drawings reduced by 33% to 20) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? Did you feel less overloaded? d. The main benefit of managing demand is that you would most likely not work on one stack of drawings at a time, instead you’ll multitask and further slow down the system. Therefore, managing demand helps minimize multitasking. 3. Reduce Variability (All rolls ≤ 3 = 3; All rolls ≥ 4 =4) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? Did you feel less overloaded? d. Should this have done us any good? e. Time Blocking promotes the same benefit (details in the Visual Work Management class). 4. Reduce Batch Size & Increase Work (Increase Work 20% to 36 drawings; Batch size = 2) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? Did you feel less overloaded? d. We got 20% more work done in the same amount of time (or less) than the baseline game (Game 1). e. Some of the added work is in the form of transaction cost, not only the drawings. f. Was the cost of operating higher or lower than the baseline game? 5. Flexible Resources (When there are 7 or more drawings in your Inbox, roll twice. Except for the Engineer.) a. How long did it take to get the 1st batch through the system? b. How long did it take to get the last batch through the system? c. How did you feel? Did you feel less overloaded? d. What do you need to have in place in order to be able to utilize flexible resources? e. Was the cost of operating higher or lower than the baseline game?
  • 28. Notes: 1. The Total Cost Curve (U-shaped) applies to ___________________ batches. 2. Cost of Delay rises with ___________________ size. 3. You don’t have to be perfect because the bottom of the total cost curve is fairly ___________________. 4. If you approach the sharp incline on the left, your total cost ___________________ dramatically. 5. Most companies are too far to the ___________________ in most areas. 6. We try to save a little ___________________ by batching things, but we lose ___________________ than we save from the delay that the batch causes. 7. Focus on reducing ___________________ and you will reduce costs 8. If you reduce costs, you increase _______________.
  • 29. Key Takeaways 1. A queue stops the flow – Slows the development process – Find and reduce the queues and you will speed up development 2. Duration varies greatly with resource availability – – You lose more time when a resource’s availability goes down than you gain back when it goes up by an equivalent amount. Keeping availability above 50% will ensure much more accurate task duration estimates. 3. What’s the most effective, least expensive way to reduce queues? Reduce Batch Sizes! PLAYBOOKHQ.co @PLAYBOOKHQ