LEADERSHIP
MANISH SINHA: EXECUTIVEDIRECTOR (SALES)
MR. SINHA IS A MECHANICAL ENGINEER WITH A VAST EXPERIENCE OF OVER 22 YEARS IN THE FIELD OF ENGINEERING
PLANNING, PAINT PROCESS AND LINE SET UP, ASSEMBLY LINES, AUTOMOTIVE ENGINE AND TRANSMISSION LINES, BODY IN
WHITE AND HEAVY ENGINEERING . DULY TRAINED WITH GLOBALLY RENOWNED COMPANIES LIKE DURR, THYSSENKRUPP
NOTHELFER, JOHN A KRAUSE, JOSTS ENGINEERING ETC. WORKED AS SALES DIRECTOR INDIA FOR DURR ASSEMBLY PRODUCTS
& DURR SOMAC, PLAYED A KEY ROLE IN ESTABLISHING THE MARKET FOR DURR ASSEMBLY LINES. PLAYED THE LEAD
RESPONSIBILITY FOR GETTING THE TATA NANO AND TATA TRUCK LUCKNOW PAINT SHOP ORDERS FOR DURR.
MUKESH AHLAWAT : MANAGING DIRECTOR
(HVAC ENGINEER, B. TECH MECHANICAL)
HAVING ABOUT 13 YEARS OF EXPERIENCE AS HVAC DESIGN ENGINEER. WORKED IN VARIOUS LOCAL AND MULTINATIONAL
COMPANIES LIKE VOLTAS, NNE PHARMAPLAN INDIA LTD., JACOBS, SUNIL NAYYER AND ASSOCIATES, AURORA CONSULATNTS,
PUNJ LLOYD GROUP AS VARIOUS LEVELS IN HVAC FIELD. HAVING EXPERTISE IN DESIGN, CO-ORDINATION AND SITE QUALITY
ASSURANCE. PROACTIVE AND WORKED WITH AN EXCELLENT BLEND OF TECHNICAL APTITUDE AND CREATIVE ABILITY.
INSPIRES DESIGN TEAMS WITH ENGAGING MANAGEMENT TECHNIQUES.
4.
RAVINDER SINGH KAKKAR: DIRECTOR
(HVAC ENGINEER, B. TECH MECHANICAL)
HAVING ABOUT 30 YEARS OF EXPERIENCE AS HVAC DESIGN ENGINEER. WORKED IN VARIOUS LOCAL AND
MULTINATIONAL COMPANIES LIKE NNE PHARMAPLAN INDIA LTD., FLUOR DANIEL INDIA PRIVATE LTD, AECOM,
BADER AL MULLA GROUP AND KHARAFI NATIONAL GROUP IN KUWAIT AS VARIOUS LEVELS IN HVAC FIELD.
HAVING EXPERTISE IN DESIGN, CO-ORDINATION AND SITE QUALITY ASSURANCE. PROACTIVE AND WORKED WITH
AN EXCELLENT BLEND OF TECHNICAL APTITUDE AND CREATIVE ABILITY. INSPIRES DESIGN TEAMS WITH
ENGAGING MANAGEMENT TECHNIQUES.
JISHAN SAIFI : MANAGER - TECHNICAL
(HVAC ENGINEER, B. TECH MECHANICAL)
HAVING ABOUT 11 YEARS OF EXPERIENCE AS HVAC DESIGN AND EXECUTION ENGINEER. SUCCESSFULLY EXECUTED
AND COMMISSIONED VARIOUS PHARMA AND NON PHARMA PROJECTS ALL OVER INDIA AND IN BANGLADESH
(NICE SYNTHETICS LTD. & MODERN SYNTAX LIMITED). HAVING THOROUGH KNOWLEDGE OF HVAC FIELD. HAVING
EXPERTISE IN DESIGN, CO-ORDINATION, PROCUREMENT AND SITE EXECUTION. PROACTIVE AND WORKED WITH
AN EXCELLENT BLEND OF TECHNICAL APTITUDE AND CREATIVE ABILITY.
LEADERSHIP
5.
ELITE MULTI-TECH ENGINEERING
ONEOF THE ENGINEERING DESIGN CONSULTANTS AND CONTRACTORS FOR CARRYING OUT THE DESIGN
AND EXECUTION OF HEATING, VENTILATION, AIR-CONDITIONING, REFRIGERATION, CLEAN ROOM,
MODULAR PARTITION, ELECTRICAL, PLUMBING AND FIRE FIGHTING PROJECTS.
OUR AIMS AND OBJECTIVES ARE TO ACHIEVE BEST CONDITIONS, WORKING TOWARDS ACHIEVING THE
ARCHITECT/CONSULTANT AND CLIENT SPECIFICATIONS, TO INTERACT WITH THE CLIENT ON A
REGULAR BASIS AND TO HAVE A GOOD MARKET RAPPORT. THE COMPANY IS PROMOTED BY A GROUP OF
YOUNG TECHNOCRATS WHO ARE TECHNICALLY KNOWLEDGEABLE AND EXPERIENCED IN COMMERCIAL
HVAC, CLEAN ROOM HVAC, CLEAN ROOM PARTITION, FIRE FIGHTING & ELECTRICAL FIELD. WE HAVE A
FULL-FLEDGED INFRASTRUCTURE, WHICH INCLUDES EXPERIENCED AND TRAINED MANPOWER AND
CENTRALLY LOCATED OFFICE.
IN TODAY’S COMPETITIVE BUSINESS CLIMATE, TECHNOLOGY NEEDS TO BE RELIABLE, COST EFFECTIVE
AND ENVIRONMENTALLY SECURE. WE HAVE IN-DEPTH KNOWLEDGE OF TECHNOLOGIES AND SKILLS TO
ENGINEER SOLUTIONS OF ANY REQUIREMENT. WE HAVE IN HOUSE CORE TEAM OF SKILLED WORK
FORCE FOR DESIGNING, PLANNING, EXECUTION & SUPERVISION WHICH HELPS CUTTING DOWN
DEPENDENCE ON OTHER AGENCIES, IDLE TIMES AND CO-ORDINATION BETWEEN OTHER CONTRACTORS.
OUR VISION IS TO BE THE LEADER IN THE FIELD OF ENGINEERING MANUFACTURING AND PROCESS
AUTOMATION SOLUTIONS THROUGH REGULAR DEVELOPMENTS, QUALITY SERVICES AND BY MEETING
TOTAL CUSTOMER SATISFACTION.
HOW WE WORK
FEASIBILITY-- - TO- - - EXECUTION
IDENTIFY THE NEED
ANALYSIS
DEVELOP SOLUTIONS
SIMULATE AND CHECKING
CONSTRUCT, TEST AND EVALUATE
IMPLEMENT THE SOLUTION TO FULFILL THE NEED
8.
PROJECT MANAGEMENT
Preparationof project
schedule and strategy
Project Budget Tendering
and value addition
PROJECT ALLOCATION
Preparation of FDA & Activity Chart
PROJECT MONITORING &
CONTROL
PROJECT PLANNING PROJECT CLOSURE
Site execution and engineering
Site safety- HSE Compliance at
site
Quality control
Change Control
Coordination
Project meeting management
Quantity Surveying and Billing
Snag-list Management
Completion of all activities
as per agreed standards.
Financial closure of
project
Handing over to client
9.
PRODUCTS
HVAC FEASIBILITY STUDY,CONCEPTUAL AND DETAILED
PLANNING & EXECUTION
PREPARATION OF DESIGN BRIEF REPORTS INTERIM SUBMISSION
DOCUMENTATION
HVAC DESIGN AND TENDER PREPARATION
PROCESS COOLING & HUMIDIFICATION
GENERAL AND CAR PARK VENTILATION SYSTEM
VARIABLE REFRIGERANT FLOW (VRF/VRV) SYSTEMS
DESIGN AUDITING
COST ESTIMATION
INTER-DISCIPLINARY CO-ORDINATION
CLOSE CO-ORDINATION WITH ARCHITECTS AND STRUCTURAL
ENGINEERS
PREPARATION OF GOOD FOR EXECUTION DRAWINGS &
SCHEMATICS
VENDOR EVALUATION AND SITE EXECUTION MONITORING
PRODUCT LINES
SERVICES
DESIGNING,INSTALLATION AND COMMISSIONING EXPERTS FOR PHARMA
PROJECTS
DESIGNING OF WAREHOUSES, SHOPPING MALLS, RESIDENTIAL PROJECTS
TURNKEY SOLUTION FOR COMPLETE SYSTEM LIKE ARCHITECTURAL, CIVIL
STRUCTURAL, ROOM FINISHES (EPOXY FLOORING, MODULAR WALL & CEILING
PARTITION SYSTEM, KIRBY STRUCTURE), ELECTRICAL, PLUMBING AND FIRE
FIGHTING SYSTEM, EXTERNAL LANDSCAPING ETC.
COMPLETE DESIGNING OF WAREHOUSES INCLUDING CIVIL & ARCHITECTURAL,
EXTERNAL FAÇADE, MEP SERVICES, AUTOMATED STORAGE RACKING, MATERIAL
TROLLEYS, MATERIAL CONVEYING SYSTEM, COLD ROOMS, ETC.
BOQ’S AND TENDER FOR ALL SERVICES
INSTALLATION AND COMMISSIONING EXPERTS FOR PROJECTS.
PERIODIC SITE SUPERVISION
PROJECT MANAGEMENT
PROJECT COMMISSIONING AND HANDOVER
HVAC executionof Residential building
HVAC execution work for commercial buildings
Up-gradation of Existing HVAC system
MEP For Building systems
Building Automation
Industrial Pressurization Systems.
Hotel Air-conditioning.
Hospital Air-conditioning.
Evaporative Air-Cooling Systems.
Cold Rooms, Chilling Rooms, Cold Storage, Blast Freezers.
Electrical Work related to Clean room HVAC & R Projects.
Warehouse design and execution
Clean Room Design, execution and site supervision
Validation documentation pre and post commissioning the project.
Tender, BOQ & Specifications
Selection of equipment and material Tender documentations
Periodic site supervision and quality assurance at site
Operation & Maintenance
PRODUCT LINE - APPLICATIONS
Organization Chart
Project Manager
Design
Execution
Erection&
Commissioning
Project Engineer
Storekeeper
Supervisor - Piping
Supervisor - Insulation
Supervisor –
commissioning
Team of 10 personnel
Team of 30 personnel
Team of 20 personnel
Team of 30 personnel
Supervisor - Ducting
PARTNER FOR DESIGN/EXECUTION
TechnoTek India
Epoxy Flooring and wall coating
PU Coating
Water proofing
FLOOR CLEANING SOLUTION
Floor disinfection
Concrete polishing
Floor grouting
Levelling,
Shuttering work
Heavy machinery shifting
All type of special welding electrodes & machines
18.
PARTNER FOR DESIGN/EXECUTION
SBJDesigners and Consultants
Architecture, Landscape, Corporate Interior & Project Management
SBJ Designers and Consultants
Architecture, Landscape, Corporate Interior & Project Management
ARCHITECTURE DESIGN & URBAN PLANNING
Site Survey & planning Design Conceptualization
Design Submission and value addition Detailed Design & Engineering
Good for Construction Drawings Tender, BOQ & Specifications Building facade- 2D, 3D Modelling As built drawings
submission Drawings for statutory approvals.
INTERIOR DESIGN
Preliminary Interior scheme layouts Furniture layouts
Material sampling and finalization Reflected ceiling plans
Tender, BOQ & Specifications 3D Modelling- Limited areas
LANDSCAPE
Soil study and selection of design Development of design concepts
Material selection– Hard and soft landscaping
Tender, BOQ & Specifications
Good for Construction Drawings
19.
PARTNER FOR DESIGN/EXECUTION
SBJDesigners and Consultants
Architecture, Landscape, Corporate Interior & Project Management
SBJ Designers and Consultants
•C. R. KOLI
•Partner, (Director – Technical, Principal Architect)
•Ex-Employee of L&T Ltd. as Sr. Principal Architect, NNE Pharmaplan as Chief Architect, DLF
Ltd. as Dy. Chief Architect), Egis India Consulting Engineers Pvt. Ltd. (Asso. GM – Airports)
•Bachelor of Architecture from VNIT/ Visvesvaraya National Institute of Technology, Nagpur
(MH.)
•MBA in Real Estate & Infrastructure Development from I. P. University, Delhi.
•Member: Council of Architecture
•Associate to All India Institute of Architects
•Registered with Municipal Corporation of Delhi.
•Registered with Municipal Corporation of Paradeep, Odisha
•Consultant to Ministry of Education, Govt. of India (Higher Edu. Infra. Projects) Mr. Koli is a
dedicated Architect, who works independently and as part of a team.
Natural leader and effective delegator who takes on added responsibility whenever necessary.
Proactive and works with an excellent blend of technical aptitude and creative ability. Inspires
design teams with engaging management techniques
20.
PARTNER FOR DESIGN/EXECUTION
SBJDesigners and Consultants
Architecture, Landscape, Corporate Interior & Project Management
SBJ Designers and Consultants
LIST OF PROJECTS:
Factory building for M/s Vikas Electro Pvt. Ltd., at Sudarshan Park, New Delhi
Maruti service center for M/s Alfa Automobiles, at Faridabad Haryana.
Maruti service center for M/s Alfa Automobiles, at Jaipur, Rajasthan
Showroom design for M/s Alfa Automobiles, at 14/5, Mathura road, Faridabad, Haryana
Maruti showroom for M/s Alfa Automobiles, in Jaipur, Rajasthan.
Office interior for M/s Aasaram Udyog Co., in Najafgarh, New Delhi
Office interior for M/s W.L.A. (India) Pvt. Ltd., Texas (USA), India Office at Gurgaon, Haryana.
Office interior for M/s JAY Industries limited, at A – 67 / 2, G. T. Karnal Road, Delhi.
Office interior for M/s Continental Device (India) Limited, C – 120,Naraina Indl. Area, New Delhi.
NIIT, computer center, at Camac Street, Calcutta.
NIIT, computer center, at Salt Lake, Calcutta.
NIS, computer center, at South Extension.- I, New Delhi
Corporate Office interior for M/s DUMEX (India) Pvt. Ltd., 507, Millennium Plaza, Sushant Lok Gurgaon
Corporate Office interior for M/s Marsh (India) Pvt. Ltd., 302, Millennium Plaza, Sushant Lok, Gurgaon
Corporate Office interior for M/s WLA Associated Pvt. Ltd., Gurgaon
21.
PARTNER FOR DESIGN/EXECUTION
SBJDesigners and Consultants
Architecture, Landscape, Corporate Interior & Project Management
M.D Electric Works is one of the well managed electrical & engineering concern
that offers highly competent to execute any type of electrical & engineering
solution to the entire satisfaction of our valued clients.
M.D Electric Works was started in 1992 by Mr. Amarjeet Singh with the objectives
of exceed client expectation through continuous quality improvement.
Their service range include electrical & engineering Management. The patrons
have appreciated their services due to their professionalism.
Their areas of specialization:
Whole internal wiring for a project including automation and non
automation wiring .
Installation of Buildings electrical distribution systems including
cables , panels , safety equipment etc
Response to complaints regarding faulty wiring , disturbance in
electrical distribution system , recalculation for a old
electrical system .
22.
PARTNER FOR DESIGN/EXECUTION
SPYVIEW SECURITY SYSTEM
CCTV Cameras
Door Interlocking / Door automation
Access Control
Attendence Face IDs
Biometric Machines
EPABX
Data Centre
Server System
Fire Alarm / fire fighting system
23.
PARTNER FOR DESIGN/EXECUTION
SPYVIEW SECURITY SYSTEM
Spy View Security system proprietor Mr. Girish Sikka established this company in 2003. Company is having
rich experience in CCTV Cameras, Fire Alarm, Fire Fighting Systems, Access Control Systems, Door
Interlocking, Door Automation, and Surveillance.
Spy View has been in this field for 2 decades and been through all types of CCTV cameras ranging from
black and white in the early 2000’s to today’s wireless high definition cameras.
Spy View have been working with Pharma companies and the companies which require clean rooms. For
past many years, it has been working with manual and PCB based programmed interlocking systems with
customer line as Mankind, Nari Pharma, Bal Pharma, Pil Pharma, Penta Group, Relax Pharmaceuticals,
Copmed Pharmaceuticals, Mascot etc.
It has extensive installation experience in the areas like Baddi, Dehradun, Haridwar, Paonta Sahib, Sikkim,
Pune, etc. Same is the experience in the Fire Fighting and Fire Alarm industry.
24.
PARTNER FOR DESIGN/EXECUTION
MEPTechProject Company
Incorporated in Year 2010
Trunkey projects relocations installation commissioning
A professional firm providing fire protection Services, life
safety
services and Mechanical Services and Electrical controls .
Encourage our team members’ growth through personal
and professional development to enhance sustained growth
of our company and satisfaction of Customer.
Engage in active partnerships with our clients to provide
design focused solutions with an unyielding approach toward
results.
25.
PARTNER FOR DESIGN/EXECUTION
MEPTechProject Company
Specialized in the field of Supply, Installation and
Commissioning of
Hydrant System
Sanitary System
Internal Plumbing work
External Drainage & Sewerage work
Automatic Sprinkler System
Wet Riser System
Fire Detection and Alarm System
Public Address System
CO₂ System
Foam System
Inergen System
26.
PRODUCT RANGE INEPOXY COATING
Epoxy Floor Coating Floor
Hardening/Epoxy
Refurbishment
Sports Epoxy PU
Coating
Hospital Antibacterial
coatings
Epoxy Water proofing Epoxy Cool Roof
Coating