3. FOR HEATING THE
DIGESTER, HAS
CHOSEN THE
SIMPLEST SOLUTION
THAT IS IN A WATER
BATH, WITH A
SMALLER CONTAINER
INSIDE THE LARGER
ONE, CONTAINING
HEATED WATER
5. THE NEXT STEP WAS THAT OF
REMEDYING THE MATERIAL. FROM
THE LABORATORIES OF TANNERY, WE
RECOVERED A STEM PVC, TO USE AS
A CONTAINER, THE WATER HEATER 10
LITERS USED FOR THE HEATING AND
THE CIRCULATION PUMP WERE
ALREADY IN THE LABORATORY,
COMPOST
8. After mounting all we had to
think of the organic material
to be placed in the
biodigester.
We used the organic material
contained in the compost and
the digester was filled to
about 3/4 of a mixture of 40%
of organic waste and water.
The choice compost seemed
interesting for the presence of
bacteria that degrade
naturally cellulose
9. OUR GARDEN FOR THE
PRODUCTION OF COMPOST
ISATISFIED
FARMERS
10. WE COULD NOTE WITH SATISFACTION THE
CONTINUING EDUCATION OF BUBBLES IN A POT
OF WATER TREATMENT, RAISING THE STORAGE
VESSEL AND FINALLY TURNING ON A SMALL
BURNER FITTED IN THE PIPE END.