ThinkingofupgradingorchangingtoaBIM workflow?
FlexibleLicenseoptions
Trainingavailablelocally
Team WorkCapabilities
FullBIM Workflow
AccreditedtoIFCstandard
ReferenceExternalBIM Models
Rapid2DDetailingRapid2DDetailing
FullyCoordinated2Dand3D
VariablePresentationstyles
BuiltinCineRenderengine
IntegratedEnergyEvaluation
AppleMaccompatible
Windowscompatible
iOS&AndiOS&AndroidModelViewers
AutomatedRevisionControl
ELEMENT ARCHICAD
CURRENT
SOFTWARE NOTES
AwardWinningPassiveHouse
A twostorey,four-bedroom homeinWestKirby,Englandfora
priceof£240,000.ThisbuildrecentlywontheDomesticNewBuild
categoryoftheBuildingsandEnergyEfficiencyAwards.
TheThehousehasnow beenoccupiedfor2yearsandtheenergy
costforheating,lighting,hotwaterandcookingwaslessthan£15
peryearforthisperiod. Asimilarhousedesignedtomeetnormal
buildingregulationswoulduse£2500worthofenergyeachyear.
“Wearedelightedtohavewonthisawardbecauseitprovesecohomesdon’thavetobeover
expensiveorneedtobeconspicuouslyunconventionalinappearance.”
ColinUsher,Director,JohnMcCallArchitects
Itsenergysaving design which includessolarpanelsand an
air-to-waterairsourceheatpump(ASHP)decreasestheirannual 
energybillsdramatically.
AABIM workflowwasusedthroughoutthedesignprocess,allowing
JohnMcCallArchitectstomodelandsimulateallaspectsofthe
building’s performance.EcoDesignerSTAR's advanced BEM
export interfaces (such as gbXML and PHPP) allow full
collaborationworkflowwithbuildingenergyconsultants.

BIM Checklist

  • 1.
    ThinkingofupgradingorchangingtoaBIM workflow? FlexibleLicenseoptions Trainingavailablelocally Team WorkCapabilities FullBIMWorkflow AccreditedtoIFCstandard ReferenceExternalBIM Models Rapid2DDetailingRapid2DDetailing FullyCoordinated2Dand3D VariablePresentationstyles BuiltinCineRenderengine IntegratedEnergyEvaluation AppleMaccompatible Windowscompatible iOS&AndiOS&AndroidModelViewers AutomatedRevisionControl ELEMENT ARCHICAD CURRENT SOFTWARE NOTES AwardWinningPassiveHouse A twostorey,four-bedroom homeinWestKirby,Englandfora priceof£240,000.ThisbuildrecentlywontheDomesticNewBuild categoryoftheBuildingsandEnergyEfficiencyAwards. TheThehousehasnow beenoccupiedfor2yearsandtheenergy costforheating,lighting,hotwaterandcookingwaslessthan£15 peryearforthisperiod. Asimilarhousedesignedtomeetnormal buildingregulationswoulduse£2500worthofenergyeachyear. “Wearedelightedtohavewonthisawardbecauseitprovesecohomesdon’thavetobeover expensiveorneedtobeconspicuouslyunconventionalinappearance.” ColinUsher,Director,JohnMcCallArchitects Itsenergysaving design which includessolarpanelsand an air-to-waterairsourceheatpump(ASHP)decreasestheirannual  energybillsdramatically. AABIM workflowwasusedthroughoutthedesignprocess,allowing JohnMcCallArchitectstomodelandsimulateallaspectsofthe building’s performance.EcoDesignerSTAR's advanced BEM export interfaces (such as gbXML and PHPP) allow full collaborationworkflowwithbuildingenergyconsultants.