Lesotho has been significant development in the areas of Dams such as Katse, Metolong, Mohale and 'Muela dam and mines such as Kao, Liqhobong and Letśeng-La-Terai diamong mine in recently years.These Dams not only provide crucial water resources water supply but also contribute to regional water supply through international partnerships. The mines have been a significant source of revenue for the country and have helped boost economic development.
Development is a process that creates growth, progress, positive change or the additional of physical, economic, environmental, social and demographic components.
Development is a process that creates growth, progress, positive change or the additional of physical, economic, environmental, social and demographic components.
This document contains information about tourists attractions Lesotho which are Thaba-Bosiu cultural village Thabana-Ntlenyane katse dam mohale dam and many others
Here we are going to talk about places of interest in Lesotho which are Thaba-Bosiu cultural village Thabana-Ntlenyane katse dam mohale dam and many others.
Laos has experienced strong economic growth in recent years driven by foreign investment in hydropower, mining and construction. The economy relies heavily on agriculture, which accounts for about 30% of GDP and 75% of total employment. Laos is developing its potential as the "battery of Southeast Asia" through investments in hydropower projects, with over 10 dams currently under construction or planning. China has been a major investor in these projects such as the Nam Khan 2 dam being built by Chinese company Sinohydro.
The document discusses how electricity can be generated from seawater in the Maldives using innovative technologies. Some key points:
1) The Maldives plans to build power stations that make electricity from seawater using new model technologies being developed in the country by 2016.
2) Each atoll will have a structure like the Thames Barrier in the UK that uses the motion of seawater to generate electricity as a backup power source across the Maldives.
3) Power plants using seawater could be built in all areas of the Maldives to provide electricity.
Field visit report of Moragahakanda reservoir project Deshan Arachchige
this report contain description about project and construction process,all information are gathered during visit by Kotelawela Defence University and literature.
Lerama Resources Pty Ltd is a 71% black-owned South African mineral exploration and project development company focused on polymetallic deposits in the Bushveld Complex. It currently has three projects in its portfolio - the Boschhoek copper-zinc-silver project, the historic Albert Silver Mine copper-silver-gold-lead-uranium project, and the Vlakfontein tin mine. Lerama is seeking investment to further explore and assess the economic potential of these projects through pre-feasibility studies and resource drilling programs.
Lerama Resources Pty Ltd is a 71% black-owned South African mineral exploration and project development company focused on polymetallic deposits in the Bushveld Complex. It currently has three projects in its portfolio - the Boschhoek copper-zinc-silver project, the historic Albert Silver Mine copper-silver-gold-lead-uranium project, and the Vlakfontein tin mine. Lerama is seeking investment to further explore and assess the economic potential of these projects through pre-feasibility studies and resource drilling programs.
This presentation provides an overview of Alpha Lithium Corp.'s Tolillar lithium project in Argentina. It notes that the project covers 27,500 hectares in the Salar de Tolillar basin, an underexplored salar near existing lithium operations. Testing has found lithium concentrations up to 504 mg/L. The presentation outlines Alpha Lithium's phased exploration and development plans to evaluate the project's resource potential and ability to support lithium brine production. It also reviews the positive project attributes including infrastructure access and the growing global lithium demand outlook driven by electric vehicle adoption.
1.) Introduction
Our Movement is not new; it is the same as it was for Freedom, Justice, and Equality since we were labeled as slaves. However, this movement at its core must entail economics.
2.) Historical Context
This is the same movement because none of the previous movements, such as boycotts, were ever completed. For some, maybe, but for the most part, it’s just a place to keep your stable until you’re ready to assimilate them into your system. The rest of the crabs are left in the world’s worst parts, begging for scraps.
3.) Economic Empowerment
Our Movement aims to show that it is indeed possible for the less fortunate to establish their economic system. Everyone else – Caucasian, Asian, Mexican, Israeli, Jews, etc. – has their systems, and they all set up and usurp money from the less fortunate. So, the less fortunate buy from every one of them, yet none of them buy from the less fortunate. Moreover, the less fortunate really don’t have anything to sell.
4.) Collaboration with Organizations
Our Movement will demonstrate how organizations such as the National Association for the Advancement of Colored People, National Urban League, Black Lives Matter, and others can assist in creating a much more indestructible Black Wall Street.
5.) Vision for the Future
Our Movement will not settle for less than those who came before us and stopped before the rights were equal. The economy, jobs, healthcare, education, housing, incarceration – everything is unfair, and what isn’t is rigged for the less fortunate to fail, as evidenced in society.
6.) Call to Action
Our movement has started and implemented everything needed for the advancement of the economic system. There are positions for only those who understand the importance of this movement, as failure to address it will continue the degradation of the people deemed less fortunate.
No, this isn’t Noah’s Ark, nor am I a Prophet. I’m just a man who wrote a couple of books, created a magnificent website: http://www.thearkproject.llc, and who truly hopes to try and initiate a truly sustainable economic system for deprived people. We may not all have the same beliefs, but if our methods are tried, tested, and proven, we can come together and help others. My website: http://www.thearkproject.llc is very informative and considerably controversial. Please check it out, and if you are afraid, leave immediately; it’s no place for cowards. The last Prophet said: “Whoever among you sees an evil action, then let him change it with his hand [by taking action]; if he cannot, then with his tongue [by speaking out]; and if he cannot, then, with his heart – and that is the weakest of faith.” [Sahih Muslim] If we all, or even some of us, did this, there would be significant change. We are able to witness it on small and grand scales, for example, from climate control to business partnerships. I encourage, invite, and challenge you all to support me by visiting my website.
This presentation by OECD, OECD Secretariat, was made during the discussion “Pro-competitive Industrial Policy” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/pcip.
This presentation was uploaded with the author’s consent.
More Related Content
Similar to BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
This document contains information about tourists attractions Lesotho which are Thaba-Bosiu cultural village Thabana-Ntlenyane katse dam mohale dam and many others
Here we are going to talk about places of interest in Lesotho which are Thaba-Bosiu cultural village Thabana-Ntlenyane katse dam mohale dam and many others.
Laos has experienced strong economic growth in recent years driven by foreign investment in hydropower, mining and construction. The economy relies heavily on agriculture, which accounts for about 30% of GDP and 75% of total employment. Laos is developing its potential as the "battery of Southeast Asia" through investments in hydropower projects, with over 10 dams currently under construction or planning. China has been a major investor in these projects such as the Nam Khan 2 dam being built by Chinese company Sinohydro.
The document discusses how electricity can be generated from seawater in the Maldives using innovative technologies. Some key points:
1) The Maldives plans to build power stations that make electricity from seawater using new model technologies being developed in the country by 2016.
2) Each atoll will have a structure like the Thames Barrier in the UK that uses the motion of seawater to generate electricity as a backup power source across the Maldives.
3) Power plants using seawater could be built in all areas of the Maldives to provide electricity.
Field visit report of Moragahakanda reservoir project Deshan Arachchige
this report contain description about project and construction process,all information are gathered during visit by Kotelawela Defence University and literature.
Lerama Resources Pty Ltd is a 71% black-owned South African mineral exploration and project development company focused on polymetallic deposits in the Bushveld Complex. It currently has three projects in its portfolio - the Boschhoek copper-zinc-silver project, the historic Albert Silver Mine copper-silver-gold-lead-uranium project, and the Vlakfontein tin mine. Lerama is seeking investment to further explore and assess the economic potential of these projects through pre-feasibility studies and resource drilling programs.
Lerama Resources Pty Ltd is a 71% black-owned South African mineral exploration and project development company focused on polymetallic deposits in the Bushveld Complex. It currently has three projects in its portfolio - the Boschhoek copper-zinc-silver project, the historic Albert Silver Mine copper-silver-gold-lead-uranium project, and the Vlakfontein tin mine. Lerama is seeking investment to further explore and assess the economic potential of these projects through pre-feasibility studies and resource drilling programs.
This presentation provides an overview of Alpha Lithium Corp.'s Tolillar lithium project in Argentina. It notes that the project covers 27,500 hectares in the Salar de Tolillar basin, an underexplored salar near existing lithium operations. Testing has found lithium concentrations up to 504 mg/L. The presentation outlines Alpha Lithium's phased exploration and development plans to evaluate the project's resource potential and ability to support lithium brine production. It also reviews the positive project attributes including infrastructure access and the growing global lithium demand outlook driven by electric vehicle adoption.
1.) Introduction
Our Movement is not new; it is the same as it was for Freedom, Justice, and Equality since we were labeled as slaves. However, this movement at its core must entail economics.
2.) Historical Context
This is the same movement because none of the previous movements, such as boycotts, were ever completed. For some, maybe, but for the most part, it’s just a place to keep your stable until you’re ready to assimilate them into your system. The rest of the crabs are left in the world’s worst parts, begging for scraps.
3.) Economic Empowerment
Our Movement aims to show that it is indeed possible for the less fortunate to establish their economic system. Everyone else – Caucasian, Asian, Mexican, Israeli, Jews, etc. – has their systems, and they all set up and usurp money from the less fortunate. So, the less fortunate buy from every one of them, yet none of them buy from the less fortunate. Moreover, the less fortunate really don’t have anything to sell.
4.) Collaboration with Organizations
Our Movement will demonstrate how organizations such as the National Association for the Advancement of Colored People, National Urban League, Black Lives Matter, and others can assist in creating a much more indestructible Black Wall Street.
5.) Vision for the Future
Our Movement will not settle for less than those who came before us and stopped before the rights were equal. The economy, jobs, healthcare, education, housing, incarceration – everything is unfair, and what isn’t is rigged for the less fortunate to fail, as evidenced in society.
6.) Call to Action
Our movement has started and implemented everything needed for the advancement of the economic system. There are positions for only those who understand the importance of this movement, as failure to address it will continue the degradation of the people deemed less fortunate.
No, this isn’t Noah’s Ark, nor am I a Prophet. I’m just a man who wrote a couple of books, created a magnificent website: http://www.thearkproject.llc, and who truly hopes to try and initiate a truly sustainable economic system for deprived people. We may not all have the same beliefs, but if our methods are tried, tested, and proven, we can come together and help others. My website: http://www.thearkproject.llc is very informative and considerably controversial. Please check it out, and if you are afraid, leave immediately; it’s no place for cowards. The last Prophet said: “Whoever among you sees an evil action, then let him change it with his hand [by taking action]; if he cannot, then with his tongue [by speaking out]; and if he cannot, then, with his heart – and that is the weakest of faith.” [Sahih Muslim] If we all, or even some of us, did this, there would be significant change. We are able to witness it on small and grand scales, for example, from climate control to business partnerships. I encourage, invite, and challenge you all to support me by visiting my website.
This presentation by OECD, OECD Secretariat, was made during the discussion “Pro-competitive Industrial Policy” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/pcip.
This presentation was uploaded with the author’s consent.
This presentation by Professor Giuseppe Colangelo, Jean Monnet Professor of European Innovation Policy, was made during the discussion “The Intersection between Competition and Data Privacy” held at the 143rd meeting of the OECD Competition Committee on 13 June 2024. More papers and presentations on the topic can be found at oe.cd/ibcdp.
This presentation was uploaded with the author’s consent.
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfBen Linders
Psychological safety in teams is important; team members must feel safe and able to communicate and collaborate effectively to deliver value. It’s also necessary to build long-lasting teams since things will happen and relationships will be strained.
But, how safe is a team? How can we determine if there are any factors that make the team unsafe or have an impact on the team’s culture?
In this mini-workshop, we’ll play games for psychological safety and team culture utilizing a deck of coaching cards, The Psychological Safety Cards. We will learn how to use gamification to gain a better understanding of what’s going on in teams. Individuals share what they have learned from working in teams, what has impacted the team’s safety and culture, and what has led to positive change.
Different game formats will be played in groups in parallel. Examples are an ice-breaker to get people talking about psychological safety, a constellation where people take positions about aspects of psychological safety in their team or organization, and collaborative card games where people work together to create an environment that fosters psychological safety.
This presentation by Yong Lim, Professor of Economic Law at Seoul National University School of Law, was made during the discussion “Artificial Intelligence, Data and Competition” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/aicomp.
This presentation was uploaded with the author’s consent.
This presentation by Juraj Čorba, Chair of OECD Working Party on Artificial Intelligence Governance (AIGO), was made during the discussion “Artificial Intelligence, Data and Competition” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/aicomp.
This presentation was uploaded with the author’s consent.
This presentation by OECD, OECD Secretariat, was made during the discussion “Artificial Intelligence, Data and Competition” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/aicomp.
This presentation was uploaded with the author’s consent.
This presentation by Tim Capel, Director of the UK Information Commissioner’s Office Legal Service, was made during the discussion “The Intersection between Competition and Data Privacy” held at the 143rd meeting of the OECD Competition Committee on 13 June 2024. More papers and presentations on the topic can be found at oe.cd/ibcdp.
This presentation was uploaded with the author’s consent.
• For a full set of 530+ questions. Go to
https://skillcertpro.com/product/servicenow-cis-itsm-exam-questions/
• SkillCertPro offers detailed explanations to each question which helps to understand the concepts better.
• It is recommended to score above 85% in SkillCertPro exams before attempting a real exam.
• SkillCertPro updates exam questions every 2 weeks.
• You will get life time access and life time free updates
• SkillCertPro assures 100% pass guarantee in first attempt.
This presentation by Katharine Kemp, Associate Professor at the Faculty of Law & Justice at UNSW Sydney, was made during the discussion “The Intersection between Competition and Data Privacy” held at the 143rd meeting of the OECD Competition Committee on 13 June 2024. More papers and presentations on the topic can be found at oe.cd/ibcdp.
This presentation was uploaded with the author’s consent.
Gamify it until you make it Improving Agile Development and Operations with ...Ben Linders
So many challenges, so little time. While we’re busy developing software and keeping it operational, we also need to sharpen the saw, but how? Gamification can be a way to look at how you’re doing and find out where to improve. It’s a great way to have everyone involved and get the best out of people.
In this presentation, Ben Linders will show how playing games with the DevOps coaching cards can help to explore your current development and deployment (DevOps) practices and decide as a team what to improve or experiment with.
The games that we play are based on an engagement model. Instead of imposing change, the games enable people to pull in ideas for change and apply those in a way that best suits their collective needs.
By playing games, you can learn from each other. Teams can use games, exercises, and coaching cards to discuss values, principles, and practices, and share their experiences and learnings.
Different game formats can be used to share experiences on DevOps principles and practices and explore how they can be applied effectively. This presentation provides an overview of playing formats and will inspire you to come up with your own formats.
This presentation by Nathaniel Lane, Associate Professor in Economics at Oxford University, was made during the discussion “Pro-competitive Industrial Policy” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/pcip.
This presentation was uploaded with the author’s consent.
This presentation by OECD, OECD Secretariat, was made during the discussion “The Intersection between Competition and Data Privacy” held at the 143rd meeting of the OECD Competition Committee on 13 June 2024. More papers and presentations on the topic can be found at oe.cd/ibcdp.
This presentation was uploaded with the author’s consent.
The importance of sustainable and efficient computational practices in artificial intelligence (AI) and deep learning has become increasingly critical. This webinar focuses on the intersection of sustainability and AI, highlighting the significance of energy-efficient deep learning, innovative randomization techniques in neural networks, the potential of reservoir computing, and the cutting-edge realm of neuromorphic computing. This webinar aims to connect theoretical knowledge with practical applications and provide insights into how these innovative approaches can lead to more robust, efficient, and environmentally conscious AI systems.
Webinar Speaker: Prof. Claudio Gallicchio, Assistant Professor, University of Pisa
Claudio Gallicchio is an Assistant Professor at the Department of Computer Science of the University of Pisa, Italy. His research involves merging concepts from Deep Learning, Dynamical Systems, and Randomized Neural Systems, and he has co-authored over 100 scientific publications on the subject. He is the founder of the IEEE CIS Task Force on Reservoir Computing, and the co-founder and chair of the IEEE Task Force on Randomization-based Neural Networks and Learning Systems. He is an associate editor of IEEE Transactions on Neural Networks and Learning Systems (TNNLS).
This presentation by Thibault Schrepel, Associate Professor of Law at Vrije Universiteit Amsterdam University, was made during the discussion “Artificial Intelligence, Data and Competition” held at the 143rd meeting of the OECD Competition Committee on 12 June 2024. More papers and presentations on the topic can be found at oe.cd/aicomp.
This presentation was uploaded with the author’s consent.
4. INTRODUCTION
Dams are massive barriers built across rivers and
streams to combine and utilize the flow
of water for human purpose. These purposes may be;
Irrigation
Hydropower
Water-Supply
Flood Control
Navigation
Fishing
Recreation
This confinement of water creates
lakes or reserviors.
5. KATSE DAM
The Katse dam, a concrete arch dam on the
Malibamats’o river in Lesotho.The dam is
located on the border of Leribe and Thaba-Tseka
district. The dam is 710 metres long and 185
metres high. It is one of the largest dam projects
in the world and stands as a remarkable feat of
engineering. The construction of the dam began
in 1991 on the Malibamats’o river tributary of
the orange(Senqu) river and it was completed in
1996. On January 22 1998, water began to be
delivered to South Africa. The dam was built by
a Consortium of Bouygues, concor, Group
5,Hochtief,kier group and sterling international.
Lesotho Dams
6. Continuation
The Katse dam is a Significant part of the Lesotho
Highlands Water Project, which is a multiphase
project designed to provide water to the Republic
of South Africa. It is also designed to generate
hydroelectric power of Lesotho.
Katse dam is an elevation of 1993m above
the sea level making it the highest elevation
dam in Africa. The dam wall is a double-
curved arch. It curves from side as well as
from top-to-bottom. The wall is 185m high,
60m wide at the base and 9m wide at top.
Length of the wall is 710m.
8. `MUELA DAM
The `Muela dam is situated on the Nqoe river in
Butha-Buthe Lesotho. The dam is a 55m high double
curvature arch structure forming the tail pond of the
`Muela Hydropower station, which will generate 72
MW of power for Lesotho. The construction of the
underground works started in March 1995, the first
draft tubes were installed in November 1996 and
commissioning of the plant is scheduled for 1998. The
site chosen, in a narrow gorge on the Nqoe river
north of `Muela village.
Lesotho Dams
9. Continuation
The purpose of the dam is to serve as a tail
pond for the `Muela underground
hydroelectric power station that generates
electricity to supply the needs of Lesotho.
The plant capacity(at phase1) is 72
MW(three Francis vertical shaft turbines at
24MW each.
10. METOLONG DAM
The Metolong dam is situated in the Maseru district,
adjacent to the villages of Ha Seeiso, Metolong and HA
Makotoko, approximately 30km East of Maseru. It is a
83m high roller compacted concrete(RCC) dam with a
reservoir capacity of 64 million cubic meter and a raw
water pumping station with a 1.2 cubic meter per second.
Lesotho Dams
11. Continuation
The construction of the dam began in August 2013 and
was completed in February 2015. Design and
construction of the dam is founded by a consortium of
Arab Donors, namely BADEA, Saudi, OFID and
Kuwait. The dam was designed for domestic and
industrial water supply for Maseru and nearby
lowland areas.
12. Lesotho Dams
MOHALE DAM
Mohale dam is the embankment ,concrete faced rock-fill
dam located in Maseru district. It is the second dam, under
the phase 1B of the series of dams of the proposed Lesotho
Highlands water Project. The dam is 145m high and 700m
long.
13. Mohale dam was built as part of phase 1B
of the LHWP to augment south Africa’s
water supply and generate electricity in
Lesotho. The construction of Mohale dam
was supervised by Mohale Consultants
Group. The dam was completed in 2003
and formally commissioned in 2004.
Continuation
15. INTRODUCTION
The diamond mining industry has been in existence in Lesotho since the last
1950s.
Prospecting rights were granted over Kao and Liqhobong pipes in 1959 but
immediately after Lesotho’s independence from colonial rule, these mines
ceased operations on account of dissatisfactory diamond production
results. In 1961, artisanal diamond mining by licensed Basotho diggers
started at Lets’eng –la-Terai, Kolo, Nqechane and Hololo. However, in
1968 the process of prospecting on Lets’eng diamond pipe commence,
Again, the results proved futile in the 1970s and the mine ceased
operations. Nonetheless, the reopening of the diamond mines in Lesotho
about a decade ago has brought benefits worthy of mention. The diamond
mining industry’s contribution to Lesotho’s economic growth has
increased quite a bit higher lately.
16. LETS’ENG-LA-TERAI DIAMOND MINE
Lets’eng diamond mines is situated high in the maloti
Mountains in the kingdom of Lesotho owned by Gem
Diamonds Limited, which owns 70% and the government of
the kingdom of Lesotho, which owns the remaining 30%.
Lesotho MINES
17. Continuation
The Lets’eng diamond mine is pleased to announce
the recovery of high quality Type II white diamond
from the Lets’eng mine in Lesotho. This mine is found
in Mokhotlong district, is 3100m above sea level and
3100m high and it is the biggest mine in Lesotho.
18. Lesotho Mines
LIQHOBONG MINE
The Liqhobong Diamond is located
within the Liqhobong valley in the
Maluti mountains, approximately
120km east-northeast. The mine has
estimated reserves of 19 million carats
of diamonds and an annual
production capacity of 1 million
carats. Liqhobong mine is operated by
Liqhobong Mining Development
Company(proprietary)
Limited(LMDC), which is 75% owned
by Firestone Diamonds and 25%
owned by the Government of Lesotho
and it is found in Butha-Buthe
district.
19. KAO MINE
Kao mine founded by Tomiro Nagase is found in Butha-Buthe
district. It is 200km away from Maseru, it is 1030m high. This
mine is owned by Gem Diamonds, Ltd and the government of
Lesotho, at an elevation of 3100m(10 200 ft). The Kao mine is
renowned for the production of rare, precious pink diamonds.
Lesotho Mines
20. In conclusion, the dams in Lesotho are a vital component of the country’s
infrastructure, significantly contributing to its economic development and
regional cooperation, particularly through the Lesotho Highlands Water
Project. This project not only improves local water exports access but also
generates substantial revenues from water exports to South Africa.
The Lesotho mines are a major source of income for the country, and they
have played a significant role in its development. However, the mines
have also had a negative impact on the environment and the health of the
local population. The government of Lesotho has taken some steps to
address these issues, but more needs to be done to ensure that the mines
are operated in a sustainable manner.
Thank you.
By:FUTHUMETSA NELISWA
CONCLUSION
21. LIST OF REFERENCES
www.link.springer.com(2013),Katse,available
at:https://link.springer.com/referenceworkentry/10.1007/978-1-4020-4410-
6_220(accessed 05 May 2024)
www.hydropower-dams.com(2022),Muela,available at:https://www.hydropower-
dams.com/news/muela-hydro-plant-in-urgent-need-of-unit-1-repair/(accessed
24 April 2024)
www.water.org.ls.com(2015),available at:https://www.water.org.ls/metolong-
authority/(accessed 28 May 2024
www.wis.orasecom.org.com(2019),Mohale,available
at:https://wis.orasecom.org/content/study/UNDP-
GEF/InfrastructureCatalogue/Documents/Reservoirs/Mohale%20Dam.pdf(accesse
d 10 May 2024)
wwhttps://www.mining-technology.com/projects/liqhobong-diamond-mine/
www.letseng diamonds.co.ls(2022),letsengdiamond mine,available
at:https://www.letsengdiamonds.co.ls/corporate-profile/(accessed 07 May
2024)
www.kao mine.com(2023),available
at://https://stormmountaindiamonds.com(accessed 23 April 2024)