Page 1 of 5
Bhavani H.S.
bhavani.hs86@gmail.com
+91-8861200591
Career Objective
 Aiming for an innovative, challenging, growth oriented and responsible career in the field of
Embedded Software.
Professional Experience
 Employer : Robert Bosch Engineering and Business Solutions Ltd (RBEI)
Designation : Senior Software Engineer
Duration : Jan-2008 to Till Date (Approx. 6.0 Years).
Job Profile : Software Integration and Testing.
Platform : Automotive Embedded System.
 Employer : JVS Electronics Pvt. Ltd. Bangalore
Designation : Embedded Engineer
Duration : Oct-2006 to Dec-2007 (Approx. 1 year).
Job Profile : Software development and Testing.
Platform : Embedded System.
Skill set
 Aware of V-Model SW Development process and applied same.
 Embedded Programming in compliance to the coding standards followed at BOSCH,MISRA
Coding guidelines.
 Experience in system, Release,Regression, Load and performance testing.
 Familiarity with real-time operating systems.
 Fast learning skills, creative analytical abilities, good technical and innovative problem
solving skills.
 Ability to support and sustain a positive work environment that fosters team performance with
strong communication and relationship management skills.
 Familiar with ASPICE and ISO 26262 (quality standards)
Technical skills
Programming
languages
C and Assembly Language for Microcontroller
Micro controllers TC17XX, Intel 8051, dsPIC30F6012 controller.
Wired Protocols SPI, I2C, CAN
RTOS ERCOS
Debugging Tool CANalyser,CANOe,UDE, Simulators, Emulator
Configuration
Management Tools
Clear case, Clear quest, ETAS, INCA, Xmetal, Code Wright, Nestor,
SDOM, Emulator, UDE Debugger
Page 2 of 5
Roles and Responsibilities
As System Designer:
 Handling and tracking SW requirements (Issue SW) in REQM-Tool
 Coordinating SW requirements (Issue SW) between customer project, customer platform and
Bosch development
 Technical SW clarification with customer, function development and calibration
 Identification of customer requirements affecting the monitoring
 Creation of rough SW requirement description, breaks down on SW package to prepare
function development order
 Carrying out SW implementation review with function development/and if required with
customer
 Carrying out functional acceptance of delivered SW (Function development, on demand with
customer)
 Verification of customer documentation
As Software Integrator:
 Integration of software packages to complete program versions.
 Creation and delivery to internal customers of test, development and series versions.
 Creation of software for delivery to the calibration
 Verification of the availability of the supplied parts needed to create a program version
 Configuration and validation of the core software and HW configuration (inputs/outputs,
EEPROM layout, etc.) in clearance with the Package Responsible.
 Configuration and validation of the process and task sequence in clearance with the Package
Responsible.
 Implementation of any necessary adaptations to SW sharing interfaces and validation of those
adaptations.
 Formal checking of program versions including documentation of the results (analysis of
make log files).
 Execution and documentation of the mandatory tests.
 Recording and documentation of the ECU (Controller) resources consumption.
 Provision of a quality status report (review and release status for each package) for the
program to deliver.
 Analysis of complaints about the software during development and series production.
 Signals changes for Tester related topics.
 Unit testing and System Testing performed on open loop lab cars and HIL (Hardware in
Loop) supplied from ETAS. Responsible to conduct final delivery tests.
As Project Quality Analyst:
Project Quality Analyst (PQA) responsible for process and quality assurance of a project.
Participation in
 ASPICE AUDIT
 Review of Base lining
 Configuration audit
 work product audits(as part of Quality assurance)
 Reporting QA status – PQSR and PI reports
Supporting in project management:
 Review of project plan, metrics
 LLBP
 Project closure
Page 3 of 5
Supporting in Engineering activities:
 Analysis of review data
 Pre-Delivery Checks for each delivery
WORK EXPERIENCE
Career Profile in Robert BOSCH:
Project #1:
Project Name Migration of Diesel and Gasoline software to common platform
Client VW Audi, Austria
Role Programmer/Team Member
Duration Jan/2008 -to- Dec/2009
Team Size 02
Environment
(With-skill
versions)
Software
(Forms 6i)
Languages: C
Internal Tools:Clear case, Clearquest, UDE debugger,
INCA, Canalyzer. Xmetal, Code wright, eSAEE, SDOM
O/S: RTOS
Hardware EDC17CP-14ECU,TC1796
Project Description :
In past functional request from VW-Audi were separately implemented in Diesel software and in
Gasoline software. This was making double effort spending for a same function.
To reduce these extra efforts Diesel software and Gasoline software were brought to a common
development environment called SDOM. As a process of this, migration of all the common software
was identified and migrated to new development environment.
Contribution
 Analysis and Identification of the common software between DS & GS.
 Involved in Allocation, Scheduling and Tracking of Tasks in the migration and Testing Phases.
 Involved in Reviews.
 Unit Testing.
 Integration of the software into new development environment.
 Integration testing of the software.
 Constructive knowledge sharing among the team members.
Project #2:
Project Name Software Development for Engine Control Unit
Client VW Audi, Austria
Role System Designer/ SW integrator/ Tester
Duration Feb/2010 -to- till date
Team Size 06
Environment
(With-skill
versions)
Software
(Forms 6i)
Languages: C
Internal Tools:Clear case, Clearqueat, SDOM,UDE
debugger, INCA, Xmetal, Code wright,
O/S: RTOS
Hardware EDC17CP-74, EDC17C-74 ECU,TC1793
Contribution
Page 4 of 5
 Analysis of the requirements
 Implementation and integration of work packages
 Involved in writing of test specifications for interface testing.
 Involved in Basic Feature Testing, interface testing.
 Involved in Review of work products.
 Involved in analysis of the DAMOS warnings and warnings related to EEPROM and DSM related
warnings.
 Constructive knowledge sharing among the team members
Career Profile in JVS Electronics:
Project:
Project Name NIDOReM – Numerical IDMT Draw-out Relay with Modbus
Role Programmer/Team Member
Duration Feb/2008 -to- Nov/2008
Team Size 04
Environment
(With-skill
versions)
Software Languages: C
Internal Tools : MPLAB ICD2 debugger
Hardware dsPIC30F6012A
Project Description :
This relay provides over current protection for power systems. Relay operating
time is determined by selecting definite time characteristics or one of the five
inverse time characteristics i.e.3s normal inverse, 1.3s normal inverse, 1.5s very
inverse, 0.8s extremely inverse and long inverse).the relay measures the current
from each of the phases and if it exceeds the set threshold, the relay extends a trip
signal after an operating time as determined by the selected curve.
Communication facility: Communication software provides the facility of data
acquisition and Supervisory control of the relay from remote location for the user.
Software also records fault history of the device.
The relay Provides time graded phase and earth protection for generators,
Transformers,capacitors, etc.
Contribution
 Involved in Code Reviews and Functional Testing.
 Design and Development of the software.
 Unit Testing.
 Integration of the software.
 Integration testing of the software.
 Constructive knowledge sharing among the team members.
Onsite Work Experience (in Vienna/Austria):
 Transfer of new project lines and to increase customer co-ordination.
Educational Profile
 B.E. in Instrumentation Technology with an aggregate of 70%.
 Diploma in Electronics and Communication engineering with an aggregate of 74%.
 SSLC with an aggregate of 78% from Board of Secondary Education, Karnataka in 2000.
Page 5 of 5
Personal Details
Date of Birth : 25.07.1984
Mobile : +91 - 8861200591
Mail ID : bhavani.hs86@gmail.com
Marital Status : Married
Husband : Working as Associate software consultant in TCS.
Passport Number : F7443653 (Valid till: 14/02/2017)
Languages Known : English, Hindi, Kannada and German (A1).
Bhavani H.S

Bhavani HS

  • 1.
    Page 1 of5 Bhavani H.S. bhavani.hs86@gmail.com +91-8861200591 Career Objective  Aiming for an innovative, challenging, growth oriented and responsible career in the field of Embedded Software. Professional Experience  Employer : Robert Bosch Engineering and Business Solutions Ltd (RBEI) Designation : Senior Software Engineer Duration : Jan-2008 to Till Date (Approx. 6.0 Years). Job Profile : Software Integration and Testing. Platform : Automotive Embedded System.  Employer : JVS Electronics Pvt. Ltd. Bangalore Designation : Embedded Engineer Duration : Oct-2006 to Dec-2007 (Approx. 1 year). Job Profile : Software development and Testing. Platform : Embedded System. Skill set  Aware of V-Model SW Development process and applied same.  Embedded Programming in compliance to the coding standards followed at BOSCH,MISRA Coding guidelines.  Experience in system, Release,Regression, Load and performance testing.  Familiarity with real-time operating systems.  Fast learning skills, creative analytical abilities, good technical and innovative problem solving skills.  Ability to support and sustain a positive work environment that fosters team performance with strong communication and relationship management skills.  Familiar with ASPICE and ISO 26262 (quality standards) Technical skills Programming languages C and Assembly Language for Microcontroller Micro controllers TC17XX, Intel 8051, dsPIC30F6012 controller. Wired Protocols SPI, I2C, CAN RTOS ERCOS Debugging Tool CANalyser,CANOe,UDE, Simulators, Emulator Configuration Management Tools Clear case, Clear quest, ETAS, INCA, Xmetal, Code Wright, Nestor, SDOM, Emulator, UDE Debugger
  • 2.
    Page 2 of5 Roles and Responsibilities As System Designer:  Handling and tracking SW requirements (Issue SW) in REQM-Tool  Coordinating SW requirements (Issue SW) between customer project, customer platform and Bosch development  Technical SW clarification with customer, function development and calibration  Identification of customer requirements affecting the monitoring  Creation of rough SW requirement description, breaks down on SW package to prepare function development order  Carrying out SW implementation review with function development/and if required with customer  Carrying out functional acceptance of delivered SW (Function development, on demand with customer)  Verification of customer documentation As Software Integrator:  Integration of software packages to complete program versions.  Creation and delivery to internal customers of test, development and series versions.  Creation of software for delivery to the calibration  Verification of the availability of the supplied parts needed to create a program version  Configuration and validation of the core software and HW configuration (inputs/outputs, EEPROM layout, etc.) in clearance with the Package Responsible.  Configuration and validation of the process and task sequence in clearance with the Package Responsible.  Implementation of any necessary adaptations to SW sharing interfaces and validation of those adaptations.  Formal checking of program versions including documentation of the results (analysis of make log files).  Execution and documentation of the mandatory tests.  Recording and documentation of the ECU (Controller) resources consumption.  Provision of a quality status report (review and release status for each package) for the program to deliver.  Analysis of complaints about the software during development and series production.  Signals changes for Tester related topics.  Unit testing and System Testing performed on open loop lab cars and HIL (Hardware in Loop) supplied from ETAS. Responsible to conduct final delivery tests. As Project Quality Analyst: Project Quality Analyst (PQA) responsible for process and quality assurance of a project. Participation in  ASPICE AUDIT  Review of Base lining  Configuration audit  work product audits(as part of Quality assurance)  Reporting QA status – PQSR and PI reports Supporting in project management:  Review of project plan, metrics  LLBP  Project closure
  • 3.
    Page 3 of5 Supporting in Engineering activities:  Analysis of review data  Pre-Delivery Checks for each delivery WORK EXPERIENCE Career Profile in Robert BOSCH: Project #1: Project Name Migration of Diesel and Gasoline software to common platform Client VW Audi, Austria Role Programmer/Team Member Duration Jan/2008 -to- Dec/2009 Team Size 02 Environment (With-skill versions) Software (Forms 6i) Languages: C Internal Tools:Clear case, Clearquest, UDE debugger, INCA, Canalyzer. Xmetal, Code wright, eSAEE, SDOM O/S: RTOS Hardware EDC17CP-14ECU,TC1796 Project Description : In past functional request from VW-Audi were separately implemented in Diesel software and in Gasoline software. This was making double effort spending for a same function. To reduce these extra efforts Diesel software and Gasoline software were brought to a common development environment called SDOM. As a process of this, migration of all the common software was identified and migrated to new development environment. Contribution  Analysis and Identification of the common software between DS & GS.  Involved in Allocation, Scheduling and Tracking of Tasks in the migration and Testing Phases.  Involved in Reviews.  Unit Testing.  Integration of the software into new development environment.  Integration testing of the software.  Constructive knowledge sharing among the team members. Project #2: Project Name Software Development for Engine Control Unit Client VW Audi, Austria Role System Designer/ SW integrator/ Tester Duration Feb/2010 -to- till date Team Size 06 Environment (With-skill versions) Software (Forms 6i) Languages: C Internal Tools:Clear case, Clearqueat, SDOM,UDE debugger, INCA, Xmetal, Code wright, O/S: RTOS Hardware EDC17CP-74, EDC17C-74 ECU,TC1793 Contribution
  • 4.
    Page 4 of5  Analysis of the requirements  Implementation and integration of work packages  Involved in writing of test specifications for interface testing.  Involved in Basic Feature Testing, interface testing.  Involved in Review of work products.  Involved in analysis of the DAMOS warnings and warnings related to EEPROM and DSM related warnings.  Constructive knowledge sharing among the team members Career Profile in JVS Electronics: Project: Project Name NIDOReM – Numerical IDMT Draw-out Relay with Modbus Role Programmer/Team Member Duration Feb/2008 -to- Nov/2008 Team Size 04 Environment (With-skill versions) Software Languages: C Internal Tools : MPLAB ICD2 debugger Hardware dsPIC30F6012A Project Description : This relay provides over current protection for power systems. Relay operating time is determined by selecting definite time characteristics or one of the five inverse time characteristics i.e.3s normal inverse, 1.3s normal inverse, 1.5s very inverse, 0.8s extremely inverse and long inverse).the relay measures the current from each of the phases and if it exceeds the set threshold, the relay extends a trip signal after an operating time as determined by the selected curve. Communication facility: Communication software provides the facility of data acquisition and Supervisory control of the relay from remote location for the user. Software also records fault history of the device. The relay Provides time graded phase and earth protection for generators, Transformers,capacitors, etc. Contribution  Involved in Code Reviews and Functional Testing.  Design and Development of the software.  Unit Testing.  Integration of the software.  Integration testing of the software.  Constructive knowledge sharing among the team members. Onsite Work Experience (in Vienna/Austria):  Transfer of new project lines and to increase customer co-ordination. Educational Profile  B.E. in Instrumentation Technology with an aggregate of 70%.  Diploma in Electronics and Communication engineering with an aggregate of 74%.  SSLC with an aggregate of 78% from Board of Secondary Education, Karnataka in 2000.
  • 5.
    Page 5 of5 Personal Details Date of Birth : 25.07.1984 Mobile : +91 - 8861200591 Mail ID : bhavani.hs86@gmail.com Marital Status : Married Husband : Working as Associate software consultant in TCS. Passport Number : F7443653 (Valid till: 14/02/2017) Languages Known : English, Hindi, Kannada and German (A1). Bhavani H.S