SlideShare a Scribd company logo
Application Note
Applying Open Compute Rack
and Power Specifications to
New and Existing Data Centers
by Kevin Gero
Strategic Account Manager
Bel Power Solutions
belfuse.com/power-solutions
APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS
TO NEW AND EXISTING DATA CENTERS
When Facebook and others launched the Open Compute Project (OCP) in 2011, the goal was to accelerate the
commercialization of hardware designs that enable greater data center efficiency and flexibility. Since then, the
OCP has gained traction in the market, growing into an influential community focused on open data center hardware.
Among the major developments in the last several years are the addition of notable members, including Apple,
Cisco, Nokia and Google; continued growth in the number and maturity of OCP specifications; and the development
of specifications for telecommunication data centers.
From its beginning, the OCP has questioned and reconsidered traditional approaches to data center design,
challenging the idea that we should continue doing things because that is the way they have always been done.
That’s great if you’re just building out your computing infrastructure, as several of the key players in OCP are, but
it can create challenges for organizations with significant investments in legacy infrastructure. Fortunately, as the
community has grown, OCP specifications have expanded to increase their applicability in legacy environments.
This is causing data center operators across the spectrum to take notice. They are increasingly evaluating the
viability of OCP specifications when building new data centers or expanding existing facilities. They often find
opportunities to drive down costs and improve efficiency, but also face some key decisions on how best to apply
the specifications—or the principles behind the specifications—to their particular environment and objectives.
The Changing Shape of Equipment Racks
One of the shifts the OCP made from conventional data center
standards in its initial Rack and Power specification was to redefine
the dimensions of the IT equipment rack from the traditional 19-inch
to 21-inch wide racks.
The 19-inch rack, according to the OCP, didn’t provide enough space
to accommodate the airflow and serviceability requirements of today’s
IT equipment. Adding two inches to the width of the rack creates
more room for cable runs, simplifies server deployment and service,
and improves airflow to create opportunities for more efficient data
center cooling. Facebook has standardized on the 21-inch rack in their
data centers and this has led to the commercialization of racks and
supporting products that comply with the 21-inch specification.
The OCP Rack and Power specification, of course, went beyond rack
dimensions. The specification essentially unbundles the traditional
server configuration, deploying servers, storage and power on
separate trays within the rack. With these components physically
separated, servers can be upgraded more cost-effectively when
new processors are introduced. It also provides greater flexibility in
configuring racks with required equipment.
Power
Zone 1
AC1 AC2
Power
Zone 2
Server &
Storage
Server &
Storage
Server &
Storage
Server &
Storage
OCP V2 rack showing location of servers,
storage and power shelves.
Page 2
Open Compute Rack • App Note BCA.00257 Rev. AA
APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS
TO NEW AND EXISTING DATA CENTERS
These benefits were compelling enough to cause OCP members who weren’t ready to abandon their 19-inch racks
to apply the principles of the Rack and Power specification to EIA-compliant 19-inch racks. Now, designers and
operators seeking to leverage the benefits of the OCP specification can choose between 19-inch and 21-inch racks,
with a full complement of racks, servers, storage and power products available for each.
Accommodating Higher Density
The OCP specifications were driven by the needs of large-scale deployments, mostly greenfield data centers built
in areas where real estate costs are low. In these environments, capacity can be easily spread out and there isn’t a
good economic case for high-density racks.
As a result, the OCP specification supports 13.2 kW of IT equipment within the rack. This is accomplished through the
use of two power shelves within the rack, each of which consists of three power supplies in an N + 1 configuration.
Each shelf supports a different zone within the rack and is connected to the rack management controller or facility-
level monitoring to collect data on temperature, power in, power out, and utilization. Power shelves can also include
“smart boxes” which archive data in the event of a failure for diagnostics.
While there generally isn’t room within the rack for additional power shelves, you can accommodate higher densities
within the OCP rack by choosing a power shelf designed for high density. Shelves are available that include six 3 kW
power supplies in an N + 1 configuration that uses just 1U of rack space. This effectively doubles the power capacity
of an OCP rack.
Due to the efficiency curve of modern power supplies, these higher density shelves can be deployed without
compromising efficiency, even if the initial capacity of the rack is well below the design specification. The power
supplies have a maximally flat efficiency curve across the load range.
The efficiency curves also highlight the differences between Platinum and Titanium power supplies. Data centers
striving to achieve the highest levels of efficiency will be tempted to specify Titanium power supplies. However, it’s
useful to evaluate the efficiency curves
in light of your expected requirements
before making a final decision. While
Titanium power supplies provide
efficiency improvements at certain
points of the curve, the efficiency of
Platinum power supplies may provide
improvements at other points, such as
light and full loading. Comparing the
performance of each at the points on
the curve you plan to operate can help
guide decisions around whether the
additional cost of a Titanium power
supply is warranted by the efficiency
gains that will be realized.
Efficiency curves for the Bel Power Platinum (PFE3000)
and Titanium (TET3000) power supplies.
Page 3
APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS
TO NEW AND EXISTING DATA CENTERS
The Question of Voltage
One of the challenges designers now face in configuring data center power is making decisions about input voltage to
the rack and output voltage from the power shelf to the servers. In the past, 208 V to the rack and 12 V to the server
were common, but as designers seek to minimize losses within the critical power path created by distribution,
conversions and step-downs, alternate approaches are being considered.
The OCP specification addresses this by bringing 277/480 V power (230/400 V in Europe) directly from the transformer
to the rack, eliminating the stepdown to 208 V. This can create a 2.5 percent efficiency improvement compared to
208 V without making significant changes to the way power is delivered to the rack.
Some designers see an opportunity to go even further. Why not, they ask, simply rectify the 480 V power coming
into the data center and deliver 380 V DC to the rack? This saves an additional 1 to 2 percent compared to the OCP
specification, but there is resistance among operators to running high-voltage DC in the data center. In addition,
equipment such as fans may still require AC power, creating complications. Still, the efficiency of DC power is
appealing and it would not be surprising if this approach finds more proponents in the future. The power shelves
used in an OCP rack can be configured to accommodate 208 V AC, 277 V AC or 380 V DC.
Output voltages can also vary. The initial OCP specification provided for 12 V output from the power shelf, which
is what most server hardware is designed to accept. But when Google joined the OCP in 2015, they developed an
OCP specification for 48 V output from the power shelf. Google is a proponent of 48 V servers for the same reason
the OCP opted to deliver higher voltages to the rack—the higher the voltage, the greater the efficiency.
In this case, delivering 48 V to the server reduces the voltage drop across the busbar and connectors by a factor
of 16 (assuming same conductor cross section), increasing the overall efficiency compared to 12 V. The bigger
advantage of 48 V, however, is that it provides a path to the future for racks with much higher power requirements.
This cannot be easily realized with 12 V distribution because of the higher currents required.
Until Google joined the OCP, the only servers that could accept 48 V input were those manufactured for Google.
It’s still too early to determine whether the OCP 48 V specification will drive broad commercialization of 48 V servers,
but the initial signs are promising. If you’re seeking to achieve the highest possible efficiency and are willing to live
with the limits of the current market for 48 V servers, this could be a viable option that is supported by the current
generation of power shelves.
A further variation comes into play as telecommunication companies transition to data centers. Telco providers have
a long history with -48 V input equipment. As they shift from central offices with purpose-built hardware to data
centers with standardized hardware and software-defined services, they will increasingly replace their specialized
equipment with servers running at 12 V with an intermediate -48 V to 12 V DC/DC shelves. In future, they may migrate
to servers directly supplied with 48 V.
Page 4
Open Compute Rack • App Note BCA.00257 Rev. AA
APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS
TO NEW AND EXISTING DATA CENTERS
Making the Move to ocp
As the OCP specifications continue to mature, they are being applied to a wider range of environments and
requirements. With a mission of improving the efficiency and flexibility of data center hardware, the OCP is helping
advance new approaches to data center design that have broad benefits within the industry. While not everybody
is well positioned to adopt the OCP specifications, data center designers and developers should, at minimum,
stay abreast of the developments within the OCP and how they are shaping the future of data center hardware.
Bel Power Solutions, a Bel group, offers world-class AC-DC and DC-DC power conversion products,
value-add solutions, complete box-build solutions and contract manufacturing services. Applications of our
power conversion devices range from board-mount power to system-level architectures for servers, storage,
networking, industrial and telecommunications industries.
Bel is headquartered in Jersey City, New Jersey. Founded in 1949, Bel designs, manufactures and markets
products that power, protect and connect electronic circuits.
Kevin Gero has primarily focused on Cloud Computing Solutions for Bel Power Solutions since Bel
Fuse acquired Power-One from ABB in 2014. Kevin previously held positions in Marketing, Program
Management, Component Engineering, Design Engineering, Application Engineering and Strategic
Account Management for Power-One and several other companies in the power industry over the
past 37 years.
Kevin Gero, Strategic Account Manager, Bel Power Solutions
belfuse.com/power-solutions
Page 5
Asia-Pacific		 Europe, Middle East		 North America
+86 755 298 85888		 +353 61 225 977		 +1 408 785 5200
© 2018 Bel Power Solutions & Protection	 App Note BCA.00257 Rev. AA
belfuse.com/power-solutions

More Related Content

What's hot

Dell Data Center Networking Overview
Dell Data Center Networking OverviewDell Data Center Networking Overview
Dell Data Center Networking Overview
Dell World
 
Cisco UCS with NetApp Storage for SAP HANA Solution
Cisco UCS with NetApp Storage for SAP HANA Solution Cisco UCS with NetApp Storage for SAP HANA Solution
Cisco UCS with NetApp Storage for SAP HANA Solution
NetApp
 
IBM Power leading Cognitive Systems
IBM Power leading Cognitive SystemsIBM Power leading Cognitive Systems
IBM Power leading Cognitive Systems
Hugo Blanco
 
Break Free from Oracle
Break Free from OracleBreak Free from Oracle
Break Free from Oracle
EDB
 
Software Defined Storage - Open Framework and Intel® Architecture Technologies
Software Defined Storage - Open Framework and Intel® Architecture TechnologiesSoftware Defined Storage - Open Framework and Intel® Architecture Technologies
Software Defined Storage - Open Framework and Intel® Architecture Technologies
Odinot Stanislas
 
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
Sashikris
 
NetApp Management Pack for VMware vRealize Operations | Blue Medora
NetApp Management Pack for VMware vRealize Operations | Blue MedoraNetApp Management Pack for VMware vRealize Operations | Blue Medora
NetApp Management Pack for VMware vRealize Operations | Blue Medora
Blue Medora
 
10 Lessons Learned from Meeting with 150 Banks Across the Globe
10 Lessons Learned from Meeting with 150 Banks Across the Globe10 Lessons Learned from Meeting with 150 Banks Across the Globe
10 Lessons Learned from Meeting with 150 Banks Across the Globe
DataWorks Summit
 
Highly Automated IT
Highly Automated ITHighly Automated IT
Highly Automated IT
Andrey Akulov
 
Times ten 18.1_overview_meetup
Times ten 18.1_overview_meetupTimes ten 18.1_overview_meetup
Times ten 18.1_overview_meetup
Byung Ho Lee
 
Replacing Oracle CDC with Oracle GoldenGate
Replacing Oracle CDC with Oracle GoldenGateReplacing Oracle CDC with Oracle GoldenGate
Replacing Oracle CDC with Oracle GoldenGate
Stewart Bryson
 
IBM POWER8 as an HPC platform
IBM POWER8 as an HPC platformIBM POWER8 as an HPC platform
IBM POWER8 as an HPC platform
Alexander Pozdneev
 
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
Principled Technologies
 
Why Networked FICON Storage Is Better Than Direct Attached Storage
Why Networked FICON Storage Is Better Than Direct Attached StorageWhy Networked FICON Storage Is Better Than Direct Attached Storage
Why Networked FICON Storage Is Better Than Direct Attached Storage
Hitachi Vantara
 
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
Milomir Vojvodic
 
Track 2, session 4, data protection and disaster recovery with riverbed
Track 2, session 4, data protection and disaster recovery with riverbedTrack 2, session 4, data protection and disaster recovery with riverbed
Track 2, session 4, data protection and disaster recovery with riverbedEMC Forum India
 
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics AcceleratorEDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
Daniel Martin
 
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics WorkbenchPivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
EMC
 

What's hot (20)

Dell Data Center Networking Overview
Dell Data Center Networking OverviewDell Data Center Networking Overview
Dell Data Center Networking Overview
 
Cisco UCS with NetApp Storage for SAP HANA Solution
Cisco UCS with NetApp Storage for SAP HANA Solution Cisco UCS with NetApp Storage for SAP HANA Solution
Cisco UCS with NetApp Storage for SAP HANA Solution
 
IBM Power leading Cognitive Systems
IBM Power leading Cognitive SystemsIBM Power leading Cognitive Systems
IBM Power leading Cognitive Systems
 
Datacenter overview
Datacenter overviewDatacenter overview
Datacenter overview
 
Database Report
Database ReportDatabase Report
Database Report
 
Break Free from Oracle
Break Free from OracleBreak Free from Oracle
Break Free from Oracle
 
Software Defined Storage - Open Framework and Intel® Architecture Technologies
Software Defined Storage - Open Framework and Intel® Architecture TechnologiesSoftware Defined Storage - Open Framework and Intel® Architecture Technologies
Software Defined Storage - Open Framework and Intel® Architecture Technologies
 
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge22by7 and DellEMC Tech Day July 20 2017 - Power Edge
22by7 and DellEMC Tech Day July 20 2017 - Power Edge
 
NetApp Management Pack for VMware vRealize Operations | Blue Medora
NetApp Management Pack for VMware vRealize Operations | Blue MedoraNetApp Management Pack for VMware vRealize Operations | Blue Medora
NetApp Management Pack for VMware vRealize Operations | Blue Medora
 
10 Lessons Learned from Meeting with 150 Banks Across the Globe
10 Lessons Learned from Meeting with 150 Banks Across the Globe10 Lessons Learned from Meeting with 150 Banks Across the Globe
10 Lessons Learned from Meeting with 150 Banks Across the Globe
 
Highly Automated IT
Highly Automated ITHighly Automated IT
Highly Automated IT
 
Times ten 18.1_overview_meetup
Times ten 18.1_overview_meetupTimes ten 18.1_overview_meetup
Times ten 18.1_overview_meetup
 
Replacing Oracle CDC with Oracle GoldenGate
Replacing Oracle CDC with Oracle GoldenGateReplacing Oracle CDC with Oracle GoldenGate
Replacing Oracle CDC with Oracle GoldenGate
 
IBM POWER8 as an HPC platform
IBM POWER8 as an HPC platformIBM POWER8 as an HPC platform
IBM POWER8 as an HPC platform
 
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
OLTP with Dell EqualLogic hybrid arrays: A comparative study with an industry...
 
Why Networked FICON Storage Is Better Than Direct Attached Storage
Why Networked FICON Storage Is Better Than Direct Attached StorageWhy Networked FICON Storage Is Better Than Direct Attached Storage
Why Networked FICON Storage Is Better Than Direct Attached Storage
 
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
Oracle real time replica solution (Oracle GoldenGate) in Telco and FSI vertic...
 
Track 2, session 4, data protection and disaster recovery with riverbed
Track 2, session 4, data protection and disaster recovery with riverbedTrack 2, session 4, data protection and disaster recovery with riverbed
Track 2, session 4, data protection and disaster recovery with riverbed
 
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics AcceleratorEDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
EDBT 2013 - Near Realtime Analytics with IBM DB2 Analytics Accelerator
 
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics WorkbenchPivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
Pivotal: Operationalizing 1000 Node Hadoop Cluster - Analytics Workbench
 

Similar to Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications to New & Existing Data Centers (Jan. 2018)

The Future Of Data Center Critical Power - GP100 eBook
The Future Of Data Center Critical Power - GP100 eBookThe Future Of Data Center Critical Power - GP100 eBook
The Future Of Data Center Critical Power - GP100 eBook
GE Energy Connections
 
Thamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server ChoiceThamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate Group
 
Delivering Carrier Grade OCP for Virtualized Data Centers
Delivering Carrier Grade OCP for Virtualized Data CentersDelivering Carrier Grade OCP for Virtualized Data Centers
Delivering Carrier Grade OCP for Virtualized Data Centers
Radisys Corporation
 
Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data center
Schneider Electric
 
Superior Cloud Economics with Power Systems
Superior Cloud Economics with Power Systems Superior Cloud Economics with Power Systems
Superior Cloud Economics with Power Systems
IBM Power Systems
 
Storage Networking Solutions for High Performance Databases by QLogic
Storage Networking Solutions for High Performance Databases by QLogicStorage Networking Solutions for High Performance Databases by QLogic
Storage Networking Solutions for High Performance Databases by QLogic
Jone Smith
 
1. OCP workshop
1. OCP workshop1. OCP workshop
1. OCP workshop
FinalBSD
 
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
Schneider Electric
 
MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1blewington
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
Schneider Electric
 
DELL PS article - Hariharan Ramalingam & Nick Jervis
DELL PS article - Hariharan Ramalingam & Nick JervisDELL PS article - Hariharan Ramalingam & Nick Jervis
DELL PS article - Hariharan Ramalingam & Nick JervisHariharan Ramalingam
 
Robust Free Power management: Dell OpenManage Power Center
Robust Free Power management: Dell OpenManage Power CenterRobust Free Power management: Dell OpenManage Power Center
Robust Free Power management: Dell OpenManage Power Center
Principled Technologies
 
owb-11gr2-code-template-mappings-133311
owb-11gr2-code-template-mappings-133311owb-11gr2-code-template-mappings-133311
owb-11gr2-code-template-mappings-133311Carnot Antonio Romero
 
Power Quality in Internet Data Centers
Power Quality in Internet Data CentersPower Quality in Internet Data Centers
Power Quality in Internet Data Centers
Leonardo ENERGY
 
Improving Oracle Database performance: Moving from older servers to 16th Gene...
Improving Oracle Database performance: Moving from older servers to 16th Gene...Improving Oracle Database performance: Moving from older servers to 16th Gene...
Improving Oracle Database performance: Moving from older servers to 16th Gene...
Principled Technologies
 
Utah Data Center Project
Utah Data Center ProjectUtah Data Center Project
Utah Data Center Project
Brent Elieson
 
Bringing a new level of HPC and AI to the OCP form factor
Bringing a new level of HPC and AI to the OCP form factorBringing a new level of HPC and AI to the OCP form factor
Bringing a new level of HPC and AI to the OCP form factor
Penguin Solutions
 
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmarkThe Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
Lenovo Data Center
 
Ibm symp14 referentin_barbara koch_power_8 launch bk
Ibm symp14 referentin_barbara koch_power_8 launch bkIbm symp14 referentin_barbara koch_power_8 launch bk
Ibm symp14 referentin_barbara koch_power_8 launch bkIBM Switzerland
 

Similar to Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications to New & Existing Data Centers (Jan. 2018) (20)

The Future Of Data Center Critical Power - GP100 eBook
The Future Of Data Center Critical Power - GP100 eBookThe Future Of Data Center Critical Power - GP100 eBook
The Future Of Data Center Critical Power - GP100 eBook
 
Thamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server ChoiceThamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server Choice
 
Delivering Carrier Grade OCP for Virtualized Data Centers
Delivering Carrier Grade OCP for Virtualized Data CentersDelivering Carrier Grade OCP for Virtualized Data Centers
Delivering Carrier Grade OCP for Virtualized Data Centers
 
Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data center
 
Superior Cloud Economics with Power Systems
Superior Cloud Economics with Power Systems Superior Cloud Economics with Power Systems
Superior Cloud Economics with Power Systems
 
Storage Networking Solutions for High Performance Databases by QLogic
Storage Networking Solutions for High Performance Databases by QLogicStorage Networking Solutions for High Performance Databases by QLogic
Storage Networking Solutions for High Performance Databases by QLogic
 
1. OCP workshop
1. OCP workshop1. OCP workshop
1. OCP workshop
 
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
 
MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
DELL PS article - Hariharan Ramalingam & Nick Jervis
DELL PS article - Hariharan Ramalingam & Nick JervisDELL PS article - Hariharan Ramalingam & Nick Jervis
DELL PS article - Hariharan Ramalingam & Nick Jervis
 
Robust Free Power management: Dell OpenManage Power Center
Robust Free Power management: Dell OpenManage Power CenterRobust Free Power management: Dell OpenManage Power Center
Robust Free Power management: Dell OpenManage Power Center
 
owb-11gr2-code-template-mappings-133311
owb-11gr2-code-template-mappings-133311owb-11gr2-code-template-mappings-133311
owb-11gr2-code-template-mappings-133311
 
Power Quality in Internet Data Centers
Power Quality in Internet Data CentersPower Quality in Internet Data Centers
Power Quality in Internet Data Centers
 
DCD_FOCUS on POWER Article
DCD_FOCUS on POWER ArticleDCD_FOCUS on POWER Article
DCD_FOCUS on POWER Article
 
Improving Oracle Database performance: Moving from older servers to 16th Gene...
Improving Oracle Database performance: Moving from older servers to 16th Gene...Improving Oracle Database performance: Moving from older servers to 16th Gene...
Improving Oracle Database performance: Moving from older servers to 16th Gene...
 
Utah Data Center Project
Utah Data Center ProjectUtah Data Center Project
Utah Data Center Project
 
Bringing a new level of HPC and AI to the OCP form factor
Bringing a new level of HPC and AI to the OCP form factorBringing a new level of HPC and AI to the OCP form factor
Bringing a new level of HPC and AI to the OCP form factor
 
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmarkThe Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
The Apache Spark config behind the indsutry's first 100TB Spark SQL benchmark
 
Ibm symp14 referentin_barbara koch_power_8 launch bk
Ibm symp14 referentin_barbara koch_power_8 launch bkIbm symp14 referentin_barbara koch_power_8 launch bk
Ibm symp14 referentin_barbara koch_power_8 launch bk
 

Recently uploaded

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 

Recently uploaded (20)

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 

Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications to New & Existing Data Centers (Jan. 2018)

  • 1. Application Note Applying Open Compute Rack and Power Specifications to New and Existing Data Centers by Kevin Gero Strategic Account Manager Bel Power Solutions belfuse.com/power-solutions
  • 2. APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS TO NEW AND EXISTING DATA CENTERS When Facebook and others launched the Open Compute Project (OCP) in 2011, the goal was to accelerate the commercialization of hardware designs that enable greater data center efficiency and flexibility. Since then, the OCP has gained traction in the market, growing into an influential community focused on open data center hardware. Among the major developments in the last several years are the addition of notable members, including Apple, Cisco, Nokia and Google; continued growth in the number and maturity of OCP specifications; and the development of specifications for telecommunication data centers. From its beginning, the OCP has questioned and reconsidered traditional approaches to data center design, challenging the idea that we should continue doing things because that is the way they have always been done. That’s great if you’re just building out your computing infrastructure, as several of the key players in OCP are, but it can create challenges for organizations with significant investments in legacy infrastructure. Fortunately, as the community has grown, OCP specifications have expanded to increase their applicability in legacy environments. This is causing data center operators across the spectrum to take notice. They are increasingly evaluating the viability of OCP specifications when building new data centers or expanding existing facilities. They often find opportunities to drive down costs and improve efficiency, but also face some key decisions on how best to apply the specifications—or the principles behind the specifications—to their particular environment and objectives. The Changing Shape of Equipment Racks One of the shifts the OCP made from conventional data center standards in its initial Rack and Power specification was to redefine the dimensions of the IT equipment rack from the traditional 19-inch to 21-inch wide racks. The 19-inch rack, according to the OCP, didn’t provide enough space to accommodate the airflow and serviceability requirements of today’s IT equipment. Adding two inches to the width of the rack creates more room for cable runs, simplifies server deployment and service, and improves airflow to create opportunities for more efficient data center cooling. Facebook has standardized on the 21-inch rack in their data centers and this has led to the commercialization of racks and supporting products that comply with the 21-inch specification. The OCP Rack and Power specification, of course, went beyond rack dimensions. The specification essentially unbundles the traditional server configuration, deploying servers, storage and power on separate trays within the rack. With these components physically separated, servers can be upgraded more cost-effectively when new processors are introduced. It also provides greater flexibility in configuring racks with required equipment. Power Zone 1 AC1 AC2 Power Zone 2 Server & Storage Server & Storage Server & Storage Server & Storage OCP V2 rack showing location of servers, storage and power shelves. Page 2
  • 3. Open Compute Rack • App Note BCA.00257 Rev. AA APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS TO NEW AND EXISTING DATA CENTERS These benefits were compelling enough to cause OCP members who weren’t ready to abandon their 19-inch racks to apply the principles of the Rack and Power specification to EIA-compliant 19-inch racks. Now, designers and operators seeking to leverage the benefits of the OCP specification can choose between 19-inch and 21-inch racks, with a full complement of racks, servers, storage and power products available for each. Accommodating Higher Density The OCP specifications were driven by the needs of large-scale deployments, mostly greenfield data centers built in areas where real estate costs are low. In these environments, capacity can be easily spread out and there isn’t a good economic case for high-density racks. As a result, the OCP specification supports 13.2 kW of IT equipment within the rack. This is accomplished through the use of two power shelves within the rack, each of which consists of three power supplies in an N + 1 configuration. Each shelf supports a different zone within the rack and is connected to the rack management controller or facility- level monitoring to collect data on temperature, power in, power out, and utilization. Power shelves can also include “smart boxes” which archive data in the event of a failure for diagnostics. While there generally isn’t room within the rack for additional power shelves, you can accommodate higher densities within the OCP rack by choosing a power shelf designed for high density. Shelves are available that include six 3 kW power supplies in an N + 1 configuration that uses just 1U of rack space. This effectively doubles the power capacity of an OCP rack. Due to the efficiency curve of modern power supplies, these higher density shelves can be deployed without compromising efficiency, even if the initial capacity of the rack is well below the design specification. The power supplies have a maximally flat efficiency curve across the load range. The efficiency curves also highlight the differences between Platinum and Titanium power supplies. Data centers striving to achieve the highest levels of efficiency will be tempted to specify Titanium power supplies. However, it’s useful to evaluate the efficiency curves in light of your expected requirements before making a final decision. While Titanium power supplies provide efficiency improvements at certain points of the curve, the efficiency of Platinum power supplies may provide improvements at other points, such as light and full loading. Comparing the performance of each at the points on the curve you plan to operate can help guide decisions around whether the additional cost of a Titanium power supply is warranted by the efficiency gains that will be realized. Efficiency curves for the Bel Power Platinum (PFE3000) and Titanium (TET3000) power supplies. Page 3
  • 4. APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS TO NEW AND EXISTING DATA CENTERS The Question of Voltage One of the challenges designers now face in configuring data center power is making decisions about input voltage to the rack and output voltage from the power shelf to the servers. In the past, 208 V to the rack and 12 V to the server were common, but as designers seek to minimize losses within the critical power path created by distribution, conversions and step-downs, alternate approaches are being considered. The OCP specification addresses this by bringing 277/480 V power (230/400 V in Europe) directly from the transformer to the rack, eliminating the stepdown to 208 V. This can create a 2.5 percent efficiency improvement compared to 208 V without making significant changes to the way power is delivered to the rack. Some designers see an opportunity to go even further. Why not, they ask, simply rectify the 480 V power coming into the data center and deliver 380 V DC to the rack? This saves an additional 1 to 2 percent compared to the OCP specification, but there is resistance among operators to running high-voltage DC in the data center. In addition, equipment such as fans may still require AC power, creating complications. Still, the efficiency of DC power is appealing and it would not be surprising if this approach finds more proponents in the future. The power shelves used in an OCP rack can be configured to accommodate 208 V AC, 277 V AC or 380 V DC. Output voltages can also vary. The initial OCP specification provided for 12 V output from the power shelf, which is what most server hardware is designed to accept. But when Google joined the OCP in 2015, they developed an OCP specification for 48 V output from the power shelf. Google is a proponent of 48 V servers for the same reason the OCP opted to deliver higher voltages to the rack—the higher the voltage, the greater the efficiency. In this case, delivering 48 V to the server reduces the voltage drop across the busbar and connectors by a factor of 16 (assuming same conductor cross section), increasing the overall efficiency compared to 12 V. The bigger advantage of 48 V, however, is that it provides a path to the future for racks with much higher power requirements. This cannot be easily realized with 12 V distribution because of the higher currents required. Until Google joined the OCP, the only servers that could accept 48 V input were those manufactured for Google. It’s still too early to determine whether the OCP 48 V specification will drive broad commercialization of 48 V servers, but the initial signs are promising. If you’re seeking to achieve the highest possible efficiency and are willing to live with the limits of the current market for 48 V servers, this could be a viable option that is supported by the current generation of power shelves. A further variation comes into play as telecommunication companies transition to data centers. Telco providers have a long history with -48 V input equipment. As they shift from central offices with purpose-built hardware to data centers with standardized hardware and software-defined services, they will increasingly replace their specialized equipment with servers running at 12 V with an intermediate -48 V to 12 V DC/DC shelves. In future, they may migrate to servers directly supplied with 48 V. Page 4
  • 5. Open Compute Rack • App Note BCA.00257 Rev. AA APPLYING OPEN COMPUTE RACK AND POWER SPECIFICATIONS TO NEW AND EXISTING DATA CENTERS Making the Move to ocp As the OCP specifications continue to mature, they are being applied to a wider range of environments and requirements. With a mission of improving the efficiency and flexibility of data center hardware, the OCP is helping advance new approaches to data center design that have broad benefits within the industry. While not everybody is well positioned to adopt the OCP specifications, data center designers and developers should, at minimum, stay abreast of the developments within the OCP and how they are shaping the future of data center hardware. Bel Power Solutions, a Bel group, offers world-class AC-DC and DC-DC power conversion products, value-add solutions, complete box-build solutions and contract manufacturing services. Applications of our power conversion devices range from board-mount power to system-level architectures for servers, storage, networking, industrial and telecommunications industries. Bel is headquartered in Jersey City, New Jersey. Founded in 1949, Bel designs, manufactures and markets products that power, protect and connect electronic circuits. Kevin Gero has primarily focused on Cloud Computing Solutions for Bel Power Solutions since Bel Fuse acquired Power-One from ABB in 2014. Kevin previously held positions in Marketing, Program Management, Component Engineering, Design Engineering, Application Engineering and Strategic Account Management for Power-One and several other companies in the power industry over the past 37 years. Kevin Gero, Strategic Account Manager, Bel Power Solutions belfuse.com/power-solutions Page 5
  • 6. Asia-Pacific Europe, Middle East North America +86 755 298 85888 +353 61 225 977 +1 408 785 5200 © 2018 Bel Power Solutions & Protection App Note BCA.00257 Rev. AA belfuse.com/power-solutions