Game testing nowadays requires
the right understanding of the
gaming industry, title publishing,
mass server loading, level
architecture and advanced
user experience knowledge.
www.gearinc.com
The gaming industry is a fast expanding
sector. The sophistication and complexity
of modern titles bring with them a wide
range of features, UI, functionality due to
interaction, server concerns with online
multiplayer options and security
concerns and payments.
Game Testing Process
www.gearinc.com
Here are the most common
game testing processes:
1.ALPHA/ BETA
TESTING
www.gearinc.com
Alpha testing is a form of
acceptance testing done mainly
by in-house QA teams.
Beta testing is the testing stage where the
company releases the game to a few beta
user groups to ‘real world’ test as many
conceivable usage scenarios as possible.
www.gearinc.com
2. FEATURE
TESTING
www.gearinc.com
Using a combination of
automated and manual testing,
all current features’ functionality
is tested to determine process,
load durability, and user logic.
www.gearinc.com
3. SMOKE
TESTING
www.gearinc.com
Also known as confidence,
sanity or build verification testing,
smoke testing is a preliminary test
performed to reveal simple failures
touching the main functions and
updates on the game.
www.gearinc.com
4.AUTOMATION
TESTING
www.gearinc.com
Automation should
be included where it
is appropriate to do
so for time and
budget benefits.
www.gearinc.com
5. LOCALIZATION
TESTING
www.gearinc.com
Localization testing is done
to make technical corrections
and review translation work
of game scripts.
Localization testers native to the area
where a game is marketed may be
hired to ensure the accuracy and
quality of the game localization.
www.gearinc.com
Game Testing Phases
www.gearinc.com
GATHERING
REQUIREMENTS
www.gearinc.com
Testers should have a thorough
understanding of the following
aspects of the game:
Storyboard, Architecture, Features,
Characters, Concept, Rules,
Pointing System, and Stages/Levels.
www.gearinc.com
PREPARATIONS
OF GAME TEST
STRATEGY
www.gearinc.com
The Test Strategy document is
prepared, which must include
sections like:
Timeline, Testers, Number of testing cycles
and testing types, In and Out-scope, Risk-based
test analysis, SLAs, Risk and mitigation, Defect
logging process, and Reporting process.
www.gearinc.com
DESIGNING
TEST CASES
www.gearinc.com
Testers should make both positive
and negative test cases. Here are
some effective test case
design techniques:
Critical Path, Exception Path Testing,
and Traditional Black Box.
www.gearinc.com
EXECUTION
OF GAME
TEST CASES
www.gearinc.com
To reveal more defects, to
further improve the quality of
the game, and content testing.
www.gearinc.com
RECORDING FOR
TEST RESULTS
www.gearinc.com
The development team should
record test results as a movie
or a series of screenshots
so they can review the
behavior effectively.
www.gearinc.com
CREATION OF
DEFECT LOG
www.gearinc.com
All the defects should be
logged, prioritized, categorized
and tracked effectively. Creating
the defect log will help
developers on their next title.
www.gearinc.com
TO DO’S WHEN
TESTING
GAMES
www.gearinc.com
Games need to be tested before,
during and after the release on the
market. Once released, gamers
expect a great experience.
It is game testers’ job to ensure that
gamers’ expectation will be met,
even surpassed.
www.gearinc.com
Here are some tips
on testing game titles:
www.gearinc.com
REVIEW THE
GAME RULES
www.gearinc.com
Evaluate and verify the
consistency of the predefined
game rules. Also, check if the
game win determination is
aligned with the game rules.
www.gearinc.com
VERIFY
FUNCTIONALITY
www.gearinc.com
The most practical way to
verify the correctness of game
elements is by playing the
actual game from start to finish.
www.gearinc.com
CHECK FOR
COMPLIANCE
www.gearinc.com
It calls for checking if protocol
compatibility and hardware
pin assignments are compatible
with both software and hardware.
www.gearinc.com
MAKE SURE IT
IS LOCALIZED
www.gearinc.com
The work of localization testers,
most often, involves facing a
spreadsheet-like interface that
lists all game scripts and their
corresponding translation.
www.gearinc.com
SOAK TESTING
www.gearinc.com
Game soaking is done by exposing
a game for an excessively long
period of execution. The purpose
of this activity is to test if the game
will display unreleased segments
of memory and mathematical
rounding discrepancies.
www.gearinc.com
PERFORM
SECURITY TEST
www.gearinc.com
Security is vital for games,
especially for network capable,
multi-user ones. Games that
need security testing most are
those with role escalation, prizes,
virtual money and selling trinkets.
www.gearinc.com
For a Free Trial
CONTACT US
hello@gearinc.com
www.gearinc.com
Skylight Building, 125D Minh
Khai, Hanoi, Vietnam
+84 24 3972 8621

Beginner’s Guide to Game Testing | What Skills and Tools You Should Know To Test Your Game