SlideShare a Scribd company logo
Barry Richardson 
www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com 
PROFILE: An accomplished, self-motivated professional with over fifteen years of senior level project management expertise in operations, logistics, engineering and new business development. Designs, develops and implements carefully detailed plans and projects that meet or exceed all customer requirements within budget and on schedule. Leads, coaches, and inspires associates to stay resolved and offer their own unique skills and talents and collaborate as a team to exceed the company’s goals and objectives. 
AREAS OF EXPERTISE 
 Program Management 
 Project Management / Execution 
 New Business Development 
 Budget Analysis / Forecasting 
 Employee Performance Development 
 Project Planning / Scheduling 
 Tactical / Logistics Planning 
 Strategic Planning 
 Product Development / Life Cycle 
 Contract Negotiation 
PROVEN ACCOMPLISHMENTS 
Coach: A team of Test Equipment (TE) Design Engineers faced a technically challenging project with critical cost and schedule constraints. If the team did not meet the contractual delivery date, the company would have to pay a 10% penalty of $3.8 million. Coached the team through developing a detailed project plan that they would own and execute. RESULT: Customer’s requirements and schedule were met and exceeded, avoiding all penalties. Team Achievement Award was presented to the team for their excellent execution of a major TE project. 
Recover: Took over the Integrated Product Team Leader (IPTL) position for a project to build new Test Systems for the EKV program. The project was 60 days behind schedule and 40% over budget. Re- planned the project and led a deep-dive into design problems. RESULT: Test Systems were delivered in time to support critical flight tests and 60% of the projected cost overrun was recovered. 
Inspire/Mentor: A US Government security planning oversight forced a 30 day shutdown of all installation and on-going training in Japan. The project team was upset and dejected, believing that they could no longer meet the customer’s requirement to start operations in the facility by the required deadline. Rallied the team, inspiring them to think creatively and work together to overcome the time lost. RESULT: All integration and training was completed three days before the scheduled facility opening. The customer was elated and recognized the team for their significant achievement. 
Collaborate: The Japan Maritime Self Defense Force (JMSDF) announced they would be four months late in providing the high purity liquid argon gas supply required for one of the missiles to be tested in the new Intermediate Level Maintenance Facility (ILMF). The JMSDF ship maintenance schedule depended on the facility going operational for at least one missile type and the delay would compromise fleet readiness. Worked collaboratively with JMSDF and the U.S. Navy to split the project into two phases, allowing the facility to open for the critical missile type first. RESULT: The ILMF went operational for one missile type on schedule. JMSDF was able to certify those rounds and deployed the ships on schedule. 
Execute: Responsible for three separate Direct Commercial Sales (DCS) contracts to provide technical support to Mitsubishi Heavy Industries. These contracts were valued at approximately $2 million each and were bid at 30% margins. RESULT: Executed contracts very lean and efficiently and was able to realize over 60% margins (doubling profit) while continuing to delight the customer. 
EDUCATION 
B.S. – Business Administration – University of Phoenix
Barry Richardson 
www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com 
POSITIONING STATEMENT: Applies expertise in strategic planning and team leadership to deploy the company’s vision and achieve the goals and objectives of the organization. 
PROFESSIONAL HISTORY 
Raytheon 
Tucson, AZ 
1994 - 2014 
Program Manager (2008 – 2014) 
 In charge of the Program Management of a $110 million project to build a new missile test facility in Japan. Directed oversight of Facility Design Requirements, Construction Inspections, Security and Operations Planning, Security Systems Installation, Ordnance Handling Equipment Installation, Test Equipment Design, Fabrication, Integration, and Installation, Facility Personnel Training, and Technical Support for Japanese Industry Partners. 
 Supervision of a team of over 30 multi-disciplined engineers and technical training and support personnel. 
 Developed and maintained the Master Schedule. Coordinated and planned the activities of Japanese and US government personnel. Directed procurement and shipping of materials required in Japan. Managed the proposal team and participated in developing executable proposals and contract negotiations, interfacing with Japanese and U.S. customers. 
 Coordinated the logistics of moving personnel to and from Japan and oversaw daily installation operations. Proactively identified and resolved problems early to avoid schedule and cost issues. Communicated with customers daily to understand their needs and concerns and to ensure all parties were aligned. 
Integrated Product Team Lead (2003 – 2008) 
 In charge of a team of TE Software, Electrical and Mechanical Engineers developing new test systems for the Capabilities Enhancement phase of the EKV program. 
 Supervised a team of 12 engineers and multiple support personnel. Developed and maintained the TE schedule and resource loading and executed to the Integrated Master Schedule. Managed a $10 million budget and the associated Cost Accounts using the Integrated Earned Value Management System. Responsible for Software and Hardware Configuration Management. 
 Reviewed and approved new TE designs, all new and modified drawings and all Engineering Change Requests. Reported progress of schedule and budget to all stakeholders. Developed and reported monthly Estimate at Completion (EAC). 
Section Manager Manufacturing (2000 – 2003) 
 Direct Supervision of a team of 10 Manufacturing Engineers who were responsible for fabricating TE to support the BMD product line. Responsible for bi-annual Employee performance development and evaluation. 
 Managed the execution of project schedules and budgets. Liaison to Supply Chain Management, TE Team Leads and Program Offices. Responsible for Product Quality of all TE built in-house or offloaded to outside vendors. 
 Participated in Material Review Board meetings. 
(continued)
Barry Richardson 
www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com 
(continued) 
Senior Tech Support Engineer (1997 – 2000) 
 Responsible for full cycle TE manufacturing, to include participating in Design Reviews, review of drawings and schematics for producibility, material/parts procurement, make/buy decisions for assembly work, scheduling and staging of TE, supervision of TE construction, and follow up with stakeholders. 
 Collaborated with TE Engineers on new TE projects and generated plans to meet the Program’s schedules and budgets. 
 Oversaw all jobs in work and resolve technical issues. Visited local assembly houses with offloaded work and provided status to all stakeholders. 
ADDITIONAL EXPERIENCE 
Fabrications Offload Production Engineer (Raytheon) - In charge of Outsourcing tooling, prototypes, and procuring raw materials for the Machine Shop. ● Production Engineer (Raytheon) - In charge of Production Support in the Central Circuit Card Assembly mini-factory. Leading member of the team implementing pull systems, POU material, and consolidating/streamlining operations in-line with Lean Manufacturing protocol. ● Factory Supervisor (Hughes Aircraft Co.) – Supervised Prototype Technicians, Assemblers, and Material handlers. ● Production Control Supervisor (Hughes Aircraft Co.) – Supervised Production Control Administrators. ● Sergeant – United States Air Force ● Technical Certifications: PMP Certification (Raytheon PMX certification program), CAM Certification (Raytheon PMX certification program), Earned Value Management Certification (Raytheon PMX certification program), Six Sigma Specialist Qualification (Raytheon Learning Institute), Risk Management for Chief Engineers and IPTL (Raytheon Learning Institute), IPPD Project Management (JACMET)

More Related Content

What's hot

T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
Terrell Story
 
Karthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of ExperienceKarthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of Experience
Karthick Sekar
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
Joe Ungvarsky
 
Uribe Res Program 12-01-15
Uribe Res Program 12-01-15Uribe Res Program 12-01-15
Uribe Res Program 12-01-15
Adam Uribe
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
Shehreyar Khan
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16
Ben Franke
 
DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1
D'Ann Pinkerton
 
RESUME_difronzo_2016
RESUME_difronzo_2016RESUME_difronzo_2016
RESUME_difronzo_2016
john difronzo
 
Resume112414
Resume112414Resume112414
Resume112414
Jim Cuatt
 
Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015
Jerry Beste
 

What's hot (20)

T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
 
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
 
Karthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of ExperienceKarthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of Experience
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
UNM CV
UNM CVUNM CV
UNM CV
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
Sureshkumar. s resume latest new
Sureshkumar. s resume latest newSureshkumar. s resume latest new
Sureshkumar. s resume latest new
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
Uribe Res Program 12-01-15
Uribe Res Program 12-01-15Uribe Res Program 12-01-15
Uribe Res Program 12-01-15
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16
 
DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1
 
Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
 
mah_resume_AUG2016
mah_resume_AUG2016mah_resume_AUG2016
mah_resume_AUG2016
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
RESUME_difronzo_2016
RESUME_difronzo_2016RESUME_difronzo_2016
RESUME_difronzo_2016
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
 
Resume112414
Resume112414Resume112414
Resume112414
 
Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015Jerry Beste Resume_04.2015
Jerry Beste Resume_04.2015
 

Viewers also liked

Thinspired_BusinessPlan Final
Thinspired_BusinessPlan FinalThinspired_BusinessPlan Final
Thinspired_BusinessPlan Final
Daniel Paz
 
Ost 284 emerging technologies exam
Ost 284 emerging technologies examOst 284 emerging technologies exam
Ost 284 emerging technologies exam
lisacfromrt3
 
ThinSpired Final PP
ThinSpired Final PPThinSpired Final PP
ThinSpired Final PP
Daniel Paz
 
Motion Design with CSS
Motion Design with CSS Motion Design with CSS
Motion Design with CSS
Val Head
 
Chomsky's view and evolution of language by Marly I. Villacrusis
Chomsky's view and evolution of language by Marly I. VillacrusisChomsky's view and evolution of language by Marly I. Villacrusis
Chomsky's view and evolution of language by Marly I. Villacrusis
marly villacrusis
 

Viewers also liked (14)

Title_problem_statement
Title_problem_statementTitle_problem_statement
Title_problem_statement
 
Ost 284 emerging technologies exam
Ost 284 emerging technologies examOst 284 emerging technologies exam
Ost 284 emerging technologies exam
 
Thinspired_BusinessPlan Final
Thinspired_BusinessPlan FinalThinspired_BusinessPlan Final
Thinspired_BusinessPlan Final
 
Ost 284 emerging technologies exam
Ost 284 emerging technologies examOst 284 emerging technologies exam
Ost 284 emerging technologies exam
 
ThinSpired Final PP
ThinSpired Final PPThinSpired Final PP
ThinSpired Final PP
 
2014 / 15 apdig
2014 / 15 apdig2014 / 15 apdig
2014 / 15 apdig
 
Curriculum Vitae updated
Curriculum Vitae updatedCurriculum Vitae updated
Curriculum Vitae updated
 
Resumao da constituição_11_ec_91
Resumao da constituição_11_ec_91Resumao da constituição_11_ec_91
Resumao da constituição_11_ec_91
 
Henita dkk pengorganisasian dan pengelolaan pp
Henita dkk pengorganisasian dan pengelolaan  ppHenita dkk pengorganisasian dan pengelolaan  pp
Henita dkk pengorganisasian dan pengelolaan pp
 
Motion Design with CSS
Motion Design with CSS Motion Design with CSS
Motion Design with CSS
 
Putting Your UIs In Motion On The Web (Animation & UX)
Putting Your UIs In Motion On The Web (Animation & UX)Putting Your UIs In Motion On The Web (Animation & UX)
Putting Your UIs In Motion On The Web (Animation & UX)
 
Designing Meaningful Animation - AIGA Design Camp 2015
Designing Meaningful Animation - AIGA Design Camp 2015Designing Meaningful Animation - AIGA Design Camp 2015
Designing Meaningful Animation - AIGA Design Camp 2015
 
Chomsky's view and evolution of language by Marly I. Villacrusis
Chomsky's view and evolution of language by Marly I. VillacrusisChomsky's view and evolution of language by Marly I. Villacrusis
Chomsky's view and evolution of language by Marly I. Villacrusis
 
The UX of Great Animation
The UX of Great AnimationThe UX of Great Animation
The UX of Great Animation
 

Similar to BarryRichardsonResume2014rev2

RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016
Miguel Montalvo
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
Gyasi Brown
 
Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud 09022016
Lynne Krogsrud 09022016
Lynne Krogsrud
 
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
Dave Parta P.E., PMP
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
Rich Bellino
 
Resume Mm Brach 1 Pager 3.0
Resume   Mm Brach 1 Pager 3.0Resume   Mm Brach 1 Pager 3.0
Resume Mm Brach 1 Pager 3.0
mbrach
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
Steve Tate
 
Tacher, Robert EXPANDED RESUME
Tacher, Robert EXPANDED RESUMETacher, Robert EXPANDED RESUME
Tacher, Robert EXPANDED RESUME
Robert Tacher
 
sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016
Steve Dipalma
 
sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016
Steve Dipalma
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
Ramiz Siddiq
 
Terry Coopers Resume
Terry Coopers ResumeTerry Coopers Resume
Terry Coopers Resume
Terry Cooper
 

Similar to BarryRichardsonResume2014rev2 (20)

RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud 09022016
Lynne Krogsrud 09022016
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016
 
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 p
 
Planning Engineer
Planning EngineerPlanning Engineer
Planning Engineer
 
Resume Mm Brach 1 Pager 3.0
Resume   Mm Brach 1 Pager 3.0Resume   Mm Brach 1 Pager 3.0
Resume Mm Brach 1 Pager 3.0
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
 
LANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIESLANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIES
 
Tacher, Robert EXPANDED RESUME
Tacher, Robert EXPANDED RESUMETacher, Robert EXPANDED RESUME
Tacher, Robert EXPANDED RESUME
 
Henry CV
Henry CVHenry CV
Henry CV
 
sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016
 
sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016sdipalma_Resume_Oct2016
sdipalma_Resume_Oct2016
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Donald Loudermilk Presentation
Donald Loudermilk PresentationDonald Loudermilk Presentation
Donald Loudermilk Presentation
 
Terry Coopers Resume
Terry Coopers ResumeTerry Coopers Resume
Terry Coopers Resume
 
Civili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CVCivili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CV
 
Christopher_Bruckner_Resume 2016
Christopher_Bruckner_Resume 2016Christopher_Bruckner_Resume 2016
Christopher_Bruckner_Resume 2016
 

BarryRichardsonResume2014rev2

  • 1. Barry Richardson www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com PROFILE: An accomplished, self-motivated professional with over fifteen years of senior level project management expertise in operations, logistics, engineering and new business development. Designs, develops and implements carefully detailed plans and projects that meet or exceed all customer requirements within budget and on schedule. Leads, coaches, and inspires associates to stay resolved and offer their own unique skills and talents and collaborate as a team to exceed the company’s goals and objectives. AREAS OF EXPERTISE  Program Management  Project Management / Execution  New Business Development  Budget Analysis / Forecasting  Employee Performance Development  Project Planning / Scheduling  Tactical / Logistics Planning  Strategic Planning  Product Development / Life Cycle  Contract Negotiation PROVEN ACCOMPLISHMENTS Coach: A team of Test Equipment (TE) Design Engineers faced a technically challenging project with critical cost and schedule constraints. If the team did not meet the contractual delivery date, the company would have to pay a 10% penalty of $3.8 million. Coached the team through developing a detailed project plan that they would own and execute. RESULT: Customer’s requirements and schedule were met and exceeded, avoiding all penalties. Team Achievement Award was presented to the team for their excellent execution of a major TE project. Recover: Took over the Integrated Product Team Leader (IPTL) position for a project to build new Test Systems for the EKV program. The project was 60 days behind schedule and 40% over budget. Re- planned the project and led a deep-dive into design problems. RESULT: Test Systems were delivered in time to support critical flight tests and 60% of the projected cost overrun was recovered. Inspire/Mentor: A US Government security planning oversight forced a 30 day shutdown of all installation and on-going training in Japan. The project team was upset and dejected, believing that they could no longer meet the customer’s requirement to start operations in the facility by the required deadline. Rallied the team, inspiring them to think creatively and work together to overcome the time lost. RESULT: All integration and training was completed three days before the scheduled facility opening. The customer was elated and recognized the team for their significant achievement. Collaborate: The Japan Maritime Self Defense Force (JMSDF) announced they would be four months late in providing the high purity liquid argon gas supply required for one of the missiles to be tested in the new Intermediate Level Maintenance Facility (ILMF). The JMSDF ship maintenance schedule depended on the facility going operational for at least one missile type and the delay would compromise fleet readiness. Worked collaboratively with JMSDF and the U.S. Navy to split the project into two phases, allowing the facility to open for the critical missile type first. RESULT: The ILMF went operational for one missile type on schedule. JMSDF was able to certify those rounds and deployed the ships on schedule. Execute: Responsible for three separate Direct Commercial Sales (DCS) contracts to provide technical support to Mitsubishi Heavy Industries. These contracts were valued at approximately $2 million each and were bid at 30% margins. RESULT: Executed contracts very lean and efficiently and was able to realize over 60% margins (doubling profit) while continuing to delight the customer. EDUCATION B.S. – Business Administration – University of Phoenix
  • 2. Barry Richardson www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com POSITIONING STATEMENT: Applies expertise in strategic planning and team leadership to deploy the company’s vision and achieve the goals and objectives of the organization. PROFESSIONAL HISTORY Raytheon Tucson, AZ 1994 - 2014 Program Manager (2008 – 2014)  In charge of the Program Management of a $110 million project to build a new missile test facility in Japan. Directed oversight of Facility Design Requirements, Construction Inspections, Security and Operations Planning, Security Systems Installation, Ordnance Handling Equipment Installation, Test Equipment Design, Fabrication, Integration, and Installation, Facility Personnel Training, and Technical Support for Japanese Industry Partners.  Supervision of a team of over 30 multi-disciplined engineers and technical training and support personnel.  Developed and maintained the Master Schedule. Coordinated and planned the activities of Japanese and US government personnel. Directed procurement and shipping of materials required in Japan. Managed the proposal team and participated in developing executable proposals and contract negotiations, interfacing with Japanese and U.S. customers.  Coordinated the logistics of moving personnel to and from Japan and oversaw daily installation operations. Proactively identified and resolved problems early to avoid schedule and cost issues. Communicated with customers daily to understand their needs and concerns and to ensure all parties were aligned. Integrated Product Team Lead (2003 – 2008)  In charge of a team of TE Software, Electrical and Mechanical Engineers developing new test systems for the Capabilities Enhancement phase of the EKV program.  Supervised a team of 12 engineers and multiple support personnel. Developed and maintained the TE schedule and resource loading and executed to the Integrated Master Schedule. Managed a $10 million budget and the associated Cost Accounts using the Integrated Earned Value Management System. Responsible for Software and Hardware Configuration Management.  Reviewed and approved new TE designs, all new and modified drawings and all Engineering Change Requests. Reported progress of schedule and budget to all stakeholders. Developed and reported monthly Estimate at Completion (EAC). Section Manager Manufacturing (2000 – 2003)  Direct Supervision of a team of 10 Manufacturing Engineers who were responsible for fabricating TE to support the BMD product line. Responsible for bi-annual Employee performance development and evaluation.  Managed the execution of project schedules and budgets. Liaison to Supply Chain Management, TE Team Leads and Program Offices. Responsible for Product Quality of all TE built in-house or offloaded to outside vendors.  Participated in Material Review Board meetings. (continued)
  • 3. Barry Richardson www.linkedin.com/in/bgrichardson 520-429-4289 beardog0701@gmail.com (continued) Senior Tech Support Engineer (1997 – 2000)  Responsible for full cycle TE manufacturing, to include participating in Design Reviews, review of drawings and schematics for producibility, material/parts procurement, make/buy decisions for assembly work, scheduling and staging of TE, supervision of TE construction, and follow up with stakeholders.  Collaborated with TE Engineers on new TE projects and generated plans to meet the Program’s schedules and budgets.  Oversaw all jobs in work and resolve technical issues. Visited local assembly houses with offloaded work and provided status to all stakeholders. ADDITIONAL EXPERIENCE Fabrications Offload Production Engineer (Raytheon) - In charge of Outsourcing tooling, prototypes, and procuring raw materials for the Machine Shop. ● Production Engineer (Raytheon) - In charge of Production Support in the Central Circuit Card Assembly mini-factory. Leading member of the team implementing pull systems, POU material, and consolidating/streamlining operations in-line with Lean Manufacturing protocol. ● Factory Supervisor (Hughes Aircraft Co.) – Supervised Prototype Technicians, Assemblers, and Material handlers. ● Production Control Supervisor (Hughes Aircraft Co.) – Supervised Production Control Administrators. ● Sergeant – United States Air Force ● Technical Certifications: PMP Certification (Raytheon PMX certification program), CAM Certification (Raytheon PMX certification program), Earned Value Management Certification (Raytheon PMX certification program), Six Sigma Specialist Qualification (Raytheon Learning Institute), Risk Management for Chief Engineers and IPTL (Raytheon Learning Institute), IPPD Project Management (JACMET)