“COMPARISION OF
OPERATIONAL DIFFICULTIES
 IN LONGWALL DIP RISE &
      STRIKE PANELS”


     -   A.Venkateshwer Reddy,
                Addl. Manager,
          Project Planning Department
    The Singareni Collieries Company Limited
BACK DROP



• It is necessity to explore low capacity
  Longwall    mining,    where     geological
  conditions permits to work 500m to 1000m
  length panels in SCCL to get bulk
  production as well as to reduce the cost of
  production.
BACK DROP



• The major challenges a head is, whether
  to follow principal stress direction while
  driving Gate roads or to plan according to
  the shape of property.
• Most of the future Longwall mine panels
  need to be laid in Dip Rise Direction, if
  Principal stress direction is taken into
  consideration.
EXPERIENCE



• Though, GDK-10A mine is being worked
  Strike & Dip rise Panels successfully, the
  gradient of Dip Rise Panels is 1 in 6 to 7.
  Where as in the proposed Longwall mines,
  Dip Rise Panels are around 1 in 4
  gradient.
TRUNKS


• Formation & Maintenance of Trunk roadways is
  problem in a direction perpendicular to principal
  stresses.
• Trunk roadways have to maintain longer periods
  and needs high stability.
• Under increased stress condition on gate roads,
  needs additional supporting like resin bolting,
  cable bolting, roof stitching, arching etc.
GATE ROADS
• More stable when laid parallel to principal stress
  direction.
• Accumulation of Water in dip galleries, increased head of
  pumping in developing gate roads and insufficient
  quantity of water for dealing with high head pumps.
• Low Gate road progress per month, i.e., less than 100m
• If twin or multiple entry system for gate road
  development adopted in future, drivage is difficult in dip
  rise panels.
• Difficulty in Material Transport and handling on increased
  gate road gradients.
• Necessitates high capacity haulers /conveyor belts,
  including man riding if provided.
GATE ROADS
•   Movement of free steered vehicles along gate roads is not feasible
    on increased gradients.
•   Only rail car man riding system for men transport along lengthy gate
    roads is applicable. Chair lift system is not possible as frequent
    shifting of return pulley while Longwall face under retreat.
•   Switch train shifting is tedious and generally for every 100 m,
    necessitates mono rail system for handling cables.
•   Emulsion supplied to supports could not return to Power pack tank
    through ring main system, leading poor quality of water emulsion
    mixture and more consumption of emulsion oil.
•   Increased Load on relay bars, advancing rams, face sprags of
    powered roof supports.
•   Ram capacity & plate size for face sprags of powered roof supports
    need to be increased.
FACE

• Face spalling is more and directly falls between AFC, on
  spill plates & walkway
• Requires advancing chocks by adjacent control due to
  face spalling while lowering support.
• Leading to uneven wear of pans of AFC and flights
  overriding due to increased cross gradient of face.
• Proper cleaning is required for advancing AFC, even
  shearer provided with cowl.
• Shearer goaf side track shoe life reduces as more weight
  of shearer shifted due to cross gradient factor.
• Wear & tear of rack bars & spacers is high, as above.
• Less load on shearer haulage due to reduced
  longitudinal gradient.
FACE
• Increased risk to shearer operator &others working
  nearby due to face spalling.
• Subsidence is not uniform due to panel varies from
  shallow to high depth- possibility of increased breathing
  from surface.
• Whenever heating or fire problem arises, could not easily
  dealt by method of inertisation and also not possible to
  drown the workings with water as an ultimate option.
• For outby transport of coal in gate road need to provide
  two or more gate belt drive heads due to increased lift.
FACE

• Shearer sump low due to increased cross face gradient.
• Face and gate roads are dry if drainage planned is
  towards the goaf.
• Less humid and comfortable ventilation conditions.
• Crushing of barrier pillar is minimized compared to strike
  panels.
• In AFC, Gravity component is eliminated for coal
  transport.
• AFC motor capacity to be increased as gravity does not
  support. (Requires high initial torque).
• No slushy condition at BSL.
FACE

• Face strata control problems are less.
• Periodic weighting interval is less
• Cavities formation in face is less due to front abutment
  pressure is less and more load is shifted to goaf side.
• Salvaging is safe and easy due to load on PRS is less.
• Face progress is less compared to strike panels.
• Property loss is more because of shape of property
  favors strike panels.
• Opined to work one dip rise short length panel in steep
  seam on experimental basis.
SUMMARY

•   As far as possible, strike panels are more
    convenient in operational aspect. Gate roads
    need to be laid oblique to Principal stress
    direction and increasing support density to
    counter the strata control problems.
•   Wherever strike panels are not feasible
    keeping in view of shape of deposit and
    principal stress, it is obvious to work dip rise
    panels     by   overcoming    the      operational
    difficulties.
CONCLUSION




• It is suggested to work Strike panels,
 instead of Dip Rise Panels in view of the
 difficulties forecasted in dip rise panels
 with 1 in 4 gradient.
COMPARISON OF DIP-RISE LONGWALL PANELS WITH STRIKE LONGWALL PANELS

S.No        Parameters                Dip Rise Panels                    Strike Panels
1      Drivage of Single or    Moderate Difficult           ✕   Easy                          ✔
           multiple Gate
           roads
2      Gate road progress      Less                         ✕   More                          ✔
3      Gate road condition     Dry                          ✔   Slushy                        ✕
4      Material and men        Risky                        ✕   Less Risky                    ✔
          Transport in Gate
          roads
5      Laying & Dismantling    Difficult                    ✕   Easy                          ✔
           of gate belts
6      Number of Belts         Two or More depends upon     ✕   Single                        ✔
          required in Main        lift
          gate
7      Switch train Shifting   Tedious & cables handling    ✕   Easy & shifting can be done   ✔
                                   is difficult                    daily
                               Requires one time shifting
                                   for every 100m or more
8    Water Drainage            Requires pumping         ✕   Does not require pumping   ✔
     During Development        Good                     ✔   Not Good                   ✕
     During extraction
9    Ventilation               Comfortable due to dry   ✔   Less Comfortable due to    ✕
                               condition                    humid condition
10   Face Spalling             More                     ✕   Less                       ✔
11   Main Weighting Span       Less                     ✔   More                       ✕
12   Periodic weighting        Similar                  ✔   Similar                    ✔
     interval
13   Periodic weighting        Less                     ✔   More                       ✕
     intensity
14   Strata Control Problems   Less                     ✔   Moderate                   ✕
15   Emulsion requirement      More                     ✕   Less                       ✔
     for supports
16   Safety to workmen         Less                     ✕   Moderate                   ✔
17   Load on Shearer           Less                     ✔   More                       ✕
     haulage
18   Wear & tear of face       More                     ✕   Less                       ✔
     equipment (AFC &
     Shearer Parts)
19   Face Equipment Creep      Less                     ✔   More & Difficult           ✕
     problem & Control
20   Sequence of Cutting          Limited to Uni-directional    ✕    Uni or Bi-directional           ✔
                                  only
21   Sump to each Cut             Less                          ✕    More                            ✔
22   Production                   Less                          ✕    Moderate                        ✔
23   Coal Transport in AFC        Gravity does not support      ✕    Gravity supports                ✔
24   AFC Motor Starting           High                          ✕    Moderate                        ✔
     Torque Requirement
25   Salvaging & installation     Easy                          ✔    Moderate Difficult              ✕
26   Dealing of Heating or        Difficult & Unsafe            ✕    Moderate Difficult & safe       ✔
     fire Problem
27   Subsidence over goaf         Non-uniform                   ✕    More or less Uniform            ✔
28   Effect of Principal stress   More because aligned          ✕    Less because aligned parallel   ✔
     on Trunks                    perpendicular
29   Effect of Principal stress   Less because aligned          ✔    More because aligned            ✕
     on gate roads                parallel                           perpendicular
30   Alternative to lower         Trunks need to be aligned     ✔    Gate roads need to aligned      ✔
     effect of Principal stress   oblique to stress direction        oblique to stress direction


                                                                11                                   1
                                                                19                                   9
                                                                                                     1
                                                                                                     1

More Related Content

Viewers also liked

Faults
FaultsFaults
Faults
RAHUL SINHA
 
Topic 4- mining methods
Topic 4- mining methodsTopic 4- mining methods
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
Coal Sccl
Coal ScclCoal Sccl
Coal ScclVR M
 
Surface mining
Surface miningSurface mining
Surface mining
Mohammad Esa Rasuly
 
Mining Methods
Mining MethodsMining Methods
Mining MethodsVR M
 

Viewers also liked (6)

Faults
FaultsFaults
Faults
 
Topic 4- mining methods
Topic 4- mining methodsTopic 4- mining methods
Topic 4- mining methods
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Coal Sccl
Coal ScclCoal Sccl
Coal Sccl
 
Surface mining
Surface miningSurface mining
Surface mining
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 

Recently uploaded

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 

Recently uploaded (20)

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 

A.V.Reddy

  • 1. “COMPARISION OF OPERATIONAL DIFFICULTIES IN LONGWALL DIP RISE & STRIKE PANELS” - A.Venkateshwer Reddy, Addl. Manager, Project Planning Department The Singareni Collieries Company Limited
  • 2. BACK DROP • It is necessity to explore low capacity Longwall mining, where geological conditions permits to work 500m to 1000m length panels in SCCL to get bulk production as well as to reduce the cost of production.
  • 3. BACK DROP • The major challenges a head is, whether to follow principal stress direction while driving Gate roads or to plan according to the shape of property. • Most of the future Longwall mine panels need to be laid in Dip Rise Direction, if Principal stress direction is taken into consideration.
  • 4. EXPERIENCE • Though, GDK-10A mine is being worked Strike & Dip rise Panels successfully, the gradient of Dip Rise Panels is 1 in 6 to 7. Where as in the proposed Longwall mines, Dip Rise Panels are around 1 in 4 gradient.
  • 5. TRUNKS • Formation & Maintenance of Trunk roadways is problem in a direction perpendicular to principal stresses. • Trunk roadways have to maintain longer periods and needs high stability. • Under increased stress condition on gate roads, needs additional supporting like resin bolting, cable bolting, roof stitching, arching etc.
  • 6. GATE ROADS • More stable when laid parallel to principal stress direction. • Accumulation of Water in dip galleries, increased head of pumping in developing gate roads and insufficient quantity of water for dealing with high head pumps. • Low Gate road progress per month, i.e., less than 100m • If twin or multiple entry system for gate road development adopted in future, drivage is difficult in dip rise panels. • Difficulty in Material Transport and handling on increased gate road gradients. • Necessitates high capacity haulers /conveyor belts, including man riding if provided.
  • 7. GATE ROADS • Movement of free steered vehicles along gate roads is not feasible on increased gradients. • Only rail car man riding system for men transport along lengthy gate roads is applicable. Chair lift system is not possible as frequent shifting of return pulley while Longwall face under retreat. • Switch train shifting is tedious and generally for every 100 m, necessitates mono rail system for handling cables. • Emulsion supplied to supports could not return to Power pack tank through ring main system, leading poor quality of water emulsion mixture and more consumption of emulsion oil. • Increased Load on relay bars, advancing rams, face sprags of powered roof supports. • Ram capacity & plate size for face sprags of powered roof supports need to be increased.
  • 8. FACE • Face spalling is more and directly falls between AFC, on spill plates & walkway • Requires advancing chocks by adjacent control due to face spalling while lowering support. • Leading to uneven wear of pans of AFC and flights overriding due to increased cross gradient of face. • Proper cleaning is required for advancing AFC, even shearer provided with cowl. • Shearer goaf side track shoe life reduces as more weight of shearer shifted due to cross gradient factor. • Wear & tear of rack bars & spacers is high, as above. • Less load on shearer haulage due to reduced longitudinal gradient.
  • 9. FACE • Increased risk to shearer operator &others working nearby due to face spalling. • Subsidence is not uniform due to panel varies from shallow to high depth- possibility of increased breathing from surface. • Whenever heating or fire problem arises, could not easily dealt by method of inertisation and also not possible to drown the workings with water as an ultimate option. • For outby transport of coal in gate road need to provide two or more gate belt drive heads due to increased lift.
  • 10. FACE • Shearer sump low due to increased cross face gradient. • Face and gate roads are dry if drainage planned is towards the goaf. • Less humid and comfortable ventilation conditions. • Crushing of barrier pillar is minimized compared to strike panels. • In AFC, Gravity component is eliminated for coal transport. • AFC motor capacity to be increased as gravity does not support. (Requires high initial torque). • No slushy condition at BSL.
  • 11. FACE • Face strata control problems are less. • Periodic weighting interval is less • Cavities formation in face is less due to front abutment pressure is less and more load is shifted to goaf side. • Salvaging is safe and easy due to load on PRS is less. • Face progress is less compared to strike panels. • Property loss is more because of shape of property favors strike panels. • Opined to work one dip rise short length panel in steep seam on experimental basis.
  • 12. SUMMARY • As far as possible, strike panels are more convenient in operational aspect. Gate roads need to be laid oblique to Principal stress direction and increasing support density to counter the strata control problems. • Wherever strike panels are not feasible keeping in view of shape of deposit and principal stress, it is obvious to work dip rise panels by overcoming the operational difficulties.
  • 13. CONCLUSION • It is suggested to work Strike panels, instead of Dip Rise Panels in view of the difficulties forecasted in dip rise panels with 1 in 4 gradient.
  • 14. COMPARISON OF DIP-RISE LONGWALL PANELS WITH STRIKE LONGWALL PANELS S.No Parameters Dip Rise Panels Strike Panels 1 Drivage of Single or Moderate Difficult ✕ Easy ✔ multiple Gate roads 2 Gate road progress Less ✕ More ✔ 3 Gate road condition Dry ✔ Slushy ✕ 4 Material and men Risky ✕ Less Risky ✔ Transport in Gate roads 5 Laying & Dismantling Difficult ✕ Easy ✔ of gate belts 6 Number of Belts Two or More depends upon ✕ Single ✔ required in Main lift gate 7 Switch train Shifting Tedious & cables handling ✕ Easy & shifting can be done ✔ is difficult daily Requires one time shifting for every 100m or more
  • 15. 8 Water Drainage Requires pumping ✕ Does not require pumping ✔ During Development Good ✔ Not Good ✕ During extraction 9 Ventilation Comfortable due to dry ✔ Less Comfortable due to ✕ condition humid condition 10 Face Spalling More ✕ Less ✔ 11 Main Weighting Span Less ✔ More ✕ 12 Periodic weighting Similar ✔ Similar ✔ interval 13 Periodic weighting Less ✔ More ✕ intensity 14 Strata Control Problems Less ✔ Moderate ✕ 15 Emulsion requirement More ✕ Less ✔ for supports 16 Safety to workmen Less ✕ Moderate ✔ 17 Load on Shearer Less ✔ More ✕ haulage 18 Wear & tear of face More ✕ Less ✔ equipment (AFC & Shearer Parts) 19 Face Equipment Creep Less ✔ More & Difficult ✕ problem & Control
  • 16. 20 Sequence of Cutting Limited to Uni-directional ✕ Uni or Bi-directional ✔ only 21 Sump to each Cut Less ✕ More ✔ 22 Production Less ✕ Moderate ✔ 23 Coal Transport in AFC Gravity does not support ✕ Gravity supports ✔ 24 AFC Motor Starting High ✕ Moderate ✔ Torque Requirement 25 Salvaging & installation Easy ✔ Moderate Difficult ✕ 26 Dealing of Heating or Difficult & Unsafe ✕ Moderate Difficult & safe ✔ fire Problem 27 Subsidence over goaf Non-uniform ✕ More or less Uniform ✔ 28 Effect of Principal stress More because aligned ✕ Less because aligned parallel ✔ on Trunks perpendicular 29 Effect of Principal stress Less because aligned ✔ More because aligned ✕ on gate roads parallel perpendicular 30 Alternative to lower Trunks need to be aligned ✔ Gate roads need to aligned ✔ effect of Principal stress oblique to stress direction oblique to stress direction 11 1 19 9 1 1