Avaya Networking Sales Modules
By Westcon Convergence
Agenda


 Introduction to Avaya Data

     Avaya’s ERS range

      WLAN & BYOD

      Secure Routing

       Management

         Sales Tools



                              2
A rich history




  I




                 3
Virtualization Among CIO’s Top
Priorities




      42%                                77M
     OF COMPANIES ARE                USERS WILL USE VDI TO

VIRTUALIZING OR PLANNING TO        DELIVER CLIENT COMPUTING

    VIRTUALIZE THEIR UC           CAPABILITIES BY 2016 (UP FROM

        APPLICATIONS                         18M in 2012)
  Nemertes Research, March 2012     Gartner Forecast: Hosted Virtual
                                    Desktops, Worldwide, 2012-2016,
                                    2012 Update
                                                                       4
Three Trends That Will Affect How
You Sell…




   Consumerization               Virtualization         Collaboration and
        of IT                                                the cloud
       Implication:                Implication:              Implication:

     The network will        All applications will be     Your application
  manage devices that       in the data center…who       performance will be
 you sell and that access       controls the data       more dependent upon
    your applications               center?             the network, than the
                                                             application
                             And what about VDI?



                                                                                5
“Avaya Networking has a strong track record of innovation…this
is the same company that invented Stacking in the late 90’s and
  were the first to market with Active-Active high availability…
  pioneers of Ethernet Fabric…anyone not paying attention to
         Avaya Networking should take another look.”

         Zeus Kerravala,
         ZK Research, 2012




                                                                   6
Key components of UC deployment


                                          UC/IPT



                      Vo WLAN




                         WLAN              LAN
Mobile Devices


                                                   IP Telephone



                                          Secure
                                          Router


                 Remote / Mobile Worker
                                                    Branch Office
                                                                    7
Avaya Networking - Data Centre to
Desktop


                                               Network Management

                          Branch
                                   Campus
  VoIP Desk                                         Data Centre
    Sets                                                                         VSP 9000


                             WLAN 8100                                    VSP 7000          Identity Engines




                                                                                                                         Wireless
                SR 4134                                                                                                   Sets
                                         ERS 8000                                ERS 4000



                                                               ERS 5000                       VPN Clients

                              AG 2330

Flare on iPad                                                              ERS 2500                            Avaya Desktop Video
                                                    ERS 3500                                                         Display

                                                                                                                                9
Ethernet Switching
What does a typical LAN look like?




                     Wiring Closet                                        2nd Floor


                                              Edge Switches



                     Wiring Closet                                         1st Floor

Comms Room


                                                         CAT5 cable to
                                                         floor boxes     Ground Floor
                    Riser     Wiring Closet


   Core Switch


                                                                                       11
Meet the family


                            Enterprise Access
                                                                   Top of Rack
                                                                                                        VSP 9000

                                                                       VSP 7000              ERS 8800
ec na m o r eP & eci r P




                                                                                                        Modular
                           Stackable
      r f




                                                            ERS 5xxx

                                           ERS 4x00                                         Enterprise Core

                                                  ERS 3500 stacking to be introduced in Feb 13
                                                   ERS 3500 stacking to be introduced in Feb 13
                                       ERS 3500
                           ERS 2500


                                                                                                  Scale & Functionality

                                                                                                                          13
Switch Clustering
Availability
 What about the nines?




          9 9 9 9
   99.5% availability     unavailable: 0.50% =43.8 hours
                                                               Industry
   99.9% availability     unavailable: 0.10% =8.76 hours        claim
   99.99% availability    unavailable: 0.01% = 52.56 minutes
                                                               Avaya’s
   99.999% availability   unavailable: 0.001%= 5.256 minutes    claim




      9
365 x 24 hr/y
                              9 9 9                                       15
Resiliency

Why is this so important?

 IP tel users hang up                         Web users
      the phone...                        experiencing long
                                           response times.


                Client/server en real-                        Most LAN networks
 Start
              time applications running                        recovered from
Network
                  into performance                                 outage
outage
                      problems


 1        6     10                        25 …                           45       seconds




Avaya Split Second            Sub-second fail-over
   fail over of a             is a key requirement
    link/switch
                                                                                     16
Simple overview of switch clustering


                                                 Failover Time Comparison       Avaya   Cisco

    Public Network
                                                   4x                   7x
                                                 Faster               Faster



  Core Switch



                                                       Link Failure         Switch Failure
Edge Switches

                                                 •   Sub second failover
                                                 •   Call does not drop (survivable)
                                                 •   All connections used at the same time –
                Call between two Avaya IP Sets
                                                     nothing wasted.

                                                                                                17
Yes, but Cisco has VSS?

         Virtual Switching
         System                   VS   Avaya’s Switch Clustering


• Only available since 2008              • Proven, available since 2001.
                                           hundreds of references available
• Only available for high end
  portfolio – reduced                    • Available across the complete
  deployment options                       core portfolio for any size core
                                           switches
• Complex set up and
  maintenance                            • Simple configuration and
                                           implementation, no special
• Special hardware and software            software
  needed - expensive and little
  investment protection                  • Cost neutral hardware – no
                                           additional or special
• Incomplete and expensive                 requirements
                                         • Complete and proven solution

                                                                              18
So what sort of network requires this?

                            30,000,000 MB
                            Total mobile data count



                            65,000,000
                            mobile text messages were sent and received



                            750,000
                            calls made from 6,000 landline VOIP phones



                            4,900,000,000 bytes of data delivered to
                            the Internet on behalf of the Games



                            1,200,000 meters of Cat5 cabling
                            installed to support 31,000 Ethernet ports


                            300,000,000
                            people visited www.vancouver2010.com,
                            representing 1.1 billion page views           19
VENA
Avaya Virtual Enterprise Network
Architecture




                             Data Center
         Branch Office                          Enterprise Campus




         A cloud grade network architecture
         Specifically designed for real-time applications
                                                                    21
Energy Efficiency
Simple overview of Energy Efficiency



        daytime                              Public Network




                            Components designed
                            to use less power
       Low    High


                                Throttle down CPU
                                usage overnight

•   Automated switch over
    control power to each
    port                         Power down low
•                                priority devices
    Designed with energy
    efficiency in mind
                                                              23
Stacking throughput/capacity
Scalability – Data Explosion




                                   Edge             Core

                               20x      1152
                               Gb/s

                                   64
                                   64              1 Terabit



21% Increase in VOIP Traffic    Cisco      Avaya
            and
 77% Video Growth by 2013


                                                               25
Plug and Play provisioning
Zero touch configuration with ADAC

ADAC – Auto Detection                                                    Network
                                                                        Management
 Auto Configuration
                                                                             Call
                                                                            Server
                                            Enterprise LAN


 IP Phone              Ethernet                                           DHCP       • Simplified deployment of
                       Routing
                        Switch
                                                                          TFTP
                                                                          HTTP
                                                                                       an Avaya IPT deployment.
                                                                           NTP       • Automates the set up of
                                                                                       VLAN and QoS settings.
            IP Phone sends LLDP packet
            upon power up                                                            • Recent Independent
                                         Ethernet switch invokes ADAC
                                                                                       testing quoted that an IP
                                         after LLDP packet received                    Handset was setup witin
                                                                                       one minute.
            IP Phone configured with
            VLAN/QoS via LLDP from ERS


                                         IP Phone DHCP for IP address
                                         and fileserver address


            IP Phone downloads
            configuration file                                                          <1 minute
                                                                                           to provision
                                         Dial tone established
                                                                                                                   27
One touch config for IP Office


                                 • Available on R 5.0.1
                                    • ‘runipoffice’ automatically
                                      sets:
                                    • VLANs
                                    • QoS
                                    • Default route
                                    • Call Server address
                                    • File Server address
                                    • Allocates switchports for IP
                                      Office, handsets & WAN.




                                                                28
Lifetime Warranty on Stackable Switches


• Lifetime Hardware Warranty
   • Next Business Day Replacement

• Lifetime Technical Support
   • Basic Technical support for life
   •Basic Tech Support plus access to
   patches for 90 days

• Optional Software Subscription
   • Nominal fee for software updates




   Industry-leading warranty that
       complements Avaya’s
      genuine TCO advantage

                                           29
                                          29
Cost Comparison
Stackable price comparison




              •   Updated for Jan 13.
              •   Pricing based on typical reseller purchase price
              •   Licence keys are applied to a whole stack rather than
                  individual licence keys on competitive products


                                                                          31
500 port network (switch clustered)


                                           1x COM Management
                           Avaya Unified
                          Communications   2x ERS 5632 FD with
                           Management
                                           Advanced Routing Kit


                                                           List Price for 500 Ports

                                                                  45% s
                                                                    ing
                                                £ 100,000
                                                                 sav
                                                £ 80,000

                                                £ 60,000

                                                £ 40,000

                                                £ 20,000



                                                                 Avaya      Cisco
                                                                £ 45,798   £ 83,066




          11x 2550 Edge Switches

                                                                                      32
1000 port network (switch clustered)


                                             1x COM Management
                             Avaya Unified
                            Communications
                             Management
                                             2x ERS 5632 FD with
                                             Advanced Routing Kit



                                                       List Price for 1,000 Ports

                                                               54% s
                                                 £ 140,000

                                                 £ 120,000
                                                                 ing
                                                 £ 100,000
                                                              sav
                                                 £ 80,000

                                                 £ 60,000

                                                £ 40,000

                                                 £ 20,000



                                                              Avaya      Cisco
                                                             £ 58,899   £ 126,784




         21x 4550T Edge Switches                                                    33
Competitive positioning
Recent Independent Testing

Miercom report for 2011
• Vs Cisco, Juniper and HP
• Plug & Play Edge
Deploy IPT endpoint in less than one minute
Key stats
• 26% more Energy efficient
• 233% more capacity
• 40% Less TCO




                                              35
Is the network edge a commodity?
  For hardware, yes:                                   For software and network integration,
                                                       no…
  Chip set                                            End to end QoS
  Processor                                           Intelligent Set-up
  Densities                                           Simplified Support

                                                        Cisco      HP     Alcatel   Juniper

End to End     – Fabric Connect (SPB)
               – Resilient Stacking – 18x throughput
   QoS


Intelligent    – Plug ’n Play in less than 1 min
  Set-up       – BYOD guest set-up in <10 sec



Simplified     – Hot-Swap auto-config in < 2 min
 Support       – Auto IP phone energy savings >50%


                                                                                          36
Is resiliency important for your
business? What is the competition doing?




Avaya is the only supplier able to offer an unique resiliency model across
                       its full networking portfolio                         37
How to compete...


What are the key strengths I should push against the following vendors?

 Competitor     Key strengths of Avaya versus...
                Complex and expensive, Stacking is expensive and
                inefficient, Limited Warranty.
                Stacking, Price, No CLI like Cisco, No switching heritage,
                WLAN not integrated, No end to end story and Warranty

                 Performance, limited 40G stacking at low end

                Low Profile, limited interop stacking with rest of ENT
                family, & performance
                No PoE+ on smaller switch. Clustering rather than resilient
                switching. Complex overlaps within portfolio.
                              The detail of how Avaya compete against each vendor is within the appendix   38
Quick reminder about the USP’s



  Switch clustering

    Energy Efficient

      Cost comparison

        Stacking capacity

           Zero Touch Config

               Lifetime warranty
                                   39
WLAN
The WLAN market landscape


• Enterprise WLAN market exceeded $2B in
  2010
• 12% CAGR to $3.6B by 2015
• Popularity of WLAN enabled client devices-
  BYOD- (smart-phones, tablets) forcing IT
  departments adoption
• Video/Voice – The network killer app will
  proliferate
• 802.11n penetration rate 49% for 2010;
  reaching 100% for 2012


                                               Source: Dell Oro January 2011
                                                                           41
                                                        41
What does a typical WLAN
network look like?


        CAT5 cable                               CAT5 cable
        AP in ceiling     Wiring Closet          AP in ceiling    2nd Floor




                                 Wiring Closet                     1st Floor

Comms Room




                                                                 Ground Floor
                        Riser    Wiring Closet


  Controller


                                                                               42
IEEE 802.11 Standard direction

• Specifications for the         802.11 Physical layer
  Physical and MAC Layers        Data Rates – Mbps

• Backward compatibility
  with legacy 802.11
  standard
• Maximize spectral
  efficiency and
  performance
• Co-existence with other
  device sharing the
  2.4GHz and 5Ghz
  frequency bands



  43
                                                         43
What is Avaya Wireless LAN 8100?


•   802.11n wireless LAN solution
•   Enables wireless network access and campus roaming
•   Developed in-house by Avaya
•   Compatible with any wired network
•   Certified for healthcare environments: EN 60601-1-2 and Draeger
•   Optimised for voice and multimedia
•   Next-generation unified wired/wireless architecture
     – Strong security
     – Improved resiliency
     – Improved performance/user experience
     – Massive scalability
     – Lower TCO




                                                                      44
Today’s WLAN 8100 Portfolio


WAP 8120
                                       WLAN 8100 Infrastructure
WAP 8120-E
WAP 8120-O                WC 8180                       WC 8180 -16L          WLAN Management Software 8100



                                                   •Lower cost option for
                   •Support for up to 512
802.11n                                            small branch deployments
                   APs (256 in first release)
Dual radio                                         •Support for 16 APs



                                Optional Wireless Network Services
  Voice/UC               Video                  E-911        Guest                       Location          Advanced
                                                           Management                    Services           Security
                                                                              Infusion
                                                                              pump           X


  Avaya 3641/3645 Avaya Flare ADVD      E-911 VoWLAN Unified Wired/Wireless        Real Time Location Wireless Intrusion
 IP Wireless Phones    A175               integration Guest Manager (iDEngines)         Tracking      Detection/Protection
                                                                                   Ekahau/Aeroscout                   45
VENA Unified Access

      Today’s Model                                               Unified Access



                                        Data traffic
                                       Control traffic


                                                                Servers
   Servers
                                                                                 witihh
                                                                                  wt
                                                                    va
                                                                   aavailiaabee 000
                                                                          l bl l 0
                                                            as s 1         nd 88
                                                          hhaee 1 2.00aand88
                                                         PP
                                                                 N 2.
                                                           WLAAN .22oonCCR
                                                            WL 7 . n
                                                                                R
                                                                  VV7
              Wireless Controllers                                                Wireless Controller
             (Application & control)                                                   (Control only)

   • Overlay Network                                             • Integrated Network
   • More Users, More Money                                      • Eliminate bottlenecks
   • Constrained Capacity                                        • Limitless Scale
                                                                 • Lower TCO
                                                                                                        46
Introducing Split Plane, the differentiator

    Today’s Model:                   Next Generation Model: Control & Data separated
  Control & Data combined




                        Wireless
                        Security                                               Wireless
                        Switch       Wireless Control
       Wireless                           Point
                                                                            Switching Point
      Controller                                                              Appliance      Wireless Switching
                                                         WC virtualized                     Point integrated to
                                                         (software only)                     edge/core switch
                                       Dedicated to                        Dedicated to
                                       control traffic                      data traffic

• Common platform for control and
data plane
• Appliance or housed in a Chassis
                                     • Control and Data planes run on           • Optimized H/W for
                                     separate network elements                  required function
                                     improving resiliency
                                     • Flexible deployment options              • Independent Scaling
                                                                                                                  47
WLAN Pricing

                                    Controllers supporting 16 AP's

           €6,000

           €5,000

           €4,000

           €3,000

           €2,000

           €1,000

               €-
                       Avaya 81xx     Extreme Altitude   Juniper WLC800R   Enterasys WS C25     Meru 1500 plus
                                            3600                                                  10 ap key
  Controllers (16AP)    $2,370             $4,900            $5,065             $3,833             $4,409

                                                                                                                       Access Points

                                                                              $1,200

                                                                              $1,000

                                                                               $800

                                                                               $600

                                                                               $400

                                                                               $200

                                                                                  $0
                                                                                          Avaya 81xx       Extreme Altitude   Juniper MP-522   Enterasys AP3605   Meru 320i
                                                                                                                4610
                                                                       802.11 a/g/n AP        $372              $500              $407              $436           $1,065




                                                                                                                                                                              48
Competitive - Wireless LAN


Capability                          Cisco                             Aruba                            Juniper
Know your              • Strong Mindshare and              • #2 WLAN Market-share            • #9 market-share in WLAN
                         Market share (50%+ share)         • Primarily WLAN only vendor      • WLAN solution acquired
competitors            • Expensive (typically 1.5x           – unable to offer end to end      from Trapeze in 2010
                         WLAN 8100)                          solution with voice/UC/CC       • Networking vendor - unable
                                                           • Large marketing push on           to offer end to end solution
                                                             BYOD                              with voice/UC/CC

Voice/Video over Wi-   • Supports 50% more 802.11a         • Support 50% more 802.11g        • Avaya WLAN supports 160%
                         voice calls per AP                  voice calls per AP                more video streams per AP
Fi support
Architecture           • Lack of wired/wireless            • As WLAN vendor, will need       • No unified solution today
                         integration: Cisco’s hair-pin       to rely on
                         solution is a far cry from true     partnerships/acquisitions for
                         unification                         integrated solution

Portfolio breadth      • Broad portfolio with range of     • Broad portfolio with wide       • Broad portfolio however
                         APs, controllers                    range of APs                      little innovation / new
                       • Strong investment and             • Rich feature set with strong      features since Trapeze
                         features                            security offering                 acquisition




   Avaya: Better than competitor Same as competitor Worse than competitor

                                                                                                                           49
Real–Time WLAN Performance
Validated

Sessions          WLAN 8100 Voice and Video Testing
                                                                                                        Avaya
                                                                                                       Industry
                                                                                                       Average




       Certified
          =                    23% =
                                   More                                         31% =More
     QoS performance        VoWLAN call sessions                               video call sessions


                                 Source: Miercom 2011 Test Results, Avaya versus: Cisco, Juniper (Trapeze), and Aruba
                                                                                                                  50
BYOD
What is BYOD?

• Bring your own device is
   • The trend of employees bringing their own device into the place of
     work:
        • Apple devices (iPad, MacBook, iPhone),
        • Non standard issue devices.
• Why is this a growing phenomena?
   • New technology appearing in the home before the workplace
   • Employees become more efficient with their own devices.
        • Industry reports vary from 10 to 20% more productive.
   •   Employee choice.
                                                              “
   •   Employer saves money on capital expense.               Analyst TechMarketView
   •   Employees take more care of their own device.          claims nearly 10 million UK
                                                              employees will be using
   •   Companies can adopt new technology quicker.            personal devices in the
                                                              workplace by 2016.
                                                              ”
                                                                                      52
Bring your own disaster!

1. Sensitive information is not as secure as device is mobile and
   can be placed in risky environments.
2. Weak security tools/software
3. Outdated software.
4. Questionable content.




                                                                    53
Building the Network ready for BYOD



        CAT5 cable                               CAT5 cable
        AP in ceiling     Wiring Closet          AP in ceiling    2nd Floor




                                 Wiring Closet                     1st Floor

Comms Room




                                                                 Ground Floor
                        Riser    Wiring Closet


  Controller


                                                                               54
Secure and Simple Guest Access…..

Avaya Identity Engines Guest Manager


 Provision guests in under
  10 seconds
 Self provisioning kiosk

 Detailed tracking and auditing

 Unified wired/wireless




                                       55
Device Fingerprinting
  Secure and Enforce IT Compliance

Identity Engines                                 IF
Ignition Server                      (identity = HR employee)

                                             AND IF
                                      (device = corp laptop)

 Case 1                                     AND IF
                                        (medium = wired)
 Employee with
 corporate laptop                            THEN
                                        ALLOW & GRANT
                                          FULL ACCESS

                                                  IF
                                     (identity = HR employee)
 Case 2                                       AND IF
 Employee with                       (device = personal iPad)
 personal iPad                               AND IF
                                       (medium = wireless)
 (same corporate
 credentials)                                THEN
                                        ALLOW & GRANT
                                        LIMITED ACCESS
                                                                56
3 key roles of NAC
(Network Access Control)

 • To ensure that users are authenticated/checked before being
1• allowed access to the network



     To set policies to determine what areas of the network
2    users can access




    To prevent the network from being vulnerable from PCs and
3   devices that lack antivirus, patches or host intrusion prevention software




                                                                                 57
Identity Engines – the components
  Core Application




                               Ignition   The brains of the solution, performs central
                               Server
                                          authorisation and authentication.




                              Ignition    Checks connected devices to ensure that
                              Posture     vulnerabilities are shut down.
    Additional Applications




                              Ignition
                              Guest       Secure guest, visitor and contractor access
                              Manager




                              Ignition     Reports highlighting user info, failed
                              Analytics    authentications, usage summaries, etc
                                                                                         58
Competitive - Access Control

Capability                    Cisco                                   Aruba                            Juniper
Know your        • Identity Services Engine (ISE)   • MOVE / Amigpod / Clear Pass         •Unified Access Control (UAC)
competitor       • Strong brand & sales execution   •   Aggressive BYOD Marketing         •Highly scalable
                 • Separated wired and wireless     •   Vendor agnostic                   •Large focus on BYOD
                   solutions                        •   Good technology acquisition of    •Complete solution includes IDS /
                 • Migration challenges from the        Avenda Systems (Nov/2011)          IPS and VPN technologies
                   CleanAccess solution             •   QuickConnect service for MAC OSX • FIPS certified
                                                        and iOS                          • Hardware product only – no
                                                                                           Virtual Appliance
Pricing          • Very expensive solution          • Expensive solution                  • Very expensive solution
                 • Seats & subscription based       • Seats based                         • Seats based

End-to-End       • Complete solution: UC,           • Limited wired experience;           • Networking vendor
Solution           networking, and services           primarily WLAN-only vendor          • No UC portfolio
                                                    • No UC portfolio


Policy control   • Limited policy granularity       • Limited policy granularity          • Limited policy granularity
& Directory      • Limited directory integration    • Limited directory integration       • Limited directory integration
                                                    • Two solutions (original & new       • Proprietary in certain areas e.g.
integration
                                                      Avenda Systems)                       EAP-JUAC protocol
Guest            • Limited                          • Fair solution                       • Limited
management

      Avaya: Better than competitor Same as competitor Worse than competitor
                                                                                                                                59
Secure Routing
Simple intro to secure routers


• Delivers the survivable SIP Voice
  platform for the Branch
                                                   IP Phones Analogue Phones   PCs   Wireless Aps   Legacy PBX



• Consolidates Branch networking
  functions into fewer, tightly-
                                                                                                    LAN Switch
  integrated devices
                                                                                                    Consolidated
    •   Reduces network complexity                                                                  functionality

    •   Streamlines capital & operational       Firewall
                                                                                                        VPN
        costs

                                                                      Wide Area Network

• Gives workers a high quality of
  experience
    •   Regardless of which applications     Secure Router
        or services are enabled across the                                           Data Centre
        network

                                                                                                                 61
Unified Branch Solution

            • Unified Branch Office Solutions
            • Unified communication ready platform- FW – IDS – Enterprise class routing,
            Ethernet without PoE, FXO / FXS, WAN
            • Uniquely integrates with Microsoft OCS service and SCS (SR4134) and SIP
            Survivability solutions (SR4134 / SR2330)


                                                                Mid Branch to Campus

                                                                          SR4134
                   Small – Mid Branch Access
                                           SR2330
                 AG2330                                     High End Converged Branch Routers
                                                                          SR3120

                                     Mid Tier
                                    Converged                    Targets Branch Offices and
           Survivable SIP gateway                                                                 Outperforms comparable Cisco 2821
                                  Branch Routers              Enterprises and Service Providers
              for centralized UC                                                                    routers delivering more than 4x
            systems, upgradeable
             to full WAN routing
                                                                                                            the throughput




                           Avaya’s Unified Branch Solutions match Cisco’s ability to enable UC / VoIP (1)
Source: (1) Avaya reporting, Tolly group reports
                                                                                                                                  62
VPN Gateway 3050/3070
 Virtual Appliance
                                                        No charge for Virtual Appliance – simply
Entry-level Virtual Appliance that can run              download the virtual appliance software
on an existing PC or VM Server                              • The Virtual Appliance contains no licencing so
                                                            product must be licenced to enable functionality
                                                            • 3050 – supports up to 250 users / tunnels
Loadable to any VMware ESX or ESXi compliant hardware       • 3070 – supports up to 1000 users / tunnels
                                                                                                             .00
                                                            • 3090 – supports up to 5000 users/tunnels itthV9 .
                                                                                                wi
                                                                                                 w        h V9
                                                                                             Nw
                                                                                            Neew

• Simply purchase the desired licenses                  • Deploy as many Virtual Appliances as
(SSL & IPsec, IPsec, SPO, etc)                          needed

• Enable the functionality / capacity just              • Use Clustering to obtain desired
like the hardware variants                              capacity




                                                                                                          63
Management
Unified Communications
Management Portfolio

                          Visualization
                          Performance             Multi-vendor network discovery, root cause
                          & Fault Manager         analysis, network topology maps
 Portfolio Applications




                          Configuration &
                          Orchestration Manager
                                                  Configuration and element management




                          Enterprise Policy       Network access control policies,
                          Manager                 bandwidth management, QoS




                          IP Flow Manager         IPFIX collection, analysis & reporting,
                                                  top 10 applications and protocols


                                                                                               65
Configuration and Orchestration Manager (COM)

What is it?
•   Offers centralised configuration, provisioning and
    troubleshooting for enterprise-wide devices and technologies
•   Delivers simplified element management with role-based
    access privileges and audit trails
•   Offers management for LAN and WAN products through
    plug-ins


Why is it needed?
•   Network services and protocols are becoming more
    complex, causing increased difficulties related to installation
    and configuration


Value Proposition
•   Reduces configuration setup time and saves operational
    costs
•   Protects the network from unauthorised changes
•   Facilitates faster configuration and changes to the network
•   Reduces the potential for network downtime                        Base license price £1,875
•   Decreases the likelihood of configuration and provisioning            Part Code: AH2735001-2.3
    errors
                                                                                                     66
Visualization Performance
& Fault Manager (VPFM)


 What is it?
 •       Delivers discovery, troubleshooting and performance
         management of all IP/SNMP devices in multi-vendor
         networks (both voice and data)
 •       Gives detailed topology maps of the IT infrastructure
         including network devices, IP phones, servers and
         applications



     Why is it needed?
     •    Administrators need to know what is on their
          networks and determine the root cause of problems



     Value Proposition
     •    Reduces complexity
     •    Decreases MTTR
     •    Proactive solution
     •    Lowers TCO through fault management                    Base license price £3,620
                                                                    Part Code: AH3313109-2.3

                                                                                               67
IP Flow Manager (IPFM)

What is it?
•   Manages network usage monitoring, abuse investigation
    and growth planning
•   Analyses applications, protocols and user activity based
    on IP Flow data captured from Ethernet Routing Switches




Why is it Needed?
•   Lack of visibility into who and which applications are
    consuming network resources and bandwidth




Value Proposition
•   More informed/accelerated resolution/planning decisions
•   Ability to resolve issues before they impact productivity
•   Reduce TCO associated with planning/diagnosing
         performance and abuse investigation                    Base license price £3,045
                                                                   Part Code: AH3313149-2.0




                                                                                              68
Enterprise Policy Manager (EPM)

What is it?
     •   Allows network administrators to manage network
         bandwidth, prioritise traffic streams and set network
         access policies
     •   Enables critical applications to receive the right QoS and
         users to be granted access to the appropriate applications
     •    Provides a rapid response to resolving new network
         threats


Why is it needed?
     •   Sensitive Applications such as voice need prioritising
     •   Network/application access by users must be controlled



Value Proposition
     •   Increases overall security and application performance
     •   Reduces complexity and simplifies provisioning of
         consistent polices
                                                                      Base license price £2,477
     •   Protects network resources                                      Part Code: AH3313103-5.1

                                                                                                    69
Section 3 – Summary and Sales tools
Pulling it all together

   Services: Location, RF            Data Centre
   Security (WIDS/WIPS)



                                                        Internet


Management
Services                                                           Aura IPT solution = 100K
                                  Core
                                                    Wireless
                                                    Controller       LAN                                35K
                                                                   + Wireless                                8K
                                            Edge                   + WAN Router                              1K
                                                                   + Management                              3K
         Wireless
         Access Points
                                                         IP Sets   = Increased value of sale 47K



    Phone                   PDA

                                                   Desktop PC’s

                                                                         Typical prices for 250 user/ports        71
Sales Pro

Recently extended to cover both
voice and networking portfolio

Competitive and displacement
information

Latest product and promotion
information


Video tutorial available




                                  73
Avaya LAN Competitive Analysis Tool
(LANCAT)




                                            1. Select the switches you want to compare




2. Run the comparison and see the results
  •1, 3 and 5 year TCO
  •Capacities
  •Bandwidth
  •Power consumption

 Link to LAN CAT
                                                                                         74
Using the Westcon price book




                               75
Avaya Networking portal




                          Key features:
                          • Latest News &
                            Highlights
                          • Latest promotion
                            news
                          • Easy to search
                            product sections
                          • Product Lifecycle
                            information
                          • Analysts views
                          • Case studies
                          • Competitive




                                            76
Updated Tell Me About …




                          77
Solution Guides




                  78
Active Networking Promotions




                               84
85
Questions




            86
Contacts

Barry Ralph    Pre Sales Specialist   barry.ralph@westcon.co.uk

               European Product
Dave Garwood                          dave.garwood@westcon.co.uk
               Manager
               Pre Sales team         NortelPresales@westcon.co.uk
Appendix
Cisco Stackables Comparison
                       ERS 4800         ERS 5600        Cisco 3750-      Cisco 3750-       Cisco 3760-      Cisco
                                                        X                E                 X                2960
Forwarding             128-184          288 – 384       160 Gbps         128 Gbps          160 Gbps         88 Gbps
bandwidth              Gbps             Gbps


Stack members          8                8               9                9                 n/a              4
Total bandwidth of     384 Gbps         1.152           64 Gbps          64 Gbps           n/a              20 Gbps
stack                                   Terabits
10/100/1000 density    24 port and      24, 48 and      24 port and 48   24 and 48 port    24 and 48        24 and 48
                       48 port          96 port         port variants    variants          ports (5 model   port variants
                       variants         variants                                           variants)

10 Gigabit SFP+        2 ports          XFP only (2     2 ports          n/a               2 ports SFP+     2 ports
                                        or 8 ports)                                        and 2 ports
                                                                                           XFP

PoE/ PoE+              Yes              PoE only        Yes              Yes               Yes              Yes
Integrated field       Yes              Yes             Yes              Yes               Yes              Yes
replaceable power
supplies

Future WLAN            Yes              Yes via ERS     No               No                No               No
integration                             5800
Future support for     Yes              Yes via ERS     No               No                No               No
Virtualized services                    5800
Warranty               Next-business-day shipment       Next-business-day delivery of replacement hardware where
                       of failed units; up to L4        available and 90 days of 8 x 5 Cisco Technical Assistance Center
                       technical support for first 90   (TAC) support.
                       days. Software updates
Juniper Stackables Comparison
                       ERS 4800                   ERS 5600                  Juniper EX 4200
Forwarding bandwidth   128-184 Gbps               288 – 384 Gbps            88-136 Gbps
Stack members          8                          8                         10
Total bandwidth of     384 Gbps                   1.152 Tbps                128 Gbps
Stack
10/100/1000 Density    24 port and 48 port        24, 48 and 96 port        24 port and 48 port
                       variants                   variants                  variants
10 Gigabit SFP+        2 ports                    XFP only (2 or 8 ports)   2 ports
PoE+                   Yes                        No                        Yes
Integrated field       Yes                        Yes                       Yes
replaceable power
supplies
Future WLAN            Yes                        Yes via ERS 5800          No
integration
Future support for     Yes                        Yes via ERS 5800          No
Virtualized services
Warranty               Next-business-day shipment of failed units; up to    Includes software
                       L4 technical support for first 90 days. Software     updates; advanced
                       updates nominal fee.                                 shipping of spares
                                                                            within one business
                                                                            day; 24x7 JTAC for 90
                                                                            days. Power and fans 5
HP Stackables Comparison
                     ERS 4800               ERS 5600               HP E4500G           HP 3800              HP 2910
Forwarding           128-184 Gbps           288 – 384 Gbps         128-176 Gbps        88 Gbps              128-176 Gbps
bandwidth
Stack members        8                      8                      Cluster up to 32    10 switches          n/a
                                                                   devices
Total bandwidth of   384 Gbps               1.152 Tbps             96 Gbps?            336 Gbps             n/a
Stack
10/100/1000          24 port and 48         24, 48 and 96 port     20 and 44 port      24 and 48 port       24 port and 48
Density              port variants          variants               variants            variants (9          port variants
                                                                                       models)

1/10 Gigabit SFP+    2 ports                XFP only (2 or 8       2 ports (via        4 ports on 48-port   4 ports
                                            ports)                 expansion           variants and 2
                                                                   module)             ports on 24 port
                                                                                       variants

PoE+                 Yes                    No                     No                  Yes                  Yes
Integrated field     Yes                    Yes                    Yes                 Yes                  No
replaceable power
supplies

Future WLAN          Yes                    Yes via ERS 5800       No                  No                   No
integration
Future support for   Yes                    Yes (via ERS           No                  No                   No
Virtualized                                 5800)
services

Warranty             Next-business-day shipment of failed          Advance replacement and
                     units; up to L3 technical support for first   next-business-day delivery; free software updates
                     90 days. Software updates nominal fee.
Avaya ERS 2500
  Product Comparison: Juniper EX2200

      Factors                          Avaya ERS 2500                                                Juniper EX2200

Performance              • Switch Fabric up to 15.6 Gbps                    • Switch Fabric up to 104 Gbps
                         • Stacking Bandwidth up to 32 Gbps                 • No Stacking

Functionality            •   Advanced resilient Stacking                    •   Gigabit Ethernet models
                         •   Mixed Stacking within ERS 2500 family          •   PoE but not full Class 3 on 48-port models
                         •   Common Enterprise-class management             •   No unified management
                         •   Advanced QoS – 802.1p & DSCP Prioritization    •   Advanced Network traffic control – 802.1p & DSCP Prioritization
                         •   Convergence ready – integrated PoE & QoS
                         •   Highly energy efficient design

Price & Value            • Full Lifetime with Next Business Day             • Limited Lifetime Warranty, but no Technical Support
                           replacement and free level 1 Technical           • EX2200-24T / 24P – no data available
                           Support for life                                 • EX2200-48T / 48P – no data available
                         • 2526T / PWR – $695 / $1,995
                         • 2550T / PWR – $1,195 / $2,995


Security, Routing        • 802.1X (SHSA & Guest VLAN), RADIUS,              • MAC limiting, Allowed MAC Addresses – configurable per port,
& Convergence              SNMPv3, SSHv2, MAC Based Security                  Dynamic ARP inspection, IP Source Guard, Local proxy ARP, Static
protocols                • Static, Local                                      ARP support, DHCP Snooping, Captive Portal, ACLs, 802.1X
                         • PoE, 802.1AB (LLDP), LLDP-MED, Advanced          • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS,
                           QoS, ADAC, Auto QoS                                MPLS, IPv6)
                                                                            • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS


                                                                                                                                                      Av
                                                                                                                                                  Adv aya
Potential Objections                 Responses
                                                                                                                                                      an
• Juniper supports one software
  stream across all products; why
                                    • Avaya’s approach is not that dissimilar, and features are shared between all
                                      products as appropriate. Importantly this means that inappropriate (overly-                                  Stac tage:
                                                                                                                                                       k  in
                                                                                                                                                    And g
  doesn’t Avaya do this               complex) features are not ported.

• The EX2200 can support PoE        • But full Class 3 is not available on all ports, making deployment and                                        Pr i c
  on all ports                        administration problematic                                                                                         e
                                    • Given that the EX2200 is non-Stackable, there seems little benefit in Gigabit,
• The EX2200 Switches are
                                      and as low-end products they are usually deployed into the Branch, where
  Gigabit Ethernet
                                      the WAN link – and not the port speed – is the limiting factor


                                                                                                                                                                96
Avaya ERS 4500
   Product Comparison: Juniper EX3200

      Factors                                    Avaya ERS 4500                                                               Juniper EX3200
                         • Switch Fabric up to 184 Gbps                                           • Switch Fabric up to 136 Gbps
Performance              • Stacking Bandwidth up to 320 Gbps                                      • No Stacking

                         •   Advanced resilient Stacking with Automatic Unit Replacement
                         •   Fast Ethernet & Gigabit model options, plus 10G Ethernet options     •   Internal power redundancy option
                         •   External power redundancy                                            •   Field-replaceable Power Redundancy
Functionality            •   Mixed Stacking within ERS 4500 family                                •   Comprehensive Routing & Multicast
                         •   Common Enterprise-class management                                   •   No unified management
                         •   Highly energy efficient design & Energy Saver mode

                         • Full Lifetime with Next Business Day replacement and free level 1
                           Technical Support for life                                             • Lifetime Warranty, no Technical Support
Price & Value            • ERS 4524GTX-PWR - $3,695                                               • EX3200-24T / 24P – $3,000 / $3,800
                         • ERS 4548GT-PWR - $6,995                                                • EX3200-48T / 48P - $5,400 / $7,000
                         • ERS 4526GTX-PWR - $5,295

                         • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP        • MAC limiting, Allowed MAC Addresses – configurable per port, Dynamic ARP
Security, Routing          Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP           inspection, IP Source Guard, Local proxy ARP, Static ARP support, DHCP
& Convergence              SourceGuard                                                              Snooping, Captive Portal, ACLs, 802.1X
protocols                • Static, RIP, OSPF (License)                                            • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS, MPLS, IPv6)
                         • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS             • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS


Potential Objections                       Responses
                                                                                                                                                       Av
• Juniper supports one software           • Avaya’s approach is not that dissimilar, and features are shared                                       Adv aya
  stream across all products; why           between all products as appropriate. Importantly this means                                                an
  doesn’t Avaya do this                     that inappropriate (overly-complex) features are not ported.                                            Stac tage:
                                                                                                                                                        k   in
• Avaya’s 4500 does not support field-    • Avaya is currently working on introducing 4500 models with this
                                                                                                                                              Bett      And g
  replaceable PSUs, unlike the EX3200       support, and it is currently available on the 5600 if important
                                                                                                                                                     er W
• The EX3200 offers a comprehensive       • However this comes at a cost, and would be very overly-                                                      a rr a
  IP Routing feature set                    complex for the typical Enterprise
                                                                                                                                                                nt   y


                                                                                                                                                                                 97
Avaya ERS 5600
   Product Comparison: Juniper EX4200

     Factors                                                 Avaya ERS 5600                                                                          Juniper EX4200
                       • Switch Fabric up to 384 Gbps                                                                         • Switch Fabric up to 136 Gbps
Performance            • 18X Stacking performance (1.152 Tbps)                                                                • Limited to 128 Gbps of Stack capacity
                       • Switch Clustering – always-on networking                                                             • No Switch Clustering

                       •   Advanced resilient Stacking with Automatic Unit Replacement
                                                                                                                              •   Resilient Stacking: “Virtual Chassis”
                       •   Field-replaceable Power Redundancy
                                                                                                                              •   Field-replaceable Power Redundancy
Functionality          •   Mixed Stacking within ERS 5000 range
                                                                                                                              •   Comprehensive Routing & Multicast
                       •   Common Enterprise-class management
                                                                                                                              •   No unified management
                       •   Convergence ready – integrated PoE & QoS

                       •   Full Lifetime with Next Business Day replacement and free level 1 Technical Support for life
                       •   5510-24 / 5520-24 - $5,495 / $5,995                                                                •   Limited Lifetime Warranty, no Technical Support
                       •   5510-48 / 5520-48 - $7,695 / $7,995                                                                •   EX4200-24T / 24P – $6,000 / $6,800
Price & Value          •   5650 / PWR - $7,995 / $8,995                                                                       •   EX4200-48T / 48P - $10,800 / $12,400
                       •   5698 / PWR - $12,995 / $14,995                                                                     •   EX4200-24F - $16,000
                       •   5530 / 5632 - $9,995 / $19,995
                                                                                                                              • MAC limiting, Allowed MAC Addresses – configurable per port,
Security,                                                                                                                       Dynamic ARP inspection, IP Source Guard, Local proxy ARP,
                       • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection (DAI), RADIUS,
Routing &                                                                                                                       Static ARP support, DHCP Snooping, Captive Portal, ACLs,
                         SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard, DoS Attack Prevention
                                                                                                                                802.1X
Convergence            • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM
                                                                                                                              • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS,
protocols              • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS
                                                                                                                                MPLS, IPv6)
                                                                                                                              • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS


Potential Objections                      Responses
                                                                                                                                                              Av
• Juniper supports one software
  stream across all products; why
                                         • Avaya’s approach is not that dissimilar, and features are shared between all
                                           products as appropriate. Importantly this means that inappropriate (overly-                                    Adv aya
                                                                                                                                                       Sup    an
  doesn’t Avaya do this                    complex) features are not ported.
                                                                                                                                                          erio tage:
                                                                                                                                                       B  etter St
• Avaya does not support BGP on
                                         • True, but there can be limited application for BGP Routing in a platform of this
                                                                                                                                                              r Pr acking
                                                                                                                                                           War ice and ,
                                           size; we see more value in support Switch Clustering so that customers can
  the 5000 Series
                                           create an always-on Core for smaller networks
                                                                                                                                                                rant
• The EX4200 can scale up to 10
                                                                                                                                                                     y
                                         • Yes, but this is only really marginally more than the 384 ports available on the
  units high, delivering higher port
                                           5600; importantly Juniper only has a 128 Gbps virtual backplane
  density (up to 480 ports)

                                                                                                                                                                                        98
Avaya ERS 2500
   Product Comparison: Extreme 150
    Factors                           Avaya ERS 2500                                                         Extreme 150
                     • Switch Fabric up to 15.6Gbps                           • Switch Fabric up to 13.6Gbps
Performance          • Stacking Bandwidth up to 32Gbps                        • No Stacking

                     •   Advanced resilient Stacking
                                                                              •   No Stacking
                     •   Mixed Stacking within ERS 2500 family
                                                                              •   PoE only available on 24-port model
                     •   Common Enterprise-class management
Functionality        •   Advanced QoS – 802.1p & DSCP Prioritization
                                                                              •   External power supply required for full 802.3af
                                                                              •   No unified management
                     •   Convergence ready – integrated PoE & QoS
                                                                              •   Network traffic control – 802.1p & DSCP Prioritization
                     •   Highly energy efficient design


                     • Full Lifetime with Next Business Day replacement
                                                                              • Limited Lifetime with Express Advanced hardware replacement
                       and free level 1 Technical Support for life
Price & Value        • ERS 2526T- $695
                                                                              • X150 24-port - $995
                                                                              • X150 48-port - $1,495
                     • ERS 2550T - $1,390


Security,            • 802.1X (SHSA & Guest VLAN), RADIUS, SNMPv3,
                                                                              • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP
Routing &              SSHv2, MAC Based Security
                                                                                Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP SourceGuard
                     • Static, Local
Convergence                                                                   • None
                     • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS,
protocols                                                                     • 802.1AB (LLDP), LLDP-MED, QoS
                       ADAC, Auto QoS


                                                                                                                                                   Av
Potential Objections                   Responses                                                                                              Adv aya
                                                                                                                                            Bett antag
                                                                                                                                                     ll a e:
                                                                                                                                                er a
• Avaya does not have a single        • Avaya leverages consistent core feature code and implements this into product                      pe     rfor
  Operating System across the           line-specific Operating Systems; this is how we deliver feature consistency in a
                                                                                                                                                     man round
  entire portfolio.                     manner that is transparent to the user                                                                            c
                                                                                                                                                     pric e and
                                      • But this is only available on one – 24-port – Switch and even then requires an                                   e
• Extreme can support PoE on all
                                        additional external power source. Avaya delivers two full-power PoE options:
  ports.
                                        12-ports and 24-ports

                                      • Avaya’s CLI also provides a common command line configuration option; and our
• Extreme has a common CLI across
                                        Unified Communication Management takes web-based common look and feel to
  all switch products.
                                        a new level of functionality.

                                                                                                                                                                  99
Avaya ERS 4500
  Product Comparison: Extreme 250e

   Factors                                          Avaya ERS 4500                                                                     Extreme 250e

                   • Switch Fabric up to 184Gbps                                                           • Switch Fabric up to 97.6Gbps
Performance        • Stacking Bandwidth up to 320Gbps                                                      • Stacking Bandwidth 40Gbps

                   •   Advanced resilient Stacking with Automatic Unit Replacement
                                                                                                           •   Resilient Stacking but no AUR
                   •   Fast Ethernet & Gigabit model options, plus 10G Ethernet options
                                                                                                           •   Fast Ethernet only, and no 10G
                   •   External power redundancy
Functionality      •   Mixed Stacking within ERS 4500 family
                                                                                                           •   External power redundancy
                                                                                                           •   Mixed Stacking across certain products
                   •   Common Enterprise-class management
                                                                                                           •   No unified management
                   •   Highly energy efficient design & Energy Saver mode

                   • Full Lifetime with Next Business Day replacement and free level 1 Technical
                     Support for life
                   • ERS 4526T-PWR - $2,995                                                                • Limited Lifetime Warranty
Price & Value      • ERS 4550 TPWR - $3,995                                                                • X250e-24p - $1,995
                   • ERS 4524GTX-PWR - $3,695                                                              • X250e-48p - $2,995
                   • ERS 4548GT-PWR - $6,995
                   • ERS 4526GTX-PWR - $5,295

Security,          • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection (DAI),     • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP
Routing &            RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard                                Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP SourceGuard
Convergence        • Static, RIP, OSPF (License)                                                           • Static, RIP; Advanced License (OSPF-Edge, ECMP, VRRP, Sflow
protocols          • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS                            • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS



Potential Objections                 Responses
                                                                                                                                                    Av
• Avaya does not have mixed         • Avaya offers distinct product lines each with numerous models that exceed
                                                                                                                                               Adv aya
                                                                                                                                             Bett antag
  Stacking between different          typical Enterprise requirements, making cross-product Stacking unnecessary
  product lines.                      & irrelevant.
                                                                                                                                                      ll a e:
                                                                                                                                                 er a
                                                                                                                                            pe  rfor
• Extremes Automatic                • When deployed at the Edge – in concert with Avaya’s Switch Clustering – the                                       man round
                                                                                                                                                             c
                                                                                                                                                        pric e and
  Protection provides sub-            ERS 4500 does not require any special configuration, and yet it provides a
  second fail-over.                   superior solution and is much simpler to deploy and manage.
                                                                                                                                                            e
                                    • Avaya’s CLI also provides a common command line configuration option;
• Extreme has a common CLI
                                      and our Unified Communication Management takes web-based common
  across all switch products.
                                      look and feel to a new level of functionality.
                                                                                                                                                                               100
Avaya ERS 5600
   Product Comparison: Extreme 450e

    Factors                                 Avaya ERS 5600                                                          Extreme 450e

                     • Switch Fabric up to 384Gbps                                         • Switch Fabric up to 256Gbps
Performance          • 4X Stacking performance (1.152Tbps)                                 • Limited to 40Gbps of Stack capacity
                     • Switch Clustering – hitless failover                                • No Switch Clustering; Circular EAPS

                     •   Advanced resilient Stacking with Automatic Unit Replacement
                                                                                           •   Resilient Stacking, but no Auto Unit Replacement
                     •   Field-replaceable Power Redundancy
                                                                                           •   External power redundancy
Functionality        •   Mixed Stacking within ERS 5000 range
                                                                                           •   Mixed Stacking across certain products
                     •   Common Enterprise-class management
                                                                                           •   No unified management
                     •   Convergence ready – integrated PoE & QoS

                     • Full Lifetime with Next Business Day replacement and free
                                                                                           • Limited Lifetime Warranty
                       level 1 Technical Support for life
Price & Value        • 5650TD-PWR - $8,995 (PPP: $178)
                                                                                           • X450e-24p - $4,995 (PPP: $208)
                                                                                           • X450e-48p - $7,495 (PPP: $156)
                     • 5698TFD-PWR - $14,995 (PPP: $153)

                     • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping,
Security,                                                                                  • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping,
                       ARP Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU
Routing &                                                                                    ARP Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP
                       Filtering, IP SourceGuard, DoS Attack Prevention
                                                                                             SourceGuard
Convergence          • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM
                                                                                           • Static, RIP, Advanced License (OSPF-edge,ECMP, VRRP, Sflow
protocols            • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC,
                                                                                           • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS
                       AutoQoS



                                                                                                                                                          Av
                                                                                                                                                     Adv aya
Potential Objections                          Responses
                                              • Avaya offers distinct product lines each with numerous models that exceed                          Bett antag
• Avaya does not have mixed Stacking
                                                typical Enterprise requirements, making cross-product Stacking unnecessary &
                                                                                                                                                  perf
                                                                                                                                                       er    e
                                                                                                                                                             al     :
                                                                                                                                                         orm l aroun
  between different product lines.
                                                irrelevant.
                                                                                                                                                             anc     d
• Extremes Automatic Protection provides      • Avaya’s Switch Clustering provides a superior solution (in terms of resiliency &                          pric e and
  sub-second fail-over.                         resource utilization) and is much simpler to deploy and manage.
                                                                                                                                                              e

                                              • Avaya’s CLI also provides a common command line configuration option; and our
• Extreme has a common CLI across all
                                                Unified Communication Management takes web-based common look and feel to
  switch products.
                                                a new level of functionality.
                                                                                                                                                                         101
Avaya ERS 2500
   Product Comparison: Enterasys A-Series

   Factors                           Avaya ERS 2500                                                        Enterasys A-Series
                  • Switch Fabric up to 15.6Gbps                                • Switch Fabric up to 17.6Gbps
Performance       • Stacking Bandwidth up to 32Gbps                             • No Stacking

                  •   Advanced resilient Stacking
                  •   Mixed Stacking within ERS 2500 family                     •   No Stacking
                  •   Common Enterprise-class management                        •   External power supply option
Functionality     •   Advanced QoS – 802.1p & DSCP Prioritization               •   No unified management
                  •   Convergence ready – integrated PoE & QoS                  •   Network traffic control – 802.1p & DSCP Prioritization
                  •   Highly energy efficient design

                  • Full Lifetime with NBD replacement & free Level 1           • Lifetime Warranty with NBD replacement & free Level 1 Technical
Price &             Technical Support for life                                    Support & Software Updates for life
Value             • ERS 2526T- $695                                             • A2H124-24 / 24P - $625 / $1,995
                  • ERS 2550T - $1,390                                          • A2H124-48 / 48P - $1,250 / $2,395


Security,         • 802.1X (SHSA & Guest VLAN), RADIUS, SNMPv3, SSHv2,
                                                                                • MAC-based Port Authentication, 802.1X (SHSA only), RADIUS Client,
                    MAC Based Security
Routing &                                                                         SSHv2, SSL, SNMPv3
                  • Static, Local
Convergence                                                                     • None
                  • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC,
protocols                                                                       • PoE, Advanced QoS
                    Auto QoS
                                                                                                                                                      Ava
                                                                                                                                                   Adv    ya
Potential Objections                         Responses                                                                                                 anta
                                                                                                                                                   S        ge
                                                                                                                                               Ente tacking :
                                                                                                                                                   rp       ,
                                                                                                                                                secu rise-cla
• Avaya does not have a redundant Power     • True, but MTBFs are rising all the time and 2500/A-Series class products are not
  Supply option.                              typically deployed into mission-critical scenarios.
                                                                                                                                                              s
                                                                                                                                               Con rity and s
                                                                                                                                                   verg
• Enterasys offer Software Updates for      • Avaya delivers a highly competitive Lifetime Warranty, and Software Updates are                           enc
  life.                                       available with the extremely cost-effective SRS Basic offering.                                              e

                                            • The list pricing is very close, but importantly Avaya offer genuine Enterprise-class
• Avaya is more expensive.                    Security & Convergence feature, plus of course Stacking. The A-Class is essentially
                                              just SMB-class.
                                                                                                                                                                  102
Avaya ERS 4500
   Product Comparison: Enterasys B-Class

   Factors                                       Avaya ERS 4500                                                                     Enterasys B-Class

                   • Switch Fabric up to 184Gbps                                                      • Switch Fabric up to 136Gbps
Performance        • Stacking Bandwidth up to 320Gbps                                                 • Stacking Bandwidth 40Gbps


                   •   Advanced resilient Stacking with Automatic Unit Replacement
                                                                                                      •   Resilient Stacking but no AUR
                   •   Fast Ethernet & Gigabit model options, plus 10G Ethernet options
                                                                                                      •   Fast Ethernet only, and no 10G
                   •   External power redundancy
Functionality      •   Mixed Stacking within ERS 4500 family
                                                                                                      •   External power redundancy
                                                                                                      •   Mixed Stacking across certain products
                   •   Common Enterprise-class management
                                                                                                      •   No unified management
                   •   Highly energy efficient design & Energy Saver mode

                   •   Full Lifetime with NBD replacement & free level 1 Technical Support for life   • Lifetime Warranty with NBD replacement & free Level 1 Technical Support &
                   •   4526T / PWR - $2,295 / $2,995                                                    Software Updates for life
                   •   4550T / PWR - $3,295 / $3,995                                                  • B5G124-24 / P2 - $2,795 / $3,595
Price & Value      •   4524GT / PWR - $2,995 / $3,695                                                 • B5G124-48 / P2 - $4,595 / $5,995
                   •   4548GT / PWR - $6,295 / $6,995                                                 • B5K125-24 / P2 - $4,295 / $5,495
                   •   4526GTX / PWR - $4,995 / $5,295                                                • B5K125-48 / P2 - $6,195 / $7,295

Security,          • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection       • MAC-based Port Authentication, ACLs, ARP/DHCP Spoof, 802.1X, RADIUS
Routing &            (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard                    Client/Accounting, SSHv2, SSL, SNMPv3
Convergence        • Static, RIP, OSPF (License)                                                      • Static, RIP
protocols          • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS                       • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS



                                                                                                                                                            Av
Potential Objections                                Responses                                                                                           Adv aya
• Avaya does not match the PoE+ (802.3at)          • There is very little real need to PoE+ today, and Avaya is in the process of                      Bett antage
  support that is available on the B-Series          developing units that will support both PoE+ and crucially field-replaceable PSUs.
                                                                                                                                                      and
                                                                                                                                                           er P
                                                                                                                                                             ri    :
                                                                                                                                                          Gen cing
• Enterasys offer Software Updates for life.
                                                   • Avaya delivers a highly competitive Lifetime Warranty, and Software Updates are
                                                     available with the extremely cost-effective SRS Basic offering.
                                                                                                                                                       Stac uine
                                                                                                                                                           king
                                                   • However they provide no independent testing and verification of this, and they
• Enterasys claim a higher Stacking bandwidth
                                                     have no virtual hot-swap capability; and important serviceability feature.


                                                                                                                                                                                103
Avaya ERS 5600
    Product Comparison: Enterasys C-Series

    Factors                                    Avaya ERS 5600                                                             Enterasys C-Series
                     • Switch Fabric up to 384Gbps                                             • Switch Fabric up to 136Gbps
Performance          • Stacking performance up to 1.152Tbps                                    • Stack capacity claimed to be 128Gbps per Switch (but no independent
                     • Switch Clustering – hitless failover                                      verification)

                     •   Advanced resilient Stacking with Automatic Unit Replacement
                                                                                               •   Resilient Stacking, but no Auto Unit Replacement
                     •   Field-replaceable Power Redundancy
                                                                                               •   External power redundancy
Functionality        •   Mixed Stacking within ERS 5000 range
                                                                                               •   802.3at PoE+ support
                     •   Common Enterprise-class management
                                                                                               •   No unified management
                     •   Convergence ready – integrated PoE & QoS


                     • Full Lifetime with Next Business Day replacement and free Level 1       • Lifetime Warranty with Next Business Day replacement and free Level 1
                       Technical Support for life                                                Technical Support & Software Updates for life
Price & Value        • 5650TD-PWR - $8,995 (PPP: $178)                                         • C5G124-48P2 - $8,995
                     • 5698TFD-PWR - $14,995 (PPP: $153)                                       • C5G125-48P2 - $11,995


Security,            • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP         • MAC-based Port Authentication, ACLs, ARP/DHCP Spoof, 802.1X, RADIUS
Routing &              Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP            Client/Accounting, SSHv2, SSL, SNMPv3
                       SourceGuard, DoS Attack Prevention                                      • Static, RIP, OSPF, VRRP, ECMP,
Convergence          • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM                    DVMRP,PIM-SM, full IPv6
protocols            • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS              • PoE 802.3af/at, 802.1AB (LLDP), LLDP-MED, Advanced QoS


                                                                                                                                                               Av
Potential Objections                              Responses                                                                                                Adv aya
                                                                                                                                                          Bett antage
• Avaya does not match the PoE+ (802.3at)        • There is very little real need to PoE+ today, the C-Series lacks internal field-
                                                                                                                                                         and
                                                                                                                                                              er P
                                                                                                                                                                ri    :
  support that is available on the C-Series        replaceable PSUs, and important serviceability requirement.
                                                                                                                                                             Gen cing
                                                                                                                                                          Stac uine
                                                 • Avaya delivers a highly competitive Lifetime Warranty, and Software
                                                                                                                                                              king
• Enterasys offer Software Updates for life.
                                                   Updates are available with the extremely cost-effective SRS Basic offering.

                                                 • Avaya is currently adding IPv6 Routing to the existing comprehensive suite.
• Enterasys already deliver IPv6 Routing.          More importantly Avaya delivers Switch Clustering; reliability is more
                                                   widely required than IPv6 Routing.
                                                                                                                                                                          104
How does this all work together?

 Unified Management simplifies
 provisioning, monitoring, and
         troubleshooting
                                                                                Network Access Control
                                                                             authenticates Users/Devices &             High performance stackables
               WLAN 8100                                                   assigns appropriate VLAN/QoS and            at the edge supporting
                Wireless                                                        Virtual Service Network                 Plug and Play Provisioning
               Controller


            Server                Data Centre                  Campus                   Distribution                       Edge
            Access                   Core                       Core




Server



                                                 Switch Clustering between tiers –
                                                    scalable from small to large                                Wireless LAN 8100 provides
                                                enterprise providing active/active at                             unmatched UC mobility
                                                         Layer 2 or Layer 3                                     performance and scale with
                                                                                                              advanced call admission control

                      Identity Engines Ignition Server
                      provides Authenticated Network
                       Access / Policy Enforcement



                                                                                                                                                105
The Innovative Leader in Real-Time
Networking



  1 min.                      2 min.           36%               40%              233%
   Certified                   Certified
                                              36% Less          40% Lower        233% Greater
   1 minute                    2 minute
                                             edge energy      edge total cost   stackable traffic
  Plug-n-Play               stackable unit
                                             consumption       of ownership         capacity
    phones                    hot-swap



 <1sec.                         31%            23%                 7x               25x
                                               23% More       Up to 7x faster  Up to 25x faster
                          31% More video                      time to service   time to service
   Certified                                 VoWLAN call
                            call sessions                        for virtual       for virtual
  sub-second                                 sessions than
                          than competitive                        network           network
    failover                                  competitive
                              average                        provisioning than provisioning than
                                                average
                                                             Switch Clustering Spanning Tree
Source: Miercom 2011 Avaya Test Reports



                                                                                                106

Avaya Networking Sales Workshop

  • 1.
    Avaya Networking SalesModules By Westcon Convergence
  • 2.
    Agenda Introduction toAvaya Data Avaya’s ERS range WLAN & BYOD Secure Routing Management Sales Tools 2
  • 3.
  • 4.
    Virtualization Among CIO’sTop Priorities 42% 77M OF COMPANIES ARE USERS WILL USE VDI TO VIRTUALIZING OR PLANNING TO DELIVER CLIENT COMPUTING VIRTUALIZE THEIR UC CAPABILITIES BY 2016 (UP FROM APPLICATIONS 18M in 2012) Nemertes Research, March 2012 Gartner Forecast: Hosted Virtual Desktops, Worldwide, 2012-2016, 2012 Update 4
  • 5.
    Three Trends ThatWill Affect How You Sell… Consumerization Virtualization Collaboration and of IT the cloud Implication: Implication: Implication: The network will All applications will be Your application manage devices that in the data center…who performance will be you sell and that access controls the data more dependent upon your applications center? the network, than the application And what about VDI? 5
  • 6.
    “Avaya Networking hasa strong track record of innovation…this is the same company that invented Stacking in the late 90’s and were the first to market with Active-Active high availability… pioneers of Ethernet Fabric…anyone not paying attention to Avaya Networking should take another look.” Zeus Kerravala, ZK Research, 2012 6
  • 7.
    Key components ofUC deployment UC/IPT Vo WLAN WLAN LAN Mobile Devices IP Telephone Secure Router Remote / Mobile Worker Branch Office 7
  • 8.
    Avaya Networking -Data Centre to Desktop Network Management Branch Campus VoIP Desk Data Centre Sets VSP 9000 WLAN 8100 VSP 7000 Identity Engines Wireless SR 4134 Sets ERS 8000 ERS 4000 ERS 5000 VPN Clients AG 2330 Flare on iPad ERS 2500 Avaya Desktop Video ERS 3500 Display 9
  • 9.
  • 10.
    What does atypical LAN look like? Wiring Closet 2nd Floor Edge Switches Wiring Closet 1st Floor Comms Room CAT5 cable to floor boxes Ground Floor Riser Wiring Closet Core Switch 11
  • 11.
    Meet the family Enterprise Access Top of Rack VSP 9000 VSP 7000 ERS 8800 ec na m o r eP & eci r P Modular Stackable r f ERS 5xxx ERS 4x00 Enterprise Core ERS 3500 stacking to be introduced in Feb 13 ERS 3500 stacking to be introduced in Feb 13 ERS 3500 ERS 2500 Scale & Functionality 13
  • 12.
  • 13.
    Availability What aboutthe nines? 9 9 9 9 99.5% availability unavailable: 0.50% =43.8 hours Industry 99.9% availability unavailable: 0.10% =8.76 hours claim 99.99% availability unavailable: 0.01% = 52.56 minutes Avaya’s 99.999% availability unavailable: 0.001%= 5.256 minutes claim 9 365 x 24 hr/y 9 9 9 15
  • 14.
    Resiliency Why is thisso important? IP tel users hang up Web users the phone... experiencing long response times. Client/server en real- Most LAN networks Start time applications running recovered from Network into performance outage outage problems 1 6 10 25 … 45 seconds Avaya Split Second Sub-second fail-over fail over of a is a key requirement link/switch 16
  • 15.
    Simple overview ofswitch clustering Failover Time Comparison Avaya Cisco Public Network 4x 7x Faster Faster Core Switch Link Failure Switch Failure Edge Switches • Sub second failover • Call does not drop (survivable) • All connections used at the same time – Call between two Avaya IP Sets nothing wasted. 17
  • 16.
    Yes, but Ciscohas VSS? Virtual Switching System VS Avaya’s Switch Clustering • Only available since 2008 • Proven, available since 2001. hundreds of references available • Only available for high end portfolio – reduced • Available across the complete deployment options core portfolio for any size core switches • Complex set up and maintenance • Simple configuration and implementation, no special • Special hardware and software software needed - expensive and little investment protection • Cost neutral hardware – no additional or special • Incomplete and expensive requirements • Complete and proven solution 18
  • 17.
    So what sortof network requires this? 30,000,000 MB Total mobile data count 65,000,000 mobile text messages were sent and received 750,000 calls made from 6,000 landline VOIP phones 4,900,000,000 bytes of data delivered to the Internet on behalf of the Games 1,200,000 meters of Cat5 cabling installed to support 31,000 Ethernet ports 300,000,000 people visited www.vancouver2010.com, representing 1.1 billion page views 19
  • 18.
  • 19.
    Avaya Virtual EnterpriseNetwork Architecture Data Center Branch Office Enterprise Campus A cloud grade network architecture Specifically designed for real-time applications 21
  • 20.
  • 21.
    Simple overview ofEnergy Efficiency daytime Public Network Components designed to use less power Low High Throttle down CPU usage overnight • Automated switch over control power to each port Power down low • priority devices Designed with energy efficiency in mind 23
  • 22.
  • 23.
    Scalability – DataExplosion Edge Core 20x 1152 Gb/s 64 64 1 Terabit 21% Increase in VOIP Traffic Cisco Avaya and 77% Video Growth by 2013 25
  • 24.
    Plug and Playprovisioning
  • 25.
    Zero touch configurationwith ADAC ADAC – Auto Detection Network Management Auto Configuration Call Server Enterprise LAN IP Phone Ethernet DHCP • Simplified deployment of Routing Switch TFTP HTTP an Avaya IPT deployment. NTP • Automates the set up of VLAN and QoS settings. IP Phone sends LLDP packet upon power up • Recent Independent Ethernet switch invokes ADAC testing quoted that an IP after LLDP packet received Handset was setup witin one minute. IP Phone configured with VLAN/QoS via LLDP from ERS IP Phone DHCP for IP address and fileserver address IP Phone downloads configuration file <1 minute to provision Dial tone established 27
  • 26.
    One touch configfor IP Office • Available on R 5.0.1 • ‘runipoffice’ automatically sets: • VLANs • QoS • Default route • Call Server address • File Server address • Allocates switchports for IP Office, handsets & WAN. 28
  • 27.
    Lifetime Warranty onStackable Switches • Lifetime Hardware Warranty • Next Business Day Replacement • Lifetime Technical Support • Basic Technical support for life •Basic Tech Support plus access to patches for 90 days • Optional Software Subscription • Nominal fee for software updates Industry-leading warranty that complements Avaya’s genuine TCO advantage 29 29
  • 28.
  • 29.
    Stackable price comparison • Updated for Jan 13. • Pricing based on typical reseller purchase price • Licence keys are applied to a whole stack rather than individual licence keys on competitive products 31
  • 30.
    500 port network(switch clustered) 1x COM Management Avaya Unified Communications 2x ERS 5632 FD with Management Advanced Routing Kit List Price for 500 Ports 45% s ing £ 100,000 sav £ 80,000 £ 60,000 £ 40,000 £ 20,000 Avaya Cisco £ 45,798 £ 83,066 11x 2550 Edge Switches 32
  • 31.
    1000 port network(switch clustered) 1x COM Management Avaya Unified Communications Management 2x ERS 5632 FD with Advanced Routing Kit List Price for 1,000 Ports 54% s £ 140,000 £ 120,000 ing £ 100,000 sav £ 80,000 £ 60,000 £ 40,000 £ 20,000 Avaya Cisco £ 58,899 £ 126,784 21x 4550T Edge Switches 33
  • 32.
  • 33.
    Recent Independent Testing Miercomreport for 2011 • Vs Cisco, Juniper and HP • Plug & Play Edge Deploy IPT endpoint in less than one minute Key stats • 26% more Energy efficient • 233% more capacity • 40% Less TCO 35
  • 34.
    Is the networkedge a commodity? For hardware, yes: For software and network integration, no… Chip set End to end QoS Processor Intelligent Set-up Densities Simplified Support Cisco HP Alcatel Juniper End to End – Fabric Connect (SPB) – Resilient Stacking – 18x throughput QoS Intelligent – Plug ’n Play in less than 1 min Set-up – BYOD guest set-up in <10 sec Simplified – Hot-Swap auto-config in < 2 min Support – Auto IP phone energy savings >50% 36
  • 35.
    Is resiliency importantfor your business? What is the competition doing? Avaya is the only supplier able to offer an unique resiliency model across its full networking portfolio 37
  • 36.
    How to compete... Whatare the key strengths I should push against the following vendors? Competitor Key strengths of Avaya versus... Complex and expensive, Stacking is expensive and inefficient, Limited Warranty. Stacking, Price, No CLI like Cisco, No switching heritage, WLAN not integrated, No end to end story and Warranty Performance, limited 40G stacking at low end Low Profile, limited interop stacking with rest of ENT family, & performance No PoE+ on smaller switch. Clustering rather than resilient switching. Complex overlaps within portfolio. The detail of how Avaya compete against each vendor is within the appendix 38
  • 37.
    Quick reminder aboutthe USP’s Switch clustering Energy Efficient Cost comparison Stacking capacity Zero Touch Config Lifetime warranty 39
  • 38.
  • 39.
    The WLAN marketlandscape • Enterprise WLAN market exceeded $2B in 2010 • 12% CAGR to $3.6B by 2015 • Popularity of WLAN enabled client devices- BYOD- (smart-phones, tablets) forcing IT departments adoption • Video/Voice – The network killer app will proliferate • 802.11n penetration rate 49% for 2010; reaching 100% for 2012 Source: Dell Oro January 2011 41 41
  • 40.
    What does atypical WLAN network look like? CAT5 cable CAT5 cable AP in ceiling Wiring Closet AP in ceiling 2nd Floor Wiring Closet 1st Floor Comms Room Ground Floor Riser Wiring Closet Controller 42
  • 41.
    IEEE 802.11 Standarddirection • Specifications for the 802.11 Physical layer Physical and MAC Layers Data Rates – Mbps • Backward compatibility with legacy 802.11 standard • Maximize spectral efficiency and performance • Co-existence with other device sharing the 2.4GHz and 5Ghz frequency bands 43 43
  • 42.
    What is AvayaWireless LAN 8100? • 802.11n wireless LAN solution • Enables wireless network access and campus roaming • Developed in-house by Avaya • Compatible with any wired network • Certified for healthcare environments: EN 60601-1-2 and Draeger • Optimised for voice and multimedia • Next-generation unified wired/wireless architecture – Strong security – Improved resiliency – Improved performance/user experience – Massive scalability – Lower TCO 44
  • 43.
    Today’s WLAN 8100Portfolio WAP 8120 WLAN 8100 Infrastructure WAP 8120-E WAP 8120-O WC 8180 WC 8180 -16L WLAN Management Software 8100 •Lower cost option for •Support for up to 512 802.11n small branch deployments APs (256 in first release) Dual radio •Support for 16 APs Optional Wireless Network Services Voice/UC Video E-911 Guest Location Advanced Management Services Security Infusion pump X Avaya 3641/3645 Avaya Flare ADVD E-911 VoWLAN Unified Wired/Wireless Real Time Location Wireless Intrusion IP Wireless Phones A175 integration Guest Manager (iDEngines) Tracking Detection/Protection Ekahau/Aeroscout 45
  • 44.
    VENA Unified Access Today’s Model Unified Access Data traffic Control traffic Servers Servers witihh wt va aavailiaabee 000 l bl l 0 as s 1 nd 88 hhaee 1 2.00aand88 PP N 2. WLAAN .22oonCCR WL 7 . n R VV7 Wireless Controllers Wireless Controller (Application & control) (Control only) • Overlay Network • Integrated Network • More Users, More Money • Eliminate bottlenecks • Constrained Capacity • Limitless Scale • Lower TCO 46
  • 45.
    Introducing Split Plane,the differentiator Today’s Model: Next Generation Model: Control & Data separated Control & Data combined Wireless Security Wireless Switch Wireless Control Wireless Point Switching Point Controller Appliance Wireless Switching WC virtualized Point integrated to (software only) edge/core switch Dedicated to Dedicated to control traffic data traffic • Common platform for control and data plane • Appliance or housed in a Chassis • Control and Data planes run on • Optimized H/W for separate network elements required function improving resiliency • Flexible deployment options • Independent Scaling 47
  • 46.
    WLAN Pricing Controllers supporting 16 AP's €6,000 €5,000 €4,000 €3,000 €2,000 €1,000 €- Avaya 81xx Extreme Altitude Juniper WLC800R Enterasys WS C25 Meru 1500 plus 3600 10 ap key Controllers (16AP) $2,370 $4,900 $5,065 $3,833 $4,409 Access Points $1,200 $1,000 $800 $600 $400 $200 $0 Avaya 81xx Extreme Altitude Juniper MP-522 Enterasys AP3605 Meru 320i 4610 802.11 a/g/n AP $372 $500 $407 $436 $1,065 48
  • 47.
    Competitive - WirelessLAN Capability Cisco Aruba Juniper Know your • Strong Mindshare and • #2 WLAN Market-share • #9 market-share in WLAN Market share (50%+ share) • Primarily WLAN only vendor • WLAN solution acquired competitors • Expensive (typically 1.5x – unable to offer end to end from Trapeze in 2010 WLAN 8100) solution with voice/UC/CC • Networking vendor - unable • Large marketing push on to offer end to end solution BYOD with voice/UC/CC Voice/Video over Wi- • Supports 50% more 802.11a • Support 50% more 802.11g • Avaya WLAN supports 160% voice calls per AP voice calls per AP more video streams per AP Fi support Architecture • Lack of wired/wireless • As WLAN vendor, will need • No unified solution today integration: Cisco’s hair-pin to rely on solution is a far cry from true partnerships/acquisitions for unification integrated solution Portfolio breadth • Broad portfolio with range of • Broad portfolio with wide • Broad portfolio however APs, controllers range of APs little innovation / new • Strong investment and • Rich feature set with strong features since Trapeze features security offering acquisition Avaya: Better than competitor Same as competitor Worse than competitor 49
  • 48.
    Real–Time WLAN Performance Validated Sessions WLAN 8100 Voice and Video Testing Avaya Industry Average Certified = 23% = More 31% =More QoS performance VoWLAN call sessions video call sessions Source: Miercom 2011 Test Results, Avaya versus: Cisco, Juniper (Trapeze), and Aruba 50
  • 49.
  • 50.
    What is BYOD? •Bring your own device is • The trend of employees bringing their own device into the place of work: • Apple devices (iPad, MacBook, iPhone), • Non standard issue devices. • Why is this a growing phenomena? • New technology appearing in the home before the workplace • Employees become more efficient with their own devices. • Industry reports vary from 10 to 20% more productive. • Employee choice. “ • Employer saves money on capital expense. Analyst TechMarketView • Employees take more care of their own device. claims nearly 10 million UK employees will be using • Companies can adopt new technology quicker. personal devices in the workplace by 2016. ” 52
  • 51.
    Bring your owndisaster! 1. Sensitive information is not as secure as device is mobile and can be placed in risky environments. 2. Weak security tools/software 3. Outdated software. 4. Questionable content. 53
  • 52.
    Building the Networkready for BYOD CAT5 cable CAT5 cable AP in ceiling Wiring Closet AP in ceiling 2nd Floor Wiring Closet 1st Floor Comms Room Ground Floor Riser Wiring Closet Controller 54
  • 53.
    Secure and SimpleGuest Access….. Avaya Identity Engines Guest Manager  Provision guests in under 10 seconds  Self provisioning kiosk  Detailed tracking and auditing  Unified wired/wireless 55
  • 54.
    Device Fingerprinting Secure and Enforce IT Compliance Identity Engines IF Ignition Server (identity = HR employee) AND IF (device = corp laptop) Case 1 AND IF (medium = wired) Employee with corporate laptop THEN ALLOW & GRANT FULL ACCESS IF (identity = HR employee) Case 2 AND IF Employee with (device = personal iPad) personal iPad AND IF (medium = wireless) (same corporate credentials) THEN ALLOW & GRANT LIMITED ACCESS 56
  • 55.
    3 key rolesof NAC (Network Access Control) • To ensure that users are authenticated/checked before being 1• allowed access to the network To set policies to determine what areas of the network 2 users can access To prevent the network from being vulnerable from PCs and 3 devices that lack antivirus, patches or host intrusion prevention software 57
  • 56.
    Identity Engines –the components Core Application Ignition The brains of the solution, performs central Server authorisation and authentication. Ignition Checks connected devices to ensure that Posture vulnerabilities are shut down. Additional Applications Ignition Guest Secure guest, visitor and contractor access Manager Ignition Reports highlighting user info, failed Analytics authentications, usage summaries, etc 58
  • 57.
    Competitive - AccessControl Capability Cisco Aruba Juniper Know your • Identity Services Engine (ISE) • MOVE / Amigpod / Clear Pass •Unified Access Control (UAC) competitor • Strong brand & sales execution • Aggressive BYOD Marketing •Highly scalable • Separated wired and wireless • Vendor agnostic •Large focus on BYOD solutions • Good technology acquisition of •Complete solution includes IDS / • Migration challenges from the Avenda Systems (Nov/2011) IPS and VPN technologies CleanAccess solution • QuickConnect service for MAC OSX • FIPS certified and iOS • Hardware product only – no Virtual Appliance Pricing • Very expensive solution • Expensive solution • Very expensive solution • Seats & subscription based • Seats based • Seats based End-to-End • Complete solution: UC, • Limited wired experience; • Networking vendor Solution networking, and services primarily WLAN-only vendor • No UC portfolio • No UC portfolio Policy control • Limited policy granularity • Limited policy granularity • Limited policy granularity & Directory • Limited directory integration • Limited directory integration • Limited directory integration • Two solutions (original & new • Proprietary in certain areas e.g. integration Avenda Systems) EAP-JUAC protocol Guest • Limited • Fair solution • Limited management Avaya: Better than competitor Same as competitor Worse than competitor 59
  • 58.
  • 59.
    Simple intro tosecure routers • Delivers the survivable SIP Voice platform for the Branch IP Phones Analogue Phones PCs Wireless Aps Legacy PBX • Consolidates Branch networking functions into fewer, tightly- LAN Switch integrated devices Consolidated • Reduces network complexity functionality • Streamlines capital & operational Firewall VPN costs Wide Area Network • Gives workers a high quality of experience • Regardless of which applications Secure Router or services are enabled across the Data Centre network 61
  • 60.
    Unified Branch Solution • Unified Branch Office Solutions • Unified communication ready platform- FW – IDS – Enterprise class routing, Ethernet without PoE, FXO / FXS, WAN • Uniquely integrates with Microsoft OCS service and SCS (SR4134) and SIP Survivability solutions (SR4134 / SR2330) Mid Branch to Campus SR4134 Small – Mid Branch Access SR2330 AG2330 High End Converged Branch Routers SR3120 Mid Tier Converged Targets Branch Offices and Survivable SIP gateway Outperforms comparable Cisco 2821 Branch Routers Enterprises and Service Providers for centralized UC routers delivering more than 4x systems, upgradeable to full WAN routing the throughput Avaya’s Unified Branch Solutions match Cisco’s ability to enable UC / VoIP (1) Source: (1) Avaya reporting, Tolly group reports 62
  • 61.
    VPN Gateway 3050/3070 Virtual Appliance No charge for Virtual Appliance – simply Entry-level Virtual Appliance that can run download the virtual appliance software on an existing PC or VM Server • The Virtual Appliance contains no licencing so product must be licenced to enable functionality • 3050 – supports up to 250 users / tunnels Loadable to any VMware ESX or ESXi compliant hardware • 3070 – supports up to 1000 users / tunnels .00 • 3090 – supports up to 5000 users/tunnels itthV9 . wi w h V9 Nw Neew • Simply purchase the desired licenses • Deploy as many Virtual Appliances as (SSL & IPsec, IPsec, SPO, etc) needed • Enable the functionality / capacity just • Use Clustering to obtain desired like the hardware variants capacity 63
  • 62.
  • 63.
    Unified Communications Management Portfolio Visualization Performance Multi-vendor network discovery, root cause & Fault Manager analysis, network topology maps Portfolio Applications Configuration & Orchestration Manager Configuration and element management Enterprise Policy Network access control policies, Manager bandwidth management, QoS IP Flow Manager IPFIX collection, analysis & reporting, top 10 applications and protocols 65
  • 64.
    Configuration and OrchestrationManager (COM) What is it? • Offers centralised configuration, provisioning and troubleshooting for enterprise-wide devices and technologies • Delivers simplified element management with role-based access privileges and audit trails • Offers management for LAN and WAN products through plug-ins Why is it needed? • Network services and protocols are becoming more complex, causing increased difficulties related to installation and configuration Value Proposition • Reduces configuration setup time and saves operational costs • Protects the network from unauthorised changes • Facilitates faster configuration and changes to the network • Reduces the potential for network downtime Base license price £1,875 • Decreases the likelihood of configuration and provisioning Part Code: AH2735001-2.3 errors 66
  • 65.
    Visualization Performance & FaultManager (VPFM) What is it? • Delivers discovery, troubleshooting and performance management of all IP/SNMP devices in multi-vendor networks (both voice and data) • Gives detailed topology maps of the IT infrastructure including network devices, IP phones, servers and applications Why is it needed? • Administrators need to know what is on their networks and determine the root cause of problems Value Proposition • Reduces complexity • Decreases MTTR • Proactive solution • Lowers TCO through fault management Base license price £3,620 Part Code: AH3313109-2.3 67
  • 66.
    IP Flow Manager(IPFM) What is it? • Manages network usage monitoring, abuse investigation and growth planning • Analyses applications, protocols and user activity based on IP Flow data captured from Ethernet Routing Switches Why is it Needed? • Lack of visibility into who and which applications are consuming network resources and bandwidth Value Proposition • More informed/accelerated resolution/planning decisions • Ability to resolve issues before they impact productivity • Reduce TCO associated with planning/diagnosing performance and abuse investigation Base license price £3,045 Part Code: AH3313149-2.0 68
  • 67.
    Enterprise Policy Manager(EPM) What is it? • Allows network administrators to manage network bandwidth, prioritise traffic streams and set network access policies • Enables critical applications to receive the right QoS and users to be granted access to the appropriate applications • Provides a rapid response to resolving new network threats Why is it needed? • Sensitive Applications such as voice need prioritising • Network/application access by users must be controlled Value Proposition • Increases overall security and application performance • Reduces complexity and simplifies provisioning of consistent polices Base license price £2,477 • Protects network resources Part Code: AH3313103-5.1 69
  • 68.
    Section 3 –Summary and Sales tools
  • 69.
    Pulling it alltogether Services: Location, RF Data Centre Security (WIDS/WIPS) Internet Management Services Aura IPT solution = 100K Core Wireless Controller LAN 35K + Wireless 8K Edge + WAN Router 1K + Management 3K Wireless Access Points IP Sets = Increased value of sale 47K Phone PDA Desktop PC’s Typical prices for 250 user/ports 71
  • 70.
    Sales Pro Recently extendedto cover both voice and networking portfolio Competitive and displacement information Latest product and promotion information Video tutorial available 73
  • 71.
    Avaya LAN CompetitiveAnalysis Tool (LANCAT) 1. Select the switches you want to compare 2. Run the comparison and see the results •1, 3 and 5 year TCO •Capacities •Bandwidth •Power consumption Link to LAN CAT 74
  • 72.
    Using the Westconprice book 75
  • 73.
    Avaya Networking portal Key features: • Latest News & Highlights • Latest promotion news • Easy to search product sections • Product Lifecycle information • Analysts views • Case studies • Competitive 76
  • 74.
    Updated Tell MeAbout … 77
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
    Contacts Barry Ralph Pre Sales Specialist barry.ralph@westcon.co.uk European Product Dave Garwood dave.garwood@westcon.co.uk Manager Pre Sales team NortelPresales@westcon.co.uk
  • 80.
  • 81.
    Cisco Stackables Comparison ERS 4800 ERS 5600 Cisco 3750- Cisco 3750- Cisco 3760- Cisco X E X 2960 Forwarding 128-184 288 – 384 160 Gbps 128 Gbps 160 Gbps 88 Gbps bandwidth Gbps Gbps Stack members 8 8 9 9 n/a 4 Total bandwidth of 384 Gbps 1.152 64 Gbps 64 Gbps n/a 20 Gbps stack Terabits 10/100/1000 density 24 port and 24, 48 and 24 port and 48 24 and 48 port 24 and 48 24 and 48 48 port 96 port port variants variants ports (5 model port variants variants variants variants) 10 Gigabit SFP+ 2 ports XFP only (2 2 ports n/a 2 ports SFP+ 2 ports or 8 ports) and 2 ports XFP PoE/ PoE+ Yes PoE only Yes Yes Yes Yes Integrated field Yes Yes Yes Yes Yes Yes replaceable power supplies Future WLAN Yes Yes via ERS No No No No integration 5800 Future support for Yes Yes via ERS No No No No Virtualized services 5800 Warranty Next-business-day shipment Next-business-day delivery of replacement hardware where of failed units; up to L4 available and 90 days of 8 x 5 Cisco Technical Assistance Center technical support for first 90 (TAC) support. days. Software updates
  • 82.
    Juniper Stackables Comparison ERS 4800 ERS 5600 Juniper EX 4200 Forwarding bandwidth 128-184 Gbps 288 – 384 Gbps 88-136 Gbps Stack members 8 8 10 Total bandwidth of 384 Gbps 1.152 Tbps 128 Gbps Stack 10/100/1000 Density 24 port and 48 port 24, 48 and 96 port 24 port and 48 port variants variants variants 10 Gigabit SFP+ 2 ports XFP only (2 or 8 ports) 2 ports PoE+ Yes No Yes Integrated field Yes Yes Yes replaceable power supplies Future WLAN Yes Yes via ERS 5800 No integration Future support for Yes Yes via ERS 5800 No Virtualized services Warranty Next-business-day shipment of failed units; up to Includes software L4 technical support for first 90 days. Software updates; advanced updates nominal fee. shipping of spares within one business day; 24x7 JTAC for 90 days. Power and fans 5
  • 83.
    HP Stackables Comparison ERS 4800 ERS 5600 HP E4500G HP 3800 HP 2910 Forwarding 128-184 Gbps 288 – 384 Gbps 128-176 Gbps 88 Gbps 128-176 Gbps bandwidth Stack members 8 8 Cluster up to 32 10 switches n/a devices Total bandwidth of 384 Gbps 1.152 Tbps 96 Gbps? 336 Gbps n/a Stack 10/100/1000 24 port and 48 24, 48 and 96 port 20 and 44 port 24 and 48 port 24 port and 48 Density port variants variants variants variants (9 port variants models) 1/10 Gigabit SFP+ 2 ports XFP only (2 or 8 2 ports (via 4 ports on 48-port 4 ports ports) expansion variants and 2 module) ports on 24 port variants PoE+ Yes No No Yes Yes Integrated field Yes Yes Yes Yes No replaceable power supplies Future WLAN Yes Yes via ERS 5800 No No No integration Future support for Yes Yes (via ERS No No No Virtualized 5800) services Warranty Next-business-day shipment of failed Advance replacement and units; up to L3 technical support for first next-business-day delivery; free software updates 90 days. Software updates nominal fee.
  • 84.
    Avaya ERS 2500 Product Comparison: Juniper EX2200 Factors Avaya ERS 2500 Juniper EX2200 Performance • Switch Fabric up to 15.6 Gbps • Switch Fabric up to 104 Gbps • Stacking Bandwidth up to 32 Gbps • No Stacking Functionality • Advanced resilient Stacking • Gigabit Ethernet models • Mixed Stacking within ERS 2500 family • PoE but not full Class 3 on 48-port models • Common Enterprise-class management • No unified management • Advanced QoS – 802.1p & DSCP Prioritization • Advanced Network traffic control – 802.1p & DSCP Prioritization • Convergence ready – integrated PoE & QoS • Highly energy efficient design Price & Value • Full Lifetime with Next Business Day • Limited Lifetime Warranty, but no Technical Support replacement and free level 1 Technical • EX2200-24T / 24P – no data available Support for life • EX2200-48T / 48P – no data available • 2526T / PWR – $695 / $1,995 • 2550T / PWR – $1,195 / $2,995 Security, Routing • 802.1X (SHSA & Guest VLAN), RADIUS, • MAC limiting, Allowed MAC Addresses – configurable per port, & Convergence SNMPv3, SSHv2, MAC Based Security Dynamic ARP inspection, IP Source Guard, Local proxy ARP, Static protocols • Static, Local ARP support, DHCP Snooping, Captive Portal, ACLs, 802.1X • PoE, 802.1AB (LLDP), LLDP-MED, Advanced • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS, QoS, ADAC, Auto QoS MPLS, IPv6) • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS Av Adv aya Potential Objections Responses an • Juniper supports one software stream across all products; why • Avaya’s approach is not that dissimilar, and features are shared between all products as appropriate. Importantly this means that inappropriate (overly- Stac tage: k in And g doesn’t Avaya do this complex) features are not ported. • The EX2200 can support PoE • But full Class 3 is not available on all ports, making deployment and Pr i c on all ports administration problematic e • Given that the EX2200 is non-Stackable, there seems little benefit in Gigabit, • The EX2200 Switches are and as low-end products they are usually deployed into the Branch, where Gigabit Ethernet the WAN link – and not the port speed – is the limiting factor 96
  • 85.
    Avaya ERS 4500 Product Comparison: Juniper EX3200 Factors Avaya ERS 4500 Juniper EX3200 • Switch Fabric up to 184 Gbps • Switch Fabric up to 136 Gbps Performance • Stacking Bandwidth up to 320 Gbps • No Stacking • Advanced resilient Stacking with Automatic Unit Replacement • Fast Ethernet & Gigabit model options, plus 10G Ethernet options • Internal power redundancy option • External power redundancy • Field-replaceable Power Redundancy Functionality • Mixed Stacking within ERS 4500 family • Comprehensive Routing & Multicast • Common Enterprise-class management • No unified management • Highly energy efficient design & Energy Saver mode • Full Lifetime with Next Business Day replacement and free level 1 Technical Support for life • Lifetime Warranty, no Technical Support Price & Value • ERS 4524GTX-PWR - $3,695 • EX3200-24T / 24P – $3,000 / $3,800 • ERS 4548GT-PWR - $6,995 • EX3200-48T / 48P - $5,400 / $7,000 • ERS 4526GTX-PWR - $5,295 • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP • MAC limiting, Allowed MAC Addresses – configurable per port, Dynamic ARP Security, Routing Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP inspection, IP Source Guard, Local proxy ARP, Static ARP support, DHCP & Convergence SourceGuard Snooping, Captive Portal, ACLs, 802.1X protocols • Static, RIP, OSPF (License) • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS, MPLS, IPv6) • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS Potential Objections Responses Av • Juniper supports one software • Avaya’s approach is not that dissimilar, and features are shared Adv aya stream across all products; why between all products as appropriate. Importantly this means an doesn’t Avaya do this that inappropriate (overly-complex) features are not ported. Stac tage: k in • Avaya’s 4500 does not support field- • Avaya is currently working on introducing 4500 models with this Bett And g replaceable PSUs, unlike the EX3200 support, and it is currently available on the 5600 if important er W • The EX3200 offers a comprehensive • However this comes at a cost, and would be very overly- a rr a IP Routing feature set complex for the typical Enterprise nt y 97
  • 86.
    Avaya ERS 5600 Product Comparison: Juniper EX4200 Factors Avaya ERS 5600 Juniper EX4200 • Switch Fabric up to 384 Gbps • Switch Fabric up to 136 Gbps Performance • 18X Stacking performance (1.152 Tbps) • Limited to 128 Gbps of Stack capacity • Switch Clustering – always-on networking • No Switch Clustering • Advanced resilient Stacking with Automatic Unit Replacement • Resilient Stacking: “Virtual Chassis” • Field-replaceable Power Redundancy • Field-replaceable Power Redundancy Functionality • Mixed Stacking within ERS 5000 range • Comprehensive Routing & Multicast • Common Enterprise-class management • No unified management • Convergence ready – integrated PoE & QoS • Full Lifetime with Next Business Day replacement and free level 1 Technical Support for life • 5510-24 / 5520-24 - $5,495 / $5,995 • Limited Lifetime Warranty, no Technical Support • 5510-48 / 5520-48 - $7,695 / $7,995 • EX4200-24T / 24P – $6,000 / $6,800 Price & Value • 5650 / PWR - $7,995 / $8,995 • EX4200-48T / 48P - $10,800 / $12,400 • 5698 / PWR - $12,995 / $14,995 • EX4200-24F - $16,000 • 5530 / 5632 - $9,995 / $19,995 • MAC limiting, Allowed MAC Addresses – configurable per port, Security, Dynamic ARP inspection, IP Source Guard, Local proxy ARP, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection (DAI), RADIUS, Routing & Static ARP support, DHCP Snooping, Captive Portal, ACLs, SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard, DoS Attack Prevention 802.1X Convergence • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM • Static, RIP, OSPF, VRRP, PIM-SM (Advanced Licence: BGP, IS-IS, protocols • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS MPLS, IPv6) • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS Potential Objections Responses Av • Juniper supports one software stream across all products; why • Avaya’s approach is not that dissimilar, and features are shared between all products as appropriate. Importantly this means that inappropriate (overly- Adv aya Sup an doesn’t Avaya do this complex) features are not ported. erio tage: B etter St • Avaya does not support BGP on • True, but there can be limited application for BGP Routing in a platform of this r Pr acking War ice and , size; we see more value in support Switch Clustering so that customers can the 5000 Series create an always-on Core for smaller networks rant • The EX4200 can scale up to 10 y • Yes, but this is only really marginally more than the 384 ports available on the units high, delivering higher port 5600; importantly Juniper only has a 128 Gbps virtual backplane density (up to 480 ports) 98
  • 87.
    Avaya ERS 2500 Product Comparison: Extreme 150 Factors Avaya ERS 2500 Extreme 150 • Switch Fabric up to 15.6Gbps • Switch Fabric up to 13.6Gbps Performance • Stacking Bandwidth up to 32Gbps • No Stacking • Advanced resilient Stacking • No Stacking • Mixed Stacking within ERS 2500 family • PoE only available on 24-port model • Common Enterprise-class management Functionality • Advanced QoS – 802.1p & DSCP Prioritization • External power supply required for full 802.3af • No unified management • Convergence ready – integrated PoE & QoS • Network traffic control – 802.1p & DSCP Prioritization • Highly energy efficient design • Full Lifetime with Next Business Day replacement • Limited Lifetime with Express Advanced hardware replacement and free level 1 Technical Support for life Price & Value • ERS 2526T- $695 • X150 24-port - $995 • X150 48-port - $1,495 • ERS 2550T - $1,390 Security, • 802.1X (SHSA & Guest VLAN), RADIUS, SNMPv3, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Routing & SSHv2, MAC Based Security Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP SourceGuard • Static, Local Convergence • None • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, protocols • 802.1AB (LLDP), LLDP-MED, QoS ADAC, Auto QoS Av Potential Objections Responses Adv aya Bett antag ll a e: er a • Avaya does not have a single • Avaya leverages consistent core feature code and implements this into product pe rfor Operating System across the line-specific Operating Systems; this is how we deliver feature consistency in a man round entire portfolio. manner that is transparent to the user c pric e and • But this is only available on one – 24-port – Switch and even then requires an e • Extreme can support PoE on all additional external power source. Avaya delivers two full-power PoE options: ports. 12-ports and 24-ports • Avaya’s CLI also provides a common command line configuration option; and our • Extreme has a common CLI across Unified Communication Management takes web-based common look and feel to all switch products. a new level of functionality. 99
  • 88.
    Avaya ERS 4500 Product Comparison: Extreme 250e Factors Avaya ERS 4500 Extreme 250e • Switch Fabric up to 184Gbps • Switch Fabric up to 97.6Gbps Performance • Stacking Bandwidth up to 320Gbps • Stacking Bandwidth 40Gbps • Advanced resilient Stacking with Automatic Unit Replacement • Resilient Stacking but no AUR • Fast Ethernet & Gigabit model options, plus 10G Ethernet options • Fast Ethernet only, and no 10G • External power redundancy Functionality • Mixed Stacking within ERS 4500 family • External power redundancy • Mixed Stacking across certain products • Common Enterprise-class management • No unified management • Highly energy efficient design & Energy Saver mode • Full Lifetime with Next Business Day replacement and free level 1 Technical Support for life • ERS 4526T-PWR - $2,995 • Limited Lifetime Warranty Price & Value • ERS 4550 TPWR - $3,995 • X250e-24p - $1,995 • ERS 4524GTX-PWR - $3,695 • X250e-48p - $2,995 • ERS 4548GT-PWR - $6,995 • ERS 4526GTX-PWR - $5,295 Security, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection (DAI), • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Routing & RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP SourceGuard Convergence • Static, RIP, OSPF (License) • Static, RIP; Advanced License (OSPF-Edge, ECMP, VRRP, Sflow protocols • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS Potential Objections Responses Av • Avaya does not have mixed • Avaya offers distinct product lines each with numerous models that exceed Adv aya Bett antag Stacking between different typical Enterprise requirements, making cross-product Stacking unnecessary product lines. & irrelevant. ll a e: er a pe rfor • Extremes Automatic • When deployed at the Edge – in concert with Avaya’s Switch Clustering – the man round c pric e and Protection provides sub- ERS 4500 does not require any special configuration, and yet it provides a second fail-over. superior solution and is much simpler to deploy and manage. e • Avaya’s CLI also provides a common command line configuration option; • Extreme has a common CLI and our Unified Communication Management takes web-based common across all switch products. look and feel to a new level of functionality. 100
  • 89.
    Avaya ERS 5600 Product Comparison: Extreme 450e Factors Avaya ERS 5600 Extreme 450e • Switch Fabric up to 384Gbps • Switch Fabric up to 256Gbps Performance • 4X Stacking performance (1.152Tbps) • Limited to 40Gbps of Stack capacity • Switch Clustering – hitless failover • No Switch Clustering; Circular EAPS • Advanced resilient Stacking with Automatic Unit Replacement • Resilient Stacking, but no Auto Unit Replacement • Field-replaceable Power Redundancy • External power redundancy Functionality • Mixed Stacking within ERS 5000 range • Mixed Stacking across certain products • Common Enterprise-class management • No unified management • Convergence ready – integrated PoE & QoS • Full Lifetime with Next Business Day replacement and free • Limited Lifetime Warranty level 1 Technical Support for life Price & Value • 5650TD-PWR - $8,995 (PPP: $178) • X450e-24p - $4,995 (PPP: $208) • X450e-48p - $7,495 (PPP: $156) • 5698TFD-PWR - $14,995 (PPP: $153) • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, Security, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Routing & ARP Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, IP Filtering, IP SourceGuard, DoS Attack Prevention SourceGuard Convergence • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM • Static, RIP, Advanced License (OSPF-edge,ECMP, VRRP, Sflow protocols • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS AutoQoS Av Adv aya Potential Objections Responses • Avaya offers distinct product lines each with numerous models that exceed Bett antag • Avaya does not have mixed Stacking typical Enterprise requirements, making cross-product Stacking unnecessary & perf er e al : orm l aroun between different product lines. irrelevant. anc d • Extremes Automatic Protection provides • Avaya’s Switch Clustering provides a superior solution (in terms of resiliency & pric e and sub-second fail-over. resource utilization) and is much simpler to deploy and manage. e • Avaya’s CLI also provides a common command line configuration option; and our • Extreme has a common CLI across all Unified Communication Management takes web-based common look and feel to switch products. a new level of functionality. 101
  • 90.
    Avaya ERS 2500 Product Comparison: Enterasys A-Series Factors Avaya ERS 2500 Enterasys A-Series • Switch Fabric up to 15.6Gbps • Switch Fabric up to 17.6Gbps Performance • Stacking Bandwidth up to 32Gbps • No Stacking • Advanced resilient Stacking • Mixed Stacking within ERS 2500 family • No Stacking • Common Enterprise-class management • External power supply option Functionality • Advanced QoS – 802.1p & DSCP Prioritization • No unified management • Convergence ready – integrated PoE & QoS • Network traffic control – 802.1p & DSCP Prioritization • Highly energy efficient design • Full Lifetime with NBD replacement & free Level 1 • Lifetime Warranty with NBD replacement & free Level 1 Technical Price & Technical Support for life Support & Software Updates for life Value • ERS 2526T- $695 • A2H124-24 / 24P - $625 / $1,995 • ERS 2550T - $1,390 • A2H124-48 / 48P - $1,250 / $2,395 Security, • 802.1X (SHSA & Guest VLAN), RADIUS, SNMPv3, SSHv2, • MAC-based Port Authentication, 802.1X (SHSA only), RADIUS Client, MAC Based Security Routing & SSHv2, SSL, SNMPv3 • Static, Local Convergence • None • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, protocols • PoE, Advanced QoS Auto QoS Ava Adv ya Potential Objections Responses anta S ge Ente tacking : rp , secu rise-cla • Avaya does not have a redundant Power • True, but MTBFs are rising all the time and 2500/A-Series class products are not Supply option. typically deployed into mission-critical scenarios. s Con rity and s verg • Enterasys offer Software Updates for • Avaya delivers a highly competitive Lifetime Warranty, and Software Updates are enc life. available with the extremely cost-effective SRS Basic offering. e • The list pricing is very close, but importantly Avaya offer genuine Enterprise-class • Avaya is more expensive. Security & Convergence feature, plus of course Stacking. The A-Class is essentially just SMB-class. 102
  • 91.
    Avaya ERS 4500 Product Comparison: Enterasys B-Class Factors Avaya ERS 4500 Enterasys B-Class • Switch Fabric up to 184Gbps • Switch Fabric up to 136Gbps Performance • Stacking Bandwidth up to 320Gbps • Stacking Bandwidth 40Gbps • Advanced resilient Stacking with Automatic Unit Replacement • Resilient Stacking but no AUR • Fast Ethernet & Gigabit model options, plus 10G Ethernet options • Fast Ethernet only, and no 10G • External power redundancy Functionality • Mixed Stacking within ERS 4500 family • External power redundancy • Mixed Stacking across certain products • Common Enterprise-class management • No unified management • Highly energy efficient design & Energy Saver mode • Full Lifetime with NBD replacement & free level 1 Technical Support for life • Lifetime Warranty with NBD replacement & free Level 1 Technical Support & • 4526T / PWR - $2,295 / $2,995 Software Updates for life • 4550T / PWR - $3,295 / $3,995 • B5G124-24 / P2 - $2,795 / $3,595 Price & Value • 4524GT / PWR - $2,995 / $3,695 • B5G124-48 / P2 - $4,595 / $5,995 • 4548GT / PWR - $6,295 / $6,995 • B5K125-24 / P2 - $4,295 / $5,495 • 4526GTX / PWR - $4,995 / $5,295 • B5K125-48 / P2 - $6,195 / $7,295 Security, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP Inspection • MAC-based Port Authentication, ACLs, ARP/DHCP Spoof, 802.1X, RADIUS Routing & (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP SourceGuard Client/Accounting, SSHv2, SSL, SNMPv3 Convergence • Static, RIP, OSPF (License) • Static, RIP protocols • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS Av Potential Objections Responses Adv aya • Avaya does not match the PoE+ (802.3at) • There is very little real need to PoE+ today, and Avaya is in the process of Bett antage support that is available on the B-Series developing units that will support both PoE+ and crucially field-replaceable PSUs. and er P ri : Gen cing • Enterasys offer Software Updates for life. • Avaya delivers a highly competitive Lifetime Warranty, and Software Updates are available with the extremely cost-effective SRS Basic offering. Stac uine king • However they provide no independent testing and verification of this, and they • Enterasys claim a higher Stacking bandwidth have no virtual hot-swap capability; and important serviceability feature. 103
  • 92.
    Avaya ERS 5600 Product Comparison: Enterasys C-Series Factors Avaya ERS 5600 Enterasys C-Series • Switch Fabric up to 384Gbps • Switch Fabric up to 136Gbps Performance • Stacking performance up to 1.152Tbps • Stack capacity claimed to be 128Gbps per Switch (but no independent • Switch Clustering – hitless failover verification) • Advanced resilient Stacking with Automatic Unit Replacement • Resilient Stacking, but no Auto Unit Replacement • Field-replaceable Power Redundancy • External power redundancy Functionality • Mixed Stacking within ERS 5000 range • 802.3at PoE+ support • Common Enterprise-class management • No unified management • Convergence ready – integrated PoE & QoS • Full Lifetime with Next Business Day replacement and free Level 1 • Lifetime Warranty with Next Business Day replacement and free Level 1 Technical Support for life Technical Support & Software Updates for life Price & Value • 5650TD-PWR - $8,995 (PPP: $178) • C5G124-48P2 - $8,995 • 5698TFD-PWR - $14,995 (PPP: $153) • C5G125-48P2 - $11,995 Security, • MAC Security, L2-4 Filtering (ACLs), 802.1X, DHCP Snooping, ARP • MAC-based Port Authentication, ACLs, ARP/DHCP Spoof, 802.1X, RADIUS Routing & Inspection (DAI), RADIUS, SSH, SSL, SNMPv3, BPDU Filtering, IP Client/Accounting, SSHv2, SSL, SNMPv3 SourceGuard, DoS Attack Prevention • Static, RIP, OSPF, VRRP, ECMP, Convergence • Static, RIP, Advanced License OSPF, VRRP, ECMP, PIM-SM DVMRP,PIM-SM, full IPv6 protocols • PoE, 802.1AB (LLDP), LLDP-MED, Advanced QoS, ADAC, AutoQoS • PoE 802.3af/at, 802.1AB (LLDP), LLDP-MED, Advanced QoS Av Potential Objections Responses Adv aya Bett antage • Avaya does not match the PoE+ (802.3at) • There is very little real need to PoE+ today, the C-Series lacks internal field- and er P ri : support that is available on the C-Series replaceable PSUs, and important serviceability requirement. Gen cing Stac uine • Avaya delivers a highly competitive Lifetime Warranty, and Software king • Enterasys offer Software Updates for life. Updates are available with the extremely cost-effective SRS Basic offering. • Avaya is currently adding IPv6 Routing to the existing comprehensive suite. • Enterasys already deliver IPv6 Routing. More importantly Avaya delivers Switch Clustering; reliability is more widely required than IPv6 Routing. 104
  • 93.
    How does thisall work together? Unified Management simplifies provisioning, monitoring, and troubleshooting Network Access Control authenticates Users/Devices & High performance stackables WLAN 8100 assigns appropriate VLAN/QoS and at the edge supporting Wireless Virtual Service Network Plug and Play Provisioning Controller Server Data Centre Campus Distribution Edge Access Core Core Server Switch Clustering between tiers – scalable from small to large Wireless LAN 8100 provides enterprise providing active/active at unmatched UC mobility Layer 2 or Layer 3 performance and scale with advanced call admission control Identity Engines Ignition Server provides Authenticated Network Access / Policy Enforcement 105
  • 94.
    The Innovative Leaderin Real-Time Networking 1 min. 2 min. 36% 40% 233% Certified Certified 36% Less 40% Lower 233% Greater 1 minute 2 minute edge energy edge total cost stackable traffic Plug-n-Play stackable unit consumption of ownership capacity phones hot-swap <1sec. 31% 23% 7x 25x 23% More Up to 7x faster Up to 25x faster 31% More video time to service time to service Certified VoWLAN call call sessions for virtual for virtual sub-second sessions than than competitive network network failover competitive average provisioning than provisioning than average Switch Clustering Spanning Tree Source: Miercom 2011 Avaya Test Reports 106

Editor's Notes

  • #5 Let ’ s start with the most important talking point in the industry for the last few years: virtualization. Virtualization is not as novel as it once was and many network managers have become skilled at running all sorts of workloads in that environment. Rather than running up against diminishing returns, it seems &quot;the more you virtualize, the more you realize the benefits of virtualization,&quot; Lazar said. In his research, about 16% of survey respondents said they are virtualizing their UC servers now, while 37.8% have no plans to do so. The rest are at some stage of considering or planning a virtual deployment. In any case, virtualization is changing the game. All our applications are or will be virtualized. Virtualization is impacting networking architecture and all suppliers need to take it into account
  • #6 Virtualisation is one major trend but not the only one. Adoption of BYOD is growing very fast. Access to your network needs to be opened-up to a lot of different devices and to continue to deliver the expected level of security. The Cloud is the third topic but for Avaya, cloud alone is nothing, we need to speak about the collaborative cloud. This is our vision with Avaya VENA. The network has evolved to a private cloud that extends to the entire enterprise. Users can access corporate applications on whatever device they choose without compromising security and without causing a lot of extra work for IT staff. Its about users collaborating in real-time from anywhere with a positive user experience. And its about providing a new level of service to users that is more equivalent to what they are getting at home. Finally its about enabling IT to be more efficient and having a network that can facilitate changing business objectives rather than constantly being a hindrance.
  • #7 Have a look at this recent quote from Zeus Kerravala. Current Analysis from December 28 th , 2012 is also saying: “ Avaya networking is aggressively competing against other networking companies through innovation, both with the early adoption and support of standards in addition to some strong technology in their intellectual property archives ” We have driven a lot of the standards related to Ethernet networks. We have been first to market with technologies that really brought Ethernet networks to a new level of reliability. We invented resilient stacking, active, active high availability with Switch Clustering and we have the industry&apos;s most comprehensive fabric implementation. We need to make sure that customers put us on their short lists for network infrastructure upgrades since we do have a compelling story to tell.
  • #9 Instructor Notes
  • #10 How our networking portfolio fits and is organized? As you can see, we have solutions for teleworkers, branches, campus and data center to support our applications and devices. Our goal with this end to end ecosystem is to bring an unmatched experience to the end users.
  • #12 typical lan and how it might look in mid-large business.
  • #16 What do the nines mean, everybody asks for so many nines. Take a look at what it means if you have a 3x9 availability, compared to 5x9? Avaya offers 5x9! For the same or lower cost than competitive offerings.
  • #17 Explain the difference between networking outage and application outage. Sub second failover of the network means uninterupted applications Voice example. After a couple of seconds you might hang up (not nice in a call centre) Data example: oracle database that hangs due to client-server synchronisation issues. The server hangs and requires a reboot. Rebooting a server may take 4 to 8 hours!, so you have an application outage of 4-8 hours due to a networking outage of 45 seconds. 45 secs is best case, STP may take minutes depending on the size of the network. RSTP does not work in all conditions. Link flap-&gt; normal STP (long failover) root bridge outage -&gt; long STP failover instead of rapdi
  • #19 Avaya switch clustering solution is proven technology Available since 2001 and deployed in many customer networks Resilience regardless of choice of core products Breadth of support extends to all of Avaya’s core infrastructure switches Simplicity of deployment Cisco’s VSS technology can only be deployed on small subset of hardware components including no WAN module support in VSS participating switches Forced hardware upgrade for Cisco customers – again New Cisco’s VSS deployment starts at $95,000 just for the VSS hardware Current Catalyst 6500 need to upgrade to get VSS support A new Avaya switch clustering solution (ERS 8600) starts at $66,980 (even less for adding other switches to clusters)
  • #20 You can imagine the connectivity and communications demands of such as event. Public stats available at http://www.bce.ca/en/news/releases/bm/2010/03/01/75406.html This was the largest and most demanding Olympic network, the 1 st ALL IP end to end DC with ERS5000 series, in excess of 90+ ERS8600 : All ran FLAWLESS = 100% AVAILABILITY ! You can see from the numbers of devices that the Olympic and Paralympic Games Network has to support to enable critical communications for athletes, officials, VANOC staff, volunteers and the media that this was a unique event and an END TO END AVAYA SOLUTIONS, Voice, UC, Mobility, net mgmt monitoring tools, Ethernet Switching for Campus &amp; Data Centre, SR series for WAN connectivity and our access control solutions (In this case SNAS due to timing of event, but emphasize Access control as opposed to platform used since our strategic platform is ID.Engines. Key messages : We are not building products to eventually achieve “Always-On” we deliver it today. In APAC, more specifically Japan : JR Tokai is a great example of super reliable 100% availability solution. © 2009 Avaya Inc. All rights reserved.
  • #22 This presentation will not go through technical details but we would like to emphase two areas: First one is Avaya VENA (Virtual Enterprise Network Architecture) is an end to end cloud grade network architecture that is designed for real-time applications. Its purpose is to facilitate the transition towards full mobile collaboration and to provide a foundation that will enable the enterprise to be ready for the next wave of applications and devices that are likely to emerge over the next 4 years. Avaya VENA is about building a private cloud so that applications are accessible from anywhere, at anytime, from any device. Its about simplifying the network, having a more agile network that is easy to make changes to and roll out new services on and its about driving down costs and enabling IT to be more efficient by alleviating many of the manual, time consuming tasks that must be done in today ’ s network environments. The architecture is an end to end network architecture that starts in the Data Center and ultimately extends into the campus and the branch. It consists of a number of key technologies including: Ethernet Switching – Including next generation Ethernet hardware for the Data Center, campus and remote locations. This includes a suite of different virtualization technologies including an end to end network fabric. Wireless – Including a unique architecture that positions customers for the increase in mobile video traffic that is expected over the next couple of years. Branch – Including a unified branch solution that consists of a range of Routers and VPN Appliances that provide secure remote connectivity and application support for branches and individuals we will be extending our fabric into these remote locations for increased simplicity and to deploy advanced services. Access control – Critical for dealing with consumertization of IT and helps tie the wired and the wireless infrastructure into a unified access network that offers consistent policies and security. Finally Network Management – Managing the virtualized and physical environments is going to be complex without the appropriate management tools to help manage, configure and troubleshoot the network. You will hear more about VENA and Virtualisation later today.
  • #26 In just three years, the bytes of data generated by digital cameras, mobile phones, businesses IT systems and devices will equal the number of grains of sand on the world&apos;s beaches “IDC”. I don’t have to tell anyone. . . Avaya’s data solutions lead in scalability. On a like for like basis, Avaya deliver 20x times the thruput of an equivalent Cisco product. Limitless scale in the core…extended product life cycles and investment protection deliver these advantages whether you are edge switch or the core
  • #28 Page Nortel Corporate Presentation © 2004 Nortel Simplified deployment and management – reduce engineering time – save money.
  • #37 None of our key competitors can match Avaya in all three of these key areas for efficient edge networking. Note that HP cannot compete in all three areas. Alcatel has some SPB support, but lacks high stacking performance Avaya Advantages: End to End QoS Fabric Connect (SPB) – Unique industry standard Resilient Stacking - 18 times the throughput Intelligent set-up Plug ’ n Play in &lt;1 min BYOD guest set-up in &lt;10 sec Simplified Support Hot-Swap auto-config in &lt; 2 min Automated IP phone energy savings &gt; 50%
  • #38 2010 Avaya Inc. All rights reserved. This slide shows a quick comparison on which products and resiliency technologies CISCO, HP, Juniper and Avaya are using in the Edge, Core and Data Centre (DC). It can be seen that Cisco, HP and Juniper are not consistent with their resiliency technologies from end to end, unlike Avaya. Also they are using a lot of proprietary solutions which are not open standard. Only Avaya has a consistent end-to-end solution which uses the same technologies in every area.
  • #45 High Scalability Unique architecture that integrates wireless LAN forwarding directly into the switching architecture providing the most cost effective way to support the mobile traffic explosion Real-time Optimised Industry leading video &amp; voice scaling over Wi-Fi 30% more video, 20% more voice over Wi-Fi than competition Unified Solution with lower TCO Unified Network, Management &amp; Policy Controllers become virtual applications; not linked to hardware
  • #48 In today’s networks, the functions of Control Plane and Data Plane are housed in a single piece of hardware: Appliance or Blade In Nortel’s next-generation architecture, we’ve split these functions; The Control Plane or Wireless Control Point can be implemented on a dedicated h/w or appliance The more compelling aspect of this is that once separated, this function lends itself to virtualization: Memory intensive, transaction based function that can be run on a Virtual Server rather dedicating h/w to this function. In fact our demo network has done just that. We have the Wireless Control Plane running on a PC with VM Ware. For the Data Plane or Wireless Switching Point, again this allows for implementation on dedicated h/w or appliance. This allows for more efficient scaling as I’ll show next. For customers that are also using Nortel switching products, the value is even more pronounced; The Wireless Switching Point can be implemented via s/w on Nortel’s wireless enable core or edge switches eliminating the need to add h/w as the wireless traffic grows. Optimization Utilize the Data infrastructure to carry the WLAN traffic without the need to terminate in Wireless Controllers (Appliances/Blades) Flexibility Core or Edge traffic flows to meet customer’s needs Improved Resiliency Wireless Control Point clustering and Hitless switching failover (SMLT) Improved Scalability Control and Data Planes scale independently and at different rates
  • #50 Backup slide.
  • #51 Third party validation of our voice and video performance… In August 2011, third party testing was conducted by Miercom, a leading, independent product test center, in Santa Clara, California. The testing compared voice call density and video stream density of Avaya WLAN 8100 versus Cisco, Aruba and Juniper (Trapeze) WLAN (leading WLAN vendors). Against the competitive set average, Avaya WLAN 8100 was 26% better in supporting 802.11a voice calls, 31% better in supporting 802.11g voice calls and 31% better in unicast video.
  • #56 A key application for wireless networks is guest access. After all, we are ‘guests’ whenever we access a wireless hotspot in a hotel, airport or coffee shop. Avaya identified that wireless guest access was not well supported outside of dedicated hot spots due to the complex applications used for provisioning. Most companies either had an open system or one with shared passwords due to the complexity or the provisioning tools. This makes tracking of individual online behavior almost impossible. Our engineers developed a guest access provisioning module that works in conjunction with our network access control application (Identity Engines). This provides an extremely simple guest access provisioning interface that can be used by reception staff, security staff or employees and allows them to easily and quickly generate individual logon credentials for guests. The organization can lock down the wireless network, but also provide quick and easy access for those that need it. As a part of Avaya’s overall NAC solution guest access can be integrated into the main corporate access control solution used for employees, corporate devices and BYOD. Activation options Immediate activation Future activation Account duration time Activate on first login Intuitive: Provision guest accounts in &lt;10 seconds Eliminates the need for a technician Detailed Tracking and Auditing
  • #57 When it comers to BYOD, the single most important thing IT needs to know is who is using what and is it safe. As we saw at the beginning , users are extremely keen to upgrade to the latest software/operating system even if there are known issues. If a new release comes out over the weekend then chances are 15-20% of your user base will be using it by Monday. IT needs to know this, especially if sensitive apps are being used. To assist with this, Avaya has developed a device fingerprinting capability as part of the NAC solution. Using this device finger printing we can identify the user, device, OS version and browser being used by the client and then assign this an access level. When a device/OS combination is deemed safe it can be assigned a more trusted access level. If the same user has another device with another OS version or updates their main device then device fingerprinting will detected this and assign a different trust level. Device fingerprinting can also be used to get a picture of the type and quantity of devices clients users are using and also how often they upgrade. This information could then be used to guide IT on what apps or browsers need testing first with corporate applications. © 2009 Avaya Inc. All rights reserved.
  • #60 Backup slides
  • #63 Unified Branch Avaya’s Unified Branch product line provides a comprehensive range of products designed to deliver exceptional performance together with a high degree of service consolidation. Delivering 4-5X reliability &amp; 2X performance advantage over the market leader, and offering tighter integration between traditional Branch devices – WAN Router, LAN Switch, Firewall, and VPN Gateway – they also feature innovative integration of Unified Communications functionality with support for 3rd-party compatibility with SIP Call Servers &amp; IP Phones, and a survivable SIP Voice platform for the Branch. SIP Survivability &amp; Inter-operability completed with Traditional Nortel CS1K/2100 as well as recently (March 2010) against Avaya Aura ! - Official software release in mid April 2010. In addition to the advanced Unified Branch products we also offer traditional WAN Core Routers for highly-scaled Enterprise applications. Avaya has one of the 3 credible Enterprise Class router, while we can compete head to head with Cisco &amp; Juniper, we typically want to approach customers from the UC/SIP side and tell them about all the network services this Advanced SIP Gateway will offer. Some new positioning for SR2330 will be launched in June 2010 as AG2330 ! This will enable us to fully take advantage of the Avaya sales force.
  • #67 COM is a real-time, multi-user configuration management tool that offers intuitive wizards and templates to simplify configuration of complex technologies including SMLT/MLT, Multicast, Routing, VLAN and VRF. It also provides centralized &apos;off-box&apos; element management to address the needs associated with managing inventory and updates. In addition, it delivers role-based access control with audit logging, ensuring that only those authorized to make configuration changes are allowed to do so. Acting as a unified configuration management platform, it delivers an extensible architecture allowing it to support pluggable device add-ons and loadable software components. Why is it needed? Configuring technologies like SMLT is extremely complex and can take many hours. With intuitive wizards and templates, configuration times are significantly reduced and parameters are built in to make sure that users enter data in correctly. VLAN managers as well make it simple to centrally create VLANs across the network, also saving time and resources. Not only are configuration setup times reduced, but so is the time needed to make configuration device changes throughout the network. This offers significant savings on operational costs. In addition, since configuration is performed centrally, the likelihood for configuration errors that come from manual configuration is reduced. And finally, the network is also protected from unauthorized changes.
  • #68 VPFM is Avaya’s performance monitoring tool. It delivers device discovery, troubleshooting and performance management of all IP/SNMP devices including phones, call servers, switches and routers regardless of vendor. It provides topology maps of the network and shows how devices are connected as can be seen in the bottom and top right-hand corner screen shots. It also does performance trending to see how performance changes over time as is shown in the top left screen shot. It also manages faults and uses correlation to tie events together, to help determine the root cause as one event often leads to several others. VPFM will alert the appropriate network administrators via an email or a page when a switch goes down or when performance metrics step outside of preset thresholds. In addition, VPFM has the ability to divide the network into device classifications based on function, so that users drill down into only the specific areas that they are interested in monitoring. VPFM is needed as it helps organizations understand how their network is setup, how it’s operating, and determine the root cause of problems in order to quickly fix them. VPFM helps to decrease the Mean Time to Recovery, through proactive monitoring and root cause analysis, ensuring that the network is always up and running. Through reducing network downtime, it saves significantly on costs. It also reduces complexity by allowing organizations to quickly and easily visualize their networks and respond when things are amiss.
  • #69 IPFM is a performance monitoring tool that analyzes application and user behavior on the network. It provides multi-vendor capabilities as it works with any switch supporting IPFIX as well as the NetFlow v5 and NetFlow v9 standards. Through its collection of IPFIX traffic, it provides insight into the network so that administrators can prevent abuse and facilitate growth planning. It offers views of top applications, users, subnets, etc. in easy to understand, at a glance summary formats. It also allows administrators to set thresholds so that they’re informed when traffic exceeds acceptable limits. This helps to prevent after the fact responses to network application performance issues—preventing network downtime and helping to make informed planning decisions.
  • #70 EPM is another configuration tool that manages network bandwidth, prioritizes traffic streams and sets network access policies. It is often tied to VoIP technologies as it can ensure that voice calls receive the right QoS. It also provides security functionality as it can quickly roll out filters across devices in order to protect against viruses and worms. The next EPM release will include support for energy saver policies and will be able to facilitate the creation of policies across the network that will dim switches during off peak hours in order to save on energy consumption.
  • #73 Expansion on topic and describe how the solutions can be x-sold.
  • #80 These questions seem pretty straightforward, but let me explain why you need to ask them: Are you gonna use IPT: there is still a huge replacement going on from traditional (digital) voice to IP based solutions. Is your Netw, QoS enabled: This seems a pretty straightforward question but we have seen enough situations where the customer forgot to turn on QoS! Actually Avaya sold a huge IPT + LAN network to a major SI in EMEA, where during the project they complained about the quality of the voice solutions. It turned out that in their advanced next gen Avaya network, they forgot swithc on the QoS! This is really important to verify Is network stable: I guess every IT manager will tell you it is stable, they do not want to show their dirty laundry to an outsider. But if you ask this to the network administrator, the one that is being called in the middle of the night you may hear a different story. Please be aware that most networks outthere are BASED ON SPANNING TREE resiliency/redundancy solutions! This is key to understand that the reality of many enterprises is to live with a Spanning Tree network in 2010. And most administrators will confirm to you it is not that stable and causes major disruptions. This is what you definitely need to identify in the customer. (we have examples of customers facing bankrupcy because of STP based network outages.... Ask about performance; bring the value of stacking to the table. Non stackables cause bottlenecks. Cost savings are always important, we can prove we are cheaper than the market leader in capex and opex. We can even beat HP if needed.
  • #82 Avaya’s Unique Value Proposition How does Avaya uniquely address the most crucial requirements of the Enterprise? First, intelligent components and designs are at the heart of Avaya’s reputation for delivering the most distinguished resiliency model in the industry. Besides being fully scalable across the Enterprise, it has been 3 rd party tested to deliver up to 7 times better resiliency than the market share leader and provides uncompromising end-to-end availability for real-time applications such as IP Telephony.   Second, providing dependability and performance only goes so far if the network is not efficient in its service delivery. An efficient network is a better performing network. Avaya’s network is designed with architectures that maximise all resources and investments, doing away with idle or under-utilised links, equipment, and even entire “architectural tiers” delivering up to 20X better performance and 1/3 less equipment.   And, last but of course not least, a network that is deterministic and optimised also needs to have the embedded flexibility to seamlessly scale as business demands evolve and grow. Through genuine innovation Avaya provides Industry-leading solutions that maximise capacity utilization, easily accommodate incremental growth, and therefore avoid unnecessary and costly fork-lift upgrades   In summary, while Avaya addresses each characteristic uniquely, the most impressive advantage is that Avaya excels at all three simultaneously. We’ll now talk at a high level how we intend to get the message out…
  • #83 I wanted to include this next slide for those of you that are not yet selling the Avaya Data portfolio. Here are a few benefits for our Avaya Data channel partners.
  • #90 In terms of the landscape, there are really 3 major competitors in this space, Cisco, HP and Juniper. Cisco offers a number of products that support their Stack Wise technology. There are 4 popular model variants that compete against the ERS 4000 and 5000 portfolios. HP offers a huge number of devices in this space; however, a couple of weeks ago they introduced the HP 3800 product which supports Meshed Stacking capabilities. It is a very strong offering in this space and will be in my opinion the strongest competition moving forward.. If HP can resolve some of the internal conflict that is occurring right now between heritage HP and heritage H3C. Juniper also competes in this space primarily with the EX4200. They have largely copied Avaya’s Stackable Chassis and Switch Clustering implementations to provide a resilient stackable solution. However, they have poor bandwidth capacity at the moment – although we believe they are working on a solution that will stack up to a Terabit. They also have an uncompetitive warranty and huge power consumption.
  • #91 In terms of where to attack Cisco, definitely attack their inefficient stacking capabilities and their in ability to offer customers the ability to scale capacity as they need it. In competitive situations with the ERS 5000 series products, you can attack the Cisco Catalyst 3750-X from a capacities and a densities perspective. Cisco tends to be very complex to operate and maintain. They have a confusing and expensive licensing model. Many of their features are proprietary. They are not as energy efficient as Avaya and they don’t have the evolution path that we can offer with future support for wireless split plane and the ability to support Virtualized Services. Cisco’s virtualization strategy is also proprietary and focused solely on the Data Center. In terms of areas where you have to defend, mindshare and market share are obviously the most significant hurdles, the feature breadth that Cisco can offer, in particular support for features such as full IPv6 routing capabilities and the warranty that they are able to offer. In terms of silver bullets – we offer 5x and 15x the virtual backplane capacity of Cisco with the ERS 4000 Series and 5000 Series respectively, we offer 25% better energy efficiency, a 50% reduction in TCO over a 5 year time period and with the ERS 5000 Series can offer a solution that is twice as dense with the availability of the only 96-port solution in the market. © 2009 Avaya Inc. All rights reserved.
  • #92 In terms of where to attack them – energy is a great place to start. We can also show that this contributes to a higher Total cost of Ownership. We can attack their lack of an end to end solution and not having any experience in next generation applications such as voice and video. We can attack their warranty, their stacking capabilities and the fact that their implementation is relatively new and they don’t have 12-13 years of deployment experience to build upon. They offer an overlay wireless architecture without any integration and they do not offer any evolution path to supporting Virtualized Services at the Campus Edge. Their virtualization strategy is proprietary and focused solely on the Data Center. In terms of where to defend, Juniper often promotes the values of JunOS and having a single OS for all platforms. One way to defend against this is that having all features on all platforms can slow down performance. Some of Juniper platforms take a very long time to boot up due to the huge software load that needs to be supported. They support rich L3 capabilities including IPv6 and they do support good scalability for a number of their features. In terms of silver bullets – we offer 3x and 10x the virtual backplane capacity of Juniper with the ERS 4000 Series and 5000 Series respectively, we offer 50% better energy efficiency, a 50% reduction in TCO over a 5 year time period and with the ERS 5000 Series can offer a solution that is twice as dense with the availability of the only 96-port solution in the market. © 2009 Avaya Inc. All rights reserved.
  • #93 In terms of how to attack – the main area to attack is with regards to the acquisition and the internal politics that is occurring right now between heritage HP and heritage 3Com folks. Their products are not as energy efficient as ours. They do not have a solution that includes next generation applications similar to what we can offer with Avaya Aura and Avaya Flare. They have a confusing WLAN story without any integration into the switching network and no evolution path to extend Virtualized services beyond the Data Center. In terms of where to defend, they are the #2 vendor in the space so have the mindshare and market share. They offer compelling price points, a comprehensive lifetime warranty, rich L3 functionality and good scaling with the new 3800 product. In terms of silver bullets we offer 20% better energy efficiency than HP with the ERS 4000 series, we offer 3x the virtual backplane capacity of the HP 3800 with the ERS 5000 Series and with the ERS 5000 Series we can offer a solution that is twice as dense with the availability of the only 96-port solution in the market. © 2009 Avaya Inc. All rights reserved.
  • #94 Starting first with Cisco. When the customer needs stacking they will generally lead with the Catalyst 3750-X or at the lower end the Cisco 2960. If a standalone offering is adequate you may see the 3760-X. We’ve included the 3750-E for completeness. You may see it in a few accounts, but it lacks 10 Gig SFP+ support and has less forwarding bandwidth than the 3750-X. The biggest knock against Cisco is their inefficient ring based bus architecture that they use for stacking. It only allows them to utilize 64 Gbps of total stack bandwidth. On the plus side, they have a wide breadth of features and they do have a very good lifetime warranty where they offer next business day delivery of replacement hardware for the life of the product and they offer software updates as part of the warranty as well. © 2009 Avaya Inc. All rights reserved.
  • #95 With Juniper they only have one product offering that supports Virtual Chassis capabilities and it’s the Juniper EX 4200. The obvious place to attack Juniper is the stack bandwidth capabilities. They only offer 128 Gbps compared to our 384 with the ERS 4000 Series and 1.152 Terabits with the ERS 5600. Power consumption is a huge issue for them, in our tests and in a separate Tolly test that HP commissioned Juniper utilized almost twice as much power than any other device in this space. They also have some weaknesses in their warranty in that power and fans – which tend to be high failure items are only covered for 5 years.. versus Avaya’s Lifetime coverage. They also only offer shipping of spares within one business – rather than next business day with Avaya. © 2009 Avaya Inc. All rights reserved.
  • #96 HP offers a number of platforms for this space; however, strategically we will likely see the 2910 in standalone scenarios and more and more the HP 3800 in stacking opportunities. This switch was introduced at the Fall Networld Interop event at the beginning of this month. Of all the devices in the market, this offering is the most comparable to Avaya’s. They have 9 model variants and they offer 2 additional 10 Gig SFP+ ports on their 48-port models compared to everyone else in the industry. They also offer a very compelling warranty with advanced replacements and next-business day delivery with free software updates. They do not however, have the solutions breadth that we do have do not have the evolution path to WLAN integration and future support for Virtualized Services. Their virtualization strategy is unclear and unfocused having announced support for both TRILL and SPB – it is also solely focused on the Data Center. © 2009 Avaya Inc. All rights reserved.
  • #106 2010 Avaya Inc. All rights reserved.