AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS – Photo Report
• Key Plan showing the Camera positions, Click on the Icon to review respective status:
1
2
3
4
5
6
7
8
9
10 11
12 13 14
15
1617
18
19
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 01
• Finishing works in progress
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 02
• Package I – Block work, Plastering and Painting in progress
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 03
• Package I – Block work and Plastering in progress
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 04
• Package I – Plastering and Tiling in progress
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 05
• Package I – Tiling work in progress.
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 06
• LEFT – Package 02 RIGHT – Package 01
Key Plan
1
2
3
4
5
6
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 07
• Package II – Finishing activities going on.
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 08
• Package I – UPVC window and Door shutter fixing in progress
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 09
• LOGON work in progress
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 10
• Package II – Internal Wall Putty work in progress
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 11
• Package II – Finishing activities going on.
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 12
• Package II – Tiling work in progress
Key Plan
7
8
9
10 11
12
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 13
• Package II – Waterproofing work in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 14
• Package II – Plastering in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 15
• Package II – Plastering in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 16
• Package II – Plastering in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 17
• Package II – Plastering in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 18
• Package II – Block work and Plastering in progress
Key Plan
13 14
15
1617
18
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS Position - 19
• Package II – Finishing work in progress
Key Plan
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS LOGON PROGRESS
• Group A Villas – OHT & Block work in progress
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS LOGON PROGRESS
• Group B Villas – Internal Plastering work in progress
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS LOGON PROGRESS
• Group C Villas – External plastering in progress
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS LOGON PROGRESS
• Group D Villas – Block work in progress
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS MOCKUP VILLA
• Front Elevation
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS MOCKUP VILLA
• Villa Entrance
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS OTHER PROGRESS
• Villa Roundabout
AURUM_Photo Report - Villas
Comments :
AURUM – VILLAS OTHER PROGRESS
• Villa Roundabout
AURUM_Photo Report - Villas
AURUM – VILLAS Aerial View
• .
AURUM_Photo Report - Villas
AURUM – VILLAS More View
• .

More Related Content

What's hot

Status report My Home Vihanga as on 25.01.2014
Status report My Home Vihanga as on 25.01.2014Status report My Home Vihanga as on 25.01.2014
Status report My Home Vihanga as on 25.01.2014
manjumyhome
 
Queens Quay Revitalization Progress Update - May 2014
Queens Quay Revitalization Progress Update - May 2014Queens Quay Revitalization Progress Update - May 2014
Queens Quay Revitalization Progress Update - May 2014
WaterfrontTO
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Crosstown TO
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
Crosstown TO
 
Status report of my home vihnaga as on 29.03.2014
Status report of my home vihnaga as on 29.03.2014Status report of my home vihnaga as on 29.03.2014
Status report of my home vihnaga as on 29.03.2014
manjumyhome
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Crosstown TO
 
Ici final project
Ici final projectIci final project
Ici final project
Chong Yu Xuan
 
Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019
Crosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Crosstown TO
 
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbaiPiramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
Real Estate & Property Investments
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
Crosstown TO
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018
Crosstown TO
 
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue StationsFall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Crosstown TO
 
Western Works CLC - Construction Update: January 18, 2022
Western Works CLC - Construction Update: January 18, 2022Western Works CLC - Construction Update: January 18, 2022
Western Works CLC - Construction Update: January 18, 2022
Crosstown TO
 
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Crosstown TO
 
Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)
Crosstown TO
 
Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022
Crosstown TO
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Crosstown TO
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Crosstown TO
 

What's hot (20)

Status report My Home Vihanga as on 25.01.2014
Status report My Home Vihanga as on 25.01.2014Status report My Home Vihanga as on 25.01.2014
Status report My Home Vihanga as on 25.01.2014
 
Queens Quay Revitalization Progress Update - May 2014
Queens Quay Revitalization Progress Update - May 2014Queens Quay Revitalization Progress Update - May 2014
Queens Quay Revitalization Progress Update - May 2014
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
 
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
 
Status report of my home vihnaga as on 29.03.2014
Status report of my home vihnaga as on 29.03.2014Status report of my home vihnaga as on 29.03.2014
Status report of my home vihnaga as on 29.03.2014
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
 
Ici final project
Ici final projectIci final project
Ici final project
 
Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
 
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbaiPiramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
Piramal realty launches tower iii north tower at piramal mahalaxmi south mumbai
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018
 
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue StationsFall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
 
Western Works CLC - Construction Update: January 18, 2022
Western Works CLC - Construction Update: January 18, 2022Western Works CLC - Construction Update: January 18, 2022
Western Works CLC - Construction Update: January 18, 2022
 
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
 
Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)
 
Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
 

More from Pacifica Companie

Aurum - Pride Towers Progress Photos
Aurum - Pride Towers Progress PhotosAurum - Pride Towers Progress Photos
Aurum - Pride Towers Progress Photos
Pacifica Companie
 
Aurum - Villa Construction Images
Aurum - Villa Construction ImagesAurum - Villa Construction Images
Aurum - Villa Construction Images
Pacifica Companie
 
Pacifica - Aurum Happiness Towers Construction Progress Images
Pacifica - Aurum Happiness Towers Construction Progress ImagesPacifica - Aurum Happiness Towers Construction Progress Images
Pacifica - Aurum Happiness Towers Construction Progress Images
Pacifica Companie
 
Aurum - Pacifica Pride Towers Construction Images
Aurum  - Pacifica Pride Towers Construction Images Aurum  - Pacifica Pride Towers Construction Images
Aurum - Pacifica Pride Towers Construction Images
Pacifica Companie
 
Aurum pacifica villas construction as on feb'2015
Aurum   pacifica villas construction as on feb'2015Aurum   pacifica villas construction as on feb'2015
Aurum pacifica villas construction as on feb'2015
Pacifica Companie
 
Aurum - Pacifica Happiness Towers Construction Images feb'2015
Aurum - Pacifica Happiness Towers Construction Images feb'2015Aurum - Pacifica Happiness Towers Construction Images feb'2015
Aurum - Pacifica Happiness Towers Construction Images feb'2015
Pacifica Companie
 

More from Pacifica Companie (6)

Aurum - Pride Towers Progress Photos
Aurum - Pride Towers Progress PhotosAurum - Pride Towers Progress Photos
Aurum - Pride Towers Progress Photos
 
Aurum - Villa Construction Images
Aurum - Villa Construction ImagesAurum - Villa Construction Images
Aurum - Villa Construction Images
 
Pacifica - Aurum Happiness Towers Construction Progress Images
Pacifica - Aurum Happiness Towers Construction Progress ImagesPacifica - Aurum Happiness Towers Construction Progress Images
Pacifica - Aurum Happiness Towers Construction Progress Images
 
Aurum - Pacifica Pride Towers Construction Images
Aurum  - Pacifica Pride Towers Construction Images Aurum  - Pacifica Pride Towers Construction Images
Aurum - Pacifica Pride Towers Construction Images
 
Aurum pacifica villas construction as on feb'2015
Aurum   pacifica villas construction as on feb'2015Aurum   pacifica villas construction as on feb'2015
Aurum pacifica villas construction as on feb'2015
 
Aurum - Pacifica Happiness Towers Construction Images feb'2015
Aurum - Pacifica Happiness Towers Construction Images feb'2015Aurum - Pacifica Happiness Towers Construction Images feb'2015
Aurum - Pacifica Happiness Towers Construction Images feb'2015
 

Recently uploaded

Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
shuilykhatunnil
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
Living in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales MeetingLiving in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales Meeting
Tom Blefko
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
SVN International Corp.
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
Shivgan Infratech
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 

Recently uploaded (9)

Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
Living in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales MeetingLiving in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales Meeting
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 

Aurum - Villas Photos

  • 1. AURUM_Photo Report - Villas Comments : AURUM – VILLAS – Photo Report • Key Plan showing the Camera positions, Click on the Icon to review respective status: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1617 18 19
  • 2. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 01 • Finishing works in progress Key Plan 1 2 3 4 5 6
  • 3. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 02 • Package I – Block work, Plastering and Painting in progress Key Plan 1 2 3 4 5 6
  • 4. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 03 • Package I – Block work and Plastering in progress Key Plan 1 2 3 4 5 6
  • 5. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 04 • Package I – Plastering and Tiling in progress Key Plan 1 2 3 4 5 6
  • 6. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 05 • Package I – Tiling work in progress. Key Plan 1 2 3 4 5 6
  • 7. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 06 • LEFT – Package 02 RIGHT – Package 01 Key Plan 1 2 3 4 5 6
  • 8. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 07 • Package II – Finishing activities going on. Key Plan 7 8 9 10 11 12
  • 9. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 08 • Package I – UPVC window and Door shutter fixing in progress Key Plan 7 8 9 10 11 12
  • 10. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 09 • LOGON work in progress Key Plan 7 8 9 10 11 12
  • 11. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 10 • Package II – Internal Wall Putty work in progress Key Plan 7 8 9 10 11 12
  • 12. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 11 • Package II – Finishing activities going on. Key Plan 7 8 9 10 11 12
  • 13. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 12 • Package II – Tiling work in progress Key Plan 7 8 9 10 11 12
  • 14. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 13 • Package II – Waterproofing work in progress Key Plan 13 14 15 1617 18
  • 15. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 14 • Package II – Plastering in progress Key Plan 13 14 15 1617 18
  • 16. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 15 • Package II – Plastering in progress Key Plan 13 14 15 1617 18
  • 17. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 16 • Package II – Plastering in progress Key Plan 13 14 15 1617 18
  • 18. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 17 • Package II – Plastering in progress Key Plan 13 14 15 1617 18
  • 19. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 18 • Package II – Block work and Plastering in progress Key Plan 13 14 15 1617 18
  • 20. AURUM_Photo Report - Villas Comments : AURUM – VILLAS Position - 19 • Package II – Finishing work in progress Key Plan
  • 21. AURUM_Photo Report - Villas Comments : AURUM – VILLAS LOGON PROGRESS • Group A Villas – OHT & Block work in progress
  • 22. AURUM_Photo Report - Villas Comments : AURUM – VILLAS LOGON PROGRESS • Group B Villas – Internal Plastering work in progress
  • 23. AURUM_Photo Report - Villas Comments : AURUM – VILLAS LOGON PROGRESS • Group C Villas – External plastering in progress
  • 24. AURUM_Photo Report - Villas Comments : AURUM – VILLAS LOGON PROGRESS • Group D Villas – Block work in progress
  • 25. AURUM_Photo Report - Villas Comments : AURUM – VILLAS MOCKUP VILLA • Front Elevation
  • 26. AURUM_Photo Report - Villas Comments : AURUM – VILLAS MOCKUP VILLA • Villa Entrance
  • 27. AURUM_Photo Report - Villas Comments : AURUM – VILLAS OTHER PROGRESS • Villa Roundabout
  • 28. AURUM_Photo Report - Villas Comments : AURUM – VILLAS OTHER PROGRESS • Villa Roundabout
  • 29. AURUM_Photo Report - Villas AURUM – VILLAS Aerial View • .
  • 30. AURUM_Photo Report - Villas AURUM – VILLAS More View • .