SlideShare a Scribd company logo
Atlanta 2015 Infrastructure Bond 
Investing in a commitment today to meet the 
infrastructure challenges of the future. 
Attached hereto is a DRAFT listing of potential bond projects which may be presented to 
voters for consideration at the [March] 2015 referendum election. This list is preliminary and 
has been compiled from a master listing of all needed infrastructure improvement. This 
preliminary listing is being presented in DRAFT form for discussion purposes only and not as 
an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36- 
81-1(d). The final projects for consideration at the referendum election will be advertised 
prior to the election and will be described on the ballot question.” 
October 2014
2 
Meeting Agenda 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
• Opening Remarks 
• Feedback from First Round of Public Meetings 
• Review Draft List of Projects 
• Horizontal (roads, sidewalks, bridges, etc.) 
• Vertical (police & fire stations, recreational centers, other facilities) 
• Questions & Answers 
• Breakout Session 
• Review Project Maps 
• Receive Public Feedback
3 
Key Events 
 June 2014: Public Information Meeting (1st Round) 
 September 2014: Public Information Meetings (2nd Round) 
December 1, 2014: City Council Votes on Legislation 
February 2015: Public Information Meetings (3rd Round) 
March 17, 2015: Residents Vote on Bond Referendum 
Please visit: www.atlantaga.gov/infrastructure 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
NOTE: Public comments received by October 10 will be included in 2nd Round analysis.
4 
State of Atlanta’s Infrastructure 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
• $1.02B infrastructure backlog 
• The 2010 State of the City’s Transportation Infrastructure Report 
identified approximately $881M of transportation infrastructure 
• The 2014 City’s Facility Infrastructure Report identified $130.8M 
backlog of projects 
• The City must take dramatic steps to increase efficiencies and change the 
way we do business 
• Tackling these problems will also require a significant cash inflow, which is 
best done through an infrastructure bond
5 
Why & How a Referendum 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
• An Infrastructure Bond Referendum is a vote within the City to approve or 
reject a request to borrow money to fund infrastructure projects 
• The Atlanta City Council must vote to authorize an election to be held for 
the purpose of determining whether bonds shall be issued for the stated 
amount and purpose 
• Mayor Reed intends to ask the City Council in November to authorize a 
bond referendum vote to be held in March 2015
6 
No Impact on Atlanta Taxpayers 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
• Atlanta taxpayers are not expected to see any increase to their property 
taxes as a result of the infrastructure bond Issuance 
• The City’s strong credit rating will provide for a lower cost of borrowing 
• The annual debt service on the bonds, estimated at $17 million, will be 
paid from implementing cost savings outlined in the Mayor’s Waste & 
Efficiency Commission Report
7 
Next Steps… 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
• Deferred maintenance backlog is $1.02 billion 
• Based on comments received and technical analysis we have narrowed the 
list to $350 million 
• Your ideas along with further technical analysis will get us to an achievable 
bond list
8 
Facilities Criteria 
Infrastructure Sustainability 
Safety Enhancement Issues 
Facility Functional Needs Met 
Funding for Facility Replacement 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
What We Heard 
10% 
9% 
17% 
33% 
31% 
0% 10% 20% 30% 40% 
Core & Shell Systems Failure 
Transportation Criteria 
3% 
11% 
11% 
8% 
7% 
7% 
6% 
10% 
14% 
25% 
0% 10% 20% 30% 
Provide for Bicycle & Pedestrian 
Facilities 
Connection to Transit 
Part of Neighoborhood Plan 
Preservation of Neighborhoods 
Leverage Federal, State Funds 
Promote Public Health and Safety 
Green Infrastructure Innovation 
Infrastructure Sustainability 
Part of Connect Atlanta Plan 
Connection to other Projects
9 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
Draft Project List 
Bond Portfolio Summary 
Facilities $101,057,400 
Transportation $234,986,484 
*Administration $14,132,781 
TOTAL $350,176,665 
What We Heard 
Facilities Projects 
Transportation 
Projects 
Facilities 
29% 
Transportation 
67% 
Administration 
4% 
Infrastructure Bond Portfolio 
* Includes Pre-bond Professional Services, Program Management and 1.5% of Construction for Art
10 
About Facilities… 
Recreational Centers 
Fire Stations 
Police Stations 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
Draft Project List 
$101,057,400 
What We Heard 
39% 
26% 
26% 
9% 
Parks & Recreation 
Fire Stations 
Police Stations 
Government Buildings 
0% 10% 20% 30% 40% 50% 
6% 
25% 
31% 
38% 
0% 10% 20% 30% 40% 50% 
Government Buildings
11 
About Transportation… 
Sidewalk, Curbing & ADA Ramps 
Unpaved Roads & Street 
Resurfacing 
Street Lights 
TIA Referendum Local Projects 
Signals, Signs, & School Zone 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
Draft Project List 
$234,986,484 
What We Heard 
12% 
12% 
10% 
9% 
31% 
27% 
0% 10% 20% 30% 40% 
Bridges 
Flashers 
42% 
35% 
12% 
10% 
Complete Streets & Sidewalks 
Roads, Curbs & Street Lights 
Traffic Operations 
Bridges 
0% 10% 20% 30% 40% 50%
12 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
Draft Project List Breakdown 
Category Description Needed Funds 
Transportation Projects Bridges, Bicycle-Pedestrian Infrastructure, Roadways, Traffic Signals $ 112,086,484 
Program - Roadway Curbing High & medium priority curbing & minor drainage program $ 21,600,000 
Program - Bicycle-Pedestrian High sidewalk repairs and DOJ/ADA compliance $ 76,000,000 
Program - Roadway Street Lights High priority lighting repair and street light LED conversions $ 21,000,000 
Program - Traffic Signage Upgrade of MUTCD size and lettering requirements for street name signs $ 4,300,000 
Transportation Total $ 234,986,484 
Facilities Projects Corrections, Fire Stations, Police Stations, Parks and Recreation Centers $ 95,614,000 
Program - ADA Compliance & OEAM ADA Compliance & Municipal Building Improvement Programs $ 5,443,400 
Facilities Total $ 101,057,400 
Administration Total Pre-bond professional services, program management, and art $ 14,132,781 
Total $ 350,176,665 
Attached hereto is a DRAFT listing of potential bond projects which may be presented to 
voters for consideration at the [March] 2015 referendum election. This list is preliminary and 
has been compiled from a master listing of all needed infrastructure improvement. This 
preliminary listing is being presented in DRAFT form for discussion purposes only and not as 
an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36- 
81-1(d). The final projects for consideration at the referendum election will be advertised 
prior to the election and will be described on the ballot question.”
13 
Key Events 
 June 2014: Public Information Meeting (1st Round) 
 September 2014: Public Information Meetings (2nd Round) 
December 1, 2014: City Council Votes on Legislation 
February 2015: Public Information Meetings (3rd Round) 
March 17, 2015: Residents Vote on Bond Referendum 
Please visit: www.atlantaga.gov/infrastructure 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
NOTE: Public comments received by October 10 will be included in 2nd Round analysis.
14 
City of Atlanta 
Kasim Reed 
Mayor 
Ceasar C. Mitchell 
President 
Michael Julian Bond 
Post 1 At Large 
Mary Norwood 
Post 2 At Large 
Andre Dickens 
Post 3 At Large 
Carla Smith 
District 1 
Kwanza Hall 
District 2 
Ivory Lee Young, Jr. 
District 3 
Cleta Winslow 
District 4 
Natalyn Archibong 
District 5 
Alex Wan 
District 6 
Howard Shook 
District 7 
Yolanda Adrean 
District 8 
Felicia A. Moore 
District 9 
C. T. Martin 
District 10 
Keisha Lance Bottoms 
District 11 
Joyce Sheperd 
District 12 
October 17, 2014 
Atlanta 2015 Infrastructure Bond 
Thank You! 
Investing in a commitment today to meet the transportation challenges of the future.

More Related Content

Viewers also liked

Performance analysis of Tax saving scheme
Performance analysis of Tax saving schemePerformance analysis of Tax saving scheme
Performance analysis of Tax saving schemedeni yatheesha
 
Presentaion on ppf and ns cs
Presentaion on ppf and ns csPresentaion on ppf and ns cs
Presentaion on ppf and ns csRanveer Singh
 
5 best tax saving instruments
5 best tax saving instruments5 best tax saving instruments
Public provident fund
Public provident fundPublic provident fund
Public provident fund
financeandtaxhub
 
Public Provident fund
Public Provident fundPublic Provident fund
Public Provident fund
Kashmira_180
 
Public provident fund
Public provident fundPublic provident fund
Public provident fund
Varun
 
Tax Saving Investments
Tax Saving InvestmentsTax Saving Investments
Tax Saving Investments
CA Jimmit Mehta
 
Public provident fund {final}
Public provident fund {final}Public provident fund {final}
Public provident fund {final}Aftab Mulla
 
Tax saving schemes
Tax saving schemesTax saving schemes
Tax saving schemesVikas Soni
 
Provident fund ppt
Provident fund pptProvident fund ppt
Provident fund ppt
Dixita S
 
Icici bank ppt
Icici bank pptIcici bank ppt
Icici bank ppt
Sanjiv Yadav
 

Viewers also liked (12)

Performance analysis of Tax saving scheme
Performance analysis of Tax saving schemePerformance analysis of Tax saving scheme
Performance analysis of Tax saving scheme
 
Mutual fund
Mutual fundMutual fund
Mutual fund
 
Presentaion on ppf and ns cs
Presentaion on ppf and ns csPresentaion on ppf and ns cs
Presentaion on ppf and ns cs
 
5 best tax saving instruments
5 best tax saving instruments5 best tax saving instruments
5 best tax saving instruments
 
Public provident fund
Public provident fundPublic provident fund
Public provident fund
 
Public Provident fund
Public Provident fundPublic Provident fund
Public Provident fund
 
Public provident fund
Public provident fundPublic provident fund
Public provident fund
 
Tax Saving Investments
Tax Saving InvestmentsTax Saving Investments
Tax Saving Investments
 
Public provident fund {final}
Public provident fund {final}Public provident fund {final}
Public provident fund {final}
 
Tax saving schemes
Tax saving schemesTax saving schemes
Tax saving schemes
 
Provident fund ppt
Provident fund pptProvident fund ppt
Provident fund ppt
 
Icici bank ppt
Icici bank pptIcici bank ppt
Icici bank ppt
 

Similar to Atl bond presentation council retreat 10-17-14

State and Local Road Project Updates: Part 3
State and Local Road Project Updates: Part 3State and Local Road Project Updates: Part 3
State and Local Road Project Updates: Part 3
Charlotte Chamber
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebfregoneseassociates
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment Plan
City of Dayton
 
Georgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure BankGeorgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure Bank
Valdosta-Lowndes Metropolitan Planning Organization
 
2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop
Cuyahoga County Planning Commission
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
SCVTA
 
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
COTA BUS
 
Garden Parkway and Monroe Connector Update
Garden Parkway and Monroe Connector UpdateGarden Parkway and Monroe Connector Update
Garden Parkway and Monroe Connector Update
Charlotte Chamber
 
ASCE_Seminar_Chang_4-16-15-Final-3
ASCE_Seminar_Chang_4-16-15-Final-3ASCE_Seminar_Chang_4-16-15-Final-3
ASCE_Seminar_Chang_4-16-15-Final-3Julius Chang
 
2040 Transportation Vision Plan
2040 Transportation Vision Plan2040 Transportation Vision Plan
Peer exchange
Peer exchangePeer exchange
Peer exchangelynch51
 
Catt May 2006 Vanier
Catt May 2006 VanierCatt May 2006 Vanier
Catt May 2006 Vanier
danajvanier
 
Integrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesIntegrating Community Development and Transportation Strategies
Integrating Community Development and Transportation Strategies
Mobility Lab
 
2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation
City of Corona
 
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
Jim Proce
 
2014 Bond Program Election Presentation
2014 Bond Program Election Presentation2014 Bond Program Election Presentation
2014 Bond Program Election Presentation
Brian Chatman
 
15 015 citywide-right-of-way_maintenance
15 015 citywide-right-of-way_maintenance15 015 citywide-right-of-way_maintenance
15 015 citywide-right-of-way_maintenance
Eduardo Luna
 
Costello Consulting
Costello ConsultingCostello Consulting
Costello Consulting
ccostello
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015
Atkins
 

Similar to Atl bond presentation council retreat 10-17-14 (20)

State and Local Road Project Updates: Part 3
State and Local Road Project Updates: Part 3State and Local Road Project Updates: Part 3
State and Local Road Project Updates: Part 3
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment Plan
 
Georgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure BankGeorgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure Bank
 
2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
 
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
Cleveland Avenue Bus Rapid Transit Public Meeting - April 9, 2014
 
Garden Parkway and Monroe Connector Update
Garden Parkway and Monroe Connector UpdateGarden Parkway and Monroe Connector Update
Garden Parkway and Monroe Connector Update
 
ASCE_Seminar_Chang_4-16-15-Final-3
ASCE_Seminar_Chang_4-16-15-Final-3ASCE_Seminar_Chang_4-16-15-Final-3
ASCE_Seminar_Chang_4-16-15-Final-3
 
2040 Transportation Vision Plan
2040 Transportation Vision Plan2040 Transportation Vision Plan
2040 Transportation Vision Plan
 
Peer exchange
Peer exchangePeer exchange
Peer exchange
 
mpo fiscal priorities committee - ptp then and now
mpo fiscal priorities committee - ptp then and nowmpo fiscal priorities committee - ptp then and now
mpo fiscal priorities committee - ptp then and now
 
Catt May 2006 Vanier
Catt May 2006 VanierCatt May 2006 Vanier
Catt May 2006 Vanier
 
Integrating Community Development and Transportation Strategies
Integrating Community Development and Transportation StrategiesIntegrating Community Development and Transportation Strategies
Integrating Community Development and Transportation Strategies
 
2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation
 
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
Jim Proce - APWA Accreditation Briefing - Palm Bay FL July 2008
 
2014 Bond Program Election Presentation
2014 Bond Program Election Presentation2014 Bond Program Election Presentation
2014 Bond Program Election Presentation
 
15 015 citywide-right-of-way_maintenance
15 015 citywide-right-of-way_maintenance15 015 citywide-right-of-way_maintenance
15 015 citywide-right-of-way_maintenance
 
Costello Consulting
Costello ConsultingCostello Consulting
Costello Consulting
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015
 

Recently uploaded

PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 

Recently uploaded (20)

PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 

Atl bond presentation council retreat 10-17-14

  • 1. Atlanta 2015 Infrastructure Bond Investing in a commitment today to meet the infrastructure challenges of the future. Attached hereto is a DRAFT listing of potential bond projects which may be presented to voters for consideration at the [March] 2015 referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvement. This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36- 81-1(d). The final projects for consideration at the referendum election will be advertised prior to the election and will be described on the ballot question.” October 2014
  • 2. 2 Meeting Agenda October 17, 2014 Atlanta 2015 Infrastructure Bond • Opening Remarks • Feedback from First Round of Public Meetings • Review Draft List of Projects • Horizontal (roads, sidewalks, bridges, etc.) • Vertical (police & fire stations, recreational centers, other facilities) • Questions & Answers • Breakout Session • Review Project Maps • Receive Public Feedback
  • 3. 3 Key Events  June 2014: Public Information Meeting (1st Round)  September 2014: Public Information Meetings (2nd Round) December 1, 2014: City Council Votes on Legislation February 2015: Public Information Meetings (3rd Round) March 17, 2015: Residents Vote on Bond Referendum Please visit: www.atlantaga.gov/infrastructure October 17, 2014 Atlanta 2015 Infrastructure Bond NOTE: Public comments received by October 10 will be included in 2nd Round analysis.
  • 4. 4 State of Atlanta’s Infrastructure October 17, 2014 Atlanta 2015 Infrastructure Bond • $1.02B infrastructure backlog • The 2010 State of the City’s Transportation Infrastructure Report identified approximately $881M of transportation infrastructure • The 2014 City’s Facility Infrastructure Report identified $130.8M backlog of projects • The City must take dramatic steps to increase efficiencies and change the way we do business • Tackling these problems will also require a significant cash inflow, which is best done through an infrastructure bond
  • 5. 5 Why & How a Referendum October 17, 2014 Atlanta 2015 Infrastructure Bond • An Infrastructure Bond Referendum is a vote within the City to approve or reject a request to borrow money to fund infrastructure projects • The Atlanta City Council must vote to authorize an election to be held for the purpose of determining whether bonds shall be issued for the stated amount and purpose • Mayor Reed intends to ask the City Council in November to authorize a bond referendum vote to be held in March 2015
  • 6. 6 No Impact on Atlanta Taxpayers October 17, 2014 Atlanta 2015 Infrastructure Bond • Atlanta taxpayers are not expected to see any increase to their property taxes as a result of the infrastructure bond Issuance • The City’s strong credit rating will provide for a lower cost of borrowing • The annual debt service on the bonds, estimated at $17 million, will be paid from implementing cost savings outlined in the Mayor’s Waste & Efficiency Commission Report
  • 7. 7 Next Steps… October 17, 2014 Atlanta 2015 Infrastructure Bond • Deferred maintenance backlog is $1.02 billion • Based on comments received and technical analysis we have narrowed the list to $350 million • Your ideas along with further technical analysis will get us to an achievable bond list
  • 8. 8 Facilities Criteria Infrastructure Sustainability Safety Enhancement Issues Facility Functional Needs Met Funding for Facility Replacement October 17, 2014 Atlanta 2015 Infrastructure Bond What We Heard 10% 9% 17% 33% 31% 0% 10% 20% 30% 40% Core & Shell Systems Failure Transportation Criteria 3% 11% 11% 8% 7% 7% 6% 10% 14% 25% 0% 10% 20% 30% Provide for Bicycle & Pedestrian Facilities Connection to Transit Part of Neighoborhood Plan Preservation of Neighborhoods Leverage Federal, State Funds Promote Public Health and Safety Green Infrastructure Innovation Infrastructure Sustainability Part of Connect Atlanta Plan Connection to other Projects
  • 9. 9 October 17, 2014 Atlanta 2015 Infrastructure Bond Draft Project List Bond Portfolio Summary Facilities $101,057,400 Transportation $234,986,484 *Administration $14,132,781 TOTAL $350,176,665 What We Heard Facilities Projects Transportation Projects Facilities 29% Transportation 67% Administration 4% Infrastructure Bond Portfolio * Includes Pre-bond Professional Services, Program Management and 1.5% of Construction for Art
  • 10. 10 About Facilities… Recreational Centers Fire Stations Police Stations October 17, 2014 Atlanta 2015 Infrastructure Bond Draft Project List $101,057,400 What We Heard 39% 26% 26% 9% Parks & Recreation Fire Stations Police Stations Government Buildings 0% 10% 20% 30% 40% 50% 6% 25% 31% 38% 0% 10% 20% 30% 40% 50% Government Buildings
  • 11. 11 About Transportation… Sidewalk, Curbing & ADA Ramps Unpaved Roads & Street Resurfacing Street Lights TIA Referendum Local Projects Signals, Signs, & School Zone October 17, 2014 Atlanta 2015 Infrastructure Bond Draft Project List $234,986,484 What We Heard 12% 12% 10% 9% 31% 27% 0% 10% 20% 30% 40% Bridges Flashers 42% 35% 12% 10% Complete Streets & Sidewalks Roads, Curbs & Street Lights Traffic Operations Bridges 0% 10% 20% 30% 40% 50%
  • 12. 12 October 17, 2014 Atlanta 2015 Infrastructure Bond Draft Project List Breakdown Category Description Needed Funds Transportation Projects Bridges, Bicycle-Pedestrian Infrastructure, Roadways, Traffic Signals $ 112,086,484 Program - Roadway Curbing High & medium priority curbing & minor drainage program $ 21,600,000 Program - Bicycle-Pedestrian High sidewalk repairs and DOJ/ADA compliance $ 76,000,000 Program - Roadway Street Lights High priority lighting repair and street light LED conversions $ 21,000,000 Program - Traffic Signage Upgrade of MUTCD size and lettering requirements for street name signs $ 4,300,000 Transportation Total $ 234,986,484 Facilities Projects Corrections, Fire Stations, Police Stations, Parks and Recreation Centers $ 95,614,000 Program - ADA Compliance & OEAM ADA Compliance & Municipal Building Improvement Programs $ 5,443,400 Facilities Total $ 101,057,400 Administration Total Pre-bond professional services, program management, and art $ 14,132,781 Total $ 350,176,665 Attached hereto is a DRAFT listing of potential bond projects which may be presented to voters for consideration at the [March] 2015 referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvement. This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36- 81-1(d). The final projects for consideration at the referendum election will be advertised prior to the election and will be described on the ballot question.”
  • 13. 13 Key Events  June 2014: Public Information Meeting (1st Round)  September 2014: Public Information Meetings (2nd Round) December 1, 2014: City Council Votes on Legislation February 2015: Public Information Meetings (3rd Round) March 17, 2015: Residents Vote on Bond Referendum Please visit: www.atlantaga.gov/infrastructure October 17, 2014 Atlanta 2015 Infrastructure Bond NOTE: Public comments received by October 10 will be included in 2nd Round analysis.
  • 14. 14 City of Atlanta Kasim Reed Mayor Ceasar C. Mitchell President Michael Julian Bond Post 1 At Large Mary Norwood Post 2 At Large Andre Dickens Post 3 At Large Carla Smith District 1 Kwanza Hall District 2 Ivory Lee Young, Jr. District 3 Cleta Winslow District 4 Natalyn Archibong District 5 Alex Wan District 6 Howard Shook District 7 Yolanda Adrean District 8 Felicia A. Moore District 9 C. T. Martin District 10 Keisha Lance Bottoms District 11 Joyce Sheperd District 12 October 17, 2014 Atlanta 2015 Infrastructure Bond Thank You! Investing in a commitment today to meet the transportation challenges of the future.

Editor's Notes

  1. Top left: Fire Station #18 Top right: Downtown Atlanta, courtesy of COA DP&CD Bottom: Fire Station #28/Zone 2 mini-precinct
  2. Here is a schedule of upcoming events…
  3. Bridge Replacement & Maintenance: $259M, 30% Street Resurfacing: $262M, 31% Sidewalks, Curbs, and ADA Ramps*: $204M, 24%
  4. Cost Savings Initiatives from Waste & Efficiency Report: Sale of Surplus Assets, Operating Savings from the Sold Assets, Workers Compensation Efficiency Savings, Performance Budgeting
  5. In the first round of Public Meetings, we hosted 7 mtgs across the City in all 4 quadrants During those meetings, you told us what project categories and criteria were most important to you Facilities Criteria Facilities Life Cycle and Safety Enhancements were the top two criteria. These criteria consistently ranked high across all seven meetings. Transportation Criteria Transportation Criteria as a whole was the most popular board among the voters, receiving a total of 1,040 dots, nearly 50 percent of all votes cast. In 6 of the 7 meetings, providing for “Bicycle and Pedestrian Facilities” was the overwhelmingly preferred criteria. “Connection to Transit” and the two neighborhood-oriented criteria rounded out the top four.
  6. Out of the votes that we received, approximately 23% went towards facilities and 77% towards transportation. Our current list of projects is broken out in a similar fashion, with 2/3 towards transportation and nearly 1/3 towards facilities. The remaining 6% will be set aside for Program Administration and Art. Examples of art would include painted pavers, sculptures, sundials, enhanced landscaping and benches, and murals
  7. Facilities Projects Recreation centers received the most votes at six of the seven meetings. Fire and police station consistently ranked second and third, with very little difference in the meeting over meeting tallies between the two types of facilities. Government buildings received just 14 of the 2,211 votes, the fewest votes of any project or criteria type across the meeting series.
  8. As stated earlier, over ¾ of your votes went towards transportation projects. Transportation Projects Pedestrian Infrastructure and Street Resurfacing were overwhelming leaders among the project offerings. There was moderate support for the TIA projects and street lights. Traffic Signals, Signs and Flashers and Bridges received the least support. The 6 Categories have been condensed to 4 types of projects on the bond list. Six of the twelve complete street projects are TIA.  Complete streets is in the Bike-Ped category.   TIA Projects ML King, Jr Dr DeKalb Ave J E Boone Blvd Howell Mill Rd Cascade Rd JE Lowery Blvd Additional Notes on the Transportation Results There is an apparent inconsistency between the Criteria “Infrastructure Sustainability” scoring low while votes for the Project Type Resurfacing Streets scoring extremely high. Two factors appeared to contribute to this: some participants may have believed “sustainability” referred to environmental sustainability rather than roadway life cycle, while many of the bicycle advocates supported resurfacing, but voted for the combined bike/ped criteria rather than the Infrastructure Sustainability” criteria. There was general consistency across the community meetings with the exception of Adamsville. At the Adamsville meeting, attendees tended to be older and the location more suburban that the other meeting locations. Participants prioritized neighborhood-related criteria, safety, and resurfacing streets over bicycle and pedestrian infrastructure. At the other six meetings, bike/ped-related projects and criteria were consistently ranked first or second.
  9. This slide just breaks down the proposed budget for each category You will see that some categories have specific projects identified and the remaining are shown as programs The maps that you will review and comment on after this presentation only shows the specific projects that have been identified. You will not see specific ADA Improvements, sidewalks, traffic signs, street lights and artwork
  10. Here is a schedule of upcoming events…
  11. This is the first step towards addressing the critical infrastructure needs of the City. We plan to seek future bonds to continue to address the backlog in an effort to put us on a proactive track towards infrastructure