A105
1
A1041
A104 2
A106
1
1
A102
1
A103
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:04PM
Site Plan
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A101
No. Description Date
1 : 50
Site
1
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
1
A103
Ceiling Luvers - Fixed between trusses.
See A106
Treated Pine Trusses, Studs & Rafters
2815
2182040400
99.74°
10.00°
207
Solar pannels
1059
361540157
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:04PM
Section 1
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A102
No. Description Date
1 : 50
Section 1
1
Ceiling pitch - 99.74 degrees
Roof pitch - 10 degrees
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
1
A102
913
Truss widt
175
Timber stairs and
beams for elevated
bed
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:05PM
Section 2
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A103
No. Description Date
1 : 50
Section 2
1
Chipboard floor board,
with carpet layer above
Hardwood
beam bolted to
column
Hardwood post
with steel stirrup
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
12000
700
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:05PM
Elevations West and East
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A104
No. Description Date
1 : 50
East
1
1 : 50
West
2
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:06PM
Elevation North
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A105
No. Description Date
1 : 50
North
1
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
16 15 14 13
1054 3767 1199
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:06PM
Elevation South
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A106
No. Description Date
1 : 50
South
1
DN
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 25
4/11/201512:46:07PM
Furnished Floor Plan
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A107
No. Description Date
1 : 25
Finished Floor Level
1
A105
1
A1041
A104 2
A106
1
1
A102
1
A103
85 3023 100 2680 85
291 2410 321 580 1450 650
5972
2731865
2138
85215485
85 3487 100 2200 100
212 1585 1790 984 624 592
100 14601290 300 740
85879100
125
4066291002365
4774
1160879
2468
1591836184
2179
849
1
A109
2
A109
Living Bed & Office
Kitchen
Laundry
Bath
Elevated Bed
2106
8141
4
7
2119
20
9
100
100 x 100 Steel posts
welded from the steel floor of container to
the roof for structural support
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:07PM
Ground Floor
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A108
No. Description Date
1 : 50
Finished Floor Level Detailed
1
Walls -
- Treated pine 70 mm stud
- Interior paster board
paint finish (gyprock)
- Spray insulation within studs
against container corrugation to
aviod condensation in colder
months
Floor -
Kitchen, laundry & bath are
tiled
Living, Bed/offic and elevated
bed are carpted
Windows & Front sliding door are
double glazed
Containers are to be welded together
- Gaps between the floors of the
containers are to be sealed with
expanding foam, then chiped board
flooring over the top
- Gaps between walls and roof are to
have a steel sheet welded covering
the gap then waterproofing paint
applied over the top
Elevated bed -
- timber beams which support the
elevated bed, are attached to the
100 x 100 steel post within the wall
10mm steel
plate imbedded
into concrete column
when poured
Container corner
locking mechanism
is welded to steel
plates
300 mm Concrete
column
150
150
Steel reveals - to be
welded to container
corragation
Concrete Column Container corragation
70 mm Stud
Window
Gyprock wallboard
Front sliding door
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 5
4/11/201512:46:07PM
Detail Drawings
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A109
No. Description Date
1 : 5
Container Corner
1
1 : 5
Window Reveal
2
A105
1
A1041
A104 2
A106
1
1 3
A
2
C
84 7
D
B
5
E
6
11981133
2982 2982
238611981198
962 962
2386
1771 2982 1235
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
1 : 50
4/11/201512:46:07PM
Columns Plans
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A110
No. Description Date
1 : 50
Top of Posts
1
Columns poured at grid intersections
Columns 150 mm radius
For column depths and hights refer to
A104
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:07PM
Orthagraphic View 1
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A111
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:07PM
Orthagraphic View 2
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A112
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:07PM
Render - Kitchen View
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A113
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:08PM
Render - Living Room View
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A114
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:08PM
Render - Front Entry View
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A115
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:08PM
Render - South East View
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A116
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:08PM
Render - North East View
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A117
No. Description Date
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit
4/11/201512:46:08PM
Schedules
1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A118
No. Description Date
Door Schedule
Level Mark Location Height Width Thickness Finish Frame Material Comments
Finished Floor Level 4 2134 1810 51
Finished Floor Level 7 2134 624
Finished Floor Level: 2
Grand total: 2
Window Schedule
Mark Location Window Style Width Height Material Glazing Remarks
9 406 1830
13 913 540
14 913 540
15 913 540
16 913 540
19 2410 2040
20 406 1830
21 1450 1200

More Related Content

Viewers also liked

Urban Design Research Methods
Urban Design Research MethodsUrban Design Research Methods
Urban Design Research MethodsPhillip Brzeski
 
Digital Marketing - The Future
Digital Marketing - The FutureDigital Marketing - The Future
Digital Marketing - The FuturePaul Marsden
 
Internet of Things: The Future of Digital Marketing
Internet of Things: The Future of Digital MarketingInternet of Things: The Future of Digital Marketing
Internet of Things: The Future of Digital MarketingIdea Imaji
 
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch Larson
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch LarsonUsing AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch Larson
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch LarsonSearch Marketing Expo - SMX
 

Viewers also liked (7)

Urban Design Research Methods
Urban Design Research MethodsUrban Design Research Methods
Urban Design Research Methods
 
Digital Marketing - The Future
Digital Marketing - The FutureDigital Marketing - The Future
Digital Marketing - The Future
 
Internet of Things: The Future of Digital Marketing
Internet of Things: The Future of Digital MarketingInternet of Things: The Future of Digital Marketing
Internet of Things: The Future of Digital Marketing
 
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch Larson
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch LarsonUsing AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch Larson
Using AdWords Scripts to Create Your Own Ad Tech Landscape By Mitch Larson
 
Rich Dad, Poor Dad
Rich Dad, Poor DadRich Dad, Poor Dad
Rich Dad, Poor Dad
 
MichaelReilly_Resume
MichaelReilly_ResumeMichaelReilly_Resume
MichaelReilly_Resume
 
Lyneham healthy place
Lyneham healthy placeLyneham healthy place
Lyneham healthy place
 

Similar to Assignment 2 - Final Documentation

First project, streatham
First project, streathamFirst project, streatham
First project, streathamFidel Karim
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioPaul Little
 
Lim choon wah 0311265 bim project 2b
Lim choon wah 0311265 bim project 2bLim choon wah 0311265 bim project 2b
Lim choon wah 0311265 bim project 2bReeve Lim
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Spindrift-cinematique-traduit
Spindrift-cinematique-traduitSpindrift-cinematique-traduit
Spindrift-cinematique-traduitEmilie Guichard
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsAustinAyo
 
Retail and Office building
Retail and Office buildingRetail and Office building
Retail and Office buildingJyoti Prashar
 
Building Information Modelling (BIM) : How Seng Guan
Building Information Modelling (BIM) : How Seng GuanBuilding Information Modelling (BIM) : How Seng Guan
Building Information Modelling (BIM) : How Seng Guanshacjhow
 
MCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYMCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYAaron McFee
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015Javier Pena
 
100% CONSTRUCTION DRAWING-YINGHUA HUANG
100% CONSTRUCTION DRAWING-YINGHUA HUANG100% CONSTRUCTION DRAWING-YINGHUA HUANG
100% CONSTRUCTION DRAWING-YINGHUA HUANGYing Hua Huang
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setarshacjhow
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawingsjiuaN59
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLISSean Roper
 

Similar to Assignment 2 - Final Documentation (20)

First project, streatham
First project, streathamFirst project, streatham
First project, streatham
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL Portfolio
 
final presentation.pdf
final presentation.pdffinal presentation.pdf
final presentation.pdf
 
Lim choon wah 0311265 bim project 2b
Lim choon wah 0311265 bim project 2bLim choon wah 0311265 bim project 2b
Lim choon wah 0311265 bim project 2b
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Spindrift-cinematique-traduit
Spindrift-cinematique-traduitSpindrift-cinematique-traduit
Spindrift-cinematique-traduit
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des Drawings
 
8 months work
8 months work8 months work
8 months work
 
Retail and Office building
Retail and Office buildingRetail and Office building
Retail and Office building
 
Building Information Modelling (BIM) : How Seng Guan
Building Information Modelling (BIM) : How Seng GuanBuilding Information Modelling (BIM) : How Seng Guan
Building Information Modelling (BIM) : How Seng Guan
 
MCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYMCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLY
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015
 
revit architecture project
revit architecture projectrevit architecture project
revit architecture project
 
100% CONSTRUCTION DRAWING-YINGHUA HUANG
100% CONSTRUCTION DRAWING-YINGHUA HUANG100% CONSTRUCTION DRAWING-YINGHUA HUANG
100% CONSTRUCTION DRAWING-YINGHUA HUANG
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 

Assignment 2 - Final Documentation

  • 1. A105 1 A1041 A104 2 A106 1 1 A102 1 A103 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:04PM Site Plan 1 Container House Brzeski 4th November Phillip R Brzeski Checker A101 No. Description Date 1 : 50 Site 1
  • 2. Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 1 A103 Ceiling Luvers - Fixed between trusses. See A106 Treated Pine Trusses, Studs & Rafters 2815 2182040400 99.74° 10.00° 207 Solar pannels 1059 361540157 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:04PM Section 1 1 Container House Brzeski 4th November Phillip R Brzeski Checker A102 No. Description Date 1 : 50 Section 1 1 Ceiling pitch - 99.74 degrees Roof pitch - 10 degrees
  • 3. Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 1 A102 913 Truss widt 175 Timber stairs and beams for elevated bed ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:05PM Section 2 1 Container House Brzeski 4th November Phillip R Brzeski Checker A103 No. Description Date 1 : 50 Section 2 1 Chipboard floor board, with carpet layer above Hardwood beam bolted to column Hardwood post with steel stirrup
  • 4. Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 12000 700 Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:05PM Elevations West and East 1 Container House Brzeski 4th November Phillip R Brzeski Checker A104 No. Description Date 1 : 50 East 1 1 : 50 West 2
  • 5. Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:06PM Elevation North 1 Container House Brzeski 4th November Phillip R Brzeski Checker A105 No. Description Date 1 : 50 North 1
  • 6. Site 0 Top of Posts 500 Top of Roof 4477 Finished Floor Level 668 Top of Walls 3326 Bottom of Roof 3402 16 15 14 13 1054 3767 1199 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:06PM Elevation South 1 Container House Brzeski 4th November Phillip R Brzeski Checker A106 No. Description Date 1 : 50 South 1
  • 7. DN ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 25 4/11/201512:46:07PM Furnished Floor Plan 1 Container House Brzeski 4th November Phillip R Brzeski Checker A107 No. Description Date 1 : 25 Finished Floor Level 1
  • 8. A105 1 A1041 A104 2 A106 1 1 A102 1 A103 85 3023 100 2680 85 291 2410 321 580 1450 650 5972 2731865 2138 85215485 85 3487 100 2200 100 212 1585 1790 984 624 592 100 14601290 300 740 85879100 125 4066291002365 4774 1160879 2468 1591836184 2179 849 1 A109 2 A109 Living Bed & Office Kitchen Laundry Bath Elevated Bed 2106 8141 4 7 2119 20 9 100 100 x 100 Steel posts welded from the steel floor of container to the roof for structural support ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:07PM Ground Floor 1 Container House Brzeski 4th November Phillip R Brzeski Checker A108 No. Description Date 1 : 50 Finished Floor Level Detailed 1 Walls - - Treated pine 70 mm stud - Interior paster board paint finish (gyprock) - Spray insulation within studs against container corrugation to aviod condensation in colder months Floor - Kitchen, laundry & bath are tiled Living, Bed/offic and elevated bed are carpted Windows & Front sliding door are double glazed Containers are to be welded together - Gaps between the floors of the containers are to be sealed with expanding foam, then chiped board flooring over the top - Gaps between walls and roof are to have a steel sheet welded covering the gap then waterproofing paint applied over the top Elevated bed - - timber beams which support the elevated bed, are attached to the 100 x 100 steel post within the wall
  • 9. 10mm steel plate imbedded into concrete column when poured Container corner locking mechanism is welded to steel plates 300 mm Concrete column 150 150 Steel reveals - to be welded to container corragation Concrete Column Container corragation 70 mm Stud Window Gyprock wallboard Front sliding door ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 5 4/11/201512:46:07PM Detail Drawings 1 Container House Brzeski 4th November Phillip R Brzeski Checker A109 No. Description Date 1 : 5 Container Corner 1 1 : 5 Window Reveal 2
  • 10. A105 1 A1041 A104 2 A106 1 1 3 A 2 C 84 7 D B 5 E 6 11981133 2982 2982 238611981198 962 962 2386 1771 2982 1235 ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 1 : 50 4/11/201512:46:07PM Columns Plans 1 Container House Brzeski 4th November Phillip R Brzeski Checker A110 No. Description Date 1 : 50 Top of Posts 1 Columns poured at grid intersections Columns 150 mm radius For column depths and hights refer to A104
  • 11. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:07PM Orthagraphic View 1 1 Container House Brzeski 4th November Phillip R Brzeski Checker A111 No. Description Date
  • 12. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:07PM Orthagraphic View 2 1 Container House Brzeski 4th November Phillip R Brzeski Checker A112 No. Description Date
  • 13. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:07PM Render - Kitchen View 1 Container House Brzeski 4th November Phillip R Brzeski Checker A113 No. Description Date
  • 14. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:08PM Render - Living Room View 1 Container House Brzeski 4th November Phillip R Brzeski Checker A114 No. Description Date
  • 15. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:08PM Render - Front Entry View 1 Container House Brzeski 4th November Phillip R Brzeski Checker A115 No. Description Date
  • 16. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:08PM Render - South East View 1 Container House Brzeski 4th November Phillip R Brzeski Checker A116 No. Description Date
  • 17. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:08PM Render - North East View 1 Container House Brzeski 4th November Phillip R Brzeski Checker A117 No. Description Date
  • 18. ScaleChecked by Drawn by Date Project number www.autodesk.com/revit 4/11/201512:46:08PM Schedules 1 Container House Brzeski 4th November Phillip R Brzeski Checker A118 No. Description Date Door Schedule Level Mark Location Height Width Thickness Finish Frame Material Comments Finished Floor Level 4 2134 1810 51 Finished Floor Level 7 2134 624 Finished Floor Level: 2 Grand total: 2 Window Schedule Mark Location Window Style Width Height Material Glazing Remarks 9 406 1830 13 913 540 14 913 540 15 913 540 16 913 540 19 2410 2040 20 406 1830 21 1450 1200