Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
16/05/201409:05:27
ADJACENT BUILDING
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A110
No. Description Date
ADJACENT BUILDING 1:200
-
-
--
-
-
- -
27
786
HILL
STREET
12 68
8
St John the
25
188
10
79.2m
14
to
18
LB
49 80
PO
66Shelter
63
FLEET ST
Hospital
26
Belgrade Theatre
(site of)
2
CORPORATION
STREET
PH
PH
190
ElSub
Sta
Lidice
Baptist's Church
77
to
117
(above)
4
79.6m
82 to 96
2
75
65
Bank
Club
(site of)
61
BO
ND
STREET
El Sub
Sta
Spon Gate
Hill Gate
Mercia
House
1to96
Post
Bablake
Boys'
Monument
Almshouse
Bonds Court
LB
TCBs
TCBs
TCB
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 800
16/05/201409:07:46
SITE PLAN
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A101
No. Description Date
1 : 800
Site
Bus stops in front of the
building is ideal for people
to get to one destination to
another. Bus stops could
result in traffic and due to it
be so close to the building
could be disadvantage
Trees are to be retained by the
Coventry City Council. Height are
about 15-20m
ADJACENT BUILDING
NEWLY BUILT COMMERCIAL
BUILDING FOR RETAIL
AND OFFICES
Pathway through the arcade
Hill street lies next to the
site and is quite with
limited traffic
NORTH
Fire exit for the building is
situated opposite side of
entrance
Any vehicle access possible is
only from service road
Sun rises in the East and sets in the West
Prevailing winds blow from
the South, South West and
West for a total of 55% of
the time
DW
REF.
UP
UP
1
2
3
4
5
6
7
A B C D E F G H I J
8
65 m²
703.8 SF
Reception Area
1
57 m²
618.3 SF
Loading Bay
5
29 m²
317.3 SF
Fire escape
7
240 m²
2583.8 SF
Cafe
9
58 m²
627.2 SF
Kitchen
6
157 m²
1693.2 SF
Retail
8
11 m²
118.7 SF
Ladies
3
11 m²
120.0 SF
Mens
4
16 m²
170.3 SF
Toilets
2
CURVED
GLAZED
ENTRANCE
ENTRANCE TO
RECEPTION
AREA
FIRE EXIT
ADJACENT BUILDING
ELEVATOR
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 200
16/05/201409:01:16
FLOOR PLANS- GROUND
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A108
No. Description Date
1 : 200
GROUND FLOOR PLAN
UP
UP
1
2
3
4
5
6
7
A B C D E F G H I J
8
65 m²
703.5 SF
Reception room
10
11 m²
119.3 SF
Ladies
11
12 m²
123.8 SF
Mens
12
16 m²
173.4 SF
Toilets
13
80 m²
861.5 SF
Board room
14
30 m²
317.6 SF
Fire escape
15
607 m²
6538.1 SF
Office space
16
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 200
16/05/201409:01:46
FLOOR PLANS- FIRST
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A109
No. Description Date
1 : 200
FIRST FLOOR PLAN
CURTAIN
WALLING
SYSTEM
ADJACENT BUILDING
ELEVATOR
SAME ARRANGEMENT ON SECOND AND THIRD FLOOR
ROOF
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
GROUND FLOOR
GROUND BEARING CONCRETE SLAB
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 200
16/05/201408:59:41
ELEVATIONS
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A105
No. Description Date
BACK 1:200
LEFT 1:200 FRONT 1:200
BRICKWORK
ENTRANCE TO RECEPTION AREA CURVED GLAZED ENTRANCE TO CAFE
Ground level
0
FIRST FLOOR PLAN
4000
1 2 3 4 5 6 7
SECOND FLOOR
PLAN
8000
THIRD FLOOR PLAN
12000
ROOF
16000
8
1
A101
1
A102
1
A103
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 100
16/05/201408:58:57
DETAIL SECTION
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A104
No. Description Date
1 : 100
DETAIL SECTION
1
Curtain walling
system
Stairs
access
from
reception
area
Elevator
Parapet Ground bearing slab
curved glazed
entrance
concrete columns
Screed Finish
Concrete slab
Insulation
Seperation Layer
DPM linked to DPC
Compacted sand
blinding
Well compacted
hardcore
Subsoil
Cavity fill below DPC
DPC min 150mm above
Perimeter insulation
Foundations to be 1:2:4 mix (cement, sharp sand, 20mm
aggregregate) with slump well
compacted and in layers and levelled. Drains passing through
foundations to be seperated
from concrete to allow movement.
Excavations are to be dug to a minimum depth of 1m and to atleast the depth of the existing
foundations and below the invert level of adjacent drains. Any trees, whether young, mature or removed
within the last 12 years, that are within 30m of the proposed site may effect the final depth of the foundation.
Final depths of excavations to be approved by a building control surveyor prior to placing concrete.
Brickwork
Blockwork
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 5
16/05/201408:56:27
GROUND FLOOR
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A101
No. Description Date
Mullion section of cladding system Block lining wall
Column of
structural frame
Structural floor
Stainless steel fixing bracket
Insulated panel
Neopreme seals
Insulated
curtain
wall infill
panel
Glazed
curtain
walling
section
Extruded
aluminium
curtain wall
frame
tied back to
structure
Void
(possible
insulated)
Closure piece/sill
Structural
column
of building
Sructural floor
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 5
16/05/201408:57:09
CURTAIN WALL SYSTEM
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A102
No. Description Date
Rigid Insulation
Grout and reinforced parapet CMU as per
structural requirements
Backer rod
Perimeter of roof insulation wrapped in air control membrane
to block airflow from roof to parapet
roof membrane
2 layers of insulation
Deflection space
Backer rod to fill deflection joint and debond
water and air barrier
fully adhered
water control
membrane
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 5
16/05/201408:57:46
ROOF PARAPET DETAIL
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A103
No. Description Date
Water, air and vapour
control membrane
Peel and stick
transition membrane:
air and water control
Parapet
flashing
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
1 : 100
16/05/201409:00:48
SECTION CONTINUED
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A107
No. Description Date
1 : 100
SECTION
BOARD ROOMFIRE STAIRS AND ESCAPE TOILETS (MEN AND WOMEN) ELEVATOR STAIRS RECEPTION AREA
FIRE EXIT OTHER SIDE OF ENTRANCE LOADING BAY ENTRANCE TO RECEPTION AREA
Scale (@ A3)
Checked by
Drawn by
Date Project number
www.autodesk.com/revit
STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION
DRWAING NUMBER REV
PROJECT CLIENT
SHEET
16/05/201409:03:02
SECTIONS CONTINUED.
Project Number
276CAB JYOTI PRASHAR
Issue Date
Author
Checker
A114
No. Description Date
SECTION BACK
FIRE EXIT
TOILETS
BOARD ROOM
RECEPTION AREA
ELEVATOR
CAFE
CURVED GLAZED ENTRANCE
CURTAIN
WALLING
STSTEM
RECEPTION AREA

More Related Content

What's hot

Tuning OEM Templates
Tuning OEM Templates Tuning OEM Templates
Tuning OEM Templates Datavail
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perakEraz
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Muhammad Haziq Azhar Mat Nazri
 
BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1Yaseen Syed
 
Modified Child Rescue System against Open Borewell
Modified Child Rescue System against Open BorewellModified Child Rescue System against Open Borewell
Modified Child Rescue System against Open Borewellijtsrd
 
Automatic sheet metal cutting machine 1
Automatic sheet metal cutting machine 1Automatic sheet metal cutting machine 1
Automatic sheet metal cutting machine 1shahbaz shaikh
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Nekumi Kida
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri DrawingsXin Dean Chong
 
Dv site analysis report
Dv site analysis reportDv site analysis report
Dv site analysis reportAh Jun
 

What's hot (11)

Tuning OEM Templates
Tuning OEM Templates Tuning OEM Templates
Tuning OEM Templates
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perak
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
 
BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1
 
Modified Child Rescue System against Open Borewell
Modified Child Rescue System against Open BorewellModified Child Rescue System against Open Borewell
Modified Child Rescue System against Open Borewell
 
Automatic sheet metal cutting machine 1
Automatic sheet metal cutting machine 1Automatic sheet metal cutting machine 1
Automatic sheet metal cutting machine 1
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
 
Bel
BelBel
Bel
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri Drawings
 
Dv site analysis report
Dv site analysis reportDv site analysis report
Dv site analysis report
 

Viewers also liked

Extension and Redevelopment
Extension and RedevelopmentExtension and Redevelopment
Extension and RedevelopmentJyoti Prashar
 
Proposed Plans
Proposed PlansProposed Plans
Proposed Plansjairofrigu
 
Presentation Teodor Caragioiu
Presentation Teodor CaragioiuPresentation Teodor Caragioiu
Presentation Teodor CaragioiuTeodor Caragioiu
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara MaybankSheau Hui Tan
 
Propose geminate house
Propose geminate housePropose geminate house
Propose geminate housejairofrigu
 
Revit 224 OFFICE BUILDING
Revit 224 OFFICE BUILDINGRevit 224 OFFICE BUILDING
Revit 224 OFFICE BUILDINGBill Handley
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsAdibah Awang
 
Balairung Seri Measured Drawings
Balairung Seri Measured DrawingsBalairung Seri Measured Drawings
Balairung Seri Measured DrawingsAmos Tan
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawingsYeeQun
 

Viewers also liked (10)

Extension and Redevelopment
Extension and RedevelopmentExtension and Redevelopment
Extension and Redevelopment
 
Proposed Plans
Proposed PlansProposed Plans
Proposed Plans
 
Presentation Teodor Caragioiu
Presentation Teodor CaragioiuPresentation Teodor Caragioiu
Presentation Teodor Caragioiu
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Propose geminate house
Propose geminate housePropose geminate house
Propose geminate house
 
Revit 224 OFFICE BUILDING
Revit 224 OFFICE BUILDINGRevit 224 OFFICE BUILDING
Revit 224 OFFICE BUILDING
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured Drawings
 
Balairung Seri Measured Drawings
Balairung Seri Measured DrawingsBalairung Seri Measured Drawings
Balairung Seri Measured Drawings
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 

Similar to Retail and Office building

First project, streatham
First project, streathamFirst project, streatham
First project, streathamFidel Karim
 
Pa5 pi-db-02-m01-003-00 itp of steel structure
Pa5 pi-db-02-m01-003-00 itp of steel structurePa5 pi-db-02-m01-003-00 itp of steel structure
Pa5 pi-db-02-m01-003-00 itp of steel structureHenrique Milk
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development PortfolioChinh Phan Duc
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-worksimaduddin91
 
Sheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final ProjectSheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final ProjectSheena Gozon
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014Martin Pauly
 
Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Ahmed Gaafar
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactivesergencad sergencad
 
5500, 5514 Broadway 200, 202, 206 Ellwood
5500, 5514  Broadway 200, 202, 206 Ellwood 5500, 5514  Broadway 200, 202, 206 Ellwood
5500, 5514 Broadway 200, 202, 206 Ellwood Marian Vargas Mendoza
 
MCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYMCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYAaron McFee
 
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01Sherif Azab
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 

Similar to Retail and Office building (20)

First project, streatham
First project, streathamFirst project, streatham
First project, streatham
 
Pa5 pi-db-02-m01-003-00 itp of steel structure
Pa5 pi-db-02-m01-003-00 itp of steel structurePa5 pi-db-02-m01-003-00 itp of steel structure
Pa5 pi-db-02-m01-003-00 itp of steel structure
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development Portfolio
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-works
 
Sheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final ProjectSheena Gozon_Revit Class_Arch 202_Final Project
Sheena Gozon_Revit Class_Arch 202_Final Project
 
ERDENEBAT 374-3
ERDENEBAT 374-3ERDENEBAT 374-3
ERDENEBAT 374-3
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
 
5500, 5514 Broadway 200, 202, 206 Ellwood
5500, 5514  Broadway 200, 202, 206 Ellwood 5500, 5514  Broadway 200, 202, 206 Ellwood
5500, 5514 Broadway 200, 202, 206 Ellwood
 
MCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLYMCFEE_AARON_PALACE_OF_ASSEMBLY
MCFEE_AARON_PALACE_OF_ASSEMBLY
 
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 

Retail and Office building

  • 1. Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 16/05/201409:05:27 ADJACENT BUILDING Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A110 No. Description Date ADJACENT BUILDING 1:200
  • 2. - - -- - - - - 27 786 HILL STREET 12 68 8 St John the 25 188 10 79.2m 14 to 18 LB 49 80 PO 66Shelter 63 FLEET ST Hospital 26 Belgrade Theatre (site of) 2 CORPORATION STREET PH PH 190 ElSub Sta Lidice Baptist's Church 77 to 117 (above) 4 79.6m 82 to 96 2 75 65 Bank Club (site of) 61 BO ND STREET El Sub Sta Spon Gate Hill Gate Mercia House 1to96 Post Bablake Boys' Monument Almshouse Bonds Court LB TCBs TCBs TCB Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 800 16/05/201409:07:46 SITE PLAN Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A101 No. Description Date 1 : 800 Site Bus stops in front of the building is ideal for people to get to one destination to another. Bus stops could result in traffic and due to it be so close to the building could be disadvantage Trees are to be retained by the Coventry City Council. Height are about 15-20m ADJACENT BUILDING NEWLY BUILT COMMERCIAL BUILDING FOR RETAIL AND OFFICES Pathway through the arcade Hill street lies next to the site and is quite with limited traffic NORTH Fire exit for the building is situated opposite side of entrance Any vehicle access possible is only from service road Sun rises in the East and sets in the West Prevailing winds blow from the South, South West and West for a total of 55% of the time
  • 3. DW REF. UP UP 1 2 3 4 5 6 7 A B C D E F G H I J 8 65 m² 703.8 SF Reception Area 1 57 m² 618.3 SF Loading Bay 5 29 m² 317.3 SF Fire escape 7 240 m² 2583.8 SF Cafe 9 58 m² 627.2 SF Kitchen 6 157 m² 1693.2 SF Retail 8 11 m² 118.7 SF Ladies 3 11 m² 120.0 SF Mens 4 16 m² 170.3 SF Toilets 2 CURVED GLAZED ENTRANCE ENTRANCE TO RECEPTION AREA FIRE EXIT ADJACENT BUILDING ELEVATOR Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 200 16/05/201409:01:16 FLOOR PLANS- GROUND Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A108 No. Description Date 1 : 200 GROUND FLOOR PLAN
  • 4. UP UP 1 2 3 4 5 6 7 A B C D E F G H I J 8 65 m² 703.5 SF Reception room 10 11 m² 119.3 SF Ladies 11 12 m² 123.8 SF Mens 12 16 m² 173.4 SF Toilets 13 80 m² 861.5 SF Board room 14 30 m² 317.6 SF Fire escape 15 607 m² 6538.1 SF Office space 16 Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 200 16/05/201409:01:46 FLOOR PLANS- FIRST Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A109 No. Description Date 1 : 200 FIRST FLOOR PLAN CURTAIN WALLING SYSTEM ADJACENT BUILDING ELEVATOR SAME ARRANGEMENT ON SECOND AND THIRD FLOOR
  • 5. ROOF THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR GROUND BEARING CONCRETE SLAB Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 200 16/05/201408:59:41 ELEVATIONS Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A105 No. Description Date BACK 1:200 LEFT 1:200 FRONT 1:200 BRICKWORK ENTRANCE TO RECEPTION AREA CURVED GLAZED ENTRANCE TO CAFE
  • 6. Ground level 0 FIRST FLOOR PLAN 4000 1 2 3 4 5 6 7 SECOND FLOOR PLAN 8000 THIRD FLOOR PLAN 12000 ROOF 16000 8 1 A101 1 A102 1 A103 Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 100 16/05/201408:58:57 DETAIL SECTION Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A104 No. Description Date 1 : 100 DETAIL SECTION 1 Curtain walling system Stairs access from reception area Elevator Parapet Ground bearing slab curved glazed entrance concrete columns
  • 7. Screed Finish Concrete slab Insulation Seperation Layer DPM linked to DPC Compacted sand blinding Well compacted hardcore Subsoil Cavity fill below DPC DPC min 150mm above Perimeter insulation Foundations to be 1:2:4 mix (cement, sharp sand, 20mm aggregregate) with slump well compacted and in layers and levelled. Drains passing through foundations to be seperated from concrete to allow movement. Excavations are to be dug to a minimum depth of 1m and to atleast the depth of the existing foundations and below the invert level of adjacent drains. Any trees, whether young, mature or removed within the last 12 years, that are within 30m of the proposed site may effect the final depth of the foundation. Final depths of excavations to be approved by a building control surveyor prior to placing concrete. Brickwork Blockwork Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 5 16/05/201408:56:27 GROUND FLOOR Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A101 No. Description Date
  • 8. Mullion section of cladding system Block lining wall Column of structural frame Structural floor Stainless steel fixing bracket Insulated panel Neopreme seals Insulated curtain wall infill panel Glazed curtain walling section Extruded aluminium curtain wall frame tied back to structure Void (possible insulated) Closure piece/sill Structural column of building Sructural floor Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 5 16/05/201408:57:09 CURTAIN WALL SYSTEM Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A102 No. Description Date
  • 9. Rigid Insulation Grout and reinforced parapet CMU as per structural requirements Backer rod Perimeter of roof insulation wrapped in air control membrane to block airflow from roof to parapet roof membrane 2 layers of insulation Deflection space Backer rod to fill deflection joint and debond water and air barrier fully adhered water control membrane Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 5 16/05/201408:57:46 ROOF PARAPET DETAIL Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A103 No. Description Date Water, air and vapour control membrane Peel and stick transition membrane: air and water control Parapet flashing
  • 10. Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 1 : 100 16/05/201409:00:48 SECTION CONTINUED Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A107 No. Description Date 1 : 100 SECTION BOARD ROOMFIRE STAIRS AND ESCAPE TOILETS (MEN AND WOMEN) ELEVATOR STAIRS RECEPTION AREA FIRE EXIT OTHER SIDE OF ENTRANCE LOADING BAY ENTRANCE TO RECEPTION AREA
  • 11. Scale (@ A3) Checked by Drawn by Date Project number www.autodesk.com/revit STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV PROJECT CLIENT SHEET 16/05/201409:03:02 SECTIONS CONTINUED. Project Number 276CAB JYOTI PRASHAR Issue Date Author Checker A114 No. Description Date SECTION BACK FIRE EXIT TOILETS BOARD ROOM RECEPTION AREA ELEVATOR CAFE CURVED GLAZED ENTRANCE CURTAIN WALLING STSTEM RECEPTION AREA