SlideShare a Scribd company logo
1 of 33
Download to read offline
Utah Statewide Growth Trends
Strategic Goals
  Take care of what we have   Preserve Infrastructure
Make the system work better   Optimize Mobility
             Improve safety   Improve Safety
          Increase capacity   Strengthen the Economy
Preserve
  Preserve
    Infrastructure
 Infrast
Pavement Conditions
3 Maintenance Levels
to Prioritize Resources

Interstate and Level 1
 • 53% of all State Highway
   Lane Miles

 • 96% of all Vehicle Miles
   Traveled on State System

Level 2
 • Less than 2,000 vehicles
   per day
Condition of Utah State
Roads

 • Overall Condition of UDOT
   Highways are Good

 • Majority of Roads in Poor
   Condition are Low
   Volume/Rural (Level 2)
Pavement Condition
                                                               Historical – Projected
                                  (Interstate – 935 miles)                                                                                      (Level 1 – 2,185 miles)
                           Ride Quality - Projected with 60 million / year                                                            Ride Quality - Projected with 90 million / year
             100%                                                                                                      100%

             90%                                                                                                       90%

             80%                                                                                                       80%

             70%                                                                                                       70%

             60%                                                                                                       60%




                                                                                                          % of Miles
% of Miles




             50%                                                                                                       50%

             40%                                                                                                       40%

             30%                                                                                                       30%

             20%                                                                                                       20%

             10%                                                                                                       10%

              0%                                                                                                        0%
                      2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020                                          2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020


               % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (95 to 98%)                  % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (90 to 95%)
Pavement Condition
                                                Historical – Projected
                                                    (Level 2 – 2,735 miles)
                                                 Ride Quality – Projected at Current Funding Levels
             100%

             90%

             80%

             70%

             60%
% of Miles




             50%

             40%

             30%

             20%

             10%

              0%
                    2008     2009        2010    2011     2012      2013        2014   2015      2016      2017       2018      2019   2020
                        % Good: IRI < 95        % Fair        % Poor: IRI > 170        Upper & Lower Threshold Band (80 to 90%)


                                                                               Over 500 centerline miles in poor condition today
                                                                  At current funding levels, poor condition roads double by 2020
Pavement Condition
                                                                 Historical – Projected
                                  (Level 2 – 2,735 miles)                                                                                    (Level 2 – 2,735 miles)
                     Ride Quality – Projected at Current Funding Levels                                                            Ride Quality - Projected with an Additional 40
                                                                                                                                                   million / year *
             100%                                                                                                      100%

             90%                                                                                                       90%

             80%                                                                                                       80%

             70%                                                                                                       70%

             60%                                                                                                       60%




                                                                                                          % of Miles
% of Miles




             50%                                                                                                       50%

             40%                                                                                                       40%

             30%                                                                                                       30%

             20%                                                                                                       20%

             10%                                                                                                       10%

              0%                                                                                                        0%
                     2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020                                          2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020


               % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (80 to 90%)                   % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (80 to 90%)

                                                                                                                                                              * Governor’s proposed 2013 budget
Condition of UDOT Bridges
Age Distribution
Optimize
  Optimize
 Mobility
    Mobility
Delay Along the Wasatch Front
    Davis, Weber, Salt Lake & Utah Counties
Mountain View Corridor
  15 miles under construction

  All 22 bridges and structures complete or underway
Mountain View Corridor
  Sections of pavement, curb, gutter, and trails placed

  Completion date – December 2012




                                                           Midas Creek Dec. 2011




 Midas Creek at the start of construction
I-15 CORE
  24 miles, 10 interchanges, 63 bridges

  35-month schedule makes this the fastest billion-dollar project in
   U.S. history

  On schedule for Dec. 2012 completion
Construction Progress
  75% complete

  95% of traffic on new concrete

  2 million square yards of concrete placed
Southern Parkway
Southern Parkway
  I-15 to airport complete

  7 miles of new road

  Future – St. George Airport to Sand Hollow Reservoir
West Davis
 EIS began: Jan 2010

 EIS funding: $8 mil

 Aug 2010 - 46 Alt
West Davis
 Sept 2011
 8 alternatives and
 options
 9 Open houses

 5,000 public comments

 Draft EIS late
 summer 2012
Hours of use   Annual User Hours and Cost Savings
Improve
 Safety
  Improve
   Safety
Zero Fatalities




 A Goal We Can All Live With
Interstate Serious Injury and Fatal Crashes
          Engineering Solutions | Saving Lives
Interstate Serious Injury and Fatal Crashes
        Involving a Vehicle that Crossed the Median
          vs Total Miles of Cable Barrier Installed
Strength
 Strengthen
   Econom
    the Economy
Economic Impact



        Number of contractor and consultant
                                companies
                             (P rimes and S ubs )


                                 602
                  Private sector employees
                    associated with current
                       construction projects


                       13,063
Strengthen the Economy
Accelerated Techniques
Accomplishments 2012
Finishing 28 projects worth more than $3 billion
Utah Statewide Growth Trends: Preserving Infrastructure, Optimizing Mobility & Improving Safety

More Related Content

Viewers also liked

A State-based Model for Runtime Resource Reservation for Component-based Appl...
A State-based Model for Runtime Resource Reservation for Component-based Appl...A State-based Model for Runtime Resource Reservation for Component-based Appl...
A State-based Model for Runtime Resource Reservation for Component-based Appl...IDES Editor
 
Estimation of IRI from PCI in Construction Work Zones
Estimation of IRI from PCI in Construction Work ZonesEstimation of IRI from PCI in Construction Work Zones
Estimation of IRI from PCI in Construction Work ZonesIDES Editor
 
Multi Similarity Measure based Result Merging Strategies in Meta Search Engine
Multi Similarity Measure based Result Merging Strategies in Meta Search EngineMulti Similarity Measure based Result Merging Strategies in Meta Search Engine
Multi Similarity Measure based Result Merging Strategies in Meta Search EngineIDES Editor
 
An Efficient Search Engine for Searching Desired File
An Efficient Search Engine for Searching Desired FileAn Efficient Search Engine for Searching Desired File
An Efficient Search Engine for Searching Desired FileIDES Editor
 
Efficient Representation of Smart Environments using a Parallelized Approach
Efficient Representation of Smart Environments using a Parallelized ApproachEfficient Representation of Smart Environments using a Parallelized Approach
Efficient Representation of Smart Environments using a Parallelized ApproachIDES Editor
 
Participatory Project
Participatory ProjectParticipatory Project
Participatory Project#Xiao Zhe#
 
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...Johan Granlund
 
International Roughness Index, IRI, and ISO 2631 Vibration Evaluation
International Roughness Index, IRI, and ISO 2631 Vibration EvaluationInternational Roughness Index, IRI, and ISO 2631 Vibration Evaluation
International Roughness Index, IRI, and ISO 2631 Vibration EvaluationJohan Granlund
 

Viewers also liked (9)

A State-based Model for Runtime Resource Reservation for Component-based Appl...
A State-based Model for Runtime Resource Reservation for Component-based Appl...A State-based Model for Runtime Resource Reservation for Component-based Appl...
A State-based Model for Runtime Resource Reservation for Component-based Appl...
 
Research Poster
Research PosterResearch Poster
Research Poster
 
Estimation of IRI from PCI in Construction Work Zones
Estimation of IRI from PCI in Construction Work ZonesEstimation of IRI from PCI in Construction Work Zones
Estimation of IRI from PCI in Construction Work Zones
 
Multi Similarity Measure based Result Merging Strategies in Meta Search Engine
Multi Similarity Measure based Result Merging Strategies in Meta Search EngineMulti Similarity Measure based Result Merging Strategies in Meta Search Engine
Multi Similarity Measure based Result Merging Strategies in Meta Search Engine
 
An Efficient Search Engine for Searching Desired File
An Efficient Search Engine for Searching Desired FileAn Efficient Search Engine for Searching Desired File
An Efficient Search Engine for Searching Desired File
 
Efficient Representation of Smart Environments using a Parallelized Approach
Efficient Representation of Smart Environments using a Parallelized ApproachEfficient Representation of Smart Environments using a Parallelized Approach
Efficient Representation of Smart Environments using a Parallelized Approach
 
Participatory Project
Participatory ProjectParticipatory Project
Participatory Project
 
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
 
International Roughness Index, IRI, and ISO 2631 Vibration Evaluation
International Roughness Index, IRI, and ISO 2631 Vibration EvaluationInternational Roughness Index, IRI, and ISO 2631 Vibration Evaluation
International Roughness Index, IRI, and ISO 2631 Vibration Evaluation
 

Similar to Utah Statewide Growth Trends: Preserving Infrastructure, Optimizing Mobility & Improving Safety

The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?Marnix van Eerde
 
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...
Amund Bråthen - konsumentanalytiker Norges sjømatråd -  Miniseminar Laks - Ju...Amund Bråthen - konsumentanalytiker Norges sjømatråd -  Miniseminar Laks - Ju...
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...Norwegian Seafood Council
 
Session #2: Test Driven Development
Session #2: Test Driven DevelopmentSession #2: Test Driven Development
Session #2: Test Driven DevelopmentSteve Lange
 
Strix Applications Case Studies
Strix  Applications  Case StudiesStrix  Applications  Case Studies
Strix Applications Case Studiestritv
 
Egyptian elections presidential debate may 2012
Egyptian elections presidential debate may 2012Egyptian elections presidential debate may 2012
Egyptian elections presidential debate may 2012SocialEyez
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
 
Antonio Donini - Civ-mil and the future of Humanitarian Action
Antonio Donini - Civ-mil and the future of Humanitarian ActionAntonio Donini - Civ-mil and the future of Humanitarian Action
Antonio Donini - Civ-mil and the future of Humanitarian ActionAustralian Civil-Military Centre
 
TV Viewership Jan - Dec 2010
TV Viewership Jan - Dec 2010TV Viewership Jan - Dec 2010
TV Viewership Jan - Dec 2010noumanfazal
 
Amie Peters
Amie Peters Amie Peters
Amie Peters Alchemy
 
District and school board leadership for academy success
District and school board leadership for academy successDistrict and school board leadership for academy success
District and school board leadership for academy successNAFCareerAcads
 
Arm2011 oliver(leininger) 6.14.11
Arm2011 oliver(leininger) 6.14.11Arm2011 oliver(leininger) 6.14.11
Arm2011 oliver(leininger) 6.14.11soder145
 
Test management
Test managementTest management
Test managementOana Feidi
 
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...Paul Stith
 
Audience Behaviour: Bring Back that Lovin‘ Feelin‘
Audience Behaviour: Bring Back that Lovin‘ Feelin‘Audience Behaviour: Bring Back that Lovin‘ Feelin‘
Audience Behaviour: Bring Back that Lovin‘ Feelin‘AchillesMedia
 

Similar to Utah Statewide Growth Trends: Preserving Infrastructure, Optimizing Mobility & Improving Safety (20)

The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
 
Workforce Statewide Presentation 2012
Workforce Statewide Presentation 2012Workforce Statewide Presentation 2012
Workforce Statewide Presentation 2012
 
Sociedade Ponto Verde by SOAP
Sociedade Ponto Verde by SOAPSociedade Ponto Verde by SOAP
Sociedade Ponto Verde by SOAP
 
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...
Amund Bråthen - konsumentanalytiker Norges sjømatråd -  Miniseminar Laks - Ju...Amund Bråthen - konsumentanalytiker Norges sjømatråd -  Miniseminar Laks - Ju...
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...
 
Session #2: Test Driven Development
Session #2: Test Driven DevelopmentSession #2: Test Driven Development
Session #2: Test Driven Development
 
Strix Applications Case Studies
Strix  Applications  Case StudiesStrix  Applications  Case Studies
Strix Applications Case Studies
 
Omi creds
Omi credsOmi creds
Omi creds
 
Egyptian elections presidential debate may 2012
Egyptian elections presidential debate may 2012Egyptian elections presidential debate may 2012
Egyptian elections presidential debate may 2012
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Antonio Donini - Civ-mil and the future of Humanitarian Action
Antonio Donini - Civ-mil and the future of Humanitarian ActionAntonio Donini - Civ-mil and the future of Humanitarian Action
Antonio Donini - Civ-mil and the future of Humanitarian Action
 
TV Viewership Jan - Dec 2010
TV Viewership Jan - Dec 2010TV Viewership Jan - Dec 2010
TV Viewership Jan - Dec 2010
 
Re Insights Graphs Oct
Re Insights Graphs OctRe Insights Graphs Oct
Re Insights Graphs Oct
 
Amie Peters
Amie Peters Amie Peters
Amie Peters
 
Direct Marketing
Direct MarketingDirect Marketing
Direct Marketing
 
District and school board leadership for academy success
District and school board leadership for academy successDistrict and school board leadership for academy success
District and school board leadership for academy success
 
Arm2011 oliver(leininger) 6.14.11
Arm2011 oliver(leininger) 6.14.11Arm2011 oliver(leininger) 6.14.11
Arm2011 oliver(leininger) 6.14.11
 
Test management
Test managementTest management
Test management
 
Mobile Devices MetaPress
Mobile Devices MetaPressMobile Devices MetaPress
Mobile Devices MetaPress
 
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
 
Audience Behaviour: Bring Back that Lovin‘ Feelin‘
Audience Behaviour: Bring Back that Lovin‘ Feelin‘Audience Behaviour: Bring Back that Lovin‘ Feelin‘
Audience Behaviour: Bring Back that Lovin‘ Feelin‘
 

More from Utah Department of Transportation

Traffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportTraffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportUtah Department of Transportation
 
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...Utah Department of Transportation
 
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...Utah Department of Transportation
 
Governor's Transportation Summit - Municipal Highway Infrastructure Overview
Governor's Transportation Summit - Municipal Highway Infrastructure OverviewGovernor's Transportation Summit - Municipal Highway Infrastructure Overview
Governor's Transportation Summit - Municipal Highway Infrastructure OverviewUtah Department of Transportation
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Utah Department of Transportation
 
Governor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim CommitteeGovernor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim CommitteeUtah Department of Transportation
 
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...Utah Department of Transportation
 

More from Utah Department of Transportation (20)

Comprehensive RUC Presentation
Comprehensive RUC PresentationComprehensive RUC Presentation
Comprehensive RUC Presentation
 
UDOT Funding
UDOT FundingUDOT Funding
UDOT Funding
 
Appropriations 2015
Appropriations 2015Appropriations 2015
Appropriations 2015
 
Traffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportTraffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs Report
 
Governor's Transportation Summit - UDOT Challenges
Governor's Transportation Summit - UDOT ChallengesGovernor's Transportation Summit - UDOT Challenges
Governor's Transportation Summit - UDOT Challenges
 
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
 
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
 
Governor's Transportation Summit - Municipal Highway Infrastructure Overview
Governor's Transportation Summit - Municipal Highway Infrastructure OverviewGovernor's Transportation Summit - Municipal Highway Infrastructure Overview
Governor's Transportation Summit - Municipal Highway Infrastructure Overview
 
Governor's Transportation Summit - Ski Utah
Governor's Transportation Summit - Ski UtahGovernor's Transportation Summit - Ski Utah
Governor's Transportation Summit - Ski Utah
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
 
Governor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim CommitteeGovernor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim Committee
 
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
 
Governor's Transportation Summit - Transportation Funding
Governor's Transportation Summit - Transportation FundingGovernor's Transportation Summit - Transportation Funding
Governor's Transportation Summit - Transportation Funding
 
Vision for UDOT's Future
Vision for UDOT's FutureVision for UDOT's Future
Vision for UDOT's Future
 
Utah Highway Users Fall Meeting
Utah Highway Users Fall MeetingUtah Highway Users Fall Meeting
Utah Highway Users Fall Meeting
 
UDOT Program Update
UDOT Program UpdateUDOT Program Update
UDOT Program Update
 
Uintah Basin Energy and Transportation Study
Uintah Basin Energy and Transportation StudyUintah Basin Energy and Transportation Study
Uintah Basin Energy and Transportation Study
 
Utah Transportation Funding
Utah Transportation FundingUtah Transportation Funding
Utah Transportation Funding
 
Utah's State Infrastructur Bank (Experience & Perspectives)
Utah's State Infrastructur Bank (Experience & Perspectives)Utah's State Infrastructur Bank (Experience & Perspectives)
Utah's State Infrastructur Bank (Experience & Perspectives)
 
UDOT Funding
UDOT FundingUDOT Funding
UDOT Funding
 

Recently uploaded

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Recently uploaded (20)

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 

Utah Statewide Growth Trends: Preserving Infrastructure, Optimizing Mobility & Improving Safety

  • 1.
  • 3. Strategic Goals Take care of what we have Preserve Infrastructure Make the system work better Optimize Mobility Improve safety Improve Safety Increase capacity Strengthen the Economy
  • 4. Preserve Preserve Infrastructure Infrast
  • 6. 3 Maintenance Levels to Prioritize Resources Interstate and Level 1 • 53% of all State Highway Lane Miles • 96% of all Vehicle Miles Traveled on State System Level 2 • Less than 2,000 vehicles per day
  • 7. Condition of Utah State Roads • Overall Condition of UDOT Highways are Good • Majority of Roads in Poor Condition are Low Volume/Rural (Level 2)
  • 8. Pavement Condition Historical – Projected (Interstate – 935 miles) (Level 1 – 2,185 miles) Ride Quality - Projected with 60 million / year Ride Quality - Projected with 90 million / year 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles % of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (95 to 98%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (90 to 95%)
  • 9. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels 100% 90% 80% 70% 60% % of Miles 50% 40% 30% 20% 10% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) Over 500 centerline miles in poor condition today At current funding levels, poor condition roads double by 2020
  • 10. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels Ride Quality - Projected with an Additional 40 million / year * 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles % of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) * Governor’s proposed 2013 budget
  • 11. Condition of UDOT Bridges
  • 13. Optimize Optimize Mobility Mobility
  • 14. Delay Along the Wasatch Front Davis, Weber, Salt Lake & Utah Counties
  • 15. Mountain View Corridor  15 miles under construction  All 22 bridges and structures complete or underway
  • 16. Mountain View Corridor  Sections of pavement, curb, gutter, and trails placed  Completion date – December 2012 Midas Creek Dec. 2011 Midas Creek at the start of construction
  • 17. I-15 CORE  24 miles, 10 interchanges, 63 bridges  35-month schedule makes this the fastest billion-dollar project in U.S. history  On schedule for Dec. 2012 completion
  • 18. Construction Progress  75% complete  95% of traffic on new concrete  2 million square yards of concrete placed
  • 20. Southern Parkway  I-15 to airport complete  7 miles of new road  Future – St. George Airport to Sand Hollow Reservoir
  • 21. West Davis  EIS began: Jan 2010  EIS funding: $8 mil  Aug 2010 - 46 Alt
  • 22. West Davis  Sept 2011 8 alternatives and options  9 Open houses  5,000 public comments  Draft EIS late summer 2012
  • 23. Hours of use Annual User Hours and Cost Savings
  • 24. Improve Safety Improve Safety
  • 25. Zero Fatalities A Goal We Can All Live With
  • 26. Interstate Serious Injury and Fatal Crashes Engineering Solutions | Saving Lives
  • 27. Interstate Serious Injury and Fatal Crashes Involving a Vehicle that Crossed the Median vs Total Miles of Cable Barrier Installed
  • 28. Strength Strengthen Econom the Economy
  • 29. Economic Impact Number of contractor and consultant companies (P rimes and S ubs ) 602 Private sector employees associated with current construction projects 13,063
  • 32. Accomplishments 2012 Finishing 28 projects worth more than $3 billion