Video and Sonar Inspection Guides Rehabilitation of the Coronado Transbay Sewer Force Main Presented and Written By Elmer Alex, PE, M. ASCE Contributions by Marc Solomon, PE;  Maggie Witt, PE; Jason Gornall, EIT Contributing Authority: Ed Walton, PE For ASCE Pipelines Conference 2009 August 18, 2009
Outline ,[object Object],[object Object],[object Object],[object Object]
Location Map City of Coronado You are Here!
City of Coronado City of San Diego Transbay Pump Station Original Force Main Seaport Village New Force Main Original Transbay Force Main Location
Challenges ,[object Object],Insert Profile Drawing Slope >30% 50 feet below MSL High Profile Locations 3,600 LF Dewatering may accelerate corrosion
Apply Lesson’s Learned from  “The Tortoise and the Hare” Fable
Risk Management Plan Development ,[object Object],[object Object],[object Object],[object Object],Respond to Risks Analyze Risks Identify Risks Track and Report Risks
Risk Management Team Name Organization Role Responsibilities Eric Minicilli City of Coronado Project Manager Project Manager and Point Of Contact for City Ed Walton City of Coronado City Engineer Kim Godby City of Coronado O&M Manage City O&M Staff Marc Solomon Winzler & Kelly Consultant/Engineer Lead Risk Manager Elmer Alex Winzler & Kelly Consultant/Engineer Alt. Risk Manager Corey Charfauros Affordable Pipeline Services Entry Point Cleaning Lead Manage cleaning & inspection support efforts James Milward Pipe Eye Int’l (acquired by Pure Technologies) Inspection Lead Pilot/Equipment Operator
Identify and Analyze Risk ,[object Object],[object Object],[object Object],Yellow Green Red Category Definition Priority Potential for 100% Failure High Potential to lengthen inspection Medium Very Low risk Low
Risk Response Risk Avoid Accept Mitigate - Prevent - Contingency
Risk Management Process Yellow Yellow Yellow Risk # Description Priority Response Team Member Activity 1 Confined Space Hazards Mitigate Affordable Pipeline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],6 Sharp Vertical Bends Endanger Cable Mitigate Pipe Eye ,[object Object],[object Object],[object Object],7 Poor Visibility & Cloudy Water Mitigate City ,[object Object],[object Object]
Pre-Inspection Activities Prepare Point of Entry on Coronado Side
Inspection Moved to San Diego Side
Mitigate Confined Space Hazards
Monitor Progress
Track and Maintain the Risk Log Yellow Yellow Yellow Risk # Description Encountered (Y/N) Category Response 1 Confined Space Hazards Yes ,[object Object],[object Object],6 Sharp Vertical Bends Endanger Cable No ,[object Object],[object Object],7 Poor Visibility & Cloudy Water Yes ,[object Object]
Clean Up & Demobilize
Inspection Results
Pipeline Rehabilitation/Re-use Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Evaluation Criteria & Weighting Factors Criteria Weighting Factors Impacts to Surroundings 18% Structural Integrity 7% Operational Reliability 15% Operational Flexibility 5% Constructability 12% Hydraulic Improvements 3% Risk 15% Capital Cost 8% O & M Cost 9% Life Cycle Cost 8%
Evaluation Matrix
Conclusion ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Questions

More Related Content

Viewers also liked

Vision for All
Vision for AllVision for All
Vision for All
fridlizius
 
Portfolio Work
Portfolio WorkPortfolio Work
Portfolio Work
TheDanGoldstein
 
Out
OutOut
Wam Paper Gen X Women In High Tech2 12 06[1]
Wam Paper Gen X Women In High Tech2 12 06[1]Wam Paper Gen X Women In High Tech2 12 06[1]
Wam Paper Gen X Women In High Tech2 12 06[1]
yvonnevick
 
Fiestas Patrias
Fiestas PatriasFiestas Patrias
Fiestas Patrias
scarlethespinoza
 
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
PTimonen, Humak, Humanistinen ammattikorkeakoulu
 
Humak in english2013
Humak in english2013Humak in english2013
Mab project v026 n va-pb
Mab project v026   n va-pbMab project v026   n va-pb
Mab project v026 n va-pbpp1pete
 
Софіт №3(7)
Софіт №3(7)Софіт №3(7)
Софіт №3(7)
Sofit Lux
 
PresentacióN Makuna
PresentacióN MakunaPresentacióN Makuna
PresentacióN Makuna
Angela Geraldine Baquero Caldas
 
Софіт №8(12)
Софіт №8(12)Софіт №8(12)
Софіт №8(12)
Sofit Lux
 
Mikkeli210312 sosiaalinenmediatyöpaja
Mikkeli210312 sosiaalinenmediatyöpajaMikkeli210312 sosiaalinenmediatyöpaja
Mikkeli210312 sosiaalinenmediatyöpaja
PTimonen, Humak, Humanistinen ammattikorkeakoulu
 
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
PTimonen, Humak, Humanistinen ammattikorkeakoulu
 
Софіт №9(13)
Софіт №9(13)Софіт №9(13)
Софіт №9(13)
Sofit Lux
 
Secondary Methods #2
Secondary Methods #2Secondary Methods #2
Secondary Methods #2
maryhochstetler
 
Humak esiteaineisto 2016
Humak esiteaineisto 2016Humak esiteaineisto 2016
Therapythorugh Love
Therapythorugh LoveTherapythorugh Love
Therapythorugh Love
jojo54
 
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
PTimonen, Humak, Humanistinen ammattikorkeakoulu
 

Viewers also liked (19)

Vision for All
Vision for AllVision for All
Vision for All
 
Portfolio Work
Portfolio WorkPortfolio Work
Portfolio Work
 
Out
OutOut
Out
 
Wam Paper Gen X Women In High Tech2 12 06[1]
Wam Paper Gen X Women In High Tech2 12 06[1]Wam Paper Gen X Women In High Tech2 12 06[1]
Wam Paper Gen X Women In High Tech2 12 06[1]
 
Fiestas Patrias
Fiestas PatriasFiestas Patrias
Fiestas Patrias
 
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
Salo 28.10.10 Sosiaalisen median konkreettisia sovellutuksia nuorisotyössä by...
 
Humak in english2013
Humak in english2013Humak in english2013
Humak in english2013
 
Mab project v026 n va-pb
Mab project v026   n va-pbMab project v026   n va-pb
Mab project v026 n va-pb
 
Софіт №3(7)
Софіт №3(7)Софіт №3(7)
Софіт №3(7)
 
PresentacióN Makuna
PresentacióN MakunaPresentacióN Makuna
PresentacióN Makuna
 
Софіт №8(12)
Софіт №8(12)Софіт №8(12)
Софіт №8(12)
 
Mikkeli210312 sosiaalinenmediatyöpaja
Mikkeli210312 sosiaalinenmediatyöpajaMikkeli210312 sosiaalinenmediatyöpaja
Mikkeli210312 sosiaalinenmediatyöpaja
 
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
Koordinaatit nuorten tieto- ja neuvontatyöhön – Suuntaviivoja ammatilliseen o...
 
Софіт №9(13)
Софіт №9(13)Софіт №9(13)
Софіт №9(13)
 
6x4,5
6x4,56x4,5
6x4,5
 
Secondary Methods #2
Secondary Methods #2Secondary Methods #2
Secondary Methods #2
 
Humak esiteaineisto 2016
Humak esiteaineisto 2016Humak esiteaineisto 2016
Humak esiteaineisto 2016
 
Therapythorugh Love
Therapythorugh LoveTherapythorugh Love
Therapythorugh Love
 
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
Verkkonuorisotoiminta ja yhdistyslakimuutos, syksy2010, Päivi Timonen HUMAK H...
 

Similar to Asce Presentation

The swedish-club-navigational-claims-report-2014
The swedish-club-navigational-claims-report-2014The swedish-club-navigational-claims-report-2014
The swedish-club-navigational-claims-report-2014
Ashok Yadav
 
The Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryThe Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline Industry
Audubon Engineering Company
 
Intro to InfraMarine
Intro to InfraMarineIntro to InfraMarine
Intro to InfraMarine
Sharath Sundar
 
A2 planning for a changing climate
A2   planning for a changing climateA2   planning for a changing climate
A2 planning for a changing climate
Planning_1
 
Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11
vtandon
 
Z claa2011 fall meeting planupdatev 2.0
Z claa2011 fall meeting planupdatev 2.0Z claa2011 fall meeting planupdatev 2.0
Z claa2011 fall meeting planupdatev 2.0
Coon Creek Watershed District
 
Enhanced Pipeline Risk Assessment
Enhanced Pipeline Risk AssessmentEnhanced Pipeline Risk Assessment
Enhanced Pipeline Risk Assessment
Asset Management Solutions for Gas and Oil Industry
 
Riley Sess3 101309
Riley Sess3 101309Riley Sess3 101309
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farms
Lloyd's Register Energy
 
Internship Presentation-2
Internship Presentation-2Internship Presentation-2
Internship Presentation-2
Ashford Ball
 
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter MeetingCrooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Coon Creek Watershed District
 
SWC_Presentation of Services_20160622_
SWC_Presentation of Services_20160622_SWC_Presentation of Services_20160622_
SWC_Presentation of Services_20160622_
Justin Cobb
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
Nippin Anand
 
Mark Johnson Resume (March 2017)
Mark Johnson Resume (March 2017) Mark Johnson Resume (March 2017)
Mark Johnson Resume (March 2017)
Mark Johnson
 
project defence 2016
project defence 2016project defence 2016
project defence 2016
Edwin-richard Tawiah
 
Sonobuoy Aerial Decelerator System
Sonobuoy Aerial Decelerator SystemSonobuoy Aerial Decelerator System
Sonobuoy Aerial Decelerator System
Josh Benedictos
 
Geo Therm Ltd - Company Profile Booklet
Geo Therm Ltd - Company Profile BookletGeo Therm Ltd - Company Profile Booklet
Geo Therm Ltd - Company Profile Booklet
Tony Dale
 
epug_33
epug_33epug_33
epug_33
Simon Kettle
 
Jardine Egaf7
Jardine Egaf7Jardine Egaf7
Jardine Egaf7
Rodrigo Pascual
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
Edwin A Merrick
 

Similar to Asce Presentation (20)

The swedish-club-navigational-claims-report-2014
The swedish-club-navigational-claims-report-2014The swedish-club-navigational-claims-report-2014
The swedish-club-navigational-claims-report-2014
 
The Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryThe Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline Industry
 
Intro to InfraMarine
Intro to InfraMarineIntro to InfraMarine
Intro to InfraMarine
 
A2 planning for a changing climate
A2   planning for a changing climateA2   planning for a changing climate
A2 planning for a changing climate
 
Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11
 
Z claa2011 fall meeting planupdatev 2.0
Z claa2011 fall meeting planupdatev 2.0Z claa2011 fall meeting planupdatev 2.0
Z claa2011 fall meeting planupdatev 2.0
 
Enhanced Pipeline Risk Assessment
Enhanced Pipeline Risk AssessmentEnhanced Pipeline Risk Assessment
Enhanced Pipeline Risk Assessment
 
Riley Sess3 101309
Riley Sess3 101309Riley Sess3 101309
Riley Sess3 101309
 
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farms
 
Internship Presentation-2
Internship Presentation-2Internship Presentation-2
Internship Presentation-2
 
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter MeetingCrooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
Crooked Lake Comp Plan Summary for 2009 CLAA Winter Meeting
 
SWC_Presentation of Services_20160622_
SWC_Presentation of Services_20160622_SWC_Presentation of Services_20160622_
SWC_Presentation of Services_20160622_
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Mark Johnson Resume (March 2017)
Mark Johnson Resume (March 2017) Mark Johnson Resume (March 2017)
Mark Johnson Resume (March 2017)
 
project defence 2016
project defence 2016project defence 2016
project defence 2016
 
Sonobuoy Aerial Decelerator System
Sonobuoy Aerial Decelerator SystemSonobuoy Aerial Decelerator System
Sonobuoy Aerial Decelerator System
 
Geo Therm Ltd - Company Profile Booklet
Geo Therm Ltd - Company Profile BookletGeo Therm Ltd - Company Profile Booklet
Geo Therm Ltd - Company Profile Booklet
 
epug_33
epug_33epug_33
epug_33
 
Jardine Egaf7
Jardine Egaf7Jardine Egaf7
Jardine Egaf7
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
 

Asce Presentation

  • 1. Video and Sonar Inspection Guides Rehabilitation of the Coronado Transbay Sewer Force Main Presented and Written By Elmer Alex, PE, M. ASCE Contributions by Marc Solomon, PE; Maggie Witt, PE; Jason Gornall, EIT Contributing Authority: Ed Walton, PE For ASCE Pipelines Conference 2009 August 18, 2009
  • 2.
  • 3. Location Map City of Coronado You are Here!
  • 4. City of Coronado City of San Diego Transbay Pump Station Original Force Main Seaport Village New Force Main Original Transbay Force Main Location
  • 5.
  • 6. Apply Lesson’s Learned from “The Tortoise and the Hare” Fable
  • 7.
  • 8. Risk Management Team Name Organization Role Responsibilities Eric Minicilli City of Coronado Project Manager Project Manager and Point Of Contact for City Ed Walton City of Coronado City Engineer Kim Godby City of Coronado O&M Manage City O&M Staff Marc Solomon Winzler & Kelly Consultant/Engineer Lead Risk Manager Elmer Alex Winzler & Kelly Consultant/Engineer Alt. Risk Manager Corey Charfauros Affordable Pipeline Services Entry Point Cleaning Lead Manage cleaning & inspection support efforts James Milward Pipe Eye Int’l (acquired by Pure Technologies) Inspection Lead Pilot/Equipment Operator
  • 9.
  • 10. Risk Response Risk Avoid Accept Mitigate - Prevent - Contingency
  • 11.
  • 12. Pre-Inspection Activities Prepare Point of Entry on Coronado Side
  • 13. Inspection Moved to San Diego Side
  • 16.
  • 17. Clean Up & Demobilize
  • 19.
  • 20. Evaluation Criteria & Weighting Factors Criteria Weighting Factors Impacts to Surroundings 18% Structural Integrity 7% Operational Reliability 15% Operational Flexibility 5% Constructability 12% Hydraulic Improvements 3% Risk 15% Capital Cost 8% O & M Cost 9% Life Cycle Cost 8%
  • 22.

Editor's Notes

  1. Original Transbay Force Main Constructed in early 1970 24-inch Ductile Iron Construction New Force main in 2007 HDPE Horizontal Directional Drilling Purpose of the inspection was to assess the original pipeline for re-use as a back up and satisfy stake holder requirements.
  2. Describe challenges (items will fly in) High Profile Location – Major shopping and tourist destinations on both sides of the Bay Slopes greater than 30% 50 feet below Mean Sea Level Length of inspection – 3,600 LF, traditional inspection not feasible Dewatering may accelerate corrosion